Loading...
HomeMy WebLinkAbout2402C CCO 01.pdf COUNTY(JFFRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JENGEN AVENUE IMPROVEMENTS CHANGE ORDER NO. O1 WEST AVENUE TO FIG AVENUE (MLP( BOULEVARD) C)CT[>BER8, 2D25 FEDERAL PROJECT N{}.: GTPL-5S42(2S8) and 8TPL-5S42(2OS) PAGE 1 (]F2 CONTRACT NO. 24-O2-C TO/ AVISON CONSTRUCTION, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the chon0e/oJ. will be added bz the contract time. REVISE PROJECT PLANS This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheets 13, 14' 15' 10, 17, 33' 34. and 35 with the previously provided Plan Sheets 13A, 14A, 15A, 10A.17A, 33A, 34A, and 35A. These revisions realign the roadway slightly to the south between Sta. 79+00 and Sta. 87+70. This change affects the below listed bid items. The compensation adjustment for the increased or decreased quantities will be made at the unit bid prices according to Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. The following items are being increased or decreased at the unit bid prices: Items:Increased Item Total Total No. Description Unit Quantity (�D_ Price Amount (0/0) % 15 Roadway Excavation (F) CY 64.00 840.00 $2.580.00 0.52 0.52 20 1.25 Foot Full Depth Reclamation 8Y 15.00 16.00 240.00 0.15 0.15 with C8nnent (F[>R-C) (F) 48 Thermoplastic Traffic Stripe LF 71.00 8.00 508.00 3.93 3.93 /DotaU2S\ 59 Thermoplastic Diagonal Yellow LF 73.00 6.50 474.50 20.22 20.22 Stripe 8" Wide TOTAL INCREASES: $3.842.50 Items:Decreased Item Total Total No. Description Unit Quantity Price Amount MQ % 19 1'Fo0t Full Depth Reclamation SY 02.00 $14.00 $808.00 (0.19) (0.19) with Cement /FDR-C\ (F) 22 Hot Mix Asphalt(Type A TON 10.00 110.00 1,880.00 (0.10) /0.10\ Grading) 40 Thermoplastic Traffic Stripe LF 83.00 0.00 37.80 (16.36) (18.38) ([)etai} SA) __Contractor We, the above signed contractor,have given careful consideration to the change proposed and hereby agree, if -Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be --Business Office nn�euauoveanupenvrmaose�/cesnecessa�m,mewvruauo"es»ecmeuanuwmaoentasmon^vmont mm�urs"ne�/m= ' ' ��Co""t.m°""geme", therefore the prices shown above. _nE/wrco. __Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JENSEN AVENUE IMPROVEMENTS CHANGE ORDER NO. 01 WEST AVENUE TO FIG AVENUE (MLK BOULEVARD) OCTOBER 8, 2025 FEDERAL PROJECT NO.: STPL-5942(296) and STPL-5942(289) PAGE 2 OF 2 CONTRACT NO. 24-02-C 47 Thermoplastic Traffic Stirpe LF 32.00 4.00 128.00 (0.52) (0.52) (Detail 22) 51 Thermoplastic Traffic Stripe LF 1,185.00 1.00 1,185.00 (5.61) (5.61) (Detail 39) 53 Thermoplastic Diagonal and LF 600.00 4.00 2,400.00 (19.63) (19.63) Chevron Traffic Stipe (6" White) TOTAL DECREASES: $6,598.80 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. NET COST THIS CHANGE ORDER: $2,756.30 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: AVISON CONSTRUCTION, INC. 4-45."L— Contractor Mandeep S. Sekhon, PE Construction Engineer By APPROVED BY: Digitally signed by Steve ,(/� Steve White White .21 Title �' ! 10:48: 3-08' 0' 10:48:43-08'00' Steven E. White, Director Public Works and Planning Accepted Date: //h7/e�� Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch, Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.