SAN JOAQUIN RIVER (REDINGER LAKE) BRIDGE ON CHANGE ORDER NO. 05
ITALIAN BAR ROAD REPLACEMENT PROJECT CONTRACT NO. 18-23-C
IN FRESNO COUNTY, NEAR AUBERRY SEPTEMBER 30, 2020
FEDERAL AID NUMBER: BRLO-5942(214) PAGE 1 OF 2
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change propo sed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
TO: AMERICAN PAVING CO.: You are hereby directed to make the herein described changes from
the plans and specifications or do the following described work not included in the plans and
specifications on this contract. By reason of the proposed change, ZERO WORKING DAYS will be
granted to the allotted contract time.
PART I: DEDUCTION FOR EXTRA WELDING INSPECTION SERVICES
Deduct from the contract the cost for additional welding inspection services on June 30, 2020, due to
the replacement of girder shear studs, according to Section 6-2.03, Department Acceptance of the
Standard Specifications. The actual cost of the inspection service incurred by the Department was
$1,121 of which will be deducted from the monies due to the contract.
Total Cost Part I: $1,121 DECREASE
PART II: DEDUCTION FOR AN EXTENDED FULL ROAD CLOSURE ON JUNE 2, 2020
Deduct from the contract, for public inconvenience, damages due to a road closure starting the morning
of June 2 and extending through the late afternoon of June 3, 2020. The contract allows for road
closures up to eight hours during a working day, with no road closures allowed beyond this duration.
This part finalizes the deduction for the overnight road closure in the amount of $4,623.00.
Total Cost Part II: $4,623 DECREASE
NET COSTS THIS CHANGE ORDER: $5,744 DECREASE
NET TIME EXTENSION THIS CCO: ZERO (0) WORKING DAYS
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
SAN JOAQUIN RIVER (REDINGER LAKE) BRIDGE ON CHANGE ORDER NO. 05
ITALIAN BAR ROAD REPLACEMENT PROJECT CONTRACT NO. 18-23-C
IN FRESNO COUNTY, NEAR AUBERRY SEPTEMBER 30, 2020
FEDERAL AID NUMBER: BRLO-5942(214) PAGE 2 OF 2
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change propo sed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
SUBMITTED BY:
RICHARD STOCKWELL, Resident Engineer
ACCEPTED BY: APPROVAL RECOMMENDED:
By:
AMERICAN PAVING COMPANY STEVE DEIS, Construction Engineer