HomeMy WebLinkAbout19-06-CAMERICANPAVINGCOMPANYCCO3.pdfCOUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
FEDERAL BRIDGE REPLACEMENT PROJECT CHANGE ORDER NO. 03
WAHTOKE CREEK BRIDGE AT LINCOLN AVENUE CONTRACT NO. 19-06-C
BRIDGE NO: 42C-0685 AUGUST 31, 2020
FEDERAL PROJECT NUMBER: BRLO-5942 (212) PAGE 1 OF 2
__ Contractor
__ Auditor
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
TO: AMERICAN PAVING COMPANY:
Make the following change(s) to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO WORKING DAYS will be added to the contract time. The
revised completion date remains July 27, 2020.
INSTALL STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BEST MANAGEMENT PRACTICES
(BMPs) EXTRA WORK
Install all BMPs required by the SWPPP. Perform all work according to the SWPPP; and Section 13, Water
Pollution Control of the Standard Specifications and Special Provisions. Compensation for this work is being
made at force account on time and materials basis as per Section 9-1.03, Payment Scope, of the Special
Provisions. Payment for this change, calculated according to Section 9-1.04, Force Account, of the Standard
Specifications, is $2,748.94.
This work did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
NET COSTS THIS CHANGE ORDER: AN INCREASE OF $2,748.94
NET TIME EXTENSION THIS CHANGE ORDER: ZERO WORKING DAYS
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
FEDERAL BRIDGE REPLACEMENT PROJECT CHANGE ORDER NO. 03
WAHTOKE CREEK BRIDGE AT LINCOLN AVENUE CONTRACT NO. 19-06-C
BRIDGE NO: 42C-0685 AUGUST 31, 2020
FEDERAL PROJECT NUMBER: BRLO-5942 (212) PAGE 2 OF 2
__ Contractor
__ Auditor
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
LARUE GOOSSEN, Resident Engineer
APPROVAL RECOMMENDED:
American Paving Company
Contractor
STEVE DEIS, GE
Construction Engineer
By:
STEVEN E. WHITE, Director
Title: Public Works and Planning
Accepted Date: Date: