HomeMy WebLinkAbout1920C CCO 01 (2).pdfCOUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
SLURRY SEALS CHANGE ORDER NO. 1
VARIOUS LOCATIONS IN FRESNO COUNTY NOVEMBER 30, 2020
CONTRACT NO. 19-20-C PAGE 1 OF 6
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
TO: AMERICAN PAVEMENT SYSTEMS, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO WORKING DAYS will be added to the contract time. The
revised completion date was September 8, 2020.
PART I: INCREASE/DECREASE/ELIMINATE ITEMS AT UNIT PRICES:
Item quantities in the Bid Book and subsequent change orders are estimates only. This Part adjusts item
quantities to the actual quantities used.
Increased Items:
Item
No. Description Unit Quantity Unit Price
Total
Amount (%)
8 Thermoplastic Marking (Stop Bar)
White
LF 201.00 $3.68 $739.68 23.13
10 Thermoplastic Marking (Yellow
Crosswalk)
LF 120.00 $3.68 $441.60 31.58
15 Type D Two-Way Yellow Reflector EA 270.00 $4.73 $1,277.10 56.02
16 Channelizing Detail 38 LF 158.00 $1.31 $206.98 91.86
17 Type G One-Way Clear
Retroreflective
EA 20.00 $4.73 $94.60 333.33
20 Bike Lane Line Detail 39 LF 220.00 $0.89 $195.80 26.51
21 Bike Lane Line Detail 39A LF 364.00 $0.89 $323.96 191.58
22 Bike Lane Symbol with Person SF 19.00 $4.73 $89.87 135.71
23 Bike Lane Arrow SF 14.00 $4.73 $66.22 200.00
24 Type IV (L Arrow) SF 15.00 $4.73 $70.95 33.33
30 Remove Thermoplastic Pavement
Traffic Stripe
LF 1,313.00 $1.05 $1,378.65 17.89
31 Remove Thermoplastic Pavement
Markings
SF 367.00 $1.58 $579.86 4.41
57 Pavement Marker (Type D Blue
Retroreflector)
EA 1.0 $210.00 $210.00 100.00
TOTAL INCREASE: $5,675.27
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
SLURRY SEALS CHANGE ORDER NO. 1
VARIOUS LOCATIONS IN FRESNO COUNTY NOVEMBER 30, 2020
CONTRACT NO. 19-20-C PAGE 2 OF 6
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
Decreased Items:
Item
No. Description Unit Quantity Unit Price
Total
Amount (%)
1 Supplemental Work $ 10,000.00 $1.00 $10,000.00 100.00
2 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 100,153.66 $1.00 $100,153.66 100.15
6 Slurry Seal TON 386.30 $65.00 $25,109.50 12.70
7 Type D Blue Retroreflector EA 29.00 $10.50 $304.50 21.17
9 Thermoplastic Marking (Stop
Ahead) White
SF 80.00 $4.73 $378.40 4.79
13 Thermoplastic Marking (Yellow
Detail 21)
LF 33.00 $1.47 $48.51 1.36
14 Thermoplastic Marking (Yellow
Detail 21)
LF 43.00 $1.47 $63.21 0.78
18 Channelizing Detail 38A LF 15.00 $1.31 $19.65 10.64
19 Right Edgelines Detail 27B LF 11.00 $0.68 $7.48 0.82
25 No Passing Zone-One Direction
(Detail 15)
LF 44.00 $1.05 $46.20 6.98
26 Centerlines (Detail 1) LF 14.00 $0.42 $5.88 0.73
42 Supplemental Work $ 500.00 $1.00 $500.00 100.00
43 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 500.00 $1.00 $500.00 100.00
48 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
50 Supplemental Work $ 500.00 $1.00 $500.00 100.00
51 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 600.00 $1.00 $600.00 100.00
59 Supplemental Work $ 500.00 $1.00 $500.00 100.00
60 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 800.00 $1.00 $800.00 100.00
66 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
68 Supplemental Work $ 500.00 $1.00 $500.00 100.00
69 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 850.00 $1.00 $850.00 100.00
77 Supplemental Work $ 500.00 $1.00 $500.00 100.00
78 Supplemental Work (Payment $ 1,500.00 $1.00 $1,500.00 100.00
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
SLURRY SEALS CHANGE ORDER NO. 1
VARIOUS LOCATIONS IN FRESNO COUNTY NOVEMBER 30, 2020
CONTRACT NO. 19-20-C PAGE 3 OF 6
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
Adjustments for Price Index
Fluctuations)
83 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 210.00 $210.00 100.00
85 Supplemental Work $ 500.00 $1.00 $500.00 100.00
86 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 560.00 $1.00 $560.00 100.00
92 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
103 Supplemental Work $ 500.00 $1.00 $500.00 100.00
104 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 900.00 $1.00 $900.00 100.00
110 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
122 Supplemental Work $ 500.00 $1.00 $500.00 100.00
123 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 1,330.00 $1.00 $1,330.00 100.00
129 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
131 Supplemental Work $ 500.00 $1.00 $500.00 100.00
132 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 1,230.00 $1.00 $1,230.00 100.00
137 Thermoplastic Marking (Stop Bar) SF 15.00 $26.00 $390.00 100.00
138 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
140 Supplemental Work $ 500.00 $1.00 $500.00 100.00
141 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 500.00 $1.00 $500.00 100.00
147 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
149 Supplemental Work $ 500.00 $1.00 $500.00 100.00
150 Supplemental Work (Payment
Adjustments for Price Index
Fluctuations)
$ 960.00 $1.00 $960.00 100.00
156 Pavement Marker (Type D Blue
Retroreflector)
EA 1.0 $210.00 $210.00 100.00
TOTAL DECREASE: $153,646.99
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
SLURRY SEALS CHANGE ORDER NO. 1
VARIOUS LOCATIONS IN FRESNO COUNTY NOVEMBER 30, 2020
CONTRACT NO. 19-20-C PAGE 4 OF 6
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
Eliminated Items:
Item
No. Description Unit Quantity Unit Price
Total
Amount (%)
33 Supplemental Work $ 500.00 $1.00 $500.00 100.00
34 Supplemental Work (Payment
Adjustments for Price Index
Fluctuation)
$ 1,400.00 $1.00 $1,400.00 100.00
35 Traffic Control System LS 1.00 $2,300.00 $2,300.00 100.00
36 Job Site Management LS 1.00 $100.00 $100.00 100.00
37 Water Pollution Control Program LS 1.00 $50.00 $50.00 100.00
38 Slurry Seal TON 41.00 $65.00 $2,665.00 100.00
39 Thermoplastic Markings (Stop Bar) SF 15.00 $26.00 $390.00 100.00
40 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
41 Mobilization LS 1.00 $100.00 $100.00 100.00
94 Supplemental Work $ 500.00 $1.00 $500.00 100.00
95 Supplemental Work (Payment
Adjustments for Price Index
Fluctuation)
$ 1,870.00 $1.00 $1,870.00 100.00
96 Traffic Control System LS 1.00 $2,300.00 $2,300.00 100.00
97 Job Site Management LS 1.00 $100.00 $100.00 100.00
98 Water Pollution Control Program LS 1.00 $50.00 $50.00 100.00
99 Slurry Seal TON 57.00 $65.00 $3,705.00 100.00
100 Thermoplastic Marking (Stop Bar) SF 15.00 $26.00 $390.00 100.00
101 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
102 Mobilization LS 1.00 $100.00 $100.00 100.00
112 Supplemental Work $ 500.00 $1.00 $500.00 100.00
113 Supplemental Work (Payment
Adjustments for Price Index
Fluctuation)
$ 3,120.00 $1.00 $3,120.00 100.00
114 Traffic Control System LS 1.00 $4,800.00 $4,800.00 100.00
115 Job Site Management LS 1.00 $100.00 $100.00 100.00
116 Water Pollution Control Program LS 1.00 $50.00 $50.00 100.00
117 Slurry Seal TON 93.00 $65.00 $6,045.00 100.00
118 Thermoplastic Marking (Stop Ahead) SF 53.00 $10.50 $556.50 100.00
119 Thermoplastic Marking (Stop Bar) SF 30.00 $10.50 $315.00 100.00
120 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
121 Mobilization LS 1.00 $100.00 $100.00 100.00
158 Supplemental Work $ 500.00 $1.00 $500.00 100.00
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
SLURRY SEALS CHANGE ORDER NO. 1
VARIOUS LOCATIONS IN FRESNO COUNTY NOVEMBER 30, 2020
CONTRACT NO. 19-20-C PAGE 5 OF 6
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
159 Supplemental Work (Payment
Adjustments for Price Index
Fluctuation)
$ 750.00 $1.00 $750.00 100.00
160 Traffic Control System LS 1.00 $3,300.00 $3,300.00 100.00
161 Job Site Management LS 1.00 $100.00 $100.00 100.00
162 Water Pollution Control Program LS 1.00 $50.00 $50.00 100.00
163 Slurry Seal TON 23.00 $65.00 $1,495.00 100.00
164 Thermoplastic Marking (Stop Bar) SF 15.00 $26.00 $390.00 100.00
165 Pavement Marker (Type D Blue
Retroreflector)
EA 1.00 $210.00 $210.00 100.00
166 Mobilization LS 1.00 $100.00 $100.00 100.00
Since you did not incur any costs associated with these items, no payment will be made for these bid items.
TOTAL DECREASE: $39,631.50
These changes did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART I: A $187,603.22 DECREASE
TOTAL TIME EXTENSION PART I: ZERO WORKING DAYS
PART II: ADJUST COMPENSATION FOR THE CALIFORNIA STATEWIDE CRUDE OIL PRICE
INDEX FLUCTUATION
According to Section 9-1.07A, “Payment Adjustment for Price Index Fluctuations”, of the Standard
Specifications and the Special Provisions, when the California Statewide Crude Oil Index changes by
more than five percent between the month of the bid opening and the month the material was used,
payment for materials containing asphalt are adjusted. The California statewide crude oil index for the
month of the bid opening, April 2020, was 365.5. The index was 345.5 for the month of July 2020, when
slurry seals were placed.
The adjustment applies to the specified percent asphalt residue (60%) for the LMCQS-1h asphalt emulsion
used for slurry seal. A total of 137.50 tons of asphalt emulsion was used. The total payment adjustment is a
decrease of $153.66. This amount is included in Bid Item No. 2, “Supplemental Work (Payment Adjustments
for Price Index Fluctuations),” in Part I of this change order.
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
TOTAL COST PART II: $0.00 (NO COST)
TOTAL TIME EXTENSION PART II: ZERO WORKING DAYS
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
SLURRY SEALS CHANGE ORDER NO. 1
VARIOUS LOCATIONS IN FRESNO COUNTY NOVEMBER 30, 2020
CONTRACT NO. 19-20-C PAGE 6 OF 6
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
NET COST THIS CHANGE ORDER: A $187,603.22 DECREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO WORKING DAYS
JASON AHUMADA, Resident Engineer
APPROVAL RECOMMENDED:
AMERICAN PAVEMENT SYSTEMS, INC.
Contractor
STEVE DEIS, Construction Engineer
By:
STEVEN E. WHITE, Director of Public Works
Title: and Planning
Accepted Date: Date:
Jason Ahumada (Nov 30, 2020 07:41 PST)
Steve Deis (Nov 30, 2020 07:42 PST)
John Dumas (Dec 1, 2020 07:32 PST)
John Dumas
John Dumas (Dec 1, 2020 07:32 PST)
John Dumas
Project Manager
Dec 1, 2020
Steven E White (Dec 1, 2020 08:19 PST)
Steven E White
Dec 1, 2020