HomeMy WebLinkAbout19-09-C AGEE CONSTRUCTION CCO 01.pdfCOUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER FRESNO CANAL AT MCKINLEY AVENUE CHANGE ORDER NO. 01 BRIDGE REPLACMENT SEPTEMBER 30, 2020 FEDERAL PROJECT NUMBER: BRLO-5942 (225) PAGE 1 OF 1 CONTRACT NO. 19-09-C __ Contractor __ Auditor Controller __ Business Office __ Board __ Const. Management __ RE/Arch. __ Design We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of t he specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. TO: AGEE CONSTRUCTION CORPORATION.: Make the following changes to the plans and specifications or do the following work not included in the plans and specifications for this contract. Because of the change(s), ZERO WORKING DAYS will be added to the contract time. MODIFY SECTION 51-4.02C OF THE STANDARD SPECIFICATIONS Replace the third paragraph of Section 51-4.02C, “Materials,” of the Standard Specifications with: “Grout for keyways must have a cementitious material content of at least 590 lb./cu yd and a grading size no larger than a 3/8-inch maximum grading . Penetration of the concrete must be near the lower limit of the specified nominal penetration.” This change does not impact the critical path for the project, so granting additional contract time was not warranted. NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: ZERO WORKING DAYS SUBMITTED BY: Jason Ahumada, Resident Engineer ACCEPTED BY: APPROVAL RECOMMENDED: By: AGEE CONSTRUCTION CORP. Steve Deis, GE Contractor Construction Engineer Title: AUTHORIZED FOR PAYMENT BY: Accepted Date: _______________________ Steven E. White, Director Public Works and Planning Date: Jason Ahumada (Oct 1, 2020 07:23 PDT) Jason Ahumada Steve Deis (Oct 1, 2020 07:27 PDT)Alan Dirlam (Oct 1, 2020 08:24 PDT) Chief Estimator Oct 1, 2020 Steven E White (Oct 1, 2020 08:32 PDT) Steven E White Oct 1, 2020