HomeMy WebLinkAbout18-23-C AMERICAN PAVING CO (2).pdfCOUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER SAN JOAQUIN RIVER (REDINGER LAKE) BRIDGE ON CHANGE ORDER NO. 06 ITALIAN BAR ROAD REPLACEMENT PROJECT CONTRACT NO. 18-23-C IN FRESNO COUNTY, NEAR AUBERRY NOVEMBER 30, 2020 FEDERAL AID NUMBER: BRLO-5942(214) PAGE 1 OF 1 __ Contractor - White __ Auditor - Canary __ Bus. Office - Green __ Board - Pink __ Const. Mgmt - Blue __ RE/Arch. - Blue __ Proj. Dev. - Goldenrod __ Contractor before Approval - White We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. TO: AMERICAN PAVING CO.: You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. By reason of the proposed change, 267 WORKING DAYS will be granted to the allotted contract time for the First Order of Work, and ZERO (0) WORKING DAYS will be granted to the allotted contract time for the Second Order of Work. ADD CONTRACT TIME TO THE FIRST ORDER OF WORK - SUBMITTALS Grant additional 267 working days to the First Order of Work - Submittals. NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: 267 WORKING DAYS (FIRST ORDER OF WORK) NET TIME EXTENSION THIS CHANGE ORDER: ZERO WORKING DAYS (SECOND ORDER OF WORK) SUBMITTED BY: RICHARD STOCKWELL, Resident Engineer ACCEPTED BY: APPROVAL RECOMMENDED: By: AMERICAN PAVING COMPANY STEVE DEIS, Construction Engineer Contractor Title: AUTHORIZED FOR PAYMENT BY: Accepted Date: ____________________ STEVEN E. WHITE, Director of Public Works and Planning Date: