A G R E E M E N T
THIS AGREEMENT (“Agreement”) is made this _____ day of __________, 2020
(“Effective Date”), by and between the COUNTY OF FRESNO, a political subdivision of the State
of California, ("County"), and the FRESNO COUNTY FIRE PROTECTION DISTRICT, ("District").
WITNESSETH
WHEREAS, the County has been designated as the sponsoring agency to administer and
implement the program for the Community Development Block Grant (“CDBG”) Program activities
of the County, and its participating cities, in accordance with the provisions of Title I of the Housing
and Community Development Act of 1974, as amended, and the laws of the State of California;
and
WHEREAS, CDBG funding has been made available to the County for housing and
community development activities; and
WHEREAS, the District has submitted the Station 93 Water Tender Refurbish, Project No.
19731 (“Project”), for CDBG funding; and
WHEREAS, the District has estimated that the total cost of the Project is $250,000, and the
District has committed local funds to the Project in the amount of $10,000 and has requested the
sum of $240,000 from the County's allocation of CDBG funds to complete the Project; and
WHEREAS, the County Board of Supervisors, at a public hearing conducted on June 4,
2019, approved the Project as a project on the back-up list, should funding become available; and
WHEREAS, there are now sufficient CDBG funds available to fund the next project on the
back-up list, which is this Project; and
WHEREAS, the Project is consistent with the objectives of the Fresno County Consolidated
Plan, including the annual Action Plan.
NOW THEREFORE, in consideration of their mutual promises as hereinafter set forth, the
District and County agree as follows:
I.PROJECT DESCRIPTION, LOCATION AND BUDGET
A.The Project consists of refurbishing an existing water tender located at Fire
Station 93 in Huron. The Project will improve fire protection services by providing a mobile water
9th June
20-0260 Agreement No. 20-211
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
supply, with firefighting capability. The Project will benefit the residents of southwest Fresno
County, primarily the unincorporated areas surrounding the Cities of Coalinga and Huron.
B. The Project site is owned by the District.
C. The work to be funded with CDBG funds is as follows:
1. Obtain all necessary permits.
2. Perform all necessary design work, including, but not limited to,
preparation of specifications, and cost estimates; bid documents and a cost or price analysis;
review of bids and recommendation for award.
3. Prepare and advertise Project bid notices and award contracts
including, but not limited to, the printing of bid documents; publishing of notices; and preparation
of bid summary.
4. Perform all design work including, but not limited to, shop drawing
review and approval; contract change order preparation; preparation of "as-built" drawings; labor
compliance; and contract administration.
5. Provide related eligible improvements.
D. The Project budget is estimated by the District as follows:
Refurbishing of Water Tender $250,000
Total $250,000
E. Notwithstanding District’s estimates in the above-described Project budget,
payments for the Project from CDBG funds shall be limited to the District’s actual costs, and shall
not exceed the total amount of $240,000.
F. The proposed funding for the Project will be provided from the following
sources:
CDBG $240,000
Local Financial Contribution $ 10,000
Total $250,000
G. Prior to any changes that may occur which would modify the scope of the
Project, the District shall submit a written request to the County. The District shall send its written
request to:
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Community Development Grants
County of Fresno
Department of Public Works and Planning
Community Development Division
2220 Tulare Street, 6th Floor
Fresno, CA 93721
If the Director of the County Department of Public Works and Planning (“Director”) determines the
modified Project is still eligible under the Federal CDBG regulations, the Director is authorized to
permit such modifications. The County shall specify in a letter to the District whether such
modifications to the scope of the Project are authorized, and if the District may proceed.
II. OBLIGATIONS OF THE COUNTY
A. The County shall reimburse the District up to, but not more than, $240,000
in CDBG funds for the Project for the District’s performance of its obligations under this Agreement.
All funds shall be paid in accordance with Section V of this Agreement.
B. The County shall review, within forty-five (45) calendar days of receipt from
the District, the design plans and specifications for the Project, as prepared by the District, for
compliance with Federal regulations, conformance with applicable code requirements sufficient to
allow for construction-related permit issuance, and the total Project cost estimate, to ensure
sufficient funds are available to complete the Project. If such conditions have been met, the County
shall specify in a letter to the District that these conditions have been met, and that the Project can
be advertised.
C. The County shall also review, within twenty-one (21) calendar days of
receipt from the District, the name of the low bidder, and cost or price analysis of the low bid
proposal prepared by the District to determine whether the contractor will be reasonably
compensated in accordance with Federal requirements, and to verify that the contractor is bonded,
and has not been disbarred or suspended from participating in Federal projects. The County shall
specify in a letter to the District that the conditions of this Section have been met, and that the
contract can be awarded.
D. The County may, upon request by the District, allow alternate procurement
procedures permitted under 24 CFR Part 84, provided the District submits satisfactory
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
documentation and justification.
E. The County shall conduct periodic inspections of the Project, as may be
required, in the determination of the County, to ensure that the intended use and group of
beneficiaries of the Project have not changed. Upon completion of the Project, but prior to the
District’s acceptance of the Project, the County shall conduct a final inspection of the Project. If
such conditions have been met, the County shall specify in a letter to the District that these
conditions have been met.
III. OBLIGATIONS OF THE DISTRICT
A. The District shall provide any and all sums of money in excess of $240,000
which may be necessary to complete the Project. For the purposes of awarding the Project within
the Agreement amount, the bid documents shall include any proposed additive or deduct
alternatives.
B. The District shall demonstrate in writing, and to the County’s satisfaction,
that it has the authority, operational ability, and financial resources for maintaining the
improvements obtained with CDBG funds under this Agreement prior to award of the Project.
C. The District shall perform, or cause to be performed, all design work required
for the Project.
D. The District shall furnish evidence to County, prior to the County’s
authorization to advertise for bids, that it has free and clear title to all parcels of land on which
Project improvements will be located, with any liens or encumbrances noted, and/or that it has
obtained or can obtain all necessary easements, rights-of-way, licenses, permits, and State and
local approvals required for the completion of the Project.
E. Upon completion of the design, the District shall submit the specifications to
the County Community Development Division. The County will ensure Federal CDBG
requirements have been adhered to, and review cost estimates to ensure sufficient funds are
available. The District shall obtain a letter from the County specifying these conditions have been
met, and that the District is approved to advertise for bids to construct the Project.
F. The District may request to utilize alternate procurement procedures
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
allowed under 24 CFR Part 84, subject to prior approval by the County Community Development
Division.
G. The District shall advertise for bids, and shall award the contract to the
lowest responsible bidder. At least ten (10) calendar days prior to the bid opening, the District
shall notify the County of the date, time, and location of the bid opening.
H. Within seven (7) calendar days following the bid opening, the District shall
furnish the Community Development Division with the name of the low bidder and cost or price
analysis of the low bid proposal prepared by the District, so that the County can verify with the
Labor Relations and Equal Opportunity Division of the HUD Area Office that the low bidder has not
been debarred or suspended from participating in Federal projects, and that the contractor will be
reasonably compensated in accordance with Federal requirements. The District shall obtain a
letter from the County specifying these conditions have been met and that the District is approved
to award the Project for construction.
I. The District shall give written notice thereof, to include a copy of the
executed contract between the District and the vendor, to the County Community Development
Division.
J. All proposed contract change orders shall not proceed until prior written
approval has been given by the County. Request for approval of a change order(s) shall include
a narrative description of the work, a cost or price analysis in accordance with HUD requirements,
and a written certification from the District that the approval of the change order is consistent with
the final cost estimate approved by the County. In addition, the District shall certify that the change
order is within the scope of the Project and is necessary to complete the Project.
K. The District shall send its written description of the cost or price analyses,
specifications, name of low bidder and low bid proposal, public notices, and all written
correspondence to:
Community Development Grants
County of Fresno
Department of Public Works and Planning
Community Development Division
2220 Tulare Street, 6th Floor
Fresno, CA 93721
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
L. The County has determined that the Project is exempt from the provisions
of the California Environmental Quality Act (CEQA) and the National Environmental Protection Act
(NEPA).
M. Upon completion of the Project, the District shall notify the County
Community Development Division so a representative of the Division can perform an inspection of
the Project to determine that it was completed in accordance with the scope of work approved and
authorized pursuant to this executed Agreement.
N. Upon approval of Project completion by the County, the District shall provide
the County Community Development Division with a resolution of acceptance, or similar
documentation, demonstrating that the Project was completed in accordance with the scope of
work approved and authorized pursuant to this executed Agreement and any approved
subsequent amendments and/or change orders, and that the District has accepted the Project.
Prior to the final request for payment, the District shall also provide the County with a written
summary of all Project work completed with CDBG and other funds.
O. During the contract period, the District shall complete and submit annually
on June 1, and upon completion of the Project, a Project Outcome Measurement Report (POM)
form, a copy of which is attached hereto as Exhibit 1 and incorporated herein by reference. The
POM shall contain the following information for the County’s Federal reporting purposes to the
U.S. Department of Housing and Urban Development (HUD):
1. Total number of households/persons assisted.
2. Number of total households/persons assisted that:
a. Now have new access to this type of public facility or
infrastructure improvement.
b. Now have improved access to this type of public facility or
infrastructure improvement.
c. Now are served by public facility or infrastructure that is no
longer substandard.
P. The District shall be responsible for maintenance of the improvements after
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
the Project is completed, and shall do so from non-CDBG resources.
Q. The District must inform the County in writing of any program income
generated by the expenditure of CDBG funds. Any program income generated as a result of the
Project must be paid to the County. For purposes of this Agreement, program income is defined
as proceeds from the disposition of CDBG-acquired real property, and principal and interest on
CDBG loans. If the District contributed financially to the improvement Project, the District may
retain a share of the program income in proportion to the District's contribution to the Project, after
the District has provided a written accounting acceptable to the County.
R. The District must obtain prior written approval from the County before
making any modification or change in the use of any real property improved, in whole or in part,
using CDBG funds in excess of $25,000. The District shall provide affected citizens with notice of,
and opportunity to comment on, any proposed change to the use of real property improved with
CDBG funds. If any real property improved with CDBG funds is sold and/or is utilized by the District
for a use which does not qualify under the CDBG Program, the District shall reimburse the County
in an amount equal to the current fair market value for the property, less any proportional share
thereof attributable to expenditures of non-CDBG funds. These requirements shall continue in
effect for five years after the Project is completed in HUD’s Integrated Disbursement and
Information System (IDIS). In the event the CDBG program is closed out, the requirements of this
Section shall remain in effect for activities or property funded with CDBG funds, unless action is
taken by the Federal government to relieve the District of these obligations.
S. The District acknowledges that the County may periodically inspect the
Project to ensure that the property is being used as described in this Agreement. The District
agrees to provide any necessary information to the County to carry out such inspections.
Furthermore, the District agrees to take corrective action if the County determines that
modifications to the use and location of the Project have resulted in a violation of the Federal
CDBG regulations.
IV. CONFORMANCE WITH APPLICABLE LAWS AND REGULATIONS
A. The District shall, and shall cause its consultants, contractors, and
8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
subcontractors to, comply with all applicable State and Federal laws and regulations governing the
Project.
B. Whenever the District uses the services of a contractor, the District shall
require that the contractor comply with all Federal, State and local laws, ordinances, regulations
and Fresno County Charter provisions applicable in the performance of their work.
C. This Project is subject to the requirements of Section 3 of the Housing and
Urban Development Act of 1968, as amended, 12 U.S.C. 1701(u). Accordingly, the District shall
require the prime contractor to complete and submit documentation prior to award of the
construction contract and upon Project completion that compliance with the Section 3 clause has
been met.
D. Because the District is receiving at least $100,000 for this Project from the
County's CDBG Program under this Agreement, the District shall complete and submit to the
County Community Development Division a "Certification of Payments to Influence Federal
Transactions" form and a "Standard Form LLL - Disclosure of Lobbying Activities" form. Likewise,
before the District awards a contract using at least $100,000 of such CDBG funds, the District shall
require the consultant and/or contractor and all their sub-consultants and/or subcontractors to
complete and submit these two (2) forms described hereinabove to both the District and the
County.
V. PAYMENT FOR THE PROJECT
A. At monthly intervals, the District shall submit a written request to the County
for payment of specified costs incurred in the performance of this Agreement. The request for the
County to make such a payment shall be in accordance with the exemplar Project Pay Request
Form attached hereto as Exhibit 2 and incorporated herein by reference. The request shall also
be accompanied by a written certification from the District that the request for payment is consistent
with the amount of work that has been completed, and that said work is in accordance with the
contract documents and this Agreement. The request for payment shall also be accompanied by
documentation acceptable to the County, such as checks, invoices or vouchers for services or
materials purchased, contractor's costs, or other costs chargeable to the Project. After appropriate
9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
review and inspection, the County shall make payment from CDBG funds provided in this
Agreement for all eligible costs specified herein up to the maximum amount payable under Section
I.
B. Any savings realized in the final cost of the Project, due to Project cost
and/or scope of work reductions, liquidated damages, or any other reason, shall be used to reduce
the amount of this Project paid for with CDBG funds in the same pro-rata share that CDBG funds
were used in payment of the Project. If the District is required to provide any additional funds
toward the Project other than described in this Agreement, any cost savings shall be first used to
reimburse the District for its contribution in excess of the total amount provided by this Agreement.
C. Payment for advertising and award shall be based on the actual costs of
printing and noticing.
D. The County shall not be bound by any agreement between the District and
its agents.
E. The County may withhold payment of the final payment request made by
the District until evidence is submitted to the County that a maintenance plan has been prepared
and adopted for the improvements constructed with CDBG funds.
F. Upon the completion of the Project, the District shall submit to the
County Community Development Division a written request for final payment of costs, which
shall provide a detailed description of the Project pay items and costs. The final pay request
shall be in accordance with Exhibit 2. The County shall not be obligated to make any payments
under this Agreement if the request for payment is submitted by the District more than sixty
(60) days after the Notice of Completion has been filed with the County Recorder’s Office. An
extension to the sixty (60) day period may be granted by the Director prior to the deadline if the
District can demonstrate just cause for the delay.
G. The County may withhold payment of the final payment request made by
the District, until a final POM and written summary of all Project work completed with CDBG and
other funds have been submitted to the County.
H. All requests for payment and supporting documentation shall be sent to:
10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Business Manager
County of Fresno
Department of Public Works and Planning
Financial Services Division
2220 Tulare Street, 6th Floor
Fresno, CA 93721
I. The District shall establish accounting and bookkeeping procedures in
accordance with standard accounting and bookkeeping practices, including, but not limited to,
employee timecards; payrolls; and other records of all transactions to be paid with CDBG funds in
accordance with the performance of this Agreement. All records and accounts shall be available
for inspection by the County, the State of California, if applicable, the Comptroller General of the
United States, and HUD or any of their duly authorized representatives at all reasonable times for
a period of at least five (5) years following final payment under this Agreement, or the closure of
all other pending matters, whichever is later. The District shall certify accounts when required or
requested by the County.
J. The District, as a subrecipient of Federal financial assistance, is required to
comply with the provisions of the Single Audit Act Amendments of 1996 (31 U.S.C. Sections 7501
et seq.). Whenever the District receives CDBG funds from the County for the Project, a copy of
any audit performed by the District in accordance with said Act shall be forwarded to the County
Community Development Grants Program Manager within nine (9) months of the end of any
District fiscal year in which funds were expended and/or received for the Project. Failure to perform
the requisite audit functions as required by this paragraph may result in the County performing any
necessary audit tasks or, at the County's option, the County contracting with a public accountant
to perform the audit. All audit costs related to the District's failure to perform the requisite audit are
the sole responsibility of the District, and such audit work costs incurred by the County shall be
billed to the District, as determined by County’s Auditor-Controller/Treasurer-Tax Collector. In the
event the District is only required to perform an audit under the provisions of the Act because the
District is receiving CDBG funds, the County may perform, or cause to be performed, the required
audit to determine whether funds provided through this Agreement have been expended in
accordance with applicable laws and regulations. Any audit-related costs incurred by the County
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
under this provision shall be charged to the County CDBG Program. The District agrees to take
prompt and appropriate corrective action on any instance of material non-compliance with
applicable laws and regulations.
K. The District shall send a copy of the audit to:
Community Development Grants
County of Fresno
Department of Public Works and Planning
Community Development Division
2220 Tulare Street, 6th Floor
Fresno, CA 93721
VI. INDEMNIFICATION
The District shall indemnify, defend, and save harmless the County, its officers,
agents, and employees from and against any and all damages, claims, and losses whatsoever
(including attorney’s fees and costs) occurring or resulting to persons, firms, or corporations
furnishing or supplying work, services, materials, or supplies in connection with the performance
of this Agreement, and from any and all damages, claims, and losses (including attorney’s fees
and costs) occurring or resulting to any person, firm, or corporation for damage, injury, or death
arising out of or connected with the District's performance of, or failure to perform, its obligations
under this Agreement. The provisions of this Section VI shall survive the termination of this
Agreement.
VII. TIME OF PERFORMANCE
A. The following schedule shall commence on the date this Agreement is
executed by the County.
1. Complete Specifications and Submit to the County for Review –
June 1, 2020.
2. Complete County Review and Approval of Specifications – June 22,
2020.
3. Begin Advertising for Bids – July 1, 2020.
4. Award Construction Contract – August 1, 2020.
B. Evidence of delivery, inspection, and acceptance by the District shall be
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
submitted to the County Community Development Division no later than February 1, 2021.
C. The final POM Report, written summary of all work completed, and request
for final payment shall be submitted to the County no later than April 1, 2021.
D. The District shall give immediate written notification to the County
Community Development Division of any events that occur which may affect the above time
schedule and completion date and the time schedule specified in the contract documents, or any
event that may have significant impact upon the Project or affect the attainment of the Project's
objectives. The Director is authorized to make adjustments in the above schedule if, in the
Director's judgment, any delay is beyond the control of the parties involved.
E. Time is of the essence in the District’s performance of this Agreement.
VIII. BREACH OF AGREEMENT
In the event the District fails to comply with any of the terms of this Agreement, the
County may, at its option, deem the District's failure a material breach of this Agreement, and utilize
any remedies permitted by law that the County deems appropriate. Should the County deem a
breach of this Agreement material, the County shall immediately be relieved of its obligations to
make further payment as provided herein. Termination of this Agreement due to breach shall not,
in any way whatsoever, limit the rights of the County in seeking any other legal relief in a court of
law or equity, including the recovery of damages. In addition to the Agreement being terminated
by the County in accordance with a material breach of this Agreement by the District, this
Agreement may also be terminated for convenience by the County in accordance with state and
federal law.
IX. TERMINATION OF PROJECT
A. If the District decides to cancel the Project covered by this Agreement, the
District shall submit a request in writing to the County Department of Public Works and Planning,
Community Development Division explaining just cause for the request. The Director is authorized
to approve such a request if, in the Director's judgment, there is just cause for the Project’s
cancellation.
B. If the District’s request to cancel the Project covered by this Agreement is
13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
approved by the Director, the District shall promptly return to the County all CDBG funds paid
pursuant to this Agreement.
X. VENUE; GOVERNING LAW
Venue for any action arising out of or relating to this Agreement shall be only in
Fresno County, California. The rights and obligations of the parties and all interpretation and
performance of this Agreement shall be governed in all respects by the laws of the State of
California.
XI. ENTIRE AGREEMENT
This Agreement constitutes the entire agreement between the District and the
County, with respect to the subject matter hereof, and supersedes all previous negotiations,
proposals, commitments, writings, advertisements, publications, and understandings of any nature
whatsoever, unless expressly included in this Agreement.
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
1 IN WITNESS WHEREOF, the parties have executed this Agreement on the date set forth
2 on page one of this Agreement.
3
4 FRESNO COUNTY FIRE PROTECTION
5
6
7
8
9
DISTRICT
By:....i._~~i!:!::::,!_----=~~.u--=-..!4-11-l-U~
President/Superintendent/
Chairman/Manager
Date: 0 't } 0~ ( a o 1...{)
FUND NO: 0001
SUBCLASS NO: 10000
ORG NO: 7205
ACCOUNT NO: 7885
PROJECT NO: N19731
ACTIVITY CODE: 7219
SW :JA :
COUNTY OF FRESNO
E.. ~ ,4... -'-tE-, ~
Ernest Buddy Men ~ Chairman of the
Board of Supervisors of the
County of Fresno
ATTEST:
Bernice E . Seidel
Clerk of the Board of Supervisors
County of Fresno, State of California
By: &~ ~ if
Deputy
REMIT TO:
Fresno County Fire Protection District
Attention: Josh Chrisman,
Administration Officer
210 S . Academy Avenue
Sanger, CA 93657
Telephone: (559) 493-4305
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
G:\7205Com0ev\-Agendas-Agreements\2020\0526_FCF POSl~tion93WaterT end&l'Refi.rtlsh1973 1 _AGT doc:x
March 19, 2020
14
Exhibit 1
County of Fresno
Project Outcome Measurement Report
G:\7205ComDev\~Agendas-Agreements\2020\0609_FCFPDStation93WaterTenderRefurbish19731_AGT.docx
October 8, 2018
Project #: _______ Project Name: ______________________________
The County of Fresno is required to submit information annually on each project
funded with Community Development Block Grant (CDBG) funds, per U.S.
Department of Housing and Urban Development (HUD) guidelines. As a
recipient of CDBG funds from the County, the County requests that you provide
the following information:
1. Years Reported: __________________ through ___________________
2. Enter the number of persons assisted that:
a. Now have new access to this type of public facility or infrastructure
improvement: _______ or N/A
(New access to a public facility or infrastructure is when the facility did not
previously exist and is provided for the first time.)
b. Now have improved access to this type of public facility or
infrastructure improvement: _______ or N/A
(Improved access to a public facility or infrastructure is when the facility or
infrastructure is improved or expanded, enabling the grantee to expand the
number of people or type of service the facility provides.)
c. Are served by this public facility or infrastructure improvement that
is no longer substandard: _______ or N/A
(A public facility or infrastructure is no longer substandard when the CDBG funds
were used to meet a quality standard, or measurably improve the quality of the
facility or infrastructure.)
(Note: The numbers of persons entered in a, b, and c, above, must add up to the total
number of persons entered in question 3.)
3. Total number of persons assisted: _______
4. Please describe the accomplishments made on this project in the past
year (i.e. construction progress). If the project is complete, please
describe the overall accomplishments made on the project.
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
Form Completed By: ______________________________________________
Exhibit 2
Project Pay Request
G:\7205ComDev\~Agendas-Agreements\2020\0609_FCFPDStation93WaterTenderRefurbish19731_AGT.docx
October 8, 2018
Date
Business Manager
County of Fresno
Department of Public Works and Planning
Financial Services Division
2220 Tulare Street, 6th Floor
Fresno, CA 93721
Subject: Request for Payment, CDBG Project No. _________
<District Name>
<Project Title>
In accordance with the executed Agreement for the above-referenced project, the
<District Name> is requesting payment of $_______ for project costs.
The District certifies that this request for payment is consistent with the amount of
work that has been completed to date, performed in accordance with the
construction contract documents and the executed Agreement, and as evidenced by
the enclosed invoices and supporting documents.
Payee Invoice # Amount
Sincerely,
<District Manager>
<District Name>
Enclosure(s)