HomeMy WebLinkAbout2402C CCO 01.pdf COUNTY(JFFRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
JENGEN AVENUE IMPROVEMENTS CHANGE ORDER NO. O1
WEST AVENUE TO FIG AVENUE (MLP( BOULEVARD) C)CT[>BER8, 2D25
FEDERAL PROJECT N{}.: GTPL-5S42(2S8) and 8TPL-5S42(2OS) PAGE 1 (]F2
CONTRACT NO. 24-O2-C
TO/ AVISON CONSTRUCTION, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the chon0e/oJ. will be added bz the contract time.
REVISE PROJECT PLANS
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheets 13, 14' 15' 10, 17, 33' 34. and 35 with the previously provided Plan Sheets 13A, 14A, 15A, 10A.17A,
33A, 34A, and 35A. These revisions realign the roadway slightly to the south between Sta. 79+00 and Sta.
87+70. This change affects the below listed bid items. The compensation adjustment for the increased or
decreased quantities will be made at the unit bid prices according to Section 9-1.03, "Payment Scope," of the
Standard Specifications and Special Provisions.
The following items are being increased or decreased at the unit bid prices:
Items:Increased
Item Total Total
No. Description Unit Quantity (�D_ Price Amount (0/0) %
15 Roadway Excavation (F) CY 64.00 840.00 $2.580.00 0.52 0.52
20 1.25 Foot Full Depth Reclamation 8Y 15.00 16.00 240.00 0.15 0.15
with C8nnent (F[>R-C) (F)
48 Thermoplastic Traffic Stripe LF 71.00 8.00 508.00 3.93 3.93
/DotaU2S\
59 Thermoplastic Diagonal Yellow LF 73.00 6.50 474.50 20.22 20.22
Stripe 8" Wide
TOTAL INCREASES: $3.842.50
Items:Decreased
Item Total Total
No. Description Unit Quantity Price Amount MQ %
19 1'Fo0t Full Depth Reclamation SY 02.00 $14.00 $808.00 (0.19) (0.19)
with Cement /FDR-C\ (F)
22 Hot Mix Asphalt(Type A TON 10.00 110.00 1,880.00 (0.10) /0.10\
Grading)
40 Thermoplastic Traffic Stripe LF 83.00 0.00 37.80 (16.36) (18.38)
([)etai} SA)
__Contractor We, the above signed contractor,have given careful consideration to the change proposed and hereby agree, if
-Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
--Business Office nn�euauoveanupenvrmaose�/cesnecessa�m,mewvruauo"es»ecmeuanuwmaoentasmon^vmont
mm�urs"ne�/m= ' '
��Co""t.m°""geme", therefore the prices shown above.
_nE/wrco.
__Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
JENSEN AVENUE IMPROVEMENTS CHANGE ORDER NO. 01
WEST AVENUE TO FIG AVENUE (MLK BOULEVARD) OCTOBER 8, 2025
FEDERAL PROJECT NO.: STPL-5942(296) and STPL-5942(289) PAGE 2 OF 2
CONTRACT NO. 24-02-C
47 Thermoplastic Traffic Stirpe LF 32.00 4.00 128.00 (0.52) (0.52)
(Detail 22)
51 Thermoplastic Traffic Stripe LF 1,185.00 1.00 1,185.00 (5.61) (5.61)
(Detail 39)
53 Thermoplastic Diagonal and LF 600.00 4.00 2,400.00 (19.63) (19.63)
Chevron Traffic Stipe (6" White)
TOTAL DECREASES: $6,598.80
These changes did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
NET COST THIS CHANGE ORDER: $2,756.30 DECREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
Robert Hendrickson, Resident Engineer
APPROVAL RECOMMENDED:
AVISON CONSTRUCTION, INC. 4-45."L—
Contractor Mandeep S. Sekhon, PE
Construction Engineer
By APPROVED BY:
Digitally signed by Steve
,(/� Steve White White
.21
Title �' ! 10:48: 3-08' 0'
10:48:43-08'00'
Steven E. White, Director
Public Works and Planning
Accepted Date: //h7/e��
Date:
_Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Management therefore the prices shown above.