Loading...
HomeMy WebLinkAbout24S03 CCO 002 - signed.pdf 0,�Aso,iA _ County of Fresno Department of Public Works and Planning Development Services&Capital Projects Division Steven E.White, Director CONTRACT CHANGE ORDER Project: Probation Tenant Improvement Contractor: Fortune-Ratliff General Contractor, Inc. Contract No 24-S-03 D-25-210 Address: 352 W Bedford Ave.Suite 107, Fresno,CA 93711 Date: 2025-10-03 Architect: Robina Wright Change Order No.: 002 Construction Contract Dollar Amount(as awarded on 4/18/2025) $2,377,711.00 Director's Change Order Limit: $131,385.00 Change Order Allowance $190,216.00 Construction Start Date(NTP Issued 6/23/2025)(First Day of Contract 7/21/2025): 2025-07-21 Original Contract Time(Calendar Days): 120 Original Construction Completion Date: 2025-11-17 Change Order Scope of Work: PCO 9.1 RFI 17 0 Existing Mirrors 0 days $7 908.00 PCO 12 RFI 29 0 Mirrors for Rooms 135& 136 0 days $340.00 PCO 13 N Doors 01&03 0 days $3 868.00 PCO 17A RFI 32 0 Existing Canopy Post Damage 0 days $1 362.00 PCO 18 RFI 8 0 Existing Countertop Brackets 0 days -$3 767.00 PCO 19 RFI 19 0 Existing Shower Valves and Accessories 5 days $13 358.00 Attachment(s): Change Order Summary,Contractors PCO,Subcontractor's Price Proposal Net Change Order Dollar Amount: $23,069.00 Net Working Days: 5 Total Change Order Dollar Amount To Date $32,865.00 Adjusted Contract Dollar Amount: $2,410,576.00 Director's Change Order Limit Balance: $98,520.00 Change Order Allowance Balance: $157,351.00 Total Adjusted Working Days To Date: 5 Adjusted Construction Completion Date: 2025-11-24 By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2. The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 24-S-03,Article VI shall apply. 1Ada*w 6 Gdte-k Reviewed: Fortune Ratliff Adam Myles�38:57 PDT) General Contractors, Inc. General Contractor IJ! -ti Reviewed: Mark Celaya Ma,kCelaya(Det 6,2 50,36:SOPDT) Senior Engineering Technician,Project Manager Jamie SylvBstor Reviewed-Cleared for Approval Jamie Sylvester Jamie Sylvester(Oct 7,202514:05:26 PDT) Principal Accountant Reviewed: Barry Mast Supervising Architect,Architect of Record Reviewed: Mandeep Sekhon NISI Construction Division Engineer,Construction Manager Reviewed: William M. Kettler ��. Deputy Director of Planning /JOAN/JA�l I/1MON�.�Reviewed: Bernard Jimenez Bernard Jimenei'� B,202 938:02PDT) Planning&Resource Management Officer Steven E White Approved: Steven E. White Steven E Whit,(0ct 8,202530:12:48 PDT) Director of Public Works and Planning Approved: Ernest"Buddy"Mendes Not Applicable Board of Supervisors, Chairman CHANGE ORDER SUMMARY Project: Probation Tenant Improvement OrderExecuted Change �. Orders 001 2025-09-30 $71,547.00 -$61,751.00 0 Includes PCO#1.1,2,3,4.1,5,6,7,8.1 002 2025-10-03 $26,836.00 -$3,767.00 5 Includes PCO#9.1,12,13,17.1,18,19 Totals $98,383.00 $65,518.00 5 Potential Executed Add Credit Rejected Pending Adj.Days DescriptionChange • •• 1.0 -$12,658.00 0 Credit for Owner-Furnished Toilet Accessories 1.1 001 -$12,742.00 0 Credit for Owner-Furnished Toilet Accessories 2.0 001 $15,195.00 0 Lighting Cost Increase 3.0 001 $14,953.00 0 Metal Studs&Dry Wall Per RFI 7&18 4.0 -$48,259.00 0 Client Revisions 4.1 001 -$49,009.00 0 Client Revisions 5 001 $2,601.00 0 RFI 30_0 Additional Soffit Demo 6 001 $27,330.00 0 Service Windows 7 001 $2,323.00 0 RFI 14_0 Gap Along South Wall Rooms 219&229 8 $9,542.00 0 Doors 06,08,and 09 8.1 001 $9,145.00 0 Doors 06,08,and 09 9 $7,908.00 0 RFI 17 0 Existing Mirrors 9.1 002 $7,908.00 0 RFI 17_0 Existing Mirrors 10 $22,689.00 0 RFI 370 Existing Insulation at Ceilings 10.1 $19,574.00 15 RFI 37_0 Existing Insulation at Ceilings 11 $25,495.00 0 Multiple RFIs Electrical Changes 12 002 $340.00 0 RFI 290 Mirrors for Rooms 135&136 13 002 $3,868.00 0 (N)Doors 01&03 14 $10,786.00 0 RFI 45_0 Epoxy at Floor Joints 15 $18,158.00 10 ASI 03 Service Window Wall Details 16 $6,164.00 4 RFI43_0 High Wall Outlets 17 $1,352.00 0 RFI 32 0 Existing Canopy Post Damage 17.1 002 $1,362.00 0 RFI 32_0 Existing Canopy Post Damage 18 002 -$3,767.00 0 RFI 8 0 Existing Countertop Brackets 19 002 $13,358.00 5 RFI 19_0 Existing Shower Valves and Accessories 20 -$6,339.00 0 Submittal 17 1 Auto-Opener Credit 21 $6,835.00 2 RFI 49_0 Exit Light Replacement 22 $3,848.00 0 (N)Door 05 23 $398.00 0 RFI 46 0 Door 10 Service 25 $1,791.00 2 RFI 26_0 Existing Columns at Room 227 Totals $98,383.00 $65,518.00 -$19,426.00 $86,710.00 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA_ LICFNSF 496147 PCO# 9_1 Fresno County Probation Tenant Improvement Date: 9/5/2025 Clovis, CA. Attn: Mark Celaya $714.00/ Daily Rate CP# 09.1 CC: Keith Eckert Schedule Impact (Days): 0 Re: RFI 17_0 Existing Mirrors Response Mark: We herewith submit our Proposed Change Order to provide new mirrors per RFI 17 0 response. Installation is included in base bid. SUB/SUPPLIER NAMES DESCRIPTION New mirrors @ Rooms 121, 137, San Joaquin Glass 223, & 224 $ 7,347.00 SUB TOTAL $ - $ 7,347.00 Liability Insurance & BR 2.25% $ - $ 165.31 Subtotal SUB TOTAL $ - $ 7,512.31 P&P Bonds 0.25% $ - $ 18.78 Subtotal SUB TOTAL $ - $ 7,531.09 Fortune-Ratliff, Inc. OH & P 5% $ - $ 376.55 TOTAL CP 1 $ - $ 7,908 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted APPROVED By Barry Mast at 4:05 pm, Sep 05, 2025 Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 RFI NO.: 170 FORTUNE/RATLIFF DATE: 8/1/2025 GENERAL CONTRACTORS, INC. CA.LZClswftm 49Ci147 REQUEST FOR INFORMATION TO Mark Celaya ATTN: Mark Celaya Senior Engineering Technician CC: Keith Eckert The County of Fresno Department of Public Works and Planning F/R JOB#: 2501 PROJECT: Fresno County Probation Tenant Improvement PROJECT NO.: 24-S-03 KEY DESCRIPTION: Existing Mirrors DRAWING: 8/A-502 SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: 8/A-502,Key note states to reinstall.The mirrors are glued to walls and not salvageable and need to be removed to perform new finish schedule Need Answer By: ASAP ADDITIONAL COST: ® YES OR ❑ NO TIME TBD DAYS SUGGESTION: Demo mirrors&provide new where this existing install occurs Contractor Signature: 1?oTv17 Project Manager ATTACHED SHEETS: ❑ YES OR ❑ NO REPLY: CANE 0 5 ( A RY A5 O 5- 5-04) ING MIRRORS AT MULTISTALL RESTROOMS WHERE MIRRORS ARE NOT SALVAGEABLE E WITH NEW MIRRORS SIMILAR TO EXISTING PER SUGGESTION NOTED ABOVE. PROVIDE FOR NEW MIRRORS AND MOUNTING HARDWARE INCLUDING ALUMINUM J-CHANNEL ND TOP CLIPS. PROVIDE SHOP DRAWING5 INDIGATING INSTALLATION INCLUDING MIRROR AND POSITION ABOVE GOUNTER5. Owner Representative Signature: Date: a 2150 E.McKinley Ave.Fresno,CA 93703 Phone:(559)268-7646 Fax:(559)268-3321 Toll Free:(800)244-6123 www.s;glass.com To: Fortune/Ratliff General Contractors Inc. Attn: Ron EXTRA Job Name: Fresno County Probation Tenant Improvement T.I. Date: 9/5/2025 Quote By: Anthony License No. 248167 C-17 Scope of work: Furnish: X"clear mirrors with flat polished edges. Mirrors mounted with top and bottom chrome j-metal and mastic adhesive. No holes or cutouts figured. Room 121 Women's Restroom: 3-78"x 48" (mirror to be split into (3) pieces.) Room 137 Men's Restroom: 2-63"x 48" Room 223 Women's Restroom: 2-72"x 48" Room 224 Men's Restroom: 2-72"x 48" Bid: $7,347.00 NOTE:THIS PROPOSAL WILL REMAIN IN EFFECT FOR 30 DAYS. We are bondable(bond not included in price)and we are a union contractor. We are a"Minority"&"Small Business"contractor. DIR#1000010471 For adding additional primary wording on Certificate add$275.00 Adding waiver of subrogation on workers comp.,will be an additional charge. EXCLUSIONS: NO CALIFORNIA STAMPED ENG.OR CALCS./NO TESTING/TWO PARTY CHECKS No cleaning or protection of Glass or Metal, not responsible for breakage by others,or thermal stress breakage,or delays beyond our control,liquidated damages; NFRC Certification or testing;overtime or night hours;anything not listed in Scope of Work above. Term: Net 10th The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified. Any changes from the plans or specifications involving additional cost shall be executed only upon signed written orders and will be an extra charge over and above this proposal. Signature Title& Print Name Date 0 r QUOTATION ANALYSIS SHEET For Accounting Purposes Only Job: Fresno Co. Probation Tenant Improvement T.I. Date: 8/7/2025 ADDS CREDITS LABOR $ - $ - MATERIAL $ 6,164.75 $ - TAX(on material) $ 514.76 $ - EQUIPMENT $ - 1 $ - SUBTOTAL $ 6,679.51 1 $ TOTAL ADDS/CREDITS $ 6,679.51 TO PROFIT $ 667.95 SUBTOTAL $ 7,347.46 PR TOTAL Is 7,347.46 'Only if Applicable 2150 E. McKinley Ave. Fresno, CA 93703 Phone: 559-268-7646 Fax: 559-268-3321 �'� www.sjglass.com FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA_ LICFNSF 496147 PCO# 12_0 Fresno County Probation Tenant Improvement Date: 9/5/2025 Clovis, CA. Attn: Mark Celaya $714.00/ Daily Rate CP# 12 CC: Keith Eckert Schedule Impact (Days): 0 Re: RFI 290 Mirrors for Rooms 135 & 136 Mark: We herewith submit our Proposed Change Order to provide and install two mirrors, one each in rooms 135 & 136 per RFI 29 0 response. SUB/SUPPLIER NAMES DESCRIPTION Shelco Industries New mirrors at Rooms 135 & 136 $ 315.72 SUB TOTAL $ - $ 315.72 Liability Insurance & BR 2.25% $ - $ 7.10 Subtotal SUB TOTAL $ - $ 322.82 P&P Bonds 0.25% $ - $ 0.81 Subtotal SUB TOTAL $ - $ 323.63 Fortune-Ratliff, Inc. OH & P 5% $ - $ 16.18 TOTAL CP 1 $ - $ 340 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: APPROVED Adam Myles,vice President By Barry Mast at 4:05 pm, Sep 24, 2025 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 RFI No.: 290 FORTUNE/RATLIFF DATE: 8/5/2025 GENERAL CONTRACTORS, INC. CA.LZ4_130wftm 49Ci147 REQUEST FOR INFORMATION TO Mark Celaya ATTN: Mark Celaya Senior Engineering Technician CC: Keith Eckert The County of Fresno Department of Public Works and Planning F/R JOB#: 2501 PROJECT: Fresno County Probation Tenant Improvement PROJECT NO.: 24-S-03 KEY DESCRIPTION: Rooms 135,136 Mirror Model/Size DRAWING: SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: Please provide Mirror model/size for rooms 135,136 Unisex Restrooms single mirrors Need Answer By: ASAP ADDITIONAL COST: ® YES OR ❑ NO TIME TBD DAYS SUGGESTION: Contractor Signature: 1'?01VV0T1aZYJ0n1 Project Manager ATTACHED SHEETS: ❑ YES OR ❑ NO REPLY: County Response (Aaron Vaden 2025-08-21) If not existing per sheet A-503, keynote 8, use Bobrick 13165 mirror, 24"W x 36"H, or similar Change Order Required: ❑ Yes or ❑ No Owner Representative Signature: Date: Shelco Industries 5425 E. Home Ave. Ste. 101 Fresno, Ca. 93727 Phone 559-233-3763 Fax 559-233-3766 Change Order TRANSMITTAL DATE: 9/3/2025 TO: Fortune Ratliff ATTENTION: Quincy PROJECT: Fresno County Probation TI REFERENCE: RF129 Provide two B165 24x36 mirrors at restrooms 135 & 136 Material $159.00 Tax $13.27 Labor $104.00 OH/P $39.45 Total $315.72 FROM: Bob Stubenberg Number of pages attached to this cover sheet: Shelco Phone 559-233-3763 Shelco Fax 559-233-3766 License #423565 DIR #1000007336 FORTUNE/RATLI FF ` GENERAL CONTRACTORS, INC. PCO# 13_0 Fresno County Probation Tenant Improvement Date: 9/5/2025 Clovis, CA. Attn: Mark Celaya $714.00/ Daily Rate CP# 13 CC: Keith Eckert Schedule Impact (Days): 0 Re: (N) Doors 01 &03 Mark: We herewith submit our Proposed Change Order to provide and install new doors and frames for door marks 01 & 03. Doors 01 &03 were originally excluded due to "(E)" on the door schedule being interpreted as existing doors as opposed to existing rooms. SUB/SUPPLIER NAMES DESCRIPTION KC&S Construction Specialties (N) Doors at Openings 01 &03 $ 3,594.02 SUB TOTAL $ - $ 3,594.02 Liability Insurance & BR 2.25% $ - $ 80.87 Subtotal SUB TOTAL $ - $ 3,674.89 P&P Bonds 0.25% $ - $ 9.19 Subtotal SUB TOTAL $ - $ 3,684.07 Fortune-Ratliff, Inc. OH & P 5% $ - $ 184.20 TOTAL CP $ - $ 3,868 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: APPROVED Adam Myles,vice President By Barry Mast at 11:30 am, Sep 26, 2025 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 12 11 10 9 8 7 6 5 4 3 2 1 GROUND FLOOR- FINISH SCHEDULE PROJECT DOOR SCHEDULE HARDWARE SCHEDULE Floor Base DOOR SIZE DOOR HARDWARE SET# COMMON DEVICE SECURING DEVICE RM.It ROOM IDENTIFICATION Finish Finish Wall Finish Ceiling Finish Comments PROPOSED MARK LOCATION (WxH) TYPE HEAD JAMB SET COMMENTS 100 MANUFACTURING (E) (E) (E) (E) TENANT 1 BB1279 4.5X4.5 BY STOREFRONT DOOR MANUFACTURER 101 (E)WAREHOUSE (E) (E) (E) (E) 01 (E)TRAINING ROOM 150 T-0"X 7'-0" A D8/A-601 2 D10/A-601 STOREFRONT SILL 1-1/2 PR PER MANUFACTURER ASSEMBLY 102 (E)STAIR CORRIDOR F2 Bi Wi C2 NCLUDING STAIR LANDING IMPROVEMENT 02 (N)OFFICE 155 T-0"X 7'-0" A D8/A-601 3 MATCH(E)FINISH 103 (E)WORK SPACEATION F2 Bi Wi C1 INTERIOR(PANIC 6VONHARD DRE 104 (E)OFFICE F1 B1 W1 C1 03 (E)CORRIDOR ROOM 145 3'-0"X 7'-0" A D8/A-601 2 B612P 4.5X4.5 1EA-RIM 626 VON DUPRIN PANIC HARDWARE 04 E OFFICE ROOM 230 T-0"X 7'-0" C D8/A-601 5 2 MAT H TEA-RIM CYLINDER LCN 40 0X SCH 106 (E)OFFICE F1 B1 W1 C1 ( ) MATCH(E)FINISH SURFACE CLOSER:LCN 4040XP HW/PA DOOR CLOSER WITH HOLD OPEN ARM 106 (N)OFFICE F7 B7 W1 C7 L 05 (E)OFFICE ROOM 218 T-0"X T-O" C D8/A-601 5 S88D SMOKE SEAL 107 HALLWAY F7 Bi Wi C7 L 06 (E)OFFICE ROOM 214 T-0"X T-0" B 1 TO MATCH EXISTING OFFICE LOCK 108 (E)OFFICE F7 B1 W1 C7 07 N OFFICE ROOM 245 T-0 X T-O" B 1 TO MATCH EXISTING D70PD RHO 626 109B (E)OFFICE Ell B W1 C 3 ( ) " SURFACE CLOSER:LCN 4040XP HW/PA DOOR CLOSER WITH HOLD OPEN ARM 109 (E)OFFICE Ell Bi W7 Ci 08 (E)OFFICE ROOM 213 T-0"X 7'-0" B 1 TO MATCH EXISTING TRIMCO 1270 WALL BUMPER 110 (E)OFFICE F7 B1 Wi C7 • S88D SMOKE SEAL ill (E)OFFICE F7 B1 IN C1 09 (E)VESTIB OFFICE LE T-0"X7'-0" B 1 WITH MATCH EXISTING EXTERIOR STOREFRONT DOOR I PANIC HARDWARE 112 E OFFICE F1 Bi W7 C1 10 E VESTIBULE ROOM 153 3'-0"X7'-0" B D5/A-601; 4 WITH PUSH CONTROL BUTTON BB12P a.sxa.s BY STOREFRONT MANUFACTURER EXIT DEVICE&PULL ( ) ( ) MAT PR 113 (E)OFFICE F7 B1 W1 C1 4 SURFACE 2 CE CLOSER: R PULL ON EXTERIOR WITH PANIC HARDWARE AT INTERIOR D3/A-601 MATCH(E)FINISH 114 (E)OFFICE F7 61 W1 C1 SURFACE CLOSER:LCN 4040XP HW/PA DOOR CLOSER WITH HOLD OPEN ARM 115 (E)OFFICE F1 B1 W1 C1 THRESHOLD:COMPLY WITH E7/A-501 AUTOMATIC DOOR OPENER WITH PUSH BUTTONS CONTROL ON BOTH SIDES: 116 (E)OFFICE F1 B1 W1 C1 LCN#8310-853T 117 (E)OFFICE F1 B1 W1 C1 200 W. O NTIAC WIDTH PER F1 BI WI C1 C OVIS,CA 93612 AY WIDTH PER SCHEDULE 119 ((E)OFFFIICEE F1 B1 W1 C1 5 . SCHEDULE WIDTH PER SCHEDULE BB1279 4s X 4.5 INTERIOR/OFFICE LOCK 120 (E)BREAK ROOM F2 B1 W1 C1 K CLIENT D8 MAT H D70PD RHO 626 121 (E)WOMEN'S F3 B1 W2 C2 K MATCH E FINISH q�01 ( ) SURFACE CLOSER:LCN 4040XP HW/PA DOOR CLOSER WITH HOLD OPEN ARM RESTROOM TRIMCO 1270 WALL BUMPER 3 DOOR SILENCERS-1229A-BROWN-TR 122 (E)OFFICE F1 B1 W7 C1 123 (E)OFFICE F1 Bi W7 q O C1 U 12 (E)OFFICE F1 B W C1 125 (E)OFFICE F1 Bi Wi C1 DOOR NOTES: 126 (E)OFFICE F2 B1 Wi C1 J m GLASS TEMP. w 127 )RECE RECEPTION F1 B1 Wi C1 � m GLASS o 1. ALL DOORS TO BE EQUIPPED WITH ACCESSIBLE HARDWARE AND BE POSITIVE LATCHED UNLESS NOTED OTHERWISE. 128 (E)RECEPTION F2 61 W7 C1 PROVIDE A MINIMUM OF 12"SPACE AT PUSH SIDE OF A DOOR WHEN IT IS EQUIPPED WITH BOTH A LATCH AND A w ww w 129 (E)OFFICE F1 B1 W1 C1 x x m CLOSER.REFER TO DRAWING So 43"AFF roil m A9/A-501FOR ADDITIONAL INFORMATION. 130 (E LOBBY F2 61 W1 C1 C)� 3856 0 w -ol o: 2. AFTER INSTALLATIONS,DOORS WITH CLOSER SHALL BE ADJUSTED TO THE FOLLOWING EFFORT:INTERIOR-5# 131 (E)CORRIDOR F2 B1 W1 C2 a a a jLBS.).EXTERIOR-5#(LBS.1 AND FIRE DOOR MAY NOT EXCEED 15 LBS. DOOR CLOSER SHALL BE ADJUSTED SO THAT 132 (E)ELEVATOR (E) (E) (E) (E) FR ES _ _ = FROM AN OPEN POSITION OF 90 DEGREES,THE TIME REQUIRED TO MOVE THE DOOR TO A POSITION OF 12 DEGREES 133 (E)EQ ROOM F2 61 W1 C2 c7 0 FROM THE LATCH IS 5 SECONDS MINIMUM. 134 (E)EE.ROOM (E) (E) (E) (E) J w ICKPLATE w KICKPLATE w 3. DOOR HARDWARE MOUNTING HEIGHT SHALL BE BETWEEN 34"-44"ABOVE THE FINISH FLOOR. J _ _ m 4. ALL GLASS DOORS AND WINDOWS WITHIN 24"OF DOOR SHOULD BE TEMPERED GLASS. 135 (E)UNISEX F3 B1 W2 C2 5. DOORS REQUIRED TO BE ACCESSIBLE SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT 136 (E)UNISEX F3 B1 W2 C2 GRASPING,PINCHING OR TWISTING OF THE WRIST.THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO 137 (E)MEN'S RESTROOM F3 B1 W2 C2 GREATER THAN 5 POUND FORCE(LBS).2022 CBC 1010.1.9.1;11 B-309.4. 138 (E)OFFICE F1 131 W1 C1 ARCHITECT 6. THE LEVER OF LEVER ACTUATED LATCHES OR LOCKS SHALL BE CURVED WITH A RETURN TO WITHIN 1/2INCH OF THE 139 (E)OFFICE F1 B1 W1 C1 DOOR TO PREVENT CATCHING ON THE CLOTHING OF PERSONS DURING EGRESS.2022 CBC 1010.1.9.1,CA Referenced 140 (E)OFFICE F1 B1 W1 C1 Standards Code,12-10-202.(f) 7. ADJUST FRAMING/INSTALL NEW ALUMINUM STOREFRONT FRAMING ON EXISTING INTERIOR ALUMINUM ASSEMBLY 141 (E)OFFICE F1 B1 W1 C1 WITH NEW DOOR CONFIGURATION.MANUFACTURER TO PROVIDE DRAWINGS AND COLOR SAMPLES TO MATCH 142 (E)OFFICE F1 B1 W1 C1 1-3/4"HOLLOW METAL DOOR ALUMINUM STOREFRONT FACTORY FINISH SOLID CORE PANEL, EXISTING ANODIZED FINISH. 143 (E)OFFICE F1 B1 W1 C1 A 1/4"THK.TEMP.CLEAR GLASS VIEW PANEL p EMPERED GLAZING 8. ALL GLASS WINDOWS AND DOORS SUBJECT TO HUMAN IMPACT SHALL HAVE SAFETY GLAZING OR PROTECTIVE GRILL. 144 (E)OFFICE F1 B1 W1 C1 HOLLOW METAL FRAME U ALUMINUM FRAME V HOLLOW METAL FRAME NOTE: 145 (E)CORRIDOR F2 B1 W1 C1 REFERTOSHEET A-501 FOR MORE INFORMATION. 146 (E)OFFICE F1 B1 W1 C1 147 (E)CONFERENCE ROOM F1 B1 W1 C1 H DOOR OPENING SCHEDULE& LEGEND L.12 14 (E)OFFICE F1 B1 W1 C1 H 149 (E)VIP ROOM F1 B1 W1 Ci - 150 (E)TRAINING ROOM F1 131 W1 C1 151 (E)STAIR CORRIDOR F2 131 W1 C2 INCLUDING STAIR LANDING R 0 B I N A VVPUGHT WIDTH PER SCHEDULE WINDOW SCHEDULE 152 E DATA E E E) E Architect&Associates,lnc. 153 E VESTIBULE F2 B1 W1 C2 ARMORTEX BULLET RESISTANT 5"OR 6" WINDOWSIZE WINDOW 154 (N)OFFICE F1 B1 W1 C1 ceRT111 uc aszaaa vas case ARMOR MARK LOCATION (WxH) TYPE COMMENTS O EOPRENE SETTING BLOCK 155 N OFFICE (E (E W1 C1 STAINLESS STEEL % 156 (E)OUTDOOR PATIO (E) (E) (E) (E) FRESNO,CA GLAZING TAPE CONTINUOUS HINGE F10 157 E STORAGE rei.ass4s"nzsz W1 (E)TRAINING ROOM 150 6'-0"x4'-0" A Aso1 w W1 (E)TRAININGROOM150 6'-0"x4'-0" A CONTROL SIDE onl""�,"em"wsnmmn�n."om THREAT SIDE FB SECOND FLOOR-FINISH SCHEDULE SPEAKER A-601 x y Base Ceiling SEAL&SIGNATURE w RM.# ROOM IDENTIFICATION Floor Finish Finish Wall Finish Finish Comments G ULL AND SECURITY LATCH a APPROVED G STAINLESS STNGE EEL---. EL = 201 (E)CORRIDOR F2 B1 W7 C2 INCLUDING STAIR LANDING c7 p CONTINUOUS HI 132024 Nov202 (E)WORK ROOM F1 B1 Wi C1 STAINLESS STEEL = 203 (E)OFFICE F1 B2 Wi C1 ?�P 7�R WR R GLAZING CAP COUNTY OF FRESNO 205 (E)OFFICE F1 Bi Wi C1 0 S N j 205 (E)OFFICE F1 Bi W7 C1 34'MAX.AFF DEVELOPMENT SERVICES zos (E)OFFICE F1 61 W7 C1 ARMORTEX BULLET ————— 207 (E)OFFICE F1 B1 W1 C1 No. 283 RESISTANT 1/2" 208 (E)OFFICE F1 B1 W1 C1 RENE­DATE GLAZING 1" 209 (E)OFFICE F1 B1 W1 C1 2 EXTRUDED 7WALL TYPE PER 6,� 210 (E)OFFICE F1 61 W7 C1 ALUMINUM FRAME SCHEDULE "ARMOREX""WI-TW-AL-HP"BULLET 211 (E)OFFICE F1 61 W1 C1 (CLEAR ANODIZED) STUDS WALL A RESISTANT ARMOR AND GLAZING 212 (E)OFFICE F1 61 W1 C1 ASSEMBLY 213 (E)OFFICE F1 B1 W1 C1 214 (E)OFFICE F1 B1 W1 C1 CONSULTANT F 215 (E)OFFICE F1 B1 W1 C1 F 216 (E)OFFICE F1 B1 W1 C1 WINDOW JAMB SECTION.A F 10 WINDOW SILL-SECTION B F$ WINDOW SCHEDULE F2 217 (E)OFFICE F1(E)OFFICE F1 B2 W1 C1 219 (E)EMPLOYEE WORK F1 B1 W1 C1 STATIONS R EXTERIOR / 22 (E)OFFICE F1 B W C1 INTERIO - ' 221 (E)DATA ROOM F1 6i Wi C1 222 JANITOR F3 Bi W2 C2 ALUMINUM 223 (E)WOMEWS F3 B1 W2 C2 STOREFRONT DOOR 224 (E)MEWS F3 137 W2 C2 3/8"HILTI KWIK-BOLT TZ PER SCHEDULE FINISH PER SCHEDULE _ 225 (E)CORRIDOR F1 B1/B2 W1 C1 SEALANT @ BASE • 226 (E)DATA ROOM F1 61 W1 C1 UPDATE ALUMINUM DOOR THRESHOLD INTERIOR WALL PER PLAN z , 227 (E)CONFERENCE F1 B2 W1 C3 FASTENED W/EXPANDING SEALANT 228 (E)OFFICE F1 B1 W1 C1 E METAL ANCHORS,SET IN TWO E 09/19/2024 CONTINUOUS BEDS OF METAL SELF-TAPPING SCREWS _ 229 (E)WORKSTATIONS F1 B1 W1 C1 EXPANSION JOINT FASTEN TO STEEL STUDS OR SPACE NEOGARD URETHANE SEALANT - - - - (E)TILT UP CONCRETE 18 GA GALV STEEL ANCHOR TO (E)TILT UP CONCRETE----,' ONCRETE p 230 (E)OFFICE F1 B1 W1 C1 FINISH PER SCHEDULE STUDS W/4-16d NAILS EA. w w SEALANT N= 231 (E)OFFICE F1 B1 W1 C1 THESE DRAWINGS AND _ SLOPE 2%_ ANCHOR SEALANT L ' Co U y 232 (E)OFFICE F1 B1 W1 C1 SPECIFICATIONS ARE THE PROPERTY ANCHOR CLIPS: 0 233 (E)OFFICE F1 B1 W7 C1 AND COPYRIGHT OF THE ARCHITECT 0 tr 6 1/2"@ 7 1/4"WALL O w AND SHALL NOT BE USED ON ANY n a --- �3 PER JAMB @ o a 5 1/2"@ 6 1/a"WALL o a 234 (E)OFFICE F1 61 W7 C1 OTHER PROJECT OR LOCATIONS 6 1/2" 7 1/4"WALL ( ) - N= -- 2PER HEAD 51/2" 61/4"WALL _ 235 (E)OFFICE F1 B1 W1 C1 @ ( ) EXCEPT AS DESCRIBED ON THE �y DOOR PER 236 (E)OFFICE F1 B1 Wi C1 DRAWINGSWITHOUT WRITTEN HM FRAME SCHEDULE 237 (E)OFFICE F1 Bi Wi C1 p w DOOR PER �((f:T' AGREEMENT WITH THE ARCHITECT. o a ` DOOR PER PLAN SCHEDULE - ` - 238 (E)OFFICE F1 Bi Wi C1 239 (E)OFFICE F1 B1 Wi C1 240 (E)OFFICE F1 B1 W1 C1 241 (E)DATA ROOM F1 B1 W1 C1 U 242 STORAGE F1 B1 W1 C1 0 243 CORRIDOR F2 B1 W1 C2 INCLUDING STAIR LANDING TYP. STOREFRONT SILL @ CONCRETE SLAB D 1 0 TYP. HM INTERIOR HEAD/JAMB SIM. D8 DOOR HEAD-EXTERIOR D5 DOOR JAMB -EXTERIOR D3 245 (E)OFFICE F1 BI W7 C1 „_ ,, _ - 245 (N)OFFICE F1 B1 W1 C1 - - - - - - - - 249 1 HALLWAY F1 61 W1 C1 MANEUVERING CLEARANCE IS REQUIRED AT THOSE DOORS SERVING AN ACCESSIBLE MEANS OF EGRESS THAT EITHER LACK STANDBY POWER OR THAT FINISH LEGEND DO NOT STAY OPEN IN POWER-OFF MODE.REFER TO G8/A-501 FOR ADDITIONAL INFORMATION FLOORING F1 NEW MODULAR CARPET TILES:INTERFACE,OPENAIR 418 STRIA 2385-COLOR:BLACK(103291) "CAUTION AUTOMATIC DOOR" F2 POLISHED CONCRETE:Polish Gnt[evel3:High Shine 1500 Grit SIGNAGE.THE SIGN SHALL BE A C[�R NATURAL"GRAY"COLOR MINIMUM OF 61NCHES IN DIAMETERu 3 WITH BLACK LETTERING ON A 2",ylW/OTy F3 DALTILE PORCELAIN TILE. N� YELLOW BACKGROUND � � BASE � AU TO M A ��j` B1 4"MANNINGTONIBURKE COVED RUBBER BASE-COLOR:727 THUNDER B2 EXISTING WOOD BASEBOARDS:REPAINTED 4 • ADDITIONAL SIGN: - -' WALL W1 PAINT: TITLE DOOR DOOR HAS SEPARATE WALL SWITCH -Li - MANUAL CONTROLS. AURA BY BENJAMIN MOORE;EGG SHELL-INTERIOR-LEVEL 4 SMOOTH FINISH THE SIGN SHOULD SAY:"ACTIVATE _ `  �' COMPLIANT CONTROLS WITH COLOR:TBD SWITCH TO OPERATE"SIGNAGE. __ - - - - - - - - - - -- CLEAR FLOOR SPACE PUSH OR PULL TO OPERATE:IF THE ___ - LO SWINGED OUTSIDE DOOR W2 DESIGN STYLE: TBD L;MENARD DESIGN COLLECTION LOCATDESIGN STYLE:TBD FINISH & OPENING PULLING,OIOTHE SIGN SHOULD TED BY PUSHING OR Op SCHEDULE DOORS IN SERIES SHALL HAVE CEILING "PUSH TO OPERATE"ON THE PUSH A 48"MIN.SEPARATION ACTIVATE BETWEEN THE SWING OF C1 ARMSTRONG OPTIMA SIDE AND"PULL TO OPERATE"ON DOORS IN SERIES. SQUARE LAY-IN,24"X 48"X 5/8";PIN PERFORATED,FINE FISSURED OR LIGHTLY TEXTURED THE PULL SIDE. EXISTING CEILING GRID B B SCALE As indicated TO OPERATE NIT POWER ASSIST DOORS:IF THE DOOR CLEAR FLOOR SPACE AT DOOR CONTROL MUST BE LOCATED OUTSIDE DOOR SWING.PLACING CONTROLS IN LOCATIONS THAT PRECLUDE BACKING-UP WILL C2 AUIRA BY BENJAMIN MOORE;SATIN ENAMEL INTERIOR-LEVEL 4 SMOOTH FINISH CD IS A POWER ASSIST DOOR,THE SIGN FACILITATE USABILITY.THE CLEAR FLOOR SPACE IS NOT REQUIRED TO BE CENTERED AT CONTROLS,BUT SHOULD BE LOCATED TO FACILITATE REACH AND COLOR:TBD SHOULD SAY"EASY OPEN DOOR- OPERATION. ACTIVATE SWITCH THEN OPEN "-- __ C3 ARMSTRONG LAY OPTIMA A 6 01 PROVIDE SIGNS ON EACH SIDE OF THE DOOR DOOR". NOTES: SQUARE LAY-IN,24"X 48"X 5/8";PIN PERFORATED,FINE FISSURED OR LIGHTLY TEXTURED 1. POWER-ASSISTED DEVICES REDUCE THE OPENING FORCE OF DOORS WITH CLOSING MECHANISMS.THEY ARE ACTIVATED BY INITIAL MANUAL FORCE,SWITCHES, GRID:15116"PRELUDE WHERE THE SWITCH IS LOCATED, THE LETTERING SHALL BE WHITE OR SENSORS.MOST REDUCE,BUT DO NOT FULLY ELIMINATE,THE MANUAL FORCE NEEDED TO OPEN A DOOR.FOR THIS REASON,THEY MUST MEET MANEUVERING THRESHOLD VE MAX. MOUNTING HEIGHT SHALL BE BETWEEN 48" AND THE BACKGROUND SHALL BE HIGH(BEVELED IF _ (E)-DENOTES EXISTING.NO PROPOSED CHANGE MINIMUM AND 60"MAXIMUM FROM FINISH BLUE. CLEARANCE REQUIREMENTS. ABOVE 1/4") REPLACE EXISTING CEILING GRID AS REQUIRED TO PROVIDE A NEW FINISH LOOK FLOOR. 2. LOW ENERGY DOORS AND GATES USUALLY REQUIRE ACTIVATION BY THE USER THROUGH A PUSH PLATE OR CONTROL AND ARE OFTEN USED IN MODERATE _ STAIRWAY FINISH:FLEXCO HEAVY DUTY RADIAL II 701E&776E AT TOP AND BOTTOM LANDING ISSUE DATE JOB NUMBER a TRAFFIC LOCATIONS AS AN ALTERNATIVE TO MANUAL OPERATION.MOST FUNCTION LIKE A MANUAL TYPE BUT WITH A POWERED OPENER AND CLOSER OPTION. 3. DOOR AND GATE CONTROLS MUST BE COMPLIANT AS OPERABLE PARTS(OPERABLE WITH ONE HAND AND WITHOUT TIGHT GRASPING,PINCHING,TWISTING OF THE L 01/31/24 2024 03 WRIST,OR MORE THAN 5 LSE).CLEAR FLOOR SPACE AT CONTROLS MUST BE LOCATED OUTSIDE THE DOOR SWING TO PREVENT USERS FROM GETTING HIT BY THE -- - _ - NOTES: DOOR. _ - 1. PROVIDE ALUMINUM SHLUTER SYSTEM TRANSITION BETWEEN FLOORING MATERIALS;UNLESS OTHERWISE NOTED.. DRAWN BY CHECKED BY o v '� FLOOR TRANSITION HEIGHT NOT TO EXCEED 1/4".PROVIDE APPROPRIATE SCHLUTER TRANSITION STIPS IN ANODIZED Author Checker m A AUTOMATIC DOOR SIGN A10 POWER ASSISTED DOOR CONTROLS qg POWER ASSISTED DOOR CLEARANCE A a� ALUMINUM FINISH.FLOOR COVERING CONTRACTOR SHALL INSTALL FLOOR LEVELING COMPOUND FOR ASMOOTH A m c 1 1/2"=1'-0° 1/2 =1-0° 1/2 =1'-01, v SEAMLESS TRANSITION. 12 11 10 9 8 7 6 5 4 3 2 1 / 432 Bitritto Way Suite#3 Modesto,CA 95356 Office 209-236-1604 C & S Fax 209-567-2925 www.kcsconstructionspecialties.com E-mail:Billing@kcsconstructionspecialties.com L(IN4TIA 1 Ia Iti}Wf I•.I fivi-Ir* License#1048604 DIR#1000063244 CHANGE ORDER PROPOSAL PROJECT NAME: Probation Tenant Improvement DATE: 8/28/2025 C.O.P 01 ADDRESS: 200 W.Pontiac Way,Clovis,CA 93612 Expires in 30 days CONTRACTOR: Fortune-Ratliff General Contractors,Inc. REASON FOR REQUEST lie:RFI,Owner,City,Other): I Add doors#1&#3 The Description of Vendor Partner Change Order Request is as follows: Add doors and frames#1&#3 into our scope Labor Breakdown:manpower x man hours x hourly rate Hoursi 6 Rate PW Area 4 $127.72 Sub Total: $ 766.32 Overhead&Profit(10%): $ 76.63 Sub Total: $ 842.95 Material Breakdown: doors referenced above $ 2,318.40 Sub Total: $ 2,318.40 Overhead&Profit(10%): $ 231.84 Sub Total: $ 2,550.24 Tax 7.875% $ 200.83 Sub Total: $ 2,751.07 Total C.O. 01 $ 3,594.02 CONTRACTOR SUBCONTRACTOR NAME NAME Katherine Harris DATE DATE 8/28/2025 12 11 10 9 8 7 6 5 4 3 2 1 FLOOR PLAN KEYNOTES: ® PROJECT 1. NEW WINDOW/FRAME ASSEMBLY.REFERTOOPENING SCHEDULEFOR ADDITIONAL INFORMATION. O O GeJ CC D 2. EXISTING POSTS.PROTECT FROM DAMAGE DURING THE WORK. p 3. EXISTING WINDOWS.PROTECT FROM DAMAGE DURING THE WORK. 8.9 7.9 6.8 5.8 4. NEW SOLID SURFACE COUNTERTOP.REFER TO C9/A-504 FOR ADDITIONAL TENANT INFORMATION. 5. EXISTING FIRE EXTINGUISHER.PROTECT FROM DAMAGE DURING THE WORK.ALIGN WITH IMPROVEMENT10 6 EXISTINGTRANSITION FINISHED WILL 9 7 6 HAVE A SMOOTH,CLEAN AND FLUSHED WITH ADJOINING SURFACE.TYPICAL ON BOTH SIDES. 7 TING COUNTERTOP/CA EWORK.PROTECT/REPAIR N,PREPARE SURFACE TO RECEIVE NEW PAINT FINISH.MAGE PARTS. CLEAN, 8. EXISTING PLUMBING FIXTURES. L 9. EXISTING WOOD PANEL AND WOOD BASE BOARDS.PROTECT/REPAIR L DAMAGE PARTS.CLAN,AND PREPARE TO RECEIVE NEW PAINT FINISH. 10. NEW DRINKING FOUNTAINS.REFER TO F9/A-504 FOR ADDITIONAL INFORMATION. NEW TUBULAR STEEL STAIR HANDRAIL.REFER TO SHEET A-802 A FOR ADDITIONAL INFORMATION. 12. NEW 12"X 12"BOX FRAMING WITH 5/8"GYP.BOARD TO MATCH EXISTING - - - - - - - i - COLUMN DESIGN. 13. NEW PUSH CONTROL AUTOMATIC DOOR OPENER WALL MOUNTED.MOUNTING HEIGHT OF OPERABLE PART SHALL BE BETWEEN 36"MINIMUM AND 44" o I$ MAXIMUM FROM FINISH FLOOR.REFER TO A3/A-601 AND A6/A-601 FOR ADDITIONAL INFORMATION. (E) <I? 14. 30"X 48"CLEAR FLOOR SPACE. CONFERENCE 15. ACCESSIBLE DOOR MANEUVERING CLEARANCE.REFER TO G8/A-501 FOR 200 W.PONTIAC WAY 227 ADDITIONAL INFORMATION. CLOVIS,CA 93612 F - - - - - - - - - - - - - - - - 16. ACCESSIBLE THRESHOLD.REPLACE AS REQUIRED TO COMPLY WITH ACCESSIBLE THRESHOLD.REFER TO F7/A-5ol FORADDITIONAL K O9 I INFORMATION. K CLIENT 17. BUILDING PRIMARY ENTRANCE WITH EXIT SIGN WITH NOTE"THIS DOOR TO REMAIN UNLOCKED WHEN THE SPACE IS OCCUPIED"[CBC 1010.2.4(3)3.21 (E)DATA ROOM (E OFFICE (E OFFICE (E FFICE (E OFFICE (E OFFICE (E OFFICE (E OF ICE (E OFFICE (E OFFICE - 7 7 I `18.� EXISTING DOOR WITH AUTOMATIC DOOR OPENER.PROVIDE 6"X 6"ISA C O T� 241 240 239 38 237 236 235 23 233 T3T (EWE (EWE I SYMBOL OF ACCESSIBILITY AND AUTOMATIC DOOR SIGN.SEE A10/A-601 FOR Cl ` _\\ (EWE 6 21g I NEWADDITIONAL INFORMATION. (E) (E) (E) (E) (E) (E) E E '_' I 1 4 OPEN NG SC EDU E OR AD/2"GYPSUM BOARD W1D TIIONALOW LIINFORMAT INNSACTION FORMATION. REFER TO YP.BID METAL TRIM OVER LEVEL 3 BALLISTIC 666 (E) (E) 9 15 20. DASHED LINE DENOTES APPROXIMATE LOCATIONS OF EXISTING WOOD O 5 TYP (E) 4 20 O (E)C 2251DOR 5 I �"� BASEBOARD.REFER TO A-201.1 FOR ADDITIONAL INFORMATION. 110 1 E)o I TYPICAL ADDITIONAL NOTES: 1$5�O w (E) I 1. CLEAN ALL EXISTING DOORS TO REMAIN.PREPARE TO RECEIVE NEW 5 TYP. - rr AN1T0 E DATA ROM 5 TYP. ry L V / O REPAINT FINISH.TYPICAL ON ALL DOORS. y GROUP B STORAGE O- --- 226 I 2. CLEAN AND REMOVE STAINS/DIRT ON EXISTING WINDOW ASSEMBLY FOR A J 4 242 11�� (E) I NEW AND CLEAN LOOK.TYPICAL ON WINDOWS. J (E1 (E) (E), E) 3. FIELD VERIFY AND ADJUST DOOR CLOSER.REFER TO A-501 FOR ADDITIONAL INFORMATION. - - - - 4. REPLACE WOOD HANDRAIL WITH POWDER COATED STEEL HANDRAIL.REFER ARCHITECT (EWE I O ® 5 -� I I BASE WOOD WORK TO REMAINT PREPARE SURFACE TO RECEITO SHEET G5/A-so2 FOR ADIONAL INFORMATION.CLEANA EDNEW PIAINTL 15 Q FINISH. (E)WORK I Q I % 11 I 5. REPAINT CABINETS/CABINET DOORS AND REPAIR WHERE APPLICABLE. Et I STATION DN I 6 CLEAN AND REPAIR ASSEMBLIES.PREPARE DO RECEIVE NEW PANT FINISH.PANELS/BASEBOARDW AND DECORATIVE SPACES TT9 e� ' (E)OFFICE I GENERAL NOTES: -- 220 14 (E� I O __� Q , � I 1. ALL INTERIOR FINISHES SHALL HAVE A MINIMUM FLAME-SPREAD INDEX NOT 4 GREATER THAN THAT SPECIFIED IN 2022 CBC TABLE 80INDEX.NO THUMB 3.13.REFER TO DN 15 (E 24410E I KEYED U 0 I I CYB ND R DEAD BOLTSLE FOR FLAME ALLOWED ON ANY DOORS UNLESS OPERATED BY A H EE m I SINGLE ACTION WITH A LEVER FROM THE INSIDE OF THE AREA SERVED. H COR ID OR I @ p / I (E)DATA ROOM 2. EGRESS DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE 2 3 - I I TA I OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT. 2022 CBC SECTION 1010.2 R O B 1 N A WRIGHT TYP. 2 / I E I 3. MANUALLY-OPERATED EDGE OR SURFACE-MOUNTED FLUSH BOLTS AND /��\V (E) ® (E) (E) SURFACE BOLTS OR ANY TYPE OF DEVICE THAT MAY BE USED TO CLOSE OR Architect&Assoclates,lnc. 1 G - - - - - - - - - - - - - ---- ----- - - -------- ---_ - - - - - - RESTRAIN THE DOOR OTHER THAN THE OPERATION OF THE LOCKING c Trieo uwsT(cnso) \/ DEVICE SHALL NOT BE USED AND ARE PROHIBITED. �N I 4. MEANS OF EGRESS ILLUMINATION SHALL BE IN ACCORDANCE TO 2022 CBC °n"'�'' SECTION 1008.REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL J8 (E MEWS (E)WOMEN'S `o I INFORMATION. 224 223 N 5. FIELD VERIFY ALL EXISTING CONDITIONS,MEASUREMENTS AND CIRCUITING ra.1154so1rzaz A-701 i I N ARRANGEMENTS.STUDY THE DRAWINGS AND VERIFY WITH EXISTING 1 CONDITION IN DETAIL PRIOR TO COMMENCING AND DEMOLITION WORK. E2 a I O REPORT DISCREPANCIES OR CONDITIONS WHICH MIGHT DISRUPT BUILDING •obm@.bi a.l9h­hn °m A-503 I FUNCTIONS TO ARCHITECT BEFORE DISTURBING EXISTING INSTALLATION. fO gnaw°9 "1P °m 6. ELEVATION TRANSITIONS OVER ADJOINING SURFACE SHALL HAVE A SEAL&SIGNATURE /� SMOOTH AND CLEAN TRANSITION WITHOUT ABRUPT CHANGE IN LEVEL EXCEEDING 1/4 INCHES.REMOVE G r�'-I REQUIRED O PROVIDE A SMOOTH AND I EVEN TRANSITION ON$OF EXISTING SWITHSURFACE ADJ CENTS G FLOOR FINISH.PATCH,REPAIR,CLEAN,AND PREPARE SURFACE TO PROPOSED PARTIAL SECOND FL OR PLAN "A" RECEIVE NEW FINISH PER FINISH SCHEDULE. 7. OUTLET AND CONTROL SHALL COMPLY WITH TYPICAL REACH RANGE R. 1/8"=1'-O" REQUIREMENT UNLESS NOTED OTHERWISE ON PLAN.SEE co/A-F0q FOR ?P WR ADDITIONAL INFORMATION. 0 0 0 5 8. EXPOSED UNFINISHED SURFACES CREATED BY REMOVAL OF EXISTING o: MATERIALS,AND SURFACES DAMAGED OR DISTURBED BY REMODELING WORK,SHALL BE REPAIRED/PATCHED WITH NEW MATERIALS AND FINISHED NO. 283 TO MATCH EXISTING WORK AS MUCH AS IT IS REQUIRED TO PROVIDE A SIMILAR EVEN APPEARANCE. rzou°TE TABLE 803.13 INTERIOR WALL&CEILING FINISH REQUIREMENT GROUP EXIT ENCLOSURE& CORRIDORS ROOMS& EXIT PASSAGEWAY ENCLOSED SPACES BUS NE S E SPRINKLE R UP B. B C C F CONSULTANT WAREHOUSE GROUP C C C 1 0 T(,8.9 T T T S-1:SPRINKLERED 7.9 6.8 5.8 FLOOR PLAN LEGEND \ " / - - ROONI I1a81&. ROOM NAME-(E)EXISTING/(N)NEW �/ O RO M EA L O O I 101 ROOM NUMBER MA7`GHE5 DOOR ig ROOM NAME AND NUMBER.REFER TO FINISH UPDATE NE U E o f g DOWN SCHEDULE FOR ADDITIONAL INFORMATION. _ ---- E 3 - ,I, E 02/18/2025 Q 6 F - -- -T - --- - C ILLUMINATED"EXIT?EXIT ROUTE SIGN.REFER TO ATION n - o i i i ELECTRICAL DRAWINGS FOR ADDITIONAL INFORM 1LL---- V 15 IBULE'(E � 5 o O o - _ _ � I THESE DRAWINGS AND AND COPYRIGHT OF THE ARCHITECT 1p ® I DOOR LEGEND SPECIFICATIONS ARE USE ONAN PROPERTY (EWE (EWE (E OFFICE (E ME (EWE (EWE AND SHALL NOT BE USED ON ANY 144 143 142 1 1 140 139 OTHER PROJECT OR LOCATIONS 13 13 O O (E[ O O ) EXCEPT AS DESCRIBED ON THE 0 (E LOBBY I DRAWINGS WITHOUT WRITTEN 130 0# NEW DOOR TAG NUMBER.REFER TO OPENING SCHEDULE AGREEMENT WITH THE ARCHITECT. (E) 2 (E) E) (E) (E) �( ( ) (E) 15 NP. I ON DRAWING A-601 FOR ADDITIONAL INFORMATION. _ (E)-DENOTES EXISTING DOOR. O (E) E CORRIDOR TYP_ , (E O2910E L (E DATA B A K LI E O K ®� 15 NP. O l-4 4 GROUP B EQ EQ I 1 PLARIFI A 031s2025 152 INDIGATES NEW 0 � B EA K LI E O K 4 CLARIFICATION 02-07-2025 D 15 NO WORK N TRUGTI N E O - J INDIGATES NEW I WINDOW LEGEND PROPOSED 15 TYP. O (E) (E) N TRUGTI N I D (E)ROOMTRAINING F (E)VIP ROOM EQ EQ (EWE L I NEW WINDOW TAG NUMBER.REFERTOOPENING 150 149 w (N OFFICE) 15 11 - �E)RECEPTIONI W# SCHEDULE ON DRAWING A-601 FOR ADDITIONAL INFORMATION. 155- -128 I- �4 E (N OFFICE (E OFFICE ® UP 154 146 15 NP. RO M A L MATGHE5 DOOR 1 19 I / I A503 R ^ E I WALL LEGEND GHE U EO� RESTROOM (E) EXISTING METAL STUD WALL. r (E) i ®1�37 �(E) 25 GA.METAL STUD AT 16"O.C.WALL INFILL WITH 5/8"GYP,BD, C I a^p � ® f4� O I (E) I ® ON EACH SIDE.ALIGN WITH EXISTING WALL SO THAT WHEN t _____ UP 1 �� 15 TYP CONFERENCE '0 0 0 0 o o �IE)ELEVATOR I TRANSEDIONI WITH ADJOINING SURFACE.TYPICAL ON BOTH N AND FLUSHED (E TAIR 19 (E)OFFICE ROOM I d --: 132 I SIDES.(USE R-11 ON 2X4&R-19 ON 2X6).REFER TO r:::: R 148 iq7 - 4 14 i- E (E)OFFICE I STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. 1 L� NEW 25 GA.2X4 METAL STUD AT 16"O.C.WITH R-11 INSULATION 1 (E)�� I ,(E)EO M ( ) 124 �(E)�•,, J (E) I(E) O O O O 134 1I AND 5/8"GYP.BOARD ON BOTH SIDES.TYPICAL UNO. TITLE - l •- (E) (E) E) --------- (E) (E) (E) I TYPICAL WALL NOTES O glo PARTIAL FLOOR "� T UNI EX 1. PROTECT EXISTING WALL TO REMAIN FROM DAMAGE DURING THE WORK. WAREHOUSE { 135 ?I< 2. REMOVE HOOKS,NAILS AND OTHER PROTRUDING OBJECTS NOT REQUIRED f 5 TYP. PLAN A S 1 (E UNISEX (E)EQ ROOM I`� FOR NEW CONSTRUCTION. A-502 136 133 I 3. PATCH,REPAIR,CLEAN,PREPARE SURFACE AS REQUIRED TO RECEIVE NEW FINISH. 0 4. MAINTAIN EXISTING INTEGRITY OF EXISTING RATED ASSEMBLY.PATCH AND B SCALE As indicated REPAIR AFFECTED AREAS AS REQUIRED TO MAINTAIN INTEGRITY OF ASSEMBLY. CD 5. FER TO TYPICAL STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. A4/S-102 &Al/S-102 N A-202. 1 O - a ISSUE DATE JOB NUMBER 01/31/24 2024 03 DRAWN BY CHECKED BY Author Checker "• PROPOSED PARTIAL GROUND FLOOR PLAN "A" A2 a m A 1/8„=1,_0,• A 12 11 10 9 8 7 6 5 4 3 2 1 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA_ LICFNSF 496147 PCO# 17_1 Fresno County Probation Tenant Improvement Date: 9/30/2025 Clovis, CA. Attn: Mark Celaya $714.00/ Daily Rate CP# 171111 CC: Barry Mast Schedule Impact (Days): 0 Re: RFI 32_0 Existing Canopy Post Damage Mark: We herewith submit our Proposed Change Order to repair the existing damaged canopy at the exterior of the building per RFI 32 0 response. SUB/SUPPLIER NAMES DESCRIPTION ASB Construction Repair Existing Canopy Post $ 1,265.09 SUB TOTAL $ - $ 1,265.09 Liability Insurance & BR 2.25% $ - $ 28.46 Subtotal SUB TOTAL $ - $ 1,293.55 P&P Bonds 0.25% $ - $ 3.23 Subtotal SUB TOTAL $ - $ 1,296.79 Fortune-Ratliff, Inc. OH & P 5% $ - $ 64.84 TOTAL CP 1 $ - $ 1,362 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: APPROVED Adam Myles, President By Barry Mast at 11:56 am, Oct 01, 2025 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 RFI NO.: 320 FORTUNE/RATLIFF DATE: 8/7/2025 GENERAL CONTRACTORS, INC. CA.LI4_130wftm 49Ci147 REQUEST FOR INFORMATION TO Mark Celaya ATTN: Mark Celaya Senior Engineering Technician CC: Keith Eckert The County of Fresno Department of Public Works and Planning F/R JOB#: 2501 PROJECT: Fresno County Probation Tenant Improvement PROJECT NO.: 24-S-03 KEY DESCRIPTION: Existing Canopy damage at exterior of building DRAWING: SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: There's an existing canopy with damage to a column at exterior of building.We are demoing other existing canopy's and material from these can be used to repair the damaged. Would County like the material to saved for future repair or FR to entertain repair? Please advise Need Answer By: ASAP ADDITIONAL COST: ® YES OR ❑ NO TIME TBD DAYS SUGGESTION: Contractor Signature: RoiilPonaidjoiiI Project Manager ATTACHED SHEETS: ❑ YES OR ❑ NO REPLY: County Response (Aaron Vaden 2025-08-21) Salvage enough material to fix the damaged post. Provide a cost to the County to repair damaged portion with the salvaged items. Change Order Required: ❑X Yes or ❑ No Owner Representative Signature: Date: dam A561W ASB Construction 1148 N. Michelle Dr. Dinuba, Ca 93618 CA License#1057664 Office: 559.396.7029 Bid Proposal @ Government/Public Wage Rates Project: Probation Dept Remodel T.I 200W. Pontiac Way #5 Clovis, Ca 93612 Attn: Estimating Dept. Bid Date: August 27, 2025 Plans dated: RFI #32 0 Scope: Shore-up & repair Canopy post 8-man hours +$ 1,100.08 15% OH/profit +$ 165.01 Grand Total =$ 1265.09 Base pay =$ 57.28 Health/Welfare =$ 12.87 Pension =$ 15.06 Vacation/Holiday =$ 5.89 Training =$ 1.20 Other =$ 1.27 July pay increase =$ 5.11 WC =$ 9.87 Taxes =$ 21.71 LI =$ 7.25 Total=$ 137.51 Canopy materials & shoring to be provided by owner/GC. Exclusions: Shop drawing/engineering, any other work then what is called out on this proposal Unless discussed prior. Over time & weekends & Union wages. Proposal good for 30 Days from the date of this proposal. G.C. responsible for water, temporary power, heat, ventilation, clean-up area & dumpster. Submitted By: Steve Hulsey, Project Estimator FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA_ LICFNSF 496147 PCO# 18_0 Fresno County Probation Tenant Improvement Date: 9/15/2025 Clovis, CA. Attn: Mark Celaya $714.00/ Daily Rate CP# 18 CC: Barry Mast Schedule Impact (Days): 0 Re: RFI 8_0 Existing Countertop Brackets Mark: We herewith submit our Proposed Change Order to provide a credit for new countertop brackets and additional cost to reinforce existing brackets per RFI 8 0 response. SUB/SUPPLIER NAMES DESCRIPTION ASB Construction Reinforce Existing Brackets $ 1,300.00 Fresno Fab-Tech Credit New Brackets $ (4,799.55) SUB TOTAL $ - $ (3,499.55) Liability Insurance & BR 2.25% $ - $ (78.74) Subtotal SUB TOTAL $ - $ (3,578.29) P&P Bonds 0.25% $ - $ (8.95) Subtotal SUB TOTAL $ - $ (3,587.24) Fortune-Ratliff, Inc. OH & P 5% $ - $ (179.36) TOTAL CP $ - $ Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: APPROVED Adam Myles, President By Barry Mast at 5:04 pm, Sep 26, 2025 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 RFI NO.: 8 0 FORTUNE/RATLIFF DATE: 7/28/2025 GENERAL CONTRACTORS, INC. CA.LI4_130wftm 49Ci147 REQUEST FOR INFORMATION TO Mark Celaya ATTN: Mark Celaya Senior Engineering Technician CC: Keith Eckert The County of Fresno Department of Public Works and Planning F/R JOB#: 2501 PROJECT: Fresno County Probation Tenant Improvement PROJECT NO.: 24-S-03 KEY DESCRIPTION: Existing Restroom Counter Brackets DRAWING: J7/A-801 SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: —Upon site review 7/24/25 it was discussed if the existing wall counter brackets in the restrooms could be reused. Barry had reviewed and requested for them to be reused the wood 2x's would need to be replaced to the fullest height which would be to the existing horizontal PVC vent pipe or higher if no obstruction. Need Answer By: ASAP ADDITIONAL COST: ❑ YES OR ❑ NO TIME DAYS SUGGESTION: Install 2x's as discussed and mentioned above,proved credit on material only for new in wall brackets that were to be provided per plans J7/A-801,material only Contractor Signature: RoiilPonaidjoiiI Project Manager ATTACHED SHEETS: ❑ YES OR ❑ NO REPLY: County espon5e ( arry Mast O 5- 7-31) eu5e of existing counter brackets in large re5troom5 i5 acceptable provided: Dimen5ion5 of existing angle brackets are compatible with new counter top construction. 2. Mounting heights Shall be verified and comply with all acce55ibility requirements. Metal Stud at every bracket Shall be fully braced and backed with 2x wood Stud from finish floor to highest extent po55ible. Potential Change Order for credit Should also account for differences in labor co5t5 in addition to materia co5t5, e.g. there Should be le55 labor to brace the existing brackets than to fabricate, transport, brace, nd install new brackets. A56 dam ASB Construction 1148 N. Michelle Dr. Dinuba, Ca 93618 CA License#1057664 Office: 559.396.7029 Bid Proposal @ Government/Public Wage Rates Project: Probation Dept Remodel T.I 200W. Pontiac Way #5 Clovis, Ca 93612 Attn: Estimating Dept. Bid Date: August 26, 2025 Plans dated: RFI #08 0 Scope: Remove/Place 2x4 & Brackets to correct height. 8.2 hrs. +$ 1,131 15% OH/Profit +$ 169 Grand Total =$ 1,300 Base pay =$ 57.28 Health/Welfare =$ 12.87 Pension =$ 15.06 Vacation/Holiday =$ 5.89 Training =$ 1.20 Other =$ 1.27 July pay increase =$ 5.11 WC =$ 9.87 Taxes =$ 21.71 LI =$ 7.25 Total=$ 137.51 Inclusions/Clarifications; 2X non treated wood studs to be replace & installed to 48" above finish floor due to existing drywall sheeting in place not allowing wood stud to extend past the 48". We will remove & install the existing brackets to the height provided by the GC. ASB EEEM ASB Construction 1148 N. Michelle Dr. Dinuba, Ca 93618 CA License#1057664 Office: 559.396.7029 Exclusions: Shop drawing/engineering, any other work then what is called out on this proposal Unless discussed prior. Over time & weekends & Union wages. Proposal good for 30 Days from the date of this proposal. G.C. responsible for water, temporary power, heat, ventilation, clean-up area & dumpster. Please include the information above in the final contract as Exhibit (A). Submitted By: Steve Hulsey, Project Estimator Fresno 45: 0 INCORPORATED CHANGE ORDER COST SUMMARY PROJECT NAME PROJECT LOCATION Fresno Co. Probation T.I. Clovis, CA DESCRIPTION OF WORK Credit for eighteen (18) counter braces and four(4) lavatory bracket supports ITEM OMITTED WORK ADDED WORK (CREDIT) COST DIRECT LABOR: ENGINEERING 0 HOURS @ $125.00 /HOUR DETAILING 0 HOURS @ $75.00 /HOUR SHOP 44 HOURS @ $80.00 /HOUR $3,520.00 FIELD 0 HOURS @ $105.00 /HOUR SUBSISTANCE 0 MDAYS C $125.00 DIRECT MATERIAL $710.00 EQUIPMENT RENTAL $0.00 TOTAL DIRECT(CREDIT)/COST ($4,230.00)1 $0.00 NET DIRECT(CREDIT)/COST -$4,230.00 O/H & PROFIT 12.00% -$507.60 TAX ON MATERIAL 8.73% -$61.95 FREIGHT $0.00 COST/(CREDIT) -$4,799.55 REMARKS ESTIMATOR DATE Travis Nishi 9/9/2025 1035 K. Street Sanger, CA 93657 • Offlce:559/875-9800 Fax:559/875-9700 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA_ LICFNSF 496147 PCO# 19_0 Fresno County Probation Tenant Improvement Date: 9/19/2025 Clovis, CA. Attn: Mark Celaya $714.00/ Daily Rate CP# 19 CC: Barry Mast Schedule Impact (Days): 5 Re: RFI 19_0 Existing Shower Valves and Accessories Mark: We herewith submit our Proposed Change Order to provide and install new shower valves, heads, and accessories per RFI 19 0 response. *This work adds five (5) days to the project schedule;the cost for added days is not reflected at this time as other documented delays are under review. SUB/SUPPLIER NAMES DESCRIPTION Todd Companies New shower valves and heads $ 11,150.00 Shelco Industries New shower accessories $ 1,260.49 Fortune-Ratliff Five (5) days added to the schedule TBD SUB TOTAL $ - $ 12,410.49 Liability Insurance & BR 2.25% $ - $ 279.24 Subtotal SUB TOTAL $ - $ 12,689.73 P&P Bonds 0.25% $ - $ 31.72 Subtotal SUB TOTAL $ - $ 12,721.45 Fortune-Ratliff, Inc. OH & P 5% $ - $ 636.07 TOTAL CP 1 $ - $ 13,358 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: APPROVED Adam Myles, President By Barry Mast at 5:14 pm, Sep 26, 2025 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 RFI NO.: 190 FORTUNE/RATLIFF DATE: 8/1/2025 GENERAL CONTRACTORS, INC. CA.LI4_130wftm 49C.147 REQUEST FOR INFORMATION TO Mark Celaya ATTN: Mark Celaya Senior Engineering Technician CC: Keith Eckert The County of Fresno Department of Public Works and Planning F/R JOB#: 2501 PROJECT: Fresno County Probation Tenant Improvement PROJECT NO.: 24-S-03 KEY DESCRIPTION: Existing Shower Valves&Accessories DRAWING: 21/A-502 SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: —Keynote example 21/A-502 refers to existing shower.There is no direction to replace shower valve or or to remove and reinstall any accessories....Grab bars,bench seating...etc Need Answer By: ASAP ADDITIONAL COST: [AYES OR ❑ NO TIME TBD DAYS SUGGESTION: Replace shower valves and heads with new,provide direction on ADA requirements and accessories Contractor Signature: 1?on zV Project Manager ATTACHED SHEETS: ❑ YES OR ❑ NO REPLY: ounty esponse ( arry Mast) - Per rob�ion epartment re�iin replace al existing shower valves,shower heads accessible shower accessor bench seatihowers at rooms 121 and 137. New shower accessories and plumbing fixtures to match existing and shall comply with current accessibility standards and nonresidential mandatory measures for indoor water use. One shall stall in each room shall be ccessible and shall comolu with C5C 118-608 Shower compartments. Change Order Required: ❑ Yes or ❑ No Owner Representative Signature: Date: TODD COMPANIES DATE: 9/16/2025 P O BOX 6820 CONTRACTOR: Fortune-Ratliff General Contractors Inc. VISALIA, CA 93290 JOB: 25057 Probation Tenant Improvements (P) PH (559) 651-5820 DESCRIPTION: RFI#19- Provide(N) shower valves and trim FAX(559) 651-5830 in restrooms# 137 & 121 Qty 4 E-MAIL jt2@jt2inc.com CHANGE ORDER PROPOSAL Contract Time Extension: 25057 - P003 pg I of2 *UPON APPROVAL OF COS'rs,TODD REQUIRES A MINIMUM OF 5 WORKING DAYS TO SCHEDULE WORK* Material Costs DIRECT MATERIAL COST $ 2,984.83 SUBTOTAL MATERIAL $ 2,984.83 Labor Costs PLUMBER 44 HRS @ $ 97.26 HR. $ 4,279.44 LABOR BURDEN 40% OF E-G $ 1,711.78 SUBTOTAL $ 5,991.22 TRAVEL TIME TRIPS $ 60.00 TRIP $ - TRAVEL TIME HRS @ $ 65.00 HR. $ - SUBTOTAL LABOR $ 5,991.22 Equipment/Other Costs EQUIPMENT-Tool Support Truck 16 HRS @ $ 45.00 HR. $ 720.00 SUBTOTAL OTHER DIRECT COST $ 720.00 SUBTOTAL PRIME COSTS $ 9,696.05 OVERHEAD/PROFIT 15% $ 1,454.41 SUBTOTAL $ 11,150.45 TOTAL COST $ 119150 ESTIMATOR:MM/pa PRICING IS VALID ON THIS CHANGE ORDER FOR 14 CALENDAR DAYS. AFTER 14 DAYS AND PRIOR TO FINALIZING THE CHANGE ORDER, CON`TAC'I'TODD TO CONFIRM THE PRICE REMAINS VALID.THIS IS DUE TO THE CURRENT HIGH VOLATILITY IN MATERIAL PRICING. R:\AR-Billings&Change Orders\Job Files 2025\25057-Fortune Ratliff-Probation Tenant Improvements(P),Clovis\Changefile\P003- RFI#19 Provide(N)_Shower valves\CO Detailsheet(long form)-P003 TODD COMPANIES DATE: 9/16/2025 P O BOX 6820 CONTRACTOR: Fortune-Ratliff General Contractors Inc. VISALIA, CA 93290 JOB: 25057 Probation Tenant Improvements (P) PH (559) 651-5820 DESCRIPTION: RFI#19-Provide(N) shower valves and trim FAX(559) 651-5830 in restrooms# 137& 121 Qty 4 E-MAIL jt2@jt2inc.com CHANGE ORDER PROPOSAL Contract Time Extension: 25057 - P003 pg2 oft Break down of materials: UOM Quantity Rate Total ZURN Z7100 SS X LH X HW ADA SHOWER W/SLIDE BAR EA 2 540.00 $ 1,080.00 ZURN Z7121 SS X LH FIXED HEAD SHOWER NON ADA EA 2 418.50 $ 837.00 1/2"COPPER PIPE FT 40 5.40 $ 216.00 1/2"COPPER COUPLING EA 8 1.35 $ 10.80 1/2"COPPER 45 EA 8 2.70 $ 21.60 1/2"COPPER 90 EA 24 1.35 $ 32.40 1/2"COPPER M.A. EA 12 1.35 $ 16.20 1/2"BA.DROP EARS EA 4 14.85 $ 59.40 2X6 BLOCKING EA 12 6.75 $ 81.00 BRAS CAP UP EA 4 9.45 $ 37.80 CADDY STRAPS EA 8 8.10 $ 64.80 1/2"PLASTIC 2H CLAMPS EA 16 0.68 $ 10.88 5/8"X1 FIBER GLASS INSULATION FT 40 5.06 $ 202.40 5/8 X 1 CALCIUM BLOCKS EA 12 6.75 $ 81.00 97 PVC JACKETING EA 12 5.40 $ 64.80 INSULATION TAPE ROLL 1 81.00 $ 81.00 SOLDEN EA 1 67.50 $ 67.50 FLUX EA 1 20.25 $ 20.25 --------- -------- Total $ 2,984.83 ADA *ACCESSORIES,GRAB BARS, SEAT,ETC.-BY OTHERS Break down of total hours: Men Hrs Total PLUMBER-Rough In hot/cold water 3 8 24 PLUMBER-Install valves&blocking 3 4 12 PLUMBER-Insulate hot 3 2 6 PLUMBER-Install trim 1 2 2 Total Hours: 44 R:\AR-Billings&Change Orders\Job Files 2025\25057-Fortune Ratliff-Probation Tenant Improvements(P),Clovis\Changefile\P003- RFI#19 Provide(N)_Shower valves\CO Detailsheet(long form)-P003 TODD COMPANIES P.O. Box 6820 (1701 N. Clancy Ct.) Visalia, CA 93290 Ph. (559) 651-5820 Fax (559) 651-5830 Date: 09/18/2025 Emailed TO: Fortune-Ratliff JOB: Probation Tenant Improvements, Clovis P.O. Box 26944, Fresno, CA 93729 JOB#: 25-057 ATTN: Quincy King, & Adam Myles We are sending you: ❑ Change Order ❑ Releases ❑ Copy of Letter ❑ Specifications ® Enclosed ® Other: SUBMITTALS Conies Date No. Description 1 911812025 3.0 Shower Submittal These are transmitted as checked below: ❑ Approved as Noted ❑ For your use ❑ Approved as Submitted ❑ For Bids Due ® As Requested ❑ Prints Returned on Loan ❑ Copies for Distribution ❑ Resubmit ❑ Copies for Approval ❑ Return ❑ Corrected Prints ❑ Returned or corrections ® For approval ® Submittal REMARKS: SIGNED BY: Xavier Ramirez DATE: 09/18/2025 \\TODD-FILE\Submittals\Job Files 2025\25-057 -Fortune Ratliff-Probation Tenant Improvements (P), Clovis\WORD DOCS\LOT-FT-2023.docx TODD COMPANIES C.S.L.N.788798,C36,A 3.0 SHOWER SUBMITTAL JOB# 25-057 SEPTEMBER 18, 2025 PROBATION TENANT IMPROVEMENTS CLOVIS, CA ********** FORTUNE-RATLIFF. P.O. BOX 26944. FRESNO, CA 93729 PHONE # (559) 432-1306 ********** TODD COMPANIES P.O. BOX 6820 1701 N. CLANCY CT. VISALIA, CA 93290-6820 PHONE # (559) 651-5820 FAX # (559) 651-5830 FOR PURPOSES OF AVAILABILITY,MULTIPLE MANUFACTURERS ARE SUBMITTED FOR APPROVAL FOR THE SAME PRODUCT.ONCE ORDERED ONLY ONE MANUFACTURER WILL BE PROVIDED. INDEX SHOWER SUBMITTAL - #3.0 JOB# 25-057 PROBATION TENANT IMPROVEMENTS CLOVIS, CA FIXTURES SHOWER - SH SH-1 SH-2 (ADA) SHOWER ( SH - 1 ) ZURN TEMP-GARD SHOWER UNIT Z7121 -SS-LH TAG ENGINEERING SPECIFICATIONS:ZURN Z7121-SS-LH Single handle pressure balancing mixing shower unit with volume control,single bronze stem,stainless steel balancing piston integral with stem assembly, metal lever handle, integral service stops, and brass adjustment limit stop screw in cap. Complete with double seal packing, adjustable brass packing nut, and removable brass seats; all exposed trim with polished nickel chrome plated surface.Valve supplied with standard shower head,arm and flange.The hot and cold inlets and shower outlet are in 1/2"female copper sweat connections. 6 1/8 11551 5 C1271 SHOWER DISCHARGE 28[711] OPTIONAL FINISHED WALL 3 4 19 2 13 — HOT & COLD INLETS � Y 2 3 8 60 t1/2[13] 4 48[1219] ADJUSTMENT [102] OPTIONAL MIN. LESS STOPS 5� 5 1/2 [140] FLOOR LINE MIN. WITH STOPS Note: All dimensions are for reference only. Do not use for pre-plumbing OPTIONS(Check/specify appropriate options)Use with Z7000 prefix STANDARDS Suffix Description Tested to meet the following standards for -BC Back Connections(1/2")(For 900 Installations), valves and plumbing fittings: Shipped as Loose Adaptors, to be Installed in the Field ASSE Standard No. 1016 _ -CC Conversion Cover Plate CSA Standard B1 25-M89 _ -DT Dial Thermometer Shower heads meet ANSI Al 12.18.1 -IP 1/2" Female Threaded Connections, Shipped as Loose Meets or Exceeds ANSI Al 17.1 M standard Adaptors, to be Installed in the Field for physically handicapped _ -MT Metal Cover, Escutcheon&Stem Handle -RC Reverse Connections(For Back-to-Back Installations) -SC Pair of Dual Spring Check Valves -STH ABS Chrome Plated Handle with Screw and Button CIP �55E -WF Wall Mounting Flange For Fiberglass or Panel Wall Installation of GIID ZURN INDUSTRIES, LLC ♦ COMMERCIAL BRASS OPERATION ♦ 2640 SOUTH WORK STREET ♦ FALCONER NY 14733 Phone: 1-716-665-1132 ♦ Fax: 1-716-665-1135 ♦ World Wide Web: www.zurn.com In Canada: ZURN INDUSTRIES LIMITED ♦ 3544 Nashua Drive ♦ Mississauga, Ontario L4V1L2 ♦ Phone: 905/405-8272 Fax: 905/405-1292 Rev.D Date:9/24/08 C.N. No. 107870 AquaSpec°is a registered trademark of Zurn Industries,LLC ©2007 Zurn Industries,LLC Dwg. No.66229 Product No.Z7121-SS-LH SHOWER ( SH - 2 ) ( ADA ) ZURN TEMP-GARD SHOWER UNIT Z7100-SS-LH-HW ENGINEERING SPECIFICATIONS:ZURN Z7100-SS-LH-HW TAG Single handle pressure balancing mixing shower valve,with single bronze stem, stainless steel balancing piston integral with stem assembly, metal lever handle, integral service stops and brass adjustment limit stop screw in cap. Complete with double seal packing, adjustable brass packing nut, and removable brass seats; all exposed trim with polished nickel chrome plated surface. Valve supplied with hand/wall shower head, 60"[1524mm] flexible metal hose,24"[610mm]mounting slide barwall connection.The valve hot and cold inlets, and shower outlet are standard with 1/2"female copper sweat connections. 6[152] OPTIONAL) CENTER OF TOP OF BRACKET T TOP OF FLOOR 66 TO 68 [1676 TO 1930] HOSE INLET SUPPLY 74 TO 76 [1880 TO 1930 ] O SHOWER DISCHARGE 32[813] OPTIONAL I' 5/8[16ADA OF & COLD INLETS Y-' i +1/2[13] FINISHED WALL _��ADJUSTMENT [102] 40[1016] 2 3/8[60] MIN. LESS STOPS OPTIONAL 5 1/2 [1 40] MIN. WITH STOPS FLOOR LINE Note: All dimensions are for reference only. Do not use for pre-plumbing OPTIONS(Check/specify appropriate options) Use with Z7000 Prefix STANDARDS Suffix Description Tested to meet the following standards for -BC Back Connections(1/2")(For 900 Installations), valves and plumbing fittings: Shipped as Loose Adaptors,to be Installed in the Field ASSE Standard No. 1016 _ -CC Conversion Cover Plate ASME Al 12.18.1/CSA B125.1 -IP 1/2"Female Threaded Connections,Shipped as Loose Meets or Exceeds ANSI Al 17.1 M standard Adaptors,to be Installed in the Field for physically handicapped _ -MT Metal Cover, Escutcheon,&Stem Handle -RC Reverse Connections(For Back to Back Installations) -SC Pair of Dual Spring Check Valves _ -STH ABS Chrome Plated Handle with Screw and Button -VB In-line Vacuum Breaker C�p -WF Wall Mounting Flange For Fiberglass or Panel Wall Installation ADA DESIGNED Handwall Options see Z7000-HW ZURN INDUSTRIES, LLC ♦ COMMERCIAL BRASS OPERATION ♦ 2640 SOUTH WORK STREET ♦ FALCONER NY 14733 Phone: 1-716-665-1132 ♦ Fax: 1-716-665-1135 ♦ World Wide Web: www.zurn.com In Canada: ZURN INDUSTRIES LIMITED ♦ 3544 Nashua Drive ♦ Mississauga, Ontario L4V1L2 ♦ Phone: 905/405-8272 Fax: 905/405-1292 AquaSpec°is a registered trademark of Zurn Industries,LLC Rev.C Date: 11/26/08 C.N. No. 107915 ©2008 Zurn Industries,LLC Dwg. No.66216 Product No.Z7100-SS-LH-HW Shelco Industries 5425 E. Home Ave. Ste. 101 Fresno, Ca. 93727 Phone 559-233-3763 Fax 559-233-3766 Change Order TRANSMITTAL DATE: 8/15/2025 TO: Fortune Ratliff ATTENTION: Ron PROJECT: Probation TI REFERENCE: RFI 19 Furnish and install the following at rooms 121 & 137. 2 — B5181 shower seat 2 — 24" grab bars 2 — 48" grab bars Material $941 .85 Tax $78.64 Labor $240.00 Total $1,260.49 FROM: Bob Stubenberg Number of pages attached to this cover sheet: Shelco Phone 559-233-3763 Shelco Fax 559-233-3766 License #423565 DIR #1000007336 REVERSIBLE SOLID PHENOLIC B-5181 Technical Data FOLDING SHOWER SEAT Shower Seat in Reversed Position 33" 840mm 195mm1/2" ��170mm 22-5mm 495mm 170mm 565mm 16-1/2" 420mm 5-1/2" " 14omm 340m 3aomm Finish Face of Wall Bolts Removed and Replaced 1-3/8' to Reverse 35mm c-l= I Seat Position 17-5/16' Mounting 440mm I Flanges(2) P 21 7/8" I III 555mm 14-7/16" 20-15/16" 365mm 530mm I L74 ® Sl� S S S Universal/Barrier-Free Support SConcealed wall 2.1/q" S Recommended Tube S backing to comply with 55mm Mounting Height local building Dia. "17"to 19" Baseplate codes,not Bolt Circle 2-1/4" 430to485mm with Spring furnished 1.1/8" 55mm by Bobrick. 30mm Guide Bracket g S S Finish Face of Floor 4_ "Consult local building codes Left-Hand Seat Shown MATERIALS: Seat—One-piece,1/211 (13mm)thick,solid phenolic with matte-finish,ivory-colored,melamine surfaces and black phenolic- resin core—cannot delaminate.Integral slots for water drainage.Secured to frame with stainless steel carriage bolts and acorn nuts.Reversible for left-or right-hand installation in the field. Frame—18-8 S,type-304,stainless steel with satin finish. 16-gauge (1.6mm),1-1/411 (30mm) square tubing and 18-gauge (1.2mm),111 (25mm) diameter seamless tubing. Mounting Flanges(2)—18-8 S,type-304,3/1611 (5mm)thick stainless steel with satin finish.311 (75mm) diameter with three mounting screw holes. Baseplate—18-8 S,type-304,heavy-gauge stainless steel. Spring—17-7,type-301,24-gauge (0.6mm) stainless steel.Spot-welded to baseplate. Guide Bracket—18-8 S,type-304,16-gauge (1.6mm) stainless steel with satin finish. continued... The illustrations and descriptions herein are applicable to production as of the date of this Technical Data Sheet. Revised 4/09 Series E Printed in U.S.A. The manufacturer reserves the right to,and does from time to time,make changes and improvements in designs and dimensions. ©2009 by Bobrick Washroom Equipment,Inc. OPERATION: Shower seat folds up against wall when not in use.The spring at the top of the baseplate holds seat in upright position until released by pulling the top of the seat away from the wall.Mounting flanges and guide bracket allow for varying mounting heights and leave the floor clear for easy cleaning.Nonporous solid phenolic seat has slots to permit water to drain,does not splinter or require oiling,and will not support growth of bacteria.Slotless round-head carriage bolts and acorn nuts provide additional safety to user.Bobrick shower seats,when properly installed,have sufficient strength to support 360 lbs., (163 kg) complying with barrier-free accessibility guidelines(including ADAAG in the U.S.A.). INSTALLATION: Installation to Wall.Secure unit to wall at points indicated by an S,with the two mounting flanges located at top and the baseplate and guide bracket below.The bottom of the support tube must be positioned within the baseplate and guide bracket before they are secured to wall.Mounting height of shower seat must comply with local building codes. For stud walls,provide concealed backing to comply with local building codes and secure with#14 x 2-1/2" (6.3 x 65mm) stainless steel sheet-metal screws furnished by manufacturer. For prefabricated shower stalls,provided adequate backing by the shower stall manufacturer. Secure with#14 x 2-1/2" (6.3 x 65mm) stainless steel mounting screws furnished by manufacturer. For masonry walls,provide fiber plugs or expansion shields for use with furnished screws,or provide 1/4" (6mm)toggle bolts or expansion bolts. Caution:These shower seats are no stronger than the anchors and walls to which they are attached and,therefore, must be firmly secured in order to support the loads for which they are intended. Consult and comply with local building codes. How to Reverse Shower Seat.The solid phenolic shower seat surface may be positioned on the stainless steel frame with the longer 20-15/16" (530mm) side on the left or right.The repositioning of the shower seat surface may be done on the frame before installation on the wall,or after the unit has been installed. If repositioning the seat surface before installation of the unit on the wall;place entire unit on a horizontal surface;remove carriage bolts and acorn nuts(4);turn seat over reversing position of long and short ends;reinstall carriage bolts and acorn nuts. If repositioning the seat surface after the unit has been installed on the wall;lower folding seat to horizontal position;remove carriage bolts and acorn nuts(4);turn seat over reversing position of long and short ends;reinstall carriage bolts and acorn nuts. Important Notes:Support square frame tubes when loosening and removing carriage bolts and acorn nuts;the square frame tubes may separate from the round tubes that support the solid phenolic shower seat.If square and round frame tubes come apart when solid phenolic shower seat is removed,reassemble by placing round frame tube ends in the round holes on the sides of the square frame tubes. SPECIFICATION: Reversible folding shower seat shall have a frame constructed of type-304,satin-finish stainless steel that consists of 16-gauge (1.6mm),1-1/4" (30mm) square tubing and 18-gauge (1.2mm),1" (25mm) diameter seamless tubing.Seat shall be one-piece, 1/2" (13mm)thick,solid phenolic with matte-finish,ivory-colored,melamine surfaces,and black phenolic-resin core;secured to frame with stainless steel carriage bolts and acorn nuts.Seat shall be reversible for left-or right-hand installation in the field. Shower seat shall be equipped with two 3" (75mm) diameter mounting flanges constructed of type-304,3/16" (5mm) thick, satin-finish stainless steel;a guide bracket constructed of type-304,16-gauge (1.6mm),satin-finish stainless steel;and a spring constructed of type-301,24-gauge (0.6mm) stainless steel that is spot-welded to a baseplate of type-304,heavy-gauge stainless steel.Seat shall remain in upright position when not in use.Shower seat shall comply with barrier-free accessibility guidelines (including ADAAG in the U.S.A.).Manufacturer's service and parts manual shall be provided to the building owner/manager upon request. Reversible Folding Shower Seat shall be Model B-5181 of Bobrick Washroom Equipment, Inc., Clifton Park, New York;Jackson,Tennessee; Los Angeles, California; Bobrick Washroom Equipment Company, Scarborough, Ontario; Bobrick Washroom Equipment Pty. Ltd.,Australia; and Bobrick Washroom Equipment Limited,United Kingdom. The illustrations and descriptions herein are applicable to production as of the date of this Technical Data Sheet. B-5181 S/E Rev.4/09 Printed in U.S.A. The manufacturer reserves the right to,and does from time to time,make changes and improvements in designs and dimensions. ©2009 by Bobrick Washroom Equipment,Inc.