HomeMy WebLinkAbout19-17-C DAWSON-MAULDIN LLC CCO01.pdfCOUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER WATERWORKS DISTRICT 41W CHANGE ORDER NO. 01 ASBESTOS CONCRETE PIPELINE REPLACEMENT PROJECT JUNE 9, 2020 CONTRACT NO.: 19-17-C PAGE 1 OF 2 __ Contractor __ Auditor Controller __ Business Office __ Board __ Const. Management __ RE/Arch. __ Design We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. TO: DAWSON-MAULDIN, LLC: Make the following changes to the plans and specifications for this contract. Because of the change(s), ZERO WORKING DAYS will be added to the contract time. The completion date remains November 25, 2020. PART I: CHANGE THE GRADE OF ASPHALT BINDER USED FOR TYPE A HMA: Replace Section 39-2.02B(3) in the Special Provisions with: The grade of asphalt binder for Type A HMA must be PG 64-28. TOTAL COST PART I: $0.00 (NO COST) TOTAL TIME EXTENSION PART I: ZERO WORKING DAYS PART II: ADJUST THE UNIT PRICE OF HMA BECAUSE OF THE CHANGE IN ASPHALT BINDER Because of the change to the asphalt binder grade in Part I of this change order, the unit cost of the changed item differs from the cost of the item in the original specifications as shown in the invoice from Vulcan that you provided. Section 4-1.05B, “Work-Character Changes,” of the Standard Specifications says that the Department adjusts the unit price for this condition. The unit price is adjusted based on the difference between the cost to perform the work as planned and the cost to perform the work as changed according to Section 9-1.15, “Work-Character Changes,” of the Standard Specifications. The costs of the asphalt concrete with PG 64-10 binder is $60.00/ton in the invoice you provided, while the cost of asphalt concrete with PG 64-28 binder is $80.00/ton regardless of the aggregate size. There are no changes to the cost of the labor, trucking, or equipment necessary to construct the asphalt concrete. Section 9-1-15, “Work-Character Changes,” says that the payment adjustment is calculated under Section 9-1.04, “Force Account.” Because your markup for the costs to perform the work as planned was included in your bid, additional markup is only included on the difference in the material costs. The difference with additional markup is $23.00/ton ($80.00/ton - $60.00/ton with 15% markup). The estimated quantity of asphalt concrete on the project is 1,000 tons. The total adjustment to the payment is $23,000. This work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: A $23,000 INCREASE TOTAL TIME EXTENSION PART II: ZERO WORKING DAYS COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER WATERWORKS DISTRICT 41W CHANGE ORDER NO. 01 ASBESTOS CONCRETE PIPELINE REPLACEMENT PROJECT JUNE 9, 2020 CONTRACT NO.: 19-17-C PAGE 2 OF 2 __ Contractor __ Auditor Controller __ Business Office __ Board __ Const. Management __ RE/Arch. __ Design We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. NET COSTS THIS CHANGE ORDER: A $23,000 INCREASE TOTAL TIME EXTENSION THIS CHANGE ORDER: ZERO WORKING DAYS _____________________________________ William Stonehouse, Resident Engineer APPROVAL RECOMMENDED: DAWSON-MAULDIN, LLC _____________________________________ Contractor Steve Deis, GE Construction Engineer By: ______________________________ APPROVED BY: Title: _____________________________ _____________________________________ Steven E. White, Director Public Works and Planning Accepted Date: _____________________ Date: _________________________________ Bill Stonehouse (Jun 29, 2020 01:23 PDT) Bill Stonehouse Steve Deis (Jun 29, 2020 07:38 PDT) mike mauldin (Jun 29, 2020 14:26 PDT) mike mauldin president Jun 29, 2020 Steven E White (Jun 29, 2020 14:27 PDT) Steven E White Jun 29, 2020