HomeMy WebLinkAbout2415C CCO 06.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
CSA 1 TAMARACK WATER INFRASTRUCTURE CHANGE ORDER NO. 6
REPLACEMENT DECEMBER 11, 2025
CONTRACT NO. 24-15-C PAGE 1 OF 2
TO: DG CONSTRUCTON, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time.
INCREASE ITEMS AT UNIT BID PRICES
This change was proposed by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, increase
items at the unit bid prices. These bid items are being adjusted per the actual field placement.
Increased Items:
Total
Item Description Unit Quantity Price Amount o� TOTAL
No.
17 6" SDR 11 HDPE Pipe LF 328.60 $96.00 $31,545.60 15.54 15.54
36 Permanent Trench TON 62.00 348.00 21,576.00 25.00 25.00
Repair HMA
TOTAL INCREASES: $53,121.60
This change did not impact the critical path for the project, so granting additional contract time was not
warranted.
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors
_Const.management therefore the prices shown above.
_RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
CSA 1 TAMARACK WATER INFRASTRUCTURE CHANGE ORDER NO. 6
REPLACEMENT DECEMBER 11, 2025
CONTRACT NO. 24-15-C PAGE 2 OF 2
NET COST THIS CHANGE ORDER: $53,121.60 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
Robert Hendrickson, Resident Engineer
APPROVAL RECOMMENDED:
DG Construction, Inc. 0A �' "
Contractor Mandeep S. Sekhon, PE
Construction Engineer
By 2�'f7 APPROVED BY:
Digitally signed by Steven
President Steven White White
Date:2025.12.15
Title 13:48:00-08'00'
Steven E. White, Director
Accepted Date:
Dec 11,2025 Public Works and Planning
Date:
_Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree, if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.