HomeMy WebLinkAbout19-17-CDAWSON-MAULDINLLCCCO2.pdfCOUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
WATERWORKS DISTRICT 41W CHANGE ORDER NO. 02
ASBESTOS CONCRETE PIPELINE REPLACEMENT PROJECT August 17, 2020
CONTRACT NO.: 19-17-C PAGE 1 OF 2
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
TO: DAWSON-MAULDIN, LLC:
Make the following change to the plans and specifications or do the following work not included in the plans
and specifications. Because of the change(s), ONE WORKING DAY will be added to the allotted contract
time. The revised completion date is November 26, 2020.
PART I: REPLACE THE VALVE AT THE WATER TANK CONNECTION FOR THE TEMPORA
SUPPLY LINE EXTRA WORK
In order to accommodate the 6-inch backflow preventer and the 6-inch HDPE bypass line, replace the valve
on the water tank connection with a 6-inch Mueller gate valve with a concrete support pad and permanent
pipe support. The Section 99-1.02B,
of the Special Provisions, does not address this change. Payment for the additional cost you incurred will be
made as extra work at an agreed lump sum price of $2,490.44. This agreed lump sum price includes all
compensation for the additional costs incurred, including additional labor, materials, equipment, overhead,
incidentals, delays if any, and markups.
This work impacts the critical path for the project, so one additional contract day is warranted.
TOTAL COST PART I: A $2,490.44 INCREASE
TOTAL TIME EXTENSION PART I: ONE WORKING DAY
NET COSTS THIS CHANGE ORDER: A $2,490.44 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ONE WORKING DAY
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
WATERWORKS DISTRICT 41W CHANGE ORDER NO. 02
ASBESTOS CONCRETE PIPELINE REPLACEMENT PROJECT August 17, 2020
CONTRACT NO.: 19-17-C PAGE 2 OF 2
__ Contractor
__ Auditor Controller
__ Business Office
__ Board
__ Const. Management
__ RE/Arch.
__ Design
We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as full payment
therefor the prices shown above.
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
______________________________________
William Stonehouse, Resident Engineer
APPROVAL RECOMMENDED:
DAWSON-MAULDIN, LLC __________________________________
Contractor Steve Deis, GE
Construction Engineer
By APPROVED BY:
Title ______________________________________
Steven E. White, Director
Public Works and Planning
Accepted Date: ____________________
Date: _________________________________