HomeMy WebLinkAbout2418C CCO 03 - REVISED.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 03 DRAPER STREET TO CLAYTON AVENUE OCTOBER 20, 2025 STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 1 OF 4 CONTRACT NO. 24-18-C TO: DON BERRY CONSTRUCTION, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), 20 -WORKING DAYS will be added to the allotted contract time. PART I: INSTALL K-MARKERS AT BETHEL AVENUE INTERSECTON— EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install K- markers at Bethel Avenue intersection as per the attached revised Plan Sheet 76B, as directed by the engineer. Perform all work in accordance with Section 82, "Signs and Markers," of the Standard Specifications and Special Provisions. Compensation for the materials will be made at an agreed price of$1,237.50, in accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. This agreed price includes compensation for all labor, materials, equipment, traffic, incidentals, overheads, markups, and profits, no additional compensation will be made thereafter. This amount will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: INSTALL ACCESSIBLE PEDESTRIAN SIGNALS (APS)AT GOLDEN STATE BOULEVARD AND MERCED STREET INTERSECTION — EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install a total of four(4) additional APS units at the Golden State Boulevard and Merced Street intersection. Perform all work in accordance with Section 86-1.02T, "Accessible Pedestrian Signals," of the Standard Specifications and Special Provisions. Compensation for the materials will be made at an agreed price of$7,920, in accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. This agreed price includes compensation for all labor, materials, equipment, traffic, incidentals, overheads, markups, and profits, no additional compensation will be made thereafter. This amount will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors therefore the prices shown above. _Const.Management RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 03 DRAPER STREET TO CLAYTON AVENUE OCTOBER 20, 2025 STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 2 OF 4 CONTRACT NO. 24-18-C TOTAL COST PART II: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS PART III: REMOVE AND REPLACE EXISITING STRIPING AT TEMPERANCE AVENUE INTERSECTION — EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, blackout the existing striping at the Temperance Avenue intersection which was placed in Phase 1 of the Golden State Boulevard Project and place new striping to match the current project striping. Perform all work in accordance with Section 84, "Markings," of the Standard Specifications and Special Provisions. Compensation for the additional striping will be made at the unit bid prices of the pertaining bid items (shown below), compensation for the removal of the existing striping (includes sealing of the surface) will be made at the agreed unit prices; $0.81 per linear foot for Details 12, 25, 39, and 39A, in accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount NO NO 54 4" White 2-Coat Paint Traffic LF 856.00 $0.70 $569.29 5.30 31.89 Striping (Detail 8, 12, 27B, 38, $599.20 38A) 55 6" White 2-Coat Paint Traffic LF 451.00 0.78 351.78 36.20 Striping (Detail 39, 39A) 1.88 57 4" Yellow 2-Coat Paint Traffic LF 1,550.00 1.30 2,015.00 13.03 37.25 Striping (Detail 21, 22, 24, 25, 29, 31, 32) TOTAL INCREASE: $2,92698 $2,965.98 A total of 2,568 linear feet of Details 12, 25, 39, and 39A were blacked out, compensation resulted in (2,568 x 0.81 = 2,080.08) $2,080.08. $2,965.98 Total compensation for the additional striping resulted in $2� 6.98, this amount will be paid through Bid Item Nos. 54, 55, and 57. Total compensation for the removal of the existing striping resulted in $2,080.08, this amount will be paid through Bid Item No. 3, Supplemental Work with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be —Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 03 DRAPER STREET TO CLAYTON AVENUE OCTOBER 20, 2025 STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 3 OF 4 CONTRACT NO. 24-18-C $2,965.98 INCREASE TOTAL COST PART III: $2,926.98 tNGRE S TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: GRANT A TIME EXTENSION This time extension was requested by the contractor. Grant a time extension of 20-working days to the "Second Order of Work" due to the long lead time for the traffic signal equipment delivery. This time extension is being granted according to Section 8-1.07B, "Time Adjustments," of the Standard Specifications. TOTAL COST PART IV: $0.00 (NO COST) TOTAL TIME EXTENSION PART IV: 20 -WORKING DAYS PART V: REVISE PROJECT PLANS (SELMA REGION) This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 77A with the attached revised Plan Sheet 77B. The revision included in this revised plan sheet adds a total of six (6) roadside signs, including R6-2, R1-2, R3(CA)(40), R9-3, and R2-1(40). Perform all work in accordance with Section 82, "Signs and Markers," of the Standard Specifications and Special Provisions. Compensation for the additional roadside signs will be made at unit bid prices of the pertaining bid items (shown below), and compensation for the additional mobilization will be made at agreed price of$605, according to Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Increased Items: Item Total Total No. Description Unit Quantity Price Amount o� 51 Roadside Sign EA 6.00 $450.00 $2,700.00 35.29 35.29 TOTAL INCREASE: $2,700.00 Total compensation for the additional roadside signs resulted in $2,700.00, this amount will be paid through Bid Item No. 51. Compensation for the additional mobilization, $605 will be made through Bid Item No. 3, Supplemental Work, with no net increase to the contract. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. AMENDED COUNTY OF FRESNO Steven Digitally signed by CONSTRUCTION MANAGEMENT Steven White CONTRACT CHANGE ORDER white Date: 20222:41 .01.21 GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 03 DRAPER STREET TO CLAYTON AVENUE OCTOBER 20, 2025 STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 4 OF 4 CONTRACT NO. 24-18-C TOTAL COST PART V: $2,700.00 INCREASE TOTAL TIME EXTENSION PART V: ZERO (0) -WORKING DAYS $5,665.98 INCREASE NET COST THIS CHANGE ORDER: $6,62e 98 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: 20 -WORKING DAYS a k�'� Jersephene Vang, Resident Engineer APPROVAL RECOMMENDED: Don Berry Construction, Inc. Contractor Mandeep S. Sekhon, PE Construction Engineer T�IZO,Dea o�� By APPROVED BY: Steven Digitally signed by Dan Dorval-CFO SEC Steven White � White Date:2025.11.03 Title 08:47:01 -08'00' Steven E. White, Director Oct 29,2025 Public Works and Planning Accepted Date: Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials, except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. I1PE K(OM?-1N) GSB-SB1'+57.79 63.50'Lt • CONFORM TO E'st CL67 M * a a '(6112--1h) 7` RI-1 • CONFORM TO Exist STRIPING �j'�� • yy u ts1 CUSTOM • R�r 1 I7YPf K(OMW R81 n x x • '. I iz las ?T � Fr +� 2' sY� II I,I 1T •1- long son ■� I. i $SB-5'B1"+59. 3082'Lt 21 .a 12' 1s' 1 'GSB-SBI"-ta1E ---1P----rz' li CSB-SB1'+60.69�0.03'R! 43 CONFD T CONFORM 70 EdM STRIPYNC R•1 z1 �I-1-1 r Enbt STRONG GOLDEN STARS BLVII ti5B-SB1"+61.17 30.99'Rt a4 x.SB-NB1'UIIE 1't CONFORM TO Eriat STRIPING Y 1 12' i 1Y' 12' y IS' rr • ---12' 1S'12 yT ---------- 11TT''P BY J I I��1� �3 1T 4• 25 � 4 p I jrz�1 ■ .l9 PS Ite�- I ipll 12 g3 - W3-1 A s7➢ • C l TO Exist STRIPIN as G AHEW) •WIO-5 R•1 I 1-1 •W10-5P • 1-6(Rt) 0WIO-51 • •W10-5PI W10-2 CITY OF KINGSBURG GOLDEN STATE BLVD SCALE 1'=40' J3� k w J a g� 3 noTE RECORD DRAWING PROJECT-PHASE 2 csB of DEPARTNIENTOFPUBLICWORKSANDPLANNING DESIGNED:—THIAHORNER REBIDENTENGINEER DOTE ' , , D\ /,/DD,) ERIK CHIN . 1zn�rza]a ECONOMC DEVELOPMEGOLDEN STATE NT AND �NDRIEDA 4LS4t INFRASIRUCTUREIMPROVEMENTS ` SIGNAGEAND STRIPING KA■5TH MAS DATE �GOLDEN BTATEBOULEVARD FOP � pgpy�NG NO.83� SHEET NO.]BSI TOTAL 10B 85B-SB1"+65b0 93./0'Lt 70 E'at 511NPING 'SS-Sal"+82.0 FORM 70 Exist SIRAPW Y.SB-SB)'+49.29 9306'Lt TSB-SB2"+28.00 8323'Lt • CONFORM TO&W S7R/P ONfORM TO Eriet STRIPING R28E G • • 70 Exist SO6PdVG • • • • R81 4 4 G RpBE�(Cp) R28�fG7 R2 R28E • � / 8 �11 r I I.ioh CONFORM TO Fist S7R/P/NG .n 1 �lis r, I �I ss fs a K fT f TO Exist 5�`7MPM�G r� i r7ni fa f2 '•MN fa' I I f2• G.SB-SBt'Lm�a—— fa. —— ,=-S82.—WE— I 189+00 (&j 190+00 191+00 r >+00 193+00 nfft• � 7+00 19+ 199+ O GOLDEN STATE BLVD GOLDEN SPATE BLVD �rygp•ns' 'TSB-t•t'GNE rr•a s•uw 2:. 189300_ 190+-00-f: fTfY fs -0 193+00 �.9-9+D0- �.95+D0- �.46+D0- fY roa�nn /aoAnr II fr f2• fY I I Iffi L�j I� � JB 53 .Y .M � • ffi �' �)��]7ry'' W10-•2Rt :ia�) fT .m *_ J SAS I V Iial I RI-2 R6 I GT N10-2 Lt c. CONFORM RJ Exist STRIPING W10-1 R6-3 o ' CITY OF MNGSBURG GOLDEN STATE BLVD SGLE. 1"_40' —J x R2-190 `t LYM'FORM/D _ * I\irll F/ 70 Exist SIR/PING • u x I x f: f��- R2-1 40 Exi2t-57R�/VLG M I � \ llfDiSON � g�Z � fa. R3G GOLIIEN SPAT�.lL fs• - + 1 'se-cLz•Lam 2s $ v 359+00 �- 362.o- 365+00 _ w � __ ut °f• x fa a 12 tq 4 b"SB-CL2" 6S 3 6' f •m Mum *' 0 *G e ffi � R GIdSl�l m� CITY OF SELMA 'x$ GOLDEN STATE BLVD ' SGLE. 1'=40' R nsTE RECORD DRAWING PROJECT-PHASE 2 �csap DFPAR721ENTOFPUBLICWORKSANDPLANNING g DE9GNED:OyNTHIA HORNER RESIDENT ENGINEER DOTE , . ' GOLDEN STATE CORRIDOR-ECONOMI COD LOPMENTAND SIGNAGE AND STRIPING OHRIINFRASIRUCTU EIMPRO EMENTS CHECI�D'.EDOARNORIEDA MARKTRONAI 9UPERVIBING ENGINEER 64TE �P GDLDEN BTATE BdJ—RD wA11R —AINON0.833 .—N..P9 TOTAL 10B