HomeMy WebLinkAbout19-17-CDAWSON-MAULDINLLCCCO3.pdfCOUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
WATERWORKS DISTRICT 41W CHANGE ORDER NO. 03
ASBESTOS CONCRETE PIPELINE REPLACEMENT PROJECT August 19, 2020
CONTRACT NO.: 19-17-C PAGE 1 OF 2
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
TO: DAWSON-MAULDIN, LLC:
Make the following changes to the plans and specifications or do work not shown in the plans and
specifications. Because of the change(s), ONE WORKING DAY will be added to the contract time. The
revised completion date is November 27, 2020.
PART I: REPLACE THE IN THE METER VAULT AT THE DOMESTIC WATER
TANK CONNECTION.
In accordance with Section 4-Standard Specifications, replace the
gate valve, concrete support under the valve and piping necessary to complete the installation.
valve will be paid for with Item #19, the remaining work will be paid as extra work at an agreed price of
$4,599.35. The agreed lump sum includes payment for all labor, equipment, tools, overhead costs; incidental
costs; delay costs if any; and markups for this change.
This work caused a delay of one day in the controlling activity of installing the new HDPE water line. One
working day will be added.
TOTAL COST PART I: $4,599.35
TOTAL TIME EXTENSION PART I: ONE WORKING DAY
NET COSTS THIS CHANGE ORDER: A $4,599.35 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ONE WORKING DAY
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
WATERWORKS DISTRICT 41W CHANGE ORDER NO. 03
ASBESTOS CONCRETE PIPELINE REPLACEMENT PROJECT August 19, 2020
CONTRACT NO.: 19-17-C PAGE 2 OF 2
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
______________________________________
William Stonehouse, Resident Engineer
APPROVAL RECOMMENDED:
DAWSON-MAULDIN, LLC __________________________________
Contractor Steve Deis, GE
Construction Engineer
By APPROVED BY:
Title ______________________________________
Steven E. White, Director
Public Works and Planning
Accepted Date: ____________________
Date: _________________________________