HomeMy WebLinkAbout2328C CCO 03.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER COUNTY SERVICE AREA 44C CHANGE ORDER NO. 3 WATER DISTRIBUTION FACILITY IMPROVEMENTS OCTOBER 15, 2025 CONTRACT NO. 23-28-C PAGE 1 OF 1 TO: WEST VALLEY CONSTRUCTION COMPANY, INC.: Make the following change(s) to the plans and specifications or do work not in the plans and specifications for this contract. Because of the proposed change, ZERO (0) -WORKING DAYS will be granted to the allotted contract time. The revised date of completion for the Second Order of Work is October 30, 2025. SUSPENSION OF CONTRACT This change was requested by the contractor. Suspend the contract from January 9, 2025, through July 29, 2025 (a total of 139 working days) for the hydropneumatic tank fabrication after submittal approval. This contract suspension is being made according to Section 8-1.06, "Suspensions," of the Special Provisions. This extends the Second Order of Work completion date to October 30, 2025. NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS w. James Drews, Resident Engineer APPROVAL RECOMMENDED: WEST VALLEY CONSTRUCTION CO., INC. 0AX "�— Contractor Mandeep S. Sekhon, PE Construction Engineer By 94P� APPROVED BY: Digitally signed by Steven Assistant Vice President Steven White White Date:2025.10.16 Title 16:25:51-07'00' Steven E. White, Director Oct 16,2025 Public Works and Planning Accepted Date: Date: Contractor-white We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor-Canary this proposal is approved,that we will provide all equipment,furnish all materials, except as may otherwise be Bus.office-Green noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board-Pink _Const.Mgmt-Blue therefor the prices shown above. _RE/Arch.-Blue _Proj.Dev.-Goldenrod If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the _Contractor before specifications as to proceeding with the ordered work and filing a written protest within the time therein Approval-White specified.