Loading...
HomeMy WebLinkAbout2402C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JENSEN AVENUE IMPROVEMENTS CHANGE ORDER NO. 02 WEST AVENUE TO FIG AVENUE (MLK BOULEVARD) JANUARY 21, 2026 FEDERAL PROJECT NO.: STPL-5942(296) and STPL-5942(289) PAGE 1 OF 2 CONTRACT NO. 24-02-C TO: AVISON CONSTRUCTION, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), TWO (2) -WORKING DAYS will be added to the contract time. PLACE A 16" WATER LINE 8' BELOW FINISH GRADE— EXTRA WORK This change was requested by the City of Fresno. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install a 16" water line from sta. 91+53 to sta. 92+08 to the depth of 8' below finish grade, and place slurry with 4-mil Visqueen. This change is being made due to conflicts with the underground utilities. Perform all work according to the applicable sections of the Standard Specifications and the Special Provisions. Payment for this work will be made as extra work at an agreed lumpsum price of$38,035.00 according to Section 9-1.03, "Payment Scope," of the Special Provisions and Standard Specifications. This price includes compensation for all labor, materials, equipment, overhead costs, markups, profits, and incidentals for performing the work. Two (2) working days will be added to the contract time for the above referenced extra work, in accordance with Section 8-1.078, "Time Adjustments," of the Standard Specifications. _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JENSEN AVENUE IMPROVEMENTS CHANGE ORDER NO. 02 WEST AVENUE TO FIG AVENUE (MLK BOULEVARD) JANUARY 21, 2026 FEDERAL PROJECT NO.: STPL-5942(296) and STPL-5942(289) PAGE 2 OF 2 CONTRACT NO. 24-02-C NET COST THIS CHANGE ORDER: $38,035.00 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: TWO (2) -WORKING DAYS iPe6an,tyS�usc�c,�a�� Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: AVISON CONSTRUCTION, INC. OA�5.�� Contractor Mandeep S. Sekhon, PE Construction Engineer By C61�1 7y-f&0' APPROVED BY: Steven Digitally signed by Steven White Project Manager White Date:2026.01.26 Title 14:08:51 -08'00' Steven E. White, Director Accepted Date: Jan 22,2026 Public Works and Planning Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.