CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
BITUMINOUS SEAL COATS CHANGE ORDER NO. 3
VARIOUS LOCATIONS IN FRESNO COUNTY SEPTEMBER 3, 2020
CONTRACT NO. 19-21-C PAGE 1 OF 3
__ Contractor
__ Auditor
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
TO: TALLEY OIL INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO WORKING DAYS will be added to the contract time. The
revised completion date is July 27, 2020.
PART I: DECREASE THE QUANTITY OF PART II OF CHANGE ORDER NO. 1 EXTRA WORK
Decrease, by one sample, Part II of Contract Change Order No. 1 to reflect the actual testing performed. Part
II of Contract Change Order No.1 pay for testing an estimated 10 samples of fog seal asphaltic emulsion at an
estimated unit price of $918.50 per sample. This reduction in quantity resulted in a decrease of $918.50.
TOTAL COST PART I: A $918.50 DECREASE
TOTAL TIME EXTENSION PART I: ZERO WORKING DAYS
PART II: INCREASE/DECREASE/ELIMINATE ITEMS AT UNIT PRICES:
Quantities in the Bid Book are estimates only. This Part adjusts items to the actual quantities used.
Increased Items:
Item
No. Description Unit Quantity @ Price
Total
Amount (%)
11 Asphaltic Emulsion (Flush Coat) TON 2.33 $550.00 $1,281.50 2.43
13 4 Thermoplastic Traffic Stripe
(Sprayable) (Detail 18)
LF 1276.00 $0.26 331.76 17.72
14 4 Thermoplastic Traffic Stripe
(Sprayable) (Detail 21)
LF 1,088.00 $0.31 $ 337.28 21.47
15 Paint Traffic Stripe (2-Coat)
(Detail 21)
LF 301.00 $0.18 $54.18 2.04
16 Paint Traffic Stripe (2-Coat)
(Detail 27B)
LF 602.00 $0.13 $78.26 2.04
23 Thermoplastic Pavement Marking SF 9.00 $5.20 $46.80 1.59
TOTAL INCREASE: $2,129.78
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
BITUMINOUS SEAL COATS CHANGE ORDER NO. 3
VARIOUS LOCATIONS IN FRESNO COUNTY SEPTEMBER 3, 2020
CONTRACT NO. 19-21-C PAGE 2 OF 3
__ Contractor
__ Auditor
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
Decreased Items:
Item
No. Description Unit Quantity @ Price
Total
Amount (%)
8 Sand Cover TON 505.32 $15.00 $7,579.80 47.58
9 Polymer Asphaltic Emulsion
(Seal Coat)
TON 44.55 $785.00 $34,971.75 10.89
10 Screenings (3/8 ) TON 880.88 $45.00 $39,639.60 23.26
12 4 Thermoplastic Traffic Stripe
(Sprayable) (Detail 5)
LF 4,075.00 $0.21 $855.75 7.94
17 Paint Traffic Stripe (2-Coat)
(Detail 39A)
LF 35.00 $ 0.13 $ 4.55 3.89
18 Paint Traffic Stripe (2-Coat)
(Detail 39)
LF 518.00 $ 0.15 $77.70 3.63
19 4 Thermoplastic Traffic Stripe
(Sprayable) (Detail 22)
LF 386.00 $ 0.31 $119.66 2.40
20 4 Thermoplastic Traffic Stripe
(Sprayable) (Detail 27B)
LF 2,086.00 $ 0.23 $479.78 3.41
21 Remove Thermoplastic Traffic Stripe
(Detail 5, 22, 27B)
LF 2,184.00 $ 0.47 $1,026.48 2.38
22 Pavement Marker (Type D) EA 92.00 $ 3.12 $287.04 6.54
TOTAL DECREASE: $85,042.11
Eliminated Items:
Item
No. Description Unit Quantity Unit Price
Total
Amount (%)
1 Supplemental Work $ 22,000.00 $1.00 $22,000.00 100.00
2 Supplemental Work (Payment
Adjustment for Price Index
Fluctuation)
$ 11,000.00 $1.00 $11,000.00 100.00
5 Temporary Cover SQYD 550.00 $ 4.00 $ 2,200.00 100.00
Since you did not incur any costs associated with these items, no payment will be made for these items.
TOTAL DECREASE: $ 35,200.00
This work did not impact the critical path for the project, so additional contract time was not warranted.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
BITUMINOUS SEAL COATS CHANGE ORDER NO. 3
VARIOUS LOCATIONS IN FRESNO COUNTY SEPTEMBER 3, 2020
CONTRACT NO. 19-21-C PAGE 3 OF 3
__ Contractor
__ Auditor
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
TOTAL COST PART II: A $118,112.33 DECREASE
TOTAL TIME EXTENSION PART II: ZERO WORKING DAYS
NET COSTS THIS CHANGE ORDER: A $119,030.83 DECREASE
NET TIME EXTENSION THIS CCO: ZERO WORKING DAYS
JAMES DREWS, Resident Engineer
APPROVAL RECOMMENDED:
TALLEY OIL INC.,
Contractor
STEVE DEIS, Construction Engineer
By:
STEVEN E. WHITE, Director of Public Works
Title: and Planning
Accepted Date: Date: