HomeMy WebLinkAbout2408C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JACALITOS CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 2 LOST HILLS ROAD, BRIDGE NUMBER: 42CO078 NOVEMBER 7, 2025 FEDERAL PROJECT NUMBER: BRLO-5942(234) PAGE 1 OF 2 CONTRACT NO. 24-08-C TO: CAL VALLEY CONSTRUCTION, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), 10 -WORKING DAYS will be added to the contract time. REMOVE UNFORSEEN BURIED OBJECTS, CONCRETE DEBRIS, AND OLD H-PILES FROM THE ABUTMENT AREAS - EXTRA WORK This compensation adjustment was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, remove and dispose the buried underground objects, concrete debris, and H-piles in the abutment areas. Perform all work according to Section 19, "Earthwork," of the Special Provisions and/or Standard Specifications. Payment for this work will be made as extra work at Force Account according to Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions; total compensation for this work resulted in $41,646.47. 10-working days will be added to the contract time for the above referenced extra work, in accordance with Section 8-1.07B, "Time Adjustments," of the Standard Specifications and Special Provisions. _Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. _RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JACALITOS CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 2 LOST HILLS ROAD, BRIDGE NUMBER: 42CO078 NOVEMBER 7, 2025 FEDERAL PROJECT NUMBER: BRLO-5942(234) PAGE 2 OF 2 CONTRACT NO. 24-08-C NET COST THIS CHANGE ORDER: $41,646.47 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: 10 -WORKING DAYS Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: Cal Valley Construction, Inc. Contractor Mandeep S. Sekhon, PE Construction Engineer cyan �orzgGaJ By Rpn Douglas(Nov 10, 2506:15:37PST) APPROVED BY: Digitally signed by Steven Project Engineer Steven White White Date:2025.11.12 Title 10:56:07-08'00' Steven E. White, Director Nov 10,2025 Public Works and Planning Accepted Date: Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials, except as may otherwise be _Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.