Loading...
HomeMy WebLinkAbout19-21-CTALLEYOILINCCCO2.pdfCOUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER BITUMINOUS SEAL COATS CHANGE ORDER NO. 2 VARIOUS LOCATIONS IN FRESNO COUNTY JULY 20, 2020 CONTRACT NO. 19-21-C PAGE 1 OF 1 TO: TALLEY OIL INC: Make the following changes to the plans and specifications or do the following work not included in the plans and specifications for this contract. Because of the change(s), ZERO WORKING DAYS will be added to the contract time. DEDUCT THE COST OF REPLACING A DAMAGED R1-1, STOP, SIGN The actual cost of replacing an R1-1, STOP, sign at the south-east corner of Barstow and Rolinda Avenues damaged by your company truck during the placement of the bituminous seal coats on Barstow Avenue will be deducted from the next payment. The damaged sign and post were replaced by Department personnel with a new sign panel and post system, at an actual cost of $208.71. NET COSTS THIS CHANGE ORDER: A $208.71 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO WORKING DAYS JAMES DREWS, Resident Engineer APPROVAL RECOMMENDED: TALLEY OIL INC. Contractor STEVE DEIS, Construction Engineer By: STEVEN E. WHITE, Director of Public Works Title: and Planning Accepted Date: Date: From:Deis, Steve To:Drews, James Cc:Sekhon, Mandeep;Querin, Martin Subject:FW: Damaged STOP Sign Date:Thursday, June 18, 2020 3:53:00 PM Attachments:image001.png