HomeMy WebLinkAbout2418C CCO 03.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 03 DRAPER STREET TO CLAYTON AVENUE OCTOBER 20, 2025 STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 1 OF 4 CONTRACT NO. 24-18-C TO: DON BERRY CONSTRUCTION, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), 20 -WORKING DAYS will be added to the allotted contract time. PART I: INSTALL K-MARKERS AT BETHEL AVENUE INTERSECTON— EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install K- markers at Bethel Avenue intersection as per the attached revised Plan Sheet 76B, as directed by the engineer. Perform all work in accordance with Section 82, "Signs and Markers," of the Standard Specifications and Special Provisions. Compensation for the materials will be made at an agreed price of$1,237.50, in accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. This agreed price includes compensation for all labor, materials, equipment, traffic, incidentals, overheads, markups, and profits, no additional compensation will be made thereafter. This amount will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: INSTALL ACCESSIBLE PEDESTRIAN SIGNALS (APS) AT GOLDEN STATE BOULEVARD AND MERCED STREET INTERSECTION — EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install a total of four(4) additional APS units at the Golden State Boulevard and Merced Street intersection. Perform all work in accordance with Section 86-1.02T, "Accessible Pedestrian Signals," of the Standard Specifications and Special Provisions. Compensation for the materials will be made at an agreed price of$7,920, in accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. This agreed price includes compensation for all labor, materials, equipment, traffic, incidentals, overheads, markups, and profits, no additional compensation will be made thereafter. This amount will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors therefore the prices shown above. _Const.Management RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 03 DRAPER STREET TO CLAYTON AVENUE OCTOBER 20, 2025 STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 2 OF 4 CONTRACT NO. 24-18-C TOTAL COST PART II: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS PART III: REMOVE AND REPLACE EXISITING STRIPING AT TEMPERANCE AVENUE INTERSECTION — EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, blackout the existing striping at the Temperance Avenue intersection which was placed in Phase 1 of the Golden State Boulevard Project and place new striping to match the current project striping. Perform all work in accordance with Section 84, "Markings," of the Standard Specifications and Special Provisions. Compensation for the additional striping will be made at the unit bid prices of the pertaining bid items (shown below), compensation for the removal of the existing striping (includes sealing of the surface) will be made at the agreed unit prices; $0.81 per linear foot for Details 12, 25, 39, and 39A, in accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/0) % 54 4" White 2-Coat Paint Traffic LF 856.00 $0.70 $559.20 5.30 31.89 Striping (Detail 8, 12, 27B, 38, 38A) 55 6" White 2-Coat Paint Traffic LF 451.00 0.78 351.78 36.20 Striping (Detail 39, 39A) 1.88 57 4" Yellow 2-Coat Paint Traffic LF 1,550.00 1.30 2,015.00 13.03 37.25 Striping (Detail 21, 22, 24, 25, 29, 31, 32) TOTAL INCREASE: $2,925.98 A total of 2,568 linear feet of Details 12, 25, 39, and 39A were blacked out, compensation resulted in (2,568 x 0.81 = 2,080.08) $2,080.08. Total compensation for the additional striping resulted in $2,925.98, this amount will be paid through Bid Item Nos. 54, 55, and 57. Total compensation for the removal of the existing striping resulted in $2,080.08, this amount will be paid through Bid Item No. 3, Supplemental Work with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. _RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 03 DRAPER STREET TO CLAYTON AVENUE OCTOBER 20, 2025 STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 3 OF 4 CONTRACT NO. 24-18-C TOTAL COST PART III: $2,925.98 INCREASE TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: GRANT A TIME EXTENSION This time extension was requested by the contractor. Grant a time extension of 20-working days to the "Second Order of Work" due to the long lead time for the traffic signal equipment delivery. This time extension is being granted according to Section 8-1.07B, "Time Adjustments," of the Standard Specifications. TOTAL COST PART IV: $0.00 (NO COST) TOTAL TIME EXTENSION PART IV: 20 -WORKING DAYS PART V: REVISE PROJECT PLANS (SELMA REGION) This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 77A with the attached revised Plan Sheet 77B. The revision included in this revised plan sheet adds a total of six (6) roadside signs, including R6-2, R1-2, R3(CA)(40), R9-3, and R2-1(40). Perform all work in accordance with Section 82, "Signs and Markers," of the Standard Specifications and Special Provisions. Compensation for the additional roadside signs will be made at unit bid prices of the pertaining bid items (shown below), and compensation for the additional mobilization will be made at agreed price of$605, according to Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions. These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Increased Items: Item Total Total No. Description Unit Quantity Price Amount NO (%) 51 Roadside Sign EA 6.00 $450.00 $2,700.00 35.29 35.29 TOTAL INCREASE: $2,700.00 Total compensation for the additional roadside signs resulted in $2,700.00, this amount will be paid through Bid Item No. 51. Compensation for the additional mobilization, $605 will be made through Bid Item No. 3, Supplemental Work, with no net increase to the contract. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 03 DRAPER STREET TO CLAYTON AVENUE OCTOBER 20, 2025 STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 4 OF 4 CONTRACT NO. 24-18-C TOTAL COST PART V: $2,700.00 INCREASE TOTAL TIME EXTENSION PART V: ZERO (0) -WORKING DAYS NET COST THIS CHANGE ORDER: $5,625.98 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: 20 -WORKING DAYS a ka� Jersephene Vang, Resident Engineer APPROVAL RECOMMENDED: Don Berry Construction, Inc. Contractor Mandeep S. Sekhon, PE Construction Engineer T�wv Z�)euld e By APPROVED BY: Steven Digitally signed by Dan Dorval-CFO/SEC Steve white White Date:2025.11.03 Title 08:47:01 -08'00' Steven E. White, Director Oct 29,2025 Public Works and Planning Accepted Date: Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials, except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. TYPE K (OM2-1 H) GSB—SB1" t57.79 63.50'Lt W y • CONFORM TO Exist STRIPING +ll CUSTOM * + — Q Q � +i TYP o- + +� R■ 1 � � • CONFORM TO Ex lPI GA 9G y • • —1 H) CUSTOM + fAD • 1°u x X R2 1 R1_1 ti / x g x x x R2X5A i • R� E M2-1H) 25 12 (-j O 112r� 125Y� 139r1 39 R81 CA HOH y39 y121 C` 2' I 1 1 4- I I I r y 251 o ,,:x.,j 12 pGSB—SBf" +59 ..94 30 9 82 ■ ■ ■ ■ ■ ■ SEEMS f 12' I 12' . . Lt 21 39 12' 12' .� ►1 12' GSB—SB1"LINE 12' 4• GS8—S81" +60.69—, 0.03'Rt 12' 12' g 21 - CONFORM TO ® 25 • � 3f CONFORM 0 Exist STRIPING z' CONFORM TO Exist STRIPING R1-1 GSB SB1"t61.17 30.99'Rt Exist STRIPING GOLDEN STATE BLVD 112 1 I GSB—NBf'LINE 1 t CONF TO Exist STRIPING 1 t 3' 12' I 12' 12' 12' 12' 12' -I— • Imo- - 12' I I 12' 12' 12' ----sa I « R6-1 Rf 12' 12' g z © 2r q 4' j j39 J • ®3 12 4' I 2.5' 25 d I I 'H FB•J® " 25 j i2 1-J • ■ 39 n 25 12 h / a 1Y3_1 + m + • • CO70RM TO Exist STRIPING _ (STOP AHEAD) • W10-5 R•1 Rl-1 •W10-5P • F o • •W10-5P W10-2 Rt 0 CITY OF KINGSBURG GOLDEN STATE BLVD SCALE 1"= 40' ti e e ql 1e eJ 2. W 1e yml O N e e O `I e b C�_g1 Y O a b Q V DATE RECORD DRAWING u PROJECT-PHASE 2 �GSBp yOf S� �fowl.eR DEPARTMENT OF PUBLIC WORKS AND PLANNING DESIGNED: CYNTHIA HORNER RESIDENT ENGINEER DATE ' W EOGM A.Np21EGA� GOLDEN STATE CORRIDOR- V �' DRAWN: ERIKCHIN ® °�Na. 61555 ECONOMIC DEVELOPMENT AND •n uJ n SIGNAGE AND STRIPING 12/12/2024 « Ero.B 30 25 • INFRASTRUCTURE IMPROVEMENTS P CHECKED: EDGAR NORIEGA MARK THOMAS SUPERVISING ENGINEER t FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG 4rf a Cll GOLDEN STATE BOULEVARD �TFOR� 4�/F 0'R RAP DRAWING NO. SS-2 SHEET NO. 76B TOTAL 109 4 + + + GSB-SB7"t65.50 93.10'Lf ONFORM TO Exist STRIPING GSB-SB2" t82.01 93.13' Lt ONFORM TO Exist STRIPING GSB-SBl" +49.29 93.06'Lf GS6-S82" +28.00 93.23' Lt • CONFORM TO Exist STRIPIN ONFORM TO Exist STRIPING A o c R28E CA • • NFORM TO Exist STRIPING / +� + r • ILLBOARD • • R81 CA v a"J9 3B/ R �+ ++ + °+� °o R28E CA CA R28E CA R28E CA R28E CA CU OM 39 RB 0 z4 • x x x x x x 24, R 38 4 x x ROBE CA x ° / I Exist $ 12 ® 3 25 C / ® �t 12't ZS r I I I 25 _ 4' n 38 12 I 1 17 z51 2' CONFORM TO Exist STRIPING II Imo----7t------ ---------------- -------------------- I L 12 12IN I 4'MIN 12' 1 I I 12, 22B-SB1"LINE 12 'O � 12' GSB-SB2"LINE I 188f00 189+00 25 190+00 191+00 z't 192+0;�4' 193+00 VIMIN 11t' 196" 1 7+00 19 + 199+ s GOLDEN STATE' BLVD ° GOLDEN STATE BLVD 11t' GSB-NBl"LINE ,'t 11 t GSB-NB2'LINE 2t' Q —188tB��1I 189kOQ 190t 't 72 12 +0 193+00 —19 4-00 —Z16,no 12' 1Qp-l-0L - N 12' 12' • I25�1 I 1 t (Fri5f • 38 9 ® 25 St I�2 I I�11 SNS CON 0 STRIPIN ss` w W -2(Rt) 1 j39�� 12 39 �1 _ a'39 ° R6-1 12 R6-3 39 W70-2 Lt CONFORM TO Exist STRIPING + o o m o • � • _8 - R6-3 CITY OF KINGSBURG GOLDEN STATE BLVD SCALE 1"= 40' D •• h R1-2 25 r x o 1 + + + + + R2-1 40 `1 ONFORM TO-rigt--S IPJ�IG 21' 12 r C FOR TO Exist STRIPING �� 38 o y _ 12 39 R2-1 40 e " JB 4' R2-1(40) I 24't 1 z p 12' 7 I Gy a ® R2-145 -- — 14't W3_ A'HITSON AVE 15' Rs 1. Rs 2 12• R30 4 GOLDEN STATE y ql yb o• 12' f GSB-CL2"UNE 25 ko 359f00 '� 362+00 365+00 m +99. 16'Rt 39 R= 12 10 "� G 12' GSB-CL2" 95 24. _ It— ym _ 12' ZF. 12 Z. v — + ry IF 12.* W3-3 12 39 T 12 4-38 T • N QV I- * I^ • h + GSB-CL2"+65.32 34.54'Rt • 7UT'LKER USTOM25 Uj7L/TY[ MARKER ITY • ti *2 + " CITY OF SELMA 'sx GOLDEN STATE BLVD SCALE- 1"= 40' V DATE RECORD DRAWING tk PROJECT-PHASE 2 1yGSBp yOf S� �owl.eq, DEPARTMENT OF PUBLIC WORKS AND PLANNING DESIGNED: CYNTHIA HORNER RESIDENT ENGINEER DATE , � - � � DGAR A.NOPoEGA� GOLDEN STATE CORRIDOR- DRAWN: ERIKCHIN R•. 6isss ECONOMIC DEVELOPMENT AND .n u3 n SIGNAGE AND STRIPING 12/12/2024 « El.6 3D 25 • INFRASTRUCTURE IMPROVEMENTS P CHECKED: EDGAR NORIEGA MARK THOMAS SUPERVISING ENGINEER DATE ')4 CIVIL,�p� FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG �� CAS"- GOLDEN STATE BOULEVARD "'7r'�R� A/%F O'R RAP ��� DRAWING NO. SS-3 SHEET NO. 77B TOTAL 109 4