HomeMy WebLinkAbout2025-11-14 24S14 CCO 01_0_SIGNED.pdf cod, County of Fresno Department of Public Works and Planning Development Services&Capital Projects Division Steven E.White, Director 1 CONTRACT CHANGE ORDER Project: Fresno County Department of Public Health Basement Renovation Contractor: Better Enterprises, Inc. Contract No.24-S-14 D-25-332 Address: 1148 N.Cypress Ave. Fresno,CA 93727 Date: 2025-11-13 Architect: Matthew Lopez Change Order No.: 1 Construction Contract Dollar Amount(as awarded on 2025-05-20) $6,763,000.00 Director's Change Order Limit: $210,000.00 Change Order Allowance $676,300.00 Construction Start Date(NTP Issued 2025-08-13): 2025-08-11 Original Contract Time(Working Days): 310 Original Construction Completion Date: 2026-11-04 Change Order Scope of Work: PCO 1 Door frames&hardware changes 0 days $11,918.82 PCO 2 Reinstallation of exsiting hydronic piping that were previously 0 days $17,990.80 Attachment(s): Change Order Summary,Contractors PCO,Subcontractor's Price Proposal Net Change Order Dollar Amount: $29,909.62 Net Working Days: 1 0 Total Change Order Dollar Amount To Date $299909.62 Adjusted Contract Dollar Amount: $6,792,909.62 Director's Change Order Limit Balance: $180,090.38 Change Order Allowance Balance: $646,390.38 Total Adjusted Working Days To Date: 0 Adjusted Construction Completion Date: 2026-11-04 By signing acceptance of this Change Order, the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2. The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 24-S-14,Article VI shall apply. MANY;(<Wkrx,G� Reviewed: Better Enterprises, Inc. Marc Ke,k.0—(N-19,202515:23:05 PST) General Contractor Reviewed: Mark Celaya Senior Engineering Technician,Project Manager Reviewed-Cleared for Approval Jamie Sylvester s — Principal Accountant Mai~f"hew Lopez Reviewed: Matthew Lopez Mztthew Lope�,Nov 14,025 8:55:20 PST) Supervising Architect,Architect of Record Reviewed: Mandeep Sekhon ,s Construction Division Engineer,Construction Manager Reviewed: William M. Kettler Deputy Director of Planning Reviewed: Bernard Jimenez Planning&&Resource Management Officer Approved: Steven E. White Ste eWnt Nov 24,202509:55:02 PST) Director of Public Works and Planning Approved: Ernest"Buddy"Mendes Not Applicable Board of Supervisors, Chairman CHANGE ORDER SUMMARY Project: Fresno County Department of Public Health Basement Renovation Change Order App. 0JMF' � . Days Potential Change Orders 1 2025-11-14 $29,909.62 $0.00 0 Includes PCO: 1,2 Totals $29,909.62 $0.00 0 PendingPotential Executed Credit Rejected D. escr Change Orders CO# am&- 4 1 1 $11,918.82 0 Doorframes&hardware changes 2 1 $17,990.80 0 Reinstallation of exsiting hydronic piping that were previously demoed Totals $29,909.62 $0.00 $0.00 $0.00 C R A F,r s t � 4 w s * T r efr'f R w1"+ POTENTIAL CHANGE ORDER REQUEST SUMMARY STANDARD PROJECT NAME: DPH Basement Renovation P.C.O. NO: 1 PROJECT NO: 24S14(BEI:255030) CRB REF: CONTRACTOR: Better Enterprises, Inc. FI REF: DATE: 11/10/25 DESCRIPTION OF CHANGE: Propoal Request#1: KC&S-Change all HM frames to AL frames. Hardware change. Omitted door. SOS/BEI -Add for additional signage. General Contactor Direct Costs Additive Costs A Labor $135.54 B Material $162.66 C Equipment $0.00 D Subtotal of Additive Cost $298.20 Deductive Costs (use minus sign to denote negative figures) E Labor $0.00 F Material $0.00 G Equipment $0.00 H Subtotal of Deductive Cost $0.00 1 Contractor's Total Direct Cost (Line D+H) $298.20 J General Contractor's Mark-up 15.0% $44.73 GC mark-up on installation. K Total General Contractor Direct Costs+Mark-up (Line I+J) $342.93 L Total of all Subcontractor Direct Costs $9,337.10 M Subcontractor Mark-up 15.0% $1,400.57 N TAX 7.875% $371.36 O General Contractor's Mark-up on Subcontractor Direct Cost 5.0% $466.86 P Total General Contractor Change Request(Line K+L+M+N) $11,918.82 COUNTY OF FRESNO DEPARTMENT OF PUBLIC WORKS AND PLANNING Date 11/13/2025 By Stefanie Sorondo To the best of my knowledge and belief, I certifiy that all costs listed above are correct. X ACCEPTED REVISE AND RESUBMIT ❑REJECTED If this cost proposal is accepted,it is provisional and does not constitute authorization to proceed with the Work as described herein.All such changes in the Work shall be authorized by a Contractor Signature Date Contract Change Order,and shall be performed under the applicable conditions of the Contract Documents. / 432 Bitritto Way Suite#3 Modesto,CA 95356 Office 209-236-1604 C & SFax 209-567-2925 ` www.kcsconstructionspecialties.com E-mail:Billing@kcsconstructionspecialties.com CONSTRUCTION SPECIALTIES.INC. License#1048604 CHANGE ORDER PROPOSAL DIR#1000063244 PROJECT NAME: Department of Public Health DATE: 11/6/2025 C.O.P Ol ADDRESS: 1221 Fulton Street Fresno,CA 93721 Expires in 30 days. CONTRACTOR: Better Enterprises,Inc. REASON FOR REQUEST (ie:RFI,Owner,City,Other): I RFI-23 0 The Description of Vendor Partner Change Order Request is as follows: Change all the HIM frames to AL frames including the following changes: Added door lites to 6 doors. Deleted door,frame,and hardware for#M0103A. Changed hardware for#M0202A,M02028,M02026,and M0202D from Group 4(locksets)to Group 11(exit devices). Changed locksets from NO series to ALX series. Added kickplates to various doors. Hoursi 41 Rate PW Area 4 $127.72 Sub Total: $ 5,236.52 Overhead&Profit(15%): $ 785.48 Sub Total: $ 6,022.00 Material Breakdown: Change all the HM frames to AL frames. $ 2,812.50 Other misc.changes mentioned above. $ 1,288.08 Sub Total: $ 4,100.58 Overhead&Profit(15%): $ 615.09 Sub Total: $ 4,715.66 Tax 7.875% $ 371.36 Sub Total: $ 5,087.02 Total C.O.P#01 $ 11,109.02 CONTRACTOR SUBCONTRACTOR NAME NAME Katherine Harris DATE DATE 11/6/2025 From: Signs of Success, Inc. -Lic.#781521 �s"Qm, a_ e Attn: Estimator DIR#1000002635 0 PR-01 Add v w �� Department of Public Health Basement Remodeloy2 Fresno,CA Quantity Size ISignage Type I Unit Price Extended Price .125"Non-Glare Acrylic with Tactile Text&Grade II Braille*Note 1 1 9"x8.5" Al -Room ID w/Window-Added @ B0303 Prep Room $166.51 $166.51 1 IMounting Hardware $5.50 Subtotal Total: $172.01 Installation Notes Tax $15.05 Submittals/Design Labor N/A Furnish Total: $187.06 Recommended N/A Non-Union,Prevailing Wage Installation N/A Per Mobilization(including first required) N/A Furnish and Install Total: N/A *Note 1 Added per PR-01 Notes Addenda 1-2 All signs provided by Signs of Success, Inc as equal or better to specs, using materials and methods as specified. Parking, Site,and other signage not noted excluded. Bid Specifically Excludes unless noted:Cast Cement,Illuminated Signs,Electronic Monument,Permits,Parking Lot Sign posts,Waiver of Subrogation,Installation unless noted,painted murals,any additional signs,materials or methods not noted. This bid is valid for 90 days. Given the present energy crisis and recent unexpected increases in costs from our vendors for products and materials,we therefore must advise our clients than the case that a delivery of products is delavedby client in excess of 90 days from the time of bid reception there will be an increase under the terms of a dollar for dollar cost pass throughf our costs increase more than 5%at the time of fabrication. 2350 Skyway Dr. Unit 10 Santa Maria,California 93455 Telephone(805)925-7545•Fax(805)925-8181 www.signsofsuccess.net Prepared by devan 9/26/2025 Page 1 c° f Fr nCountyo es o 1s56 DEPARTMENT OF PUBLIC WORKS AND PLANNING p p STEVEN E.WHITE, DIRECTOR FRF�' Proposal Request Date: September 23, 2025 Request Number: PR 010 — Door Schedule, Door Hardware, Door Signage, & Door B0209A Direction Change PROJECT: Department of Public Health Basement Renovation 1221 Fulton St. Fresno, CA 93721 Contract No.: 24-S-14 ARCHITECT: Matthew B. Lopez, County of Fresno, Public Works & Planning CONTRACTOR: Better Enterprises, Inc. 1148 N. Cypress Ave. Fresno, CA 93727 The County requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein.The Contractor shall submit the proposal within five(5)days or notify the Project Manager in writing of the anticipated date of submission. DESCRIPTION: Please provide a proposal, in accordance with the project documents, for the following: 1. Revised door schedule, door hardware schedule, & door signage (see attached sheet A7.02 & sheet A7.03). 2. Direction of door B0209A swing changed (see attached 8.5"x11" exhibit). DEVELOPMENT SERVICES AND CAPITAL PROJECTS DIVISION 2220 Tulare Street,Sixth Floor/Fresno, California 93721 /Phone(559)600-5206/FAX(559)600-4548 The County of Fresno is an Equal Opportunity Employer 1 12 3 4 5 6 7 8 9 110 111 12 13 14 15 16 117 DOOR SCHEDULE DOOR HARDWARE SCHEDULE DOOR SCHD. NOTES m r 1. BY GAGE MANUFACTURER L z "� y "+ ¢ a o w r 2 STAIN LES5 FINISH INARF BY PRL TO 8E BRUSHED L m ¢ Y x w< w m ¢ a¢ z p r a 3. ADD 5ION ON EORE55 5IDE"MAXIMUM ¢ w r U w M a r r w r r w g a w OCCUPANCY 145" U N a w 4 z w ¢ z tY w w w tY F 0 r 4. FIELD VERIFY DIMENSIONS.DO OR AND O w x w LL ¢w m ww w ¢ r a ¢ 2 w wx w w 3x Ox O m 3 y w w y a y m m rn ¢ N w w ❑M g ¢rn ¢ w p Y w r< J x w SIDELIGHTS 1/2"THICK TEMPERED CLEAR O O O O w O O O w tY w w z w z r tY U CD O rn Y r VISION GLAZING.ALL COMPONENTS BY PRL 0 0 0 ow 0 0 0 �w ¢w �w �^ 0 ¢ o ? ° 0 > > o GLASS❑ ❑ ❑ ❑rn ❑ ❑ ❑ m x m w w m z x z U ❑ a a Y z 5 FINIS SYSTEMS,INC. . FINISHED OPENING (E)BOEL1 ELEVATOR - (E) - - - (E) - - (E) - - - - IVES IVES PUSH PLATE, 6. BY CAGE MANUFACTURER (E)BOEL2 ELEVATOR - (E) - - - (E) - - (E) - - - - b"X1b"W/ 1. KAWNEER WIDE STILE 500,1/4"THICK LGN 404OXP,689 IVES W5401GVX, 8190EZHD-0, 36"KICK _ 1 5OHLA&E ALX10 PASSAGE,U526D(626) HALER BB1199 ALUMINUM U526D F-MOUNT, F-MOUNT HANDLE PLATE TEMPERED CLEAR VISION GLAZING (E)80EL3 ELEVATOR - (E) - - - (E) - - (E) - - - - U5260 8190EZHO-10", e. ACTIVE 25 RH;SIGN ON DOOR:"FIRE K (E)BOST1 STAIR 81 - (E) - - - (E) - - (E) 90 MIN. - - 18 U5320 SPRINKLER RISER" K BY GAGED BY GAGED BY GAGED BY GAGED 9. ADD SIGN ON EGRESS SIDE"MAXIMUM (E)BOST3 STAIR 53 - (E) - - - (E) - - (E) `10 MIN.MIN. - - 18 2 BY GAGED STORAGE VENDOR STORAGE BY GAGED VENDOR VENDOR VENDOR VENDOR 10. ACTIVE I5 RH STORAGE BY GAGED STORAGE STORAGE STORAGE STORAGE - OCCUPANCY 235" BOXXA 5TAIR 82 3'-O"X l'-0" VENDOR A 1-3/4" 5G PL 1 AL AG 5 - A3 STORAGE 15 11. REOE55 HOLD OPEN WHERE P055IBLE BOTTOM PIVOT- 12. ALL HARDWARE BY MANUFACTURER,BRUSHED 80101A VESTIBULE PR.b'-O"X 1'-0' AA 1-3/4" 5C PL 1 AL AG 8 - - - 15 _ PRL 3010DP; DORMA RT588,PRL _ PRL _ 3 TOP PIVOT-SEE 5010A 1"END LOAD ARM PL3-EO5-10" - STAINLESS STEEL FINISH (E)50102A GRILLER - (E) - - - (E) - - (E) 45 MIN. - - 18 13. CARD READER ACTIVATED,FAIL-SAFE CLOSER 14. BOTH DOORS TO SWING TOWARDS WEST (E)80103A BOILER - (E) - - - (E) - - (E) 45 MIN. - - 18 LON 4040XP,689 IVES W5401CVX, _ _ _ _ DIRECTION,TOWARDS EGRESS STAIR (E)50103B BOILER - (E) - - - (E) - - (E) 45 MIN. - - ,g 4 5GHLAGE ALX10,U526D(626) HALER BB1199 ALUMINUM U526D 15. FOR PL DOOR FINISH COLOR SELECTION,USE (E)B0104A ELECTRICAL - (E) - - - (E) - - (E) 45 MIN. - - 18 4' 5GHLAGE ALX10,U526D(626) HAGER BB1199 LGN 404OXP,689 YIIL50NART MONTANA WALNUT 111OK-16 PREMIUM ALUMINUM - LAMINATE,FINECRAIN FINISH J (E)50105A STORAGE - (E) - - - (E) - - (E) - - - - 16. TEMPERED SAFETY GLAZING LITE J 5 5GHLA0E ALX80,U526D(626) HALER BB1199 - IVES W5401CVX, 36"KICK _ 11. DOOR LITE FRAME FINISH TO BE AIR LOUVERS (E)80106A ELECTRICAL - (E) - - - (E) - - (E) - - - - U526D PLATE BRAND,BRONZE COLOR B0107A HOUSEKEEPING 3'-0..X 1'-0" A 1-3/4" SC PL 1 AL AC 5' - A3 HSKPG 15 5' 5GHLAGE ALX80,U526D(626) HALER BB1199 - IVES F5495 STOP 36"KICK 16. CONTRACTOR TO VERIFY IF DOOR AND DOOR AGGE55IBLE AND HOLDER PLATE FRAME HAVE FIRE RATING LABEL AFFIXED;FIRE 50106A TOILET 3'-0"X 1'-0" A 1-3/4" 50 PL 1 AL AG 13 - 82,C2 15 LGN 404OXP,689 IVES W5401CVX, 36"KICK RATING LABEL TO BE INSTALLED WHERE TOILET 6 SCHLA6E ALX60,U526D(626) HALER BB1199 - - - MISSING ALUMINUM U526D PLATE 50202A BREAK PR.b'-O"X 1'-0' AAA 1-3/4" SG PL 1 AL AG 12 45 MIN. Al BREAK 3,11,151 ib,11 LGN 4040XP,b89 IVES F5495 STOP _ _ 36"KICK _ 802026 BREAK 3'-6"X 6'-8" B 1-3/4" 50 PL 1 AL AO 11 45 MIN. Ai BREAK 3,15,16,11 6' SGHLAGE ALX80,U526D(626) HAGER BB1199 ALUMINUM AND HOLDER PLATE B0205A CONFERENCE 3'-0"X 1'-3 1/2" G MF MF GZ MF MF FF 3 - A2 CONFERENCE 4,12 VON DUPRIN AX-9821-F-996LNL 80204A CONFERENCE 3'-0"X T-31/2" 6 MF MF GZ MF MF FF 3 - A2 CONFERENCE 4,12 AGGE55IBLE,FIRE RATED PANIC LCN 4040XP,689 H 1 DEVICE,VERTICAL SURFACE MOUNTED HAGER BB1199 ALUMINUM;IVES COP, IVES W5401CVX, H PR.S'-11 GO MF MF GZ MF MF FF 3 Al 15/16" SERIESBAR U526D HARDWARE NOTES 80205A OFFICE LOUNGE X 7'-3 1/2" - OFFICE LOUNGE 4,12 RODS,PULL-5IDE RHODES LEVER W/ COORDINATOR NIGHT LATCH,U526D(626) 30206A MEN TOILET 3'-O"X 1'-0" A 1-3/4" SG PL 1 AL AG 1 - B, G, ACCESSIBLE 15 MENS TOILET ACTIVE LEAF-5GHLAGE ALX80,U5260 IVES W5401CVX, 1. ALL HINGES SHALL BE 304L STAINLESS,U532D AGGE55IBLE a (626);INACTIVE LEAF-IVES FB358 HALER BB1199 - U526D - - - FINISH,5"HIGH x 4"WIDE,U.N.O. 80201A WOMEN TOILET 3'-O"X 1'-0" A 1-3/4" SO PL 1 AL AG 1 - 51,01 NOMENS TOILET 15 MANUAL TOP FLUSH BOLT 2. ALL HARDWARE FINISHES SHALL BE U532D(FOR BO209A HALL PR.6-0"X T-0' AA 1-3/4" 5O PL - - - 7 - - - 14,15 ACTIVE LEAF-SGHLAGE ALXIES,U5260 STAINLESS ITEMS)OR U526D(FOR 9 (626);INACTIVE LEAF-IVES F5556 HAGER 881199 - IVES W5401CVX, _ _ - _ NON-STAINLESS STEEL ITEMS). 50211A CONFERENCE 5-0"X T-3 1/4" 6 MF MF GZ MF MF FF 3 - A2 CONFERENCE 4,12 MANUAL TOP FLUSH BOLT U526D 3. ALL LOCKS SHALL BE CYLINDRICAL TYPE U.N.O. 4. ALL LOCK CYLINDERS SHALL BE PROVIDED WITH B0301A MEDIA ROOM 3'-O"X 1'-0" 8 1-3/4" SG PL 1 AL AG 4 - Al MEDIA ROOM 15,16,1l LGN 4040XP,689 ACTIVE LEAF-5GHLA6E IVES F U526D FULL SIZE INTERCHANGABLE CORES(FSICS). GLUMINUM;IVES COP, 36"KICK 80302A MEDIA ROOM 3'-O"X 1'-0" B 1-3/4" SG PL 1 AL AG 4 AlAi MEDIA ROOM 15,16,11 10 AUTO INACTIVE LEAF-IVES F841P HAGER BB1199 SERIES BAR PLATE 5. ALL LEVERS SHALL ARE "5GHLAGE RE MO STYLE G 50303 PREP ROOM V-O"X T-V - - - - - - - - - Al PREP ROOM 5 AUTO FLUSH TOP/BOTTOM BOLTS COORDINATOR b. ALL DOOR PANELS ARE SOLID CORE WOOD 1 3/4"THICK,WITH PLASTID LAMINATE FINISH 50400A OPEN SPACE PR.6-0"X T-0' AA 1-3/4" SO PL 1 AL AG 1 - Al GAGED STORAGE 15 VON DUPRIN AX-98RIM-F-996LNL ALL SIDE(LESS TOP 8 BOTTOM),U.N.O. AGGE55IBLE,FIRE RATED PANIC 1. ALL FRAMES ARE ALUMINUM,FACE WELDED, LGN 404OXP,689 IVES W5401CVX, 36"KICK 30401A GAGED STORAGE 4'-0"X 1'-0" G MF MF MF MF MF FF 2 - - - 6 11 DEVICE,RIM LATCH,PULL-SIDE HAGER 8B1199 - - - DOUBLE RABET,FACTORY PRIMED RHODE5 LEVER W/NIGHT LATCH, ALUMINUM U526D PLATE 8. ALL OPERABLE DOORS SHALL HAVE TYPED' 50402A GAGED STORAGE 4'-O"X 1'-O" G MF MF MF MF MF FF 2 - - - 6 U5260(626) 5I6NA6E ADHERED TO FRAME WITH 3M 1/16" B0403A GAGED STORAGE 4'-01X T-0" G MF MF MF MF MF FF 2 - - - 6 VON DUPRIN AX-9821-F-996LNL THICK DOUBLE SIDED FOAM TAPE LGN 4040XP,689 9. WHERE EGRESS DOORS ARE USED IN PAIRS, 80404A GAGED STORAGE 4'-O"X 1'-O" G MF MF MF MF MF FF 2 - - - 6 AGGE55IBLE,FIRE RATED PANIC LGN 180E MAGNETIC ALUMINUM;IVES COR 36"KICK _ APPROVED AUTOMATIC FLUSH BOLTS SHALL BE 50405A CAGED STORAGE 4'-O"X T-0" C, MF MF MF MF MF FF 2 - - _ 6 12 DEVICE,VERTICAL SURFACE MOUNTED HAGER 8B1199 5ERIE5 BAR HOLD OPEN LINKED - PLATE PERMITTED TO BE USED,PROVIDED THAT THE RODS,PULL-SIDE RH DES LEVER W/ COORDINATOR TO FA SYSTEM DOOR LEAF HAVING THE AUTOMATIC FLUSH F 80406A GAGED STORAGE 4'-0"X T-O" G MF MF MF MF MF FF 2 - - - 6 NIGHT LATCH,U526D(626) BOLTS DOES NOT HAVE A DOORKNOB OR F 30401A CAGED STORAGE 4'-O"X 7-0" G MF MF MF MF MF FF 2 - - - 6 13 5CH1_A6E ALX405,U526D(62b) HAGER BB1199 - IVES W54010VX, 36"KICK SURFACE MOUNTED HARDWARE.GBG 1010.2.4.4 U526D PLATE 10. ALL DOOR LOCK5ET5 TO BE COMPATIBLE WITH 51101 LOBBY -0"X T-9 1/2" 5 MF MF 6Z MF MF FF SF2 - - - 1,15 LON 4040XP,689 IVES W5401CVX, _ _ 36"KICK LARGE FORMAT INTERCHANGEABLE OORE5 11015 6 LOBBY 3'-O"X 1'-9 1/2" 5 MF MF GZ MF MF FF 5F2 - - - 7,13 14 SGHLAGE ALX105,U526D(626) HAGER 8B1199 ALUMINUM U526D PLATE (E)MOEL1 ELEVATOR - (E) - - - (E) - - (E) - - - - (E) (E) (E) (E) - - - - - (E)M05T1 STAIR M1 - (E) - - - (E) - - (E) 90 MIN. - - 18 OF (N/A) (N/A) (N/A) (N/A) - - - _ ARCHITECT: (E)MOST2 STAIR M2 - (E) - - - (E) - - (E) 90 MIN. - - 1g go AR q Matlhm B.LopU,kchited KAWNEER OFFSET LGN 404OXP,b89 Fds /IT caiifomia Ur�nse Architect No.C 26483 5F CO-9/GP-II,ADAMS RITE M51850 - - - - - EW' R FT Ren.12-31-2025 PA ALUMINUM v ��' <a Fresno County Department of (E)M0103A EQUIPMENT - (E) - - - (E) - - (E) - - - - CO 1186 MEL RIM EXIT DEVICE;REX KAWNEER OFFSET LGN 4040XP,689 N Poblic Waft,W Planning E M0104A STORAGE 3'-6"X 1'-O" A 1-3/4" SO PL 1 AL AG 5 - A3 STORAGE 15 SF2 - - - - - _ Develapment S.M..and E C 26483 Capital Protects Dlvlslon M0105A WOMEN TOILET 3'-O"X 1'-0" A 1-3/4" SG PL 1 AL AG 1 - B,,C, ACCESSIBLE 15 DOOR FRAME TYPES ABBREVIATIONS GENERAL DOOR NOTES N9 "''=-"-2025 , 2226 Tulare,3tteet 8Ih Floor WOMENS TOILET Fresno,Cal format93721 Sth M0106A MEN TOILET 3'-0"X 11-0" A 1-3/4" SO PL 1 AL AG 1 - 51,01 AGGE55IBLE 15 AG...............ANODIZED,CLEAR TF OF CAf-,4C� Office:(559)6W9 24 MENS TOILET 1. FIRE DOOR SHALL BE LABELED SHOWING THE NAME OF THE Email:mallopezQfmsnawuntyca.gov AL...............ALUMINUM MANUFACTURER,THE NAME OF THE THIRD-PARTY INSPECTION M0101A STORAGE 3'-61,X 1'-0" A 1-5/4" 50 PL 1 AL AO 6 - A3 STORAGE 15 1 VARIES 1 (E)...............EXI5TIN6 AGENCY,THE FIRE PROTECTION RATING,AND WHERE ALUMINUM BY WALL FA...............FIRE ALARM REQUIRED FOR FIRE DOORS IN EXISTING ENCLOSURES AND PROJECT: M0108A NETWORK 4'-O"X 1'-O" A 1-3/4" SO PL 1 AL AG 5 - A3 IDF/TELECOM 15 DOOR FRAME FF...............FACTORY FINISHED EXIT PASSAGEWAYS BY SECTION 1163 5,THE MAXIMUM M0109A MEGHANIGAL PR.6'-O"X 1'-0" AA 1-3/4" SG PL 1 AL AC e - A3 MEGHANIGAL 8,15 SYSTEM �+ GZ...............GLAZING TRANSMITTED TEMPERATURE END POINT.SMOKE AND DRAFT DEPARTMENT OF PUBLIC HEALTH MF...............MANUFACTURER SPECIFIED CONTROL DOOR COMPLYING THE UL 1164 SHALL BE LABELED AS M0202A MEETING 3'-0"X 1'-0" B 1-3/4" SG PL 1 AL AG 11 45 MIN. A2 MEETING EAST 9,15,ib,11 ANODIZED, BASEMENT RENOVATION (N/A).............NOT APPLICABLE SUCH AND SHALL ALSO COMPLY WITH SECTION 116.5.1.LABELS 1221 FULTON STREET,FRESNO,CA 93721 D M02025 MEETING 3'-O"X 1'-0" B 1-3/4" SG PL 1 AL AC 11 45 MIN. A2 MEETING EAST 9,15,ib,17 CLEAR FINISH PL...............PLASTIC LAMINATE SHALL BE APPROVED AND PERMANENTLY ABOVE FINISH D EQ. alY 2' alY EQ. all` PR. PAIR FLOORIXED. THE LABEL SHALL BE APPLIED AT THE FACTORY ISSUE :4DATE'-0 2 M02020 MEETING 3'-0"X 1'-0" B 1-3/4" SG PL 1 AL AG 11 45 MIN. A2 MEETING WEST 9,15,16,11 ar rt' PT...............PAINT OF LOCATION WHERE FABRICATION AND ASSEMBLY ARE ISSUE DATE:20 80371 3 SC...............SOLID GORE PERFORMED. PROJECT:G:\Ca0371 M0202D MEETING 3'-O"X 1'-O" 8 1-3/4" 5C PL 1 AL AC 11 45 MIN. A2 MEETING WEST 9,15,ib,17 t r FILE NAME:Basement Re tive Projects\T80371-DPH TYPE 1 SCHD............. SCHEDULE 2. SMOKE AND DRAFT CONTROL DOORS COMPLYING WITH UL 1184 PRIVATE U.N.O..............UNLESS NOTED OTHERWISE SHALL BE LABELED IN ACCORDANCE WITH SECTION 116.5.1 AND Brix-Mercer Basement Renovation\30 M0203A BREAKOUT ROOM 3'-0"X 1'-0" B 1-3/4" SG PL 1 AL AG 4' - Al MEETING 15,16,tt Desi n\Dnswin s\CAD\T80371 A7.00 SHALL SHOW THE LETTER'S'ON THE FIRE RATING LABEL OF THE M02055 BREAKOUT ROOM 3'-0"X 1'-0" B 1-3/4" 50 PL 1 AL AG 4' 45 MIN. A3 PRIVATE 15,16,ti DOOR TYPES DOOR. THIS MARKING SHALL INDICATE THAT THE DOOR AND SHEET TITLE: MEETING FRAME ASSEMBLY ARE IN COMPLIANCE WHEN LISTED OR LABELED GASKETING 15 ALSO INSTALLED. PREPARED FOOD „ - A3 PREPARED FOOD 15,16,11 3. FIRE DOOR FRAME SHALL BE LABELED SHOWING THE NAMES OF SCHEDULES - M0204A HOLDING 3'-b"X l-O B 1-3/4" 5G PL 1 AL AG b' g�� THE MANUFACTURER AND THE THIRD-PARTY INSPECTION C M02045 PREPARED FOOD 3'_6"X 1'-O" B 1-3/4" 5C PL 1 AL AG 14 45 MIN. - - 15,16,iT AGENCY. C HOLDING 6 4. DOOR OPERATING DEVICES SHALL NOT REQUIRE TIGHT DOORS WINDOWS M0205A STORAGE PR.6-0"X T-0' AA 1-3/4" SO PL 1 AL AG 10 45 MIN. A3 STORAGE 10,15 ;o m GRASPING,TIGHT PINCHING OR TWI5TING OF THE WRIST TO / / \ - / - / OPERATE.(GBG 1010.1.9-2016) M0301A ACTIVITY ROOM PR.6-0"X 6'-10 55 1-3/4" MF GZ MF MF FF SF - Al ACTIVITY ROOM 1 / / \ 5. THE UNLATCHING OF ANY DOOR OR LEAF SHALL NOT REQUIRE 3/4" MORE THAN ONE OPERATION.(GBG 1010.L0.5-2016) M0502A MECHANICAL PR.6'-0"X T-0' AA 1-5/4" SG PL 1 AL AG 8 - A3 MECHANICAL 15 \ \ / -� b. FIRE DOOR ASSEMBLIES SHALL BE INSTALLED IN M03026 MEGHANIGAL PR.6-0"X 1'-0' AA 1-3/4" SG PL 1 AL AG 8 - A3 MEGHANIGAL 15 ACCORDANCE WITH THE PROVISIONS OF CEO 715 4 NFPA 50. o❑ (GBG 116.5-2016) M0303A STORAGE PR.6-0"X 1'-0" AA 1-3/4" SG PL 1 AL AG 9 - A3 STORAGE 15 \ \ / a \ / a a m 1. THE CLEARANCES BETWEEN THE TOP e VERTICAL EDGES OF THE artment of x FINISH 4 DOOR 8 THEN SHALL NOT EXCEED 1/6"FOR WOOD DOORS. • . .Planning ACCE55I8LE SIDES PL �' J+ M0304A WOMEN5 VESTIBULE 3'-0"X 1'-0" A 1-3/4" SO PL 1 AL AO 1 - 51,G1 WOMENS TOILET 15 t f f f f r !'+ (NFPA 80;63.1.1.1) B AND SHOWER TYPE A TYPE AA TYPE'AA.1' TYPE B TYPE 'C' e. A CLOSIN&DEVICE SHALLE INSTALLED ON EVERY FIRE DOOR.DOOR CLOSERS SH AL BE ADJUSTED SO THAT FROM ANCapital Projects Division `ems w B M0305 MENS BATHROOM 3'-6"X 1'-0.. - - - - - - - - - - - 5 OPEN POSITION OF 90 DEGREES,THE TIME REQUIRED TO Q 1896 0 AGGE55I5LE MOVE THE DOOR TO A POSITION OF 12 DEGREES FROM THE iu-- IN +S M0306A MENS VESTIBULE 3'-0"X 1'-0" A 1-3/4" 5O PL 1 AL AC 1 - B1,Gt MEN5 TOILET 15 LATCH I5 5 SECONDS MINIMUM(680 118-404.2.8.1) _ F'RE� AND SHOWER FRAME RAILS TOP 9. DOOR HANDLES,PULLS,LATCHES 4 LOCKS 4 OTHER OPERATING / 8 BOT ONLY TYP % / \ % % / % / \ % DEVICES SHALL BE INSTALLED 34"MINIMUM TO 44" MAXIMUM M0309 WOMENS BATHROOM 3'-b"X 1'-O' - - - - - - - - - - - 5 HDWR TYPE 3 A.F.F.(CBC 118-404.2.1-2016) 10. CONTROLLED DOOR OPERATOR SHALL BE READILY OPENABLE SHEET NUMBER THE EGRESS DIRECTION WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT(GBG 1010.1.9-2016) \ \ / FRAME STILES B H\ \ / 11. DOORS OPENING FORGES SHALL COMPLY WITH THE SIDES,RAILS TO REQUIREMENTS ,5 LIST.3 AND AII_-5 4.2.9-SHALL U �� O A \\ \\ //// MID 8 BOT,TYP 0 /\\ �\\ //i/ 12. LOCKING DEVICES LISTED A5 FAIL-SAFE SHALL UNLOCK UPON A HDWR TYPE 5F2 L055 OF POWER PER 1010.2.12. TYPE'& TYPE'GG' TYPE'S' TYPE'SS' SHEET OF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 j DRAWN BY:<INITIALS> PLOT DATE:2025-09-23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 DOOR DETAILS DOOR SIGNAGE TYPES DOOR SIGNAGE NOTES DOOR,SEE DOOR SCHEDULE 8 1/2" PERMANENT 5IGNA6E TO 6E INSTALLED ON WALL ADJACENT TO LATCH SIDE OF DOOR OR A5 INDICATED ON 5/8"GYP.BD TYPE'X'TYP. ALUMINUM FRAME vim` ELEVATIONS. SIGNS WITH RAISED CHARACTERS AND BRAILLE SHALL BE LOCATED AS INDICATED ON L WRGB AT TOILET ROOM 4 NET 2 9 TYPICAL ACCE55IBILITY DETAILS,48"MINIMUM ABOVE FINISH FLOOR,MEASURED FROM THE BASE LINE OF L LOCATIONS METAL STUDS,5EE 57RUCT 4 3 _ THE LOWEST LINE OF BRAILLE AND 60"MAXIMUM ABOVE FINISH FLOOR,MEASURED FROM THE BASELINE OF FRAMING DETAILS THE HIGHEST LINE OF RAISED CHARACTERS OR GRAPHIC. - METAL STUDS,SEE STRUGT.4 � m 2 m a FRAMING DETAILS 5/6"GYP.BD TYPE'X'TYP. v o a n ALL SIGNS SHALL BE ADHERED USING 3M 1/16"THICK DOUBLE SIDED FOAM TAPE AND SILICONE ADHESIVE. WRGB AT TOILET ROOM 4 WET LOCATIONS 6020 - 8 PUBLIC 115-216.8-TOILET ROOMS AND BATHING ROOMS :1 ALUMINUM FRAME 4 a M� WOMEN RESTROOM DOORWAYS LEADING TO TOILET ROOMS AND BATHING ROOMS COMPLYING WITH SECTION 11B-603 SHALL BE v 4 IDENTIFIED BY A GEOMETRIC SYMBOL COMPLYING WITH SECTION 118-103.1.2.6. 5ION SHALL COMPLY WITH ADJACENT WALL,WHERE ry 5 5 SECTION 118-103.5 AND SHALL INCLUDE THE INTERNATIONAL SYMBOL OF ACCESSIBILITY COMPLY WITH °"UR5 TYPE Al TYPE B1 TYPE B1 TYPE B2 SECTION 118-103.1.2.1. -W MATCH DOOR SIGNAGE FOR SEX 115-103.2 DOOR,SEE DOOR �� Q" do 6 1/4" RAISED CHARACTERS ON SIGNS SHALL COMPLY WITH GBG 118-103.2. CHARACTERS SHALL BE UPPERCASE,SAN n n n n n n n n v SERIF,RAT.E 2 MINIMUM H 2"MAX IN HEIGHT BASED ON THE SCHEDULE � - �'+ 9 10 MAX UPPERCASE"I". THE WIDTH OF THE UPPERCASE"0"I5 TO BE 60%MIN.AND 110%MAX.OF THE HEIGHT OF THE 2 UPPERCASE LETTER"I". STROKE THICKNESS OF THE UPPERCASE LETTER"I"SHALL BE 15%MAX.OF THE HEIGHT 8 OF THE CHARACTER, WALL THICKNESS11B-103.3-BRAILLE BRAILLE SHALL BE CONTRACTED(GRADE 2)AND SHALL COMPLY WITH SECTIONS 118-103.3 FOR DIMENSIONS, 13020 CAPITALIZATION AND POSITION AND 115-103.4.FOR INSTALLATION HEIGHT AND LOCATION. GBG TABLE DOOR JAMB (HEAD SIM.) DOOR JAMB AT WALL 118-103.3.1. v 4 SCALE:3"=1'-0" SCALE:3"=1'-0" ? 5 BRAILLE SHALL BE POSITIONED BELOW THE CORRESPONDING TEXT IN A HORIZONTAL FORMAT. BRAILLE SHALL BE SEPARATED 3/6"MIJ ry ANY OTHER,TACTILE CHARACTERS. TYPE A2 TYPE C1 TYPE C1 TYPE C2 CHARACTERS ON SIGNS SHALLNBEN LOCATED 48 MI°N.ABOVE FINISH FLOOR MEASURED FROM THEE BASELINE OF J MATCH DOOR SIGNAGE FOR SEX THE LOWEST BRAILLE CELLS AND 60 MAX. ABOVE FINISH FLOOR,MEASURED FROM THE BASELINE OF THE V HIGHEST LINE OF RAISED CHARACTERS. WHERE A TACTILE SIGN I5 PROVIDED AT A DOOR,THE 5ION SHALL BE LOCATED ALONGSIDE THE DOOR AT SIGNAGE MATERIAL NOTES THE LATCH SIDE;AT DOUBLE DOORS WITH ONE ACTIVE LEAF,THE SIGN SHALL BE LOCATED ON THE INACTIVE LEAF;AT DOUBLE DOORS WITH TWO ACTIVE LEAVES,THE SIGN SHALL BE LOCATED TO THE RIGHT OF THE B0201 1/8"THICK NON-GLARE ACRYLIC WITH 6. 5LIDER WITH LAMINATED PAPER INSERT. RIGHT HAND DOOR. WHERE THERE I5 NOT WALL SPACE AT THE LATCH 5IDE OF A 5INOE DOOR OR AT THE SANDED EDGES.PAINTED COVER TO MATCH ACRYLIC ITEM 1.VENDO RIGHT SIDE OF A DOUBLE DOOR,SIGNS SHALL BE LOCATED ON THE NEAREST ADJACENT WALL. SECOND-SURFACE.PAINT:P3 TO DETERMINE METHOD OF CONSTRUCTION. SIGNS CONTAINING TACTILE CHARACTER SHALL BE LOCATED 50 THAT A CLEAR FLOOR SPACE OF 16"x 16" H TYPE A3 2. ALUMINUM LAMINATE DETAIL. 1. 112"TEXT,RAISED 1/32"ABOVE SIGN FACE; MIN.CENTERED ON THE TACTILE CHARACTERS I5 PROVIDED BEYOND THE ARC OF ANY DOOR SWING. WHERE H FONT:TBD;TEXT COLOR:P5 PERMANENT IDENTIFICATION SIGNAGE I5 PROVIDE FOR ROOMS AND SPACES THEY SHALL BE LOCATED ON 3. 1/8"NON-GLARE ACRYLIC FACE AND THE APPROACH SIDE OF THE DOOR AS ONE ENTERS THE ROOM OR SPACE. SIGNS THAT IDENTIFY EXITS 1 BACKER WITH SPACERS TO ALLOW FOR 8. 1/4"THICK NON-GLARE ACRYLIC WITH SHALL BE LOCATED ON THE APPROACH SIDE OF THE DOOR AS ONE EXISTS THE ROOM OR SPACE. INSERT.SANDED EDCE5. SANDED EDGES.PAINTED SECOND- 5URFACE.PAINT:P3 118-103.5-VISUAL GHARAGTERS 4 4. 1-3/6"TEXT,RAISED 1/32"ABOVE SIGN CHARACTERS AND THEIR BACKGROUND SHALL HAVE A NON-GLARE FINISH AND GHARAGTERS SHALL CONTRAST FACE;FONT:TBD;TEXT COLOR:P5 9. GRAPHIC RAISED 1/32"ABOVE SIGN FACE; WITH THEIR BACKGROUND. CHARACTER SHALL BE UPPERCASE OR LOWERCASE OR A COMBINATION OF BOTH. FONT:TBD;TEXT COLOR:P5 MINIMUM CHARACTER HEIGHT SHALL COMPLY WITH TABLE 115-105.5.5. VISUAL CHARACTERS SHALL BE 40" TYPE D 5. GRADE 2 GLA55 BEAD BRAILLE. MIN.ABOVE FINISH FLOOR. TEXT SHALL BE IN A HORIZONTAL FORMAT. CHARACTERS SHALL COMPLY WITH 10.RAISED GRAPHICS OPTIONAL FOR ALL- 118-103.5.4 AND 115-105.5.5 REGARDING THEIR PROPORTION AND HEIGHT. GENDER DOOR SIGNAGE 1113.103.1.2.6-TOILET AND BATHING FACILITIES GEOMETRIC SYMBOLS G DOORWAYS LEADING TO TOILET ROOMS AND BATING ROOMS SHALL BE IDENTIFIED BY A GEOMETRIC G SYMBOL. THE SYMBOL SHALL BE MOUNTED AT 55"MIN.AND 60"MAX.ABOVE FINISH FLOOR MEASURED TO THE CENTERLINE OF THE SYMBOL. WHERE A DOOR I5 PROVIDED THE SYMBOL SHALL BE MOUNTED WITHIN 1"OF THE VERTICAL CENTERLINE OF THE DOOR. MENS TOILET AND BATHING FACILITIES SHALL BE IDENTIFIED WITH AN EQUILATERAL TRIANGLE,1/4"THICK WITH EDGES 12"LONG AND A VERTEX POINTING UPWARD. THE SYMBOL SHALL CONTRAST WITH THE DOOR. WOMENS TOILET AND BATHING FACILITIES SHALL BE IDENTIFIED BY A GIRGLE,1/4"THICK AND 12" DIAMETER. THE SYMBOL SHALL CONTRAST WITH THE DOOR. UNISEX TOILET AND BATHING FACILITIES SHALL BE IDENTIFIED BY A GIRGLE,1/4"THICK AND 12"DIAMETER WITH A 1/4"THICK TRIANGLE WITH A VERTEX POINTING UPWARD SUPERIMPOSED ON THE GIRGLE AND WITHIN F THE DIAMETER. THE TRIANGLE SYMBOL SHALL CONTRAST WITH THE GIRGLE SYMBOL AND THE GIRGLE F SYMBOL SHALL CONTRAST WITH THE DOOR. ARCHITECT: SbD qRC@ Matthew B.Lopez,Amhltect 451 I�, Califomia license Architect No.C 26483 VC' �y,5a B 7d�n� Ren.12-31-2025 Fresno County Depadment of ep Public Works and Planning E Development Services and E C 26483 CapitalProtectsDlvl— N� UN:12-31-2025 . 2220 Tulare Street,Sth Floor `Q �y Fresno,California 93721 9 OF CALIFCY' Office:(559)&W0 24 Email:mafopu&-n—unty-gov PROJECT: DEPARTMENT OF PUBLIC HEALTH BASEMENT RENOVATION D 1221 FULTON STREET,FRESNO,CA 93721 D APN:466-211-03T ISSUE DATE:202509-23 PROJECT NO.:T80371 FILE NAME:G:\Capita'\Active Projects\T80371-DPH Brix-Mercer Basement Renovation\30 Design\Drawings\CAD\T80371 A7.00 SHEET TITLE: DOOR DETAILS & DOOR SIGNAGE Department of Public Works and Planning co B Capital Projects Division e 220 Tulare Street,8th Floo 856 0 O+f Fresno,California 93721 tRE`' SHEET NUMBER: A A 7 m O 3 A SHEET OF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DRAWN BY:<INITIALS> PLOT DATE:2025-09-23 J/ — m I ---vh— — —Ail — ® o — T1 — 8 I CD 4 VESTIBULE B 105 0 60100 a —I — Q�92 F A4.02 1 VESTIBULE o � JANITOR m 9 B0101 m HSKP 60109 Relo1. 4" I oto7 � I A6.01 _ I o M HALL }® (E ELECT I � 602t0 `� I B0106 )1 _ 2, / HALL PREP B0209 I KITCHEN \ I 0CIO A6.02 I � 13 B0208 ° I � 4" I 0 \ WOMEN/XT I o \BF0707 / \ O \ 3 o I I % I I N 4 207A n 2 N T- — — 8 EAK 5'-2 3 4" 6'-6 3 4" B 202 I n1 HALL PROPOSED BASEMENT FLOOR PLAN-DOOR B0209A SWING DIRECTION CHANGE County of Fresno SCALE:1/6'=T-O' Department of Public Works and Planning I Development Services & Capital Projects Division I Steven E. White, Directory �r�O C R A F,r s t � 4 w s * T r efr'f R w1"+ POTENTIAL CHANGE ORDER REQUEST SUMMARY STANDARD PROJECT NAME: DPH Basement Renovation P.C.O. NO: 02 PROJECT NO: 24S14(BEI:255030) CRB REF: CONTRACTOR: Better Enterprises, Inc. FI REF: DATE: 11/10/25 DESCRIPTION OF CHANGE: Strategic Mechanical: Reinstallation of existing hydronic piping that were previously demoed per RFI 37 response. General Contactor Direct Costs Additive Costs A Labor $0.00 B Material $0.00 C Equipment $0.00 D Subtotal of Additive Cost $0.00 Deductive Costs (use minus sign to denote negative figures) $0.00 E Labor $0.00 F Material $0.00 G Equipment $0.00 H Subtotal of Deductive Cost $0.00 1 Contractor's Total Direct Cost (Line D+H) $0.00 J General Contractor's Mark-up 15.0% $0.00 GC mark-up on installation. K Total General Contractor Direct Costs+Mark-up (Line I+J) $0.00 L Total of all Subcontractor Direct Costs $14,992.33 M $0.00 N Subcontractor Mark-up 15.0% $2,248.85 O General Contractor's Mark-up on Subcontractor Direct Cost 5.0% $749.62 P Total General Contractor Change Request(Line K+L+M+N) $17,990.80 COUNTY OF FRESNO DEPARTMENT OF PUBLIC WORKS AND PLANNING To the best of my knowledge and belief, I cerlifiy that all costs listed above are correct. Date 1 v13/2025 By Stefanie Sorondo ®ACCEPTED REVISE AND RESUBMIT ❑REJECTED If this cost proposal is accepted,it is provisional and does not Contractor Signature Date constitute authorization to proceed with the Work as described herein.All such changes in the Work shall be authorized by a Contract Change Order,and shall be performed under the applicable conditions of the Contract Documents. STRATEGICMECHANICAL Mechanical Electrical Plumbing REQUEST FOR CHANGE ORDER RFC No: 001 RFC DATE: 10/10/2025 JOB No: 25138 To: Jake Hooper- Better Enterprises Inc Job Name: DPH Basement Renovation Description of Change: Over-Demoed Hydronics The following change order is for the cost of installing missing hydronic piping in the Mercer basement. The highlighted piping is shown as existing on the contract documents, however the installed existing piping does not reflect what is shown on drawings. The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. Labor Hours Rate Total Field Labor 81 127.47 10,325.07 81 $10,325.07 Material Qty Cost Tax Total Winn Material 1 964.22 80.51 1,044.73 Misc Material 1 150.00 12.53 162.53 93.04 $1,207.26 Subcontracts Number RFC Total Karcher-Add'II Insulation 3,460.00 $3,460.00 Description Pcnt Amount$ Labor 10,325.07 Material 1,207.26 Subcontracts 3,460.00 Total Cost $14,992.33 15% Markup 15% 2,248.85 Contract Amount $17,241.18 Time Impact days Upon approval, the sum of$17,241.18 will be added to the contract price. APPROVAL: BY: RICHARD CHILDRES BY: STRATEGIC MECHANICAL, INC. BETTER ENTERPRISES INC DATE: 10/10/2025 DATE: 4661 E COMMERCE AVE FRESNO CA 93725 1 P: (559)291-1952 F:(559)291-1805 LICENSE No. 834679 1 DIR: 1000001726 STRATEGIC MECHANICAL,INC. Esimate Take-Off Bid Item RFC001 Over-Demoed Hydronics $ 964.22 $ $ 3,460.00 0.0 81.0 0.0 0.0 Unit Cost Totals Description CITY Unit Material Equipment Rentals&Subs Shop(Hrs) Field(Hrs) TM(Hrs) OT(Hrs) Material Equipment Rentals&Subs Shop(Hrs) Field(Hrs) TM(Hrs) OT(Hrs) FastPipe Takeoff 1 lot 81.00 $ $ $ 81.0 Material 1 lot $ 964.22 $ 964.22 $ $ Insulation 1 lot $ 3,460 $ $ $ 3,460.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Subtotals $ 964.22 $ $ 3,460.00 0.0 81.0 0.0 0.0 Page 1 of 1 Printed on 10/10/2025 PipeDetail Company: Strategic Mechanical Inc. JobName: 25138 RFC 001 Over Demoed Hydronics - Over Demoed Hydronics STRATEGICMECHANICAL Material Set: Factor 1 Labor Set: 0.8 Run Date: 10/9/2025 10:52 Sort Key: By Matl Group ❑Subtotals Mad Unit Matl Net Net Unit Adj Job Job Group Qty Size Description Wt Price Disc Price Total Hours Hours Fact Total bline6 40 % Plain Threaded Rod 0.0 $ 0.26 Q $ 0.26 $ 10.40 0.09 3.6 1.00 3.6 bline6 40 '/2 Plain Threaded Rod 0.0 $ 0.50 Q $ 0.50 $ 20.00 0.10 4.0 1.00 4.0 fnwhgr 20 % Hex Nuts 0.0 $ 0.05 Q $ 0.05 $ 1.00 0.05 1.0 1.00 1.0 fnwhgr 20 '/2 Hex Nuts 0.0 $ 0.09 Q $ 0.09 $ 1.80 0.05 1.0 1.00 1.0 fnwhgr 20 % Plain Washer 0.0 $ 0.05 Q $ 0.05 $ 1.00 0.00 0.0 1.00 0.0 fnwhgr 20 '/2 Plain Washer 0.0 $ 0.08 Q $ 0.08 $ 1.60 0.00 0.0 1.00 0.0 hanger 8 3 Plain Standard Clevis Hanger 10.6 $ 2.18 Q $ 2.18 $ 17.44 0.10 0.8 1.00 0.8 hanger 2 5 Plain Standard Clevis Hanger 4.9 $ 4.95 Q $ 4.95 $ 9.90 0.10 0.2 1.00 0.2 hanger 10 6 Plain Standard Clevis Hanger 32.0 $ 6.83 Q $ 6.83 $ 68.30 0.11 1.1 1.00 1.1 job 4 2'/2 POC-1 Point of Connection 0.0 $ 50.00 1.00 $50.00 $ 200.00 3.50 14.0 1.00 14.0 joint 2 1 Sch 40 Butt Weld Joints 0.0 $ 0.80 1.00 $ 0.80 $ 1.60 0.00 0.0 1.00 0.0 joint 2 2 Sch 40 Butt Weld Joints 0.0 $ 1.10 1.00 $ 1.10 $ 2.20 0.00 0.0 1.00 0.0 joint 14 2'/2 Sch 40 Butt Weld Joints 0.0 $ 1.20 1.00 $ 1.20 $ 16.80 0.00 0.0 1.00 0.0 shield 8 3x12 Galv Insulation Prot Shield 7.4 $ 4.81 Q $ 4.81 $ 38.48 0.18 1.5 1.00 1.5 shield 2 5x12 Galv Insulation Prot Shield 2.9 $ 7.74 Q $ 7.74 $ 15.48 0.18 0.4 1.00 0.4 shield 10 6x12 Galv Insulation Prot Shield 21.9 $ 8.78 Q $ 8.78 $ 87.80 0.18 1.8 1.00 1.8 stlpip 56 1 Sch 40 Blk Steel Pipe A53 T&C 94.2 $ 2.06 Q $ 2.06 $ 115.30 0.07 4.0 1.00 4.0 stlpip 24 2 Sch 40 Blk Steel Pipe A53 T&C 88.0 $ 4.48 Q $ 4.48 $ 108.05 0.10 2.5 1.00 2.5 stlpip 22 2'/z Sch 40 ERW Blk Stl Pipe A53A PE 124.9 $ 5.55 Q $ 5.55 $ 119.72 0.18 3.8 1.00 3.8 stlpip 75 2'/z Sch 40 ERW Blk Stl Pipe A53B PE 434.1 $ 5.55 Q $ 5.55 $ 416.12 0.18 13.2 1.00 13.2 uppera 10 % Plain Wide Jaw Top C-Clamp 5.4 $ 2.98 Q $ 2.98 $ 29.80 0.18 1.8 1.00 1.8 uppera 10 '/2 Plain Wide Jaw Top C-Clamp 5.1 $ 4.10 Q $ 4.10 $ 41.00 0.19 1.9 1.00 1.9 wldfit 2 2'h Std Wt Steel Weld Tee 11.6 $ 15.03 Q $15.03 $ 30.06 4.42 8.8 1.00 8.8 wldfit 2 2'h x1 Std Wt Steel Weld Conc Reducer 2.6 $122.37 0.22 $26.92 $ 53.84 2.10 4.2 1.00 4.2 wldfit 2 2'h x2 Std Wt Steel Weld Conc Reducer 3.2 $ 8.89 Q $ 8.89 $ 17.78 2.72 5.4 1.00 5.4 wldfit 2 2'h Std Wt Steel Weld LR 90 Ell 6.4 $ 10.48 Q $10.48 $ 20.96 2.95 5.9 1.00 5.9 855.3 $ 1,446.43 81.0 81.0 Page 1 'Im.upjw OF FRESNO ------------- PLUMBING•PVF•INDUSTRIAL 2836 N LARKIN AVE FRESNO, CA 93 72 7 PHONE (559) 291-6005 ======--=---_---_---=---=---_ --_===--_-=-= - =-=-=--- FAX (559) 291-6780 Expiration Date 11108125 Revised Date 10109125 Quoted'' To Customer Bid Due Date 10/09/25 STRATEGIC MECHANICAL INC 4 661 E COMMERCE AVE - - - - - - - - --- - --- - - - - - - --- - ---=---=--- FRESNO, CA 93 725-22 04 ==_e ---------=--=----_-_-===-a====- -__=_-_-_=-- Phone (559) 291-1 952 -12 Fax (559) 291-3633 (559) 291-6005 Customer Payment Terms Quoted To Salesperson FOB' 001258 2% 10TH, NET 30TH Mike Wells MICHAEL WELLS S ** ALL QUOTES ARE GOOD FOR 72 HOURS STAINLESS AND CARBONSTEEL QUOTES ARE GOOD FOR 24 HOURS *** ON Unit Extended .Line Qty. D e s cr i p t i o n Price , UOM Price 1.0 40 H104 3/8X10 THREADED ROD .440000 EA 17.60 137035020 2.0 40 H104 1/2X10 THREADED ROD .650000 EA 26.00 137035030 3.0 20 E145 3/8 STANDARD HEX NUT .100000 EA 2.00 137031570 4.0 20 E145 1/2 STANDARD HEX NUT .220000 EA 4.40 137031350 5.0 20 3/8 FLAT WASHER .100000 EA 2.00 056467256 6.0 20 1/2 FLAT WASHER .100000 EA 2.00 056467258 7.0 8 B3100 3 ZPLT CLEVIS HANGER 3.680000 EA 29.44 054171218 8.0 2 B3100 5 ZPLT CLEVIS HANGER 3.860000 EA 7.72 054171224 9.0 10 B3100 6 ZPLT CLEVIS HANGER 8.770000 EA 87.70 054171226 10.0 63 1 STD BLK T&C A53F CW PIPE 1.460000 FT 91.98 000501415 11.0 24 2 STD BLK T&C A53F CW PIPE 3.710000 FT 89.04 000501430 12.0 22 2-1/2 ST BLK BEV A53B ERW PIPE 4.420000 FT 97.24 001001005 13.0 75 2-1/2 ST BLK BEV A53B ERW PIPE 4.420000 FT 331.50 001001005 14.0 10 B3033 3/8 PLN TOP BEAM CLAMP 3.280000 EA 32.80 054169020 15.0 10 B3033 1/2 PLTD WIDE JAW CLAMP 5.800000 EA 58.00 0541B3033ZNB 16.0 2 2-1/2 STD WELD TEE 11.710000 EA 23.42 034004930 17.0 2 2/2X1 WELD CONC RED 20.200000 EA 40.40 18.0 2 2-1/2X2 STD CONC WELD RDCR 6.320000 EA 12.64 034007130 uppfy. OF F R E S N 0 ------------- PLUMBING•PVF•INDUSTRIAL = Expiration Date 11108125 Revised Date 10109125 Bid Due Date 10109125 Unit Extended',''. Line Qty. D e s c r i p t i o n Price UOM Price 19.0 2 2-1/2 STD LR 90 WELDING ELL 4.170000 EA 8.34 034002160 Tax Area Id Net Sales 964.22 050191300 Frei ht . 00 Tax 76.90 Quotation Total 1,041.12 D::�TAR4r.F=M=W=k /n s dti0)i1 Change Order Date: October 10,2025 Customer: Strategic Mechanical Attention: Richard Childress Plan Date 11/15/2022 Project: Fresno County Dept of Public Health Basemem ADDENDUMS INCLUDES: EXCLUSIONS: Unlined Duct Insulation Victaulics/Underground/Trench Pipe x Supply Return Flex Ducts X Linear Diffusers/Diffuser Cans/Diffuser Plenums X Duct Lining/Plenum Lining x Stencils/Labels X Painting/Sealants X Firestopping x Existing Except Points of Connection X Pipe Insulation: Exposed Cond.Space Duct In Areas Served X Heating Hot Water-11/2"&2"Fiberglass x Storage Tanks X Chill Water 1"Fiberglass x Overtime X Steam Condensate Drains X Steam Condensate Return Boiler Breeching/Stacks/Flues X Refrigerant Suction&Liquid 1"Rubber Sheet Metal Shoe/Saddle/Shield Refrigerant suction&Liquid Outdoors alum jkt General Exhaust Ducts X Interior Primary Condensate Drains: Outside Air X Domestic Cold Water Working through T-bar Ceiling/Hard Lid X Domestic Hot Water Chiller Bodies/Heads/Piping X Oversized Insulation at Seismic Restraints X Access Doors at Grease Duct to be cut by others X Quotation Amount $ 3,460.00 Liquidated Damages X Exposed Cond.Space Duct In Areas Served X Clarifications/Alternate Add: Per Specification Section: 230800 ***We exclude any additional cost related to OSHA 30-Hour Training Policy.Our proposal expires 30 days from the date above. Respectfully Submitted, State Contractors License#309141,Expires 01/31/2027 KARCHER INSULATION,INC. Public Works DIR#1000006996,Expires 06/30/2025 ,I bebcaj,tar cedes SIGN AND DATE FOR AUTHORIZATION 2300 East Orangewood Avenue I Anaheim, CA 92806 (714)385-1223 (714)385-1878 FAX KEYNOTES: ♦,. (D Referto Detail A/M-B for branch dampers,typical. co BSB � ��♦ OBranch dampers not required upstream of VAV - 7 �• �`` boxes. I Refer to typical Details C,D,and E/M-7 for VAV box - mounting,controls,and piping. --- - - -- -- - -- ------- -- _ 4 Fire/smoke damper. Refer to Detail AIM-1.1. - -' '" 23 w/OdU- O ,',,. _ ; I R 4•N "I RETURNAIP,.. ODuct,smoke detector,typical. Refer to Electrical Drawings for specifications,installation,and wiring. O = I:_; $"0' _ -- CD-2,1 WAY When installed in conjunction with an FSD,the , 18 _ _ 200 CFM )44 detector must be within 5'of the FSD. -'F "' 12 12"0 I I r MEM T-WQ Ld " -- I I 9 { Mi07A5, �• "-, Efl ARC OSpace above Meeting Rooms ceilings is used as a I (E)48'k30"O.A.DROP. LAS,yHip return air plenum. Materials and wiring in this plenum must be plenum rated. JU�,��' `Y rc OEMS control panel with one transformer for - I R A,D controller and one transformer for VAV boxes. CR-2 1 I ., Wiring to VAV boxes by Control Contractor. r-- s L.. NO.c3eoz0 OPoint of oonnection of new E.A.duct to existing. I j L — _ - rsEIM:W°'L'6/� Q2 21 I o. 20 F OF 6A1 , OOutdoor air duct with 1"thermal liner. Liner required 1 CD-1,350 C M vav HWS on all Mercer O.A.ducts to prevent condensation as (7YP.OF 4 4 .A.D. 27 I ', CE-2 12'k12" the inlet temperatures may be below freezing. — 250 CFM -I'� -'�' . ' /� /nURATORE ASSOCIATES 10 Ceiling in Activity Room is a grid only. Diffusers and lights are attached to grid,but there are no ceiling I P8 �• CD-1 ¢ I ,�I��:�,�.I.1 p"Oy � PROVIDE BOTTOM EXTENSION tiles.See Architectural plans.All ductwork,piping 12'0 12"0 I -O 4 "�- ON(E)24'k10"EA.RISERAND CONSULTANT STAMP (with or without insulation),hangers,dampers,etc. ," — _ PROVIDE(2)10"0 TAPS. EessrO,� visible from below and must be painted flat black. "-Q- ,c 23 Do not paint over any nameplates or model g — 32 numbers. - = '_ _ _ _ _ SI 11 End of acoustic lining. No insulation is required - - downstream. _' .:;b.. " - ..b - `'.O. . O.' _ .. 4,b -::k. O..-. '. HA L M` �, " M01 2 - .. .'. R..A.D. WR-1,_16"XS,'290CFM M e-1. v I, - - 12' 2 sr9rE HA \\eo p r ' CE 2, kl " 12 Existing ductwork will be used for Activity Room • - ).. I _ VA3 250 CFM oP cAC I'. economizer relief. 13 Typical Room Sensor and CO2 sensor.CO2 only r——— I _ ——J "� 1 A ■� C C required for selected zones. Refer to Control I / 28'k1 =o J 1 I AH MECHANICA Diagrams. B 1 -3 I Mo3oz ,9 ry£N'T r _ E N G I N E E R I N G GROUP 14 Refer to Detail A/M-8 for S.A.diffuser connections. M-6 10" s - -- -MO106, roe.x.Mooi„n.e.,szn"ion ­'uvmw O I���r71 AFS (OFFSET U \ I I CD-2 I \/ ( I --' i 25 X 20 \� I/\ 29 EMS _ ;., Issvl eawim 21003 rnzissvi n3i-iaez 15 Provide concentric reducer when required to match I Li— — 120V — — — — — 8"0_, ; VAV inlet,typical. I JJ, MANUAL CR-1 CD- 27 _———— —— ———— 4'k14 i ar to 16 Exhaust tnort re uUed unless llshowo/and no filteris VOLUME I r'-`O I I I`L` I 122 x22"O.A 24 VFD _ I ` _;- _ _-.. .� g 9 DAMPER. VFD I I — — = ——— — — —————— CD-2,1 WAY O required. I 100 ___ _ I I _— OO CFM attach in ductwork must be sheet metal,internal 100 O 9 P P 9 _ �I OA.D. 11 14„0 I _I'M-8 S COp I 9 0 30 r� APPROVED 17 Return air grille open to plenum above ceiling. 11 2-1d2 C4VS"&CUVR,' 18 Return duct open to plenum.See Detail E/M-8. _ I -J .� 2s 6"0 I fo 2"CWS&CWR CR-1 0 I 1z"m , au^ r,aL49 p n REFER TO TYPICAL ��-- _ TIVITY I N I 2 1010 VA2 � DETAIL(B/M-8 19 Insulated piping through rated wall. RefertoDetail FRESNGRREDEPARTMENT G/M-7. In Mechanical Room,provide tees,and 0307 0 I route 1-1/2 HWS&HWR to AH/B-1 and route 2" 1 � 1 - __ HWS&HWR towards AH/B-2 and AH/B-3.Then 1 a 12"0 12"0 - 1 STAIR split to V-1/2"HWS and HWR to AH/B-2,and 1" OST2 HWS and HWR to AH/B-3. Refer to Detail B/M-7. I 2" I C 1 20 Point of connection on new O.A.duct to existing 50 C 12"0 I 50 C 3 VA 3 CFM drop. Provide turning vanes in elbow. 1 O21 Point of connection of new 2-112"CWS to CWR to 1'/ STOR existing. —'♦ C -1 CD-1 22 Duct does not require insulation. 15 314 1 j 15D — REVISION TABLE: DESCRIPTION DATE 23 This duct detector serves FSD/B-1 and AH/B-1 20 - - - - - - - - - —- - - - - ` - -— - - - - - supply air. 24 2"CWS drop to and CWR riser from AH/B-i. (E)20"0 TO EF-12. \�\ : - 12 WHEN HW RCWPFEPING TO NEW I 25 1-1/2"CWS to and 1-1/2"CWR from AH/B-2 and (E)10"0 TO EF-6. �`f CD- CD-1 CD 1 O EXISTING,VERIFYSUPPLY 1-1/2"CWS to and 1-1/2"CWR from AH/B-3. Refer 92"0 350 CFM l -f CD-2,-2W AND RETURN AND THAT to Detail B/M-7. REFER TO (E)8"0 E.A.DUCTS L—. 7"0• SHEET M-3 FOR ABANDONED IN PLACE, 31 _ to _ _•150 E 8"0 TO EF-8. THE EXISTING,VERIFY 26 34"x 22"(net inside)R.A.opening. CONTINUATION. O ., - ,- THAT THE EXISTING PIPE 100 -'� ",,A;"F:F. •`` SIZE IS EQUAL TO OR (E)8"0 TO EF-9 II ," DATE. 11/15/2022 12' ?� LARGER. SCALE: As indicated 27 "AFS"airflow station,rectangular or round,requiretl -. _ , on AH/8-1,B-2,8-3 and B-4. Refer to Detail AIM-7. (E)16"0 TO EF-5. \ I , JOB NUMBER: - BA7HROOM O28 Cap unused chilled or hot water piping and insulate 8 � - ends,typical. 125,CFM .. - - ADDRESS: 29 Y_ t Refer to Detail A/M-11.1. 16"0 4"re , 12 , BRIX & MERCER BLDGS 30 Motorized return air damper forAH/B-3. 12 _ - - 1221 FULTON ST 31 Sealing around ductwork is not required at _ CD-1 350 C M - - _�y�/ _ FRESNO, CA 93721 this shaft,but do replace vinyl covered ducts -'•y"0-, " - "�" - withasheetmetalcapandsealairtight. 14 .: STBUIS APPROVE VESTIBULE; _•. - ANJ k 21-1137 21-105379 32 When balancing damper is located over a hard 03/17/2023 ceiling,provide a cable-controlled damper,flexible CD-1 1 - - - _ COUNTY OF FRESNO PROJECT. cable,and ceiling-mounted cable controller.When 350 M 14 _ - DEVELOPMENT SERVICES than FRESNO COUNTY DEPT. OF ceiling wilincontroller label more record"from theshowingdamper, -!" •0" _ ' CD'2;-2W " PUBLIC HEALTH BASEMENT provide ceiling label or a record drawing showing - which ceiling controller is connected to which 1 CD-2,24Y 'yam CFM- ',WOMEWS.- damper.This note applies throughout the project. I =;u6cFM BATrIRooM"�,. RENOVATION F b36s SHEET TILE: I I I M-4.2 M-4.3 CE-2,12'5c12" ENLARGED BASEMENT HVAC 350 CFM 7777/ F �. G M-4.1 M-4.4 PLAN F-, EXHAUST DUCTWORK ON SHEET METAL PARTIAL MERCER BASEMENT RCP PLAN PROJECT BEESMETAL SHEET NUMBER META OR SHEET METAL w/ACOUSTIC 9CAIE 1�4„�1-0' LINING(WHERE SHOWN)TYR KEY PLAN. A ■ TRUE PROJECT 4 NORTH NORTH 050 ix*mxu xuvexn.eu co A FTIEP q PREPARED TO EE,A.GRILLE KEYNOTES: -7 3 FOO TO 150 CFM. ORefer to Detail A/M-8 for branch dampers,typical. ffj 9 __ _F 71 � EQUIP OBranch dampers not required upstream of VAV boxes. M 020 ORefer to typical Details C,D,and E/M-7 for VAV box mounting, — — - C controls,and piping. r— 1 "0 (E) ELEV 09 ARC H OTORA E cD-1 I MOEL1 pU6LA5 M it 4 Fire/smoke damper. Refer to Detail AIM-1.1. 4A Q M02 5 10" 300 2 ODuct,smoke detector installed within 5'of fire/smoke dampers, g" CD- typical. Refer to Electrical Drawings for specifications, I 2501 12"0 16 325 installation,and wiring. O Space above Meeting Rooms ceilings is used as a return air 4" ENN0.015020 6 e plenum. Materials and wiring in this plenum must be plenum CD-1RENEPUL:60 oQ�` rated. CD-1 314" 1250 11010 8„ 47'X_- HOT&1 "0 c p V��300 EMS control panel with one transformer for controller and one 1 B EAK 0T — P"�transformer for VAV boxes.Wiring to VAV boxes by Control R00 I Contractor. 12"f0 2" /nURATORE ASSOCIATES Point of connection of new E.A.duct to existing. 12 R- VAg1v° �"0 CONSULTANTSTAMP Outdoor air duct with 1"thermal liner. Liner required on all I ppFESslMercer O.A.ducts to prevent Condensation as the inletM01 1 (E STA temperatures may be below freezing. 5 - E-1 8"0S / 2 18"x 18"(inside clear)discharge plenum with 1"liner. 29r12" $© D I S 314' 1 D-1 Liquid,suction,and pressure equalizing lines routed up,in theexisting,rated duct shaft,to ODUs on roof. See Sheet M-3 forfcontinuation.Attach piping to shaft at 5'o.c.Any penetrations of �Q -. --_-- --------- of cAu�the shaft in theupper Floors,to gain access,must be restored to Q-';- ,'. .B_5- ,the original construction at the end of each day to maintain a •I -1-hour shaft rating. - 22LAWRENCE Piping shall be attached to the outer wall and will require 45 A' ENGINEERING GROUP offsets around horizontal protrusions. Determine exact routing in21003 FAfield. N.MIe A—,.1.1.1 F—FCA93- - CR-2 i 1 1 m x l 1 11362 NETWORK '�``� 559d312Liquid,suction,and pressure equalizing lines between Branch 17' S —-.(Selector Boxes and Outdoor Unit. Refer to details on Sheet 14"fib M 0108r3"HWS&HWR M-11.1 for sizin Horizontal runs of refri erant in should be 9 9 PP 9 1600 CF r I' 5"CWS&CWR routed within 12"of the structure whenever possible.All lines I �shall be insulated in all locations. 2"0 2"0 _ _ __ M o'.•:.;I: IDU ,5 - j APPROVED Liquid,suction,and pressure equalizing lines through existing 14 I I �� ' CD- 024 B-1 gII �ll holes in the masonry wall. See notations on Sheet M-4.3. 20 k14"Sheet metal duct. Offset up. 2"0 I I _ /�/ /�-� r 'rRefer to Detail J/M-8 for installation. (E)18"0 TO EF-10. 10z"0FRESNO FIRE DEPARTMENT Refrigerant lines through existing holes in masonry wall. (E)12"0 TO EF-2.Typical room sensor with adjustable set point. See Control REFER TO "' � I IDiagramsKA and typical detail F/M-0.0. SHEET M-3 FOR T I I ' •'1 ICONTINUATION. (E)18"0 TO EF-11. -:B I - .- '0 I (E)4"GAS RISER TO ROOF. 5,Airflow station. Refer to Detail A/M-7. .�, 24. 5 I M019 EE PLUMBING DRAWINGS. 2820 Extendexisting roundductsto relief air plenum. — 14"(d28 21 HW supply and return piping to VAV and AH manifolds. D-1,350i R.A.DI~ A 4CHW supply and return piping to AH manifold. - � — L� JOffset ductwork to avoid vertical framing of soffit,typical. FSD EMS CONTROL PANEL . _.,,: 120 VOLTS.SEE DET A/M-11.1REN90N TABLE One-hour fire barrier where shown. - - ., ,• . - 2 REV. DESCRIPTION DATE Access panel on bottom of duct. Coordinate locations of FSD, F ,, rE return air dam er,and smoke detector in this area.P ASSeal around ducts and pipes entering shaft to prevent leaks intothe R.A.plenum over the Meeting Rooms.Where abandoned CD-1, 502^ WS& lNR ^0exhaust risers have a vinyl Covering,replace covering with aTYP• FI,sheet metal cap and seal airtight. Bottom opening shall be 2 12" gsealed to prevent airflow,but it does not need to be enclosed to 2"01-hour construction 12.W -PDATE: 11/15/2022 26Return air grille CFM equals the sum of the supply diffusers for •' _ SCALE: As indicated that room unless otherwise noted,typical throughout project. .'`O.' 3/4 JOB NUMBER: Where R.A.grille CFM is shown,it shall be balanced at full,air handler VAV airflow. MEETI Gt4^0ADDRESS Pressure sensor for control of EF-11. CR 1�,Remove entire section of exhaust duct(in shaft)to EFA to get 1 „0 10 va "HWS S I I 00 . BR X & MERCER BLDGS space for new refrigerant piping. -: 5 HWR 2Remove entire section of exhaust duct(in shaft)to EF-3 to get : 1 ) 1221 FULTON ST space for new refrigerant piping. -;�•,, APPROVED FRESNO, CA 93721 I 03/17/202330Existing exhaust riser from floor above to roof to remain. 'j r AHJ R 21.1137 21-105379 I' COUNTY OF FRESNO 31Outline ofexisting,rated,ductshaftto roof. Shaft is open atthe 1 -1 •• r DEVELOPMENT SERVICES PROl bottom.Seal around ducts and piping at bottom of shaft. - S E DE.C/M8 P. .C. l ''O enin shall be sealed to reventairflow,butitdoesnotneed v r I N� 12 w/IDU- 20"0 ` I" - FRESNO COUNTY DEPT. OF to be enclosed to 1-hour construction. p H BASEMENT RENOVATION _ __ _. _ _ _ M-4.2 M-4.3 II SHEET TITLE:ENLARGED BASEMENTHVAC G DA.D. PLAN M-4.1 M-4.4 CHILLED WATER PIPING ENLARGED BASEMENT RCP PLAN TO&MECHANROM ICAL ROOM FLOOR MECHANICAL ROOM TO REMAIN. seEer Nuuaea KEYPLAN: A_4.G n TRUE PROJECT 't14'-t'-D' I NORTH NORTH V I U TI—L"""n,a "z" „ .31 9 amp t py : Aloo . .10 W- 16A �i Better Enterprises, Inc.�. Request For Information 1148 North Cypress Avenue T Fresno CA93727 Date of Request: 10/28/2025 "...,06 (559)233-2225 RFI#: 37 License: 1012660 Prepared By: Jake Hooper To: Dept of Public Works Project: 255030 2220 Tulare Street, 6th Floor County of Fresno DPH Basement Renovati Fresno CA 93721 1221 Fulton Street Fresno CA 93721 You are hereby invited to provide information on the following items. Attachments: Information must be received prior to 11/04/2025 to be considered. Potential Change in May require a Requires a Change Project Schedule Change Order l of Plans/Specifications Please see the attached marked up sheets M-4.2 and M-4.1. Sheets M-4.2 and M-4.1 show Mercer HHW and CHW points of connection being down stream of the existing shut off valves near the Mercer shaft. This is not reflective of the piping in the field; actual existing piping in the field ends at the shut off valves near the Mercer shaft.The attached marked up sheets have the missing existing piping runs highlighted. It is unclear if the piping in question was demoed at a later time, but it will need to be reinstalled for the Mercer basement to function properly. SMI suggests that this piping be reinstalled at a cost. Please advise if this is acceptable. Information Supplied: Restore HW and CHW piping in the Mercer basement (on Sheets M-4.3 and M-4.4)to complete piping to the air handlers and VAV boxes. Refer to the Specifications for pipe insulation. Contact the Engineer if there are any questions regarding pipe sizing. Jose S. Jaime/LEG October 29, 2025 Page 1 of 1 STRATEGICMECHANICAL Strategic Mechanical,Inc. Project:25138 DPH Basement Renovation 4661 E Commerce Ave 1221 Fulton St. Fresno,California 93725 Fresno,California 93721 P:+15592911952 RFI #22: Existing Hydronics Demoed Revision 0 Status Open To Richard Childress(Strategic Mechanical, Inc.) From Darrick Avila(Strategic Mechanical, Inc.) 4661 E Commerce Ave Fresno,California 93725 Date Initiated Oct 28,2025 Due Date Oct 31,2025 Location Project Stage Course of Construction Cost Impact Yes(Unknown) Schedule Impact TBD Spec Section Cost Code Drawing Number M-4.1 and M-4.2 Reference Linked Drawings M-4.2 Received From Darrick Avila(Strategic Mechanical, Inc.) Copies To Darrick Avila(Strategic Mechanical, Inc.), Richard Childress(Strategic Mechanical, Inc.), Ian Smith (Strategic Mechanical, Inc.) Activity/ Question Question from Darrick Avila Strategic Mechanical,Inc.on Tuesday, Sep 16, 2025 at 02:32 PM EDT Please see the attached marked up sheets M-4.2 and M-4.1.Sheets M-4.2 and M-4.1 show Mercer HHW and CHW points of connection being down stream of the existing shut off valves near the Mercer shaft.This is not reflective of the piping in the field;actual existing piping in the field ends at the shut off valves near the Mercer shaft.The attached marked up sheets have the missing existing piping runs highlighted. It is unclear if the piping in question was demoed at a later time,but it will need to be reinstalled for the Mercer basement to function properly.SMI suggests that this piping be reinstalled at a cost. Please advise if this is acceptable. Attachments 050-M-4.1 -ENLARGED BASEMENT HVAC PLAN.pdf,051 -M-4.2-ENLARGED BASEMENT HVAC PLAN.pdf, Photo of Existing Conditions.pdf Awaiting an Official Response Strategic Mechanical, Inc. Page 1 of 1 Printed On:Oct 28,2025 01:34 PM PDT 2025-11 -14 24S 14 CCO 01 0 Final Audit Report 2025-11-24 Created: 2025-11-14 By: Stefanie Sorondo(stsorondo@fresnocountyca.gov) Status: Signed Transaction ID: CBJCHBCAABAAZ-xUoiieO_THNGESVmm_TczNjfNzESUG "2025-11 -14 24S 14 CCO 01_0" H istory Document created by Stefanie Sorondo (stsorondo@fresnocountyca.gov) 2025-11-14-4:57:23 PM GMT Document emailed to Matthew Lopez (mattlopez@fresnocountyca.gov) for approval 2025-11-14-4:57:59 PM GMT Email viewed by Matthew Lopez (mattlopez@fresnocountyca.gov) 2025-11-17-4:34:00 PM GMT Document approved by Matthew Lopez (mattlopez@fresnocountyca.gov) Approval Date:2025-11-17-4:50:32 PM GMT-Time Source:server Document emailed to jake@betterenterprisesinc.com for signature 2025-11-17-4:50:37 PM GMT Email viewed by jake@betterenterprisesinc.com 2025-11-19-11:10:18 PM GMT Signer jake@betterenterprisesinc.com entered name at signing as Marc Kerkochian 2025-11-19-11:23:03 PM GMT Document e-signed by Marc Kerkochian (jake@betterenterprisesinc.com) Signature Date:2025-11-19-11:23:05 PM GMT-Time Source:server Document emailed to Mark Celaya (mcelaya@fresnocountyca.gov) for signature 2025-11-19-11:23:10 PM GMT Email viewed by Mark Celaya (mcelaya@fresnocountyca.gov) 2025-11-19-11:23:30 PM GMT Document e-signed by Mark Celaya (mcelaya@fresnocountyca.gov) Signature Date:2025-11-20-3:05:30 PM GMT-Time Source:server Q Adobe Acrobat Sign Document emailed to Jamie Sylvester Qsylvester@fresnocountyca.gov)for signature 2025-11-20-3:05:36 PM GMT Email viewed by Jamie Sylvester asylvester@fresnocountyca.gov) 2025-11-20-4:48:46 PM GMT Document e-signed by Jamie Sylvester Qsylvester@fresnocountyca.gov) Signature Date:2025-11-20-6:08:50 PM GMT-Time Source:server Document emailed to Matthew Lopez (mattlopez@fresnocountyca.gov) for signature 2025-11-20-6:08:55 PM GMT Email viewed by Matthew Lopez (mattlopez@fresnocountyca.gov) 2025-11-20-6:09:17 PM GMT Document e-signed by Matthew Lopez (mattlopez@fresnocountyca.gov) Signature Date:2025-11-24-4:55:20 PM GMT-Time Source:server Document emailed to Mandeep Sekhon (msekhon@fresnocountyca.gov)for signature 2025-11-24-4:55:25 PM GMT Email viewed by Mandeep Sekhon (msekhon@fresnocountyca.gov) 2025-11-24-4:58:25 PM GMT Document e-signed by Mandeep Sekhon (msekhon@fresnocountyca.gov) Signature Date:2025-11-24-4:59:23 PM GMT-Time Source:server Document emailed to William Kettler(wkettler@fresnocountyca.gov)for signature 2025-11-24-4:59:28 PM GMT Email viewed by William Kettler(wkettler@fresnocountyca.gov) 2025-11-24-5:06:24 PM GMT Document e-signed by William Kettler(wkettler@fresnocountyca.gov) Signature Date:2025-11-24-5:07:21 PM GMT-Time Source:server Document emailed to Bernard Jimenez (BJimenez@fresnocountyca.gov)for signature 2025-11-24-5:07:26 PM GMT Email viewed by Bernard Jimenez (BJimenez@fresnocountyca.gov) 2025-11-24-5:13:27 PM GMT Ole Document e-signed by Bernard Jimenez (BJimenez@fresnocountyca.gov) Signature Date:2025-11-24-5:13:59 PM GMT-Time Source:server `+ Document emailed to Steve White (stwhite@fresnocountyca.gov)for signature 2025-11-24-5:14:04 PM GMT Q Adobe Acrobat Sign Email viewed by Steve White (stwhite@fresnocountyca.gov) 2025-11-24-5:21:24 PM GMT Document e-signed by Steve White (stwhite@fresnocountyca.gov) Signature Date:2025-11-24-5:55:02 PM GMT-Time Source:server Agreement completed. 2025-11-24-5:55:02 PM GMT Adobe Acrobat Sign