HomeMy WebLinkAbout24S08 DBH Olive Building Phase 1 CCO 004 Stakeholders Set 004.pdf coU�� County of Fresno Department of Public Works and Planning 1856 Development Services&Capital Projects Division FR�g� Steven E.White, Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: DBH Olive Avenue Roof Replacement&Fagade Repairs Contract No.: 24-S-08 D-25-017 Date: 2025-09-04 Contractor: Fortune-Ratliff General Contractor, Inc. Architect: Robina Wright Change Order No.: 004 Construction Contract Dollar Amount(BAI 73 2024-12-17) $3,165,830.00 Director's Change Order Limit: $170,791.50 Contract Time(Calendar Days): 137 Construction Start Date(NTP Issued 2025-03-05): 2025-03-05 Original Construction Completion Date: 2025-07-19 Change Order Scope of Work: PCO#010-May Damaged Plywood&Joist Replacement PCO#012-Hardie Soffit Panel Caulking PCO#013-June Damaged Plywood&Joist Replacement PCO#014.1 - T&M for Glulam Repairs and Window Board-Up PCO#015-RF121_0 Caulking at Soffit-Brick Transition Attachment(s): Contractors PCO, Change Order Summary Net Change Order Dollar Amount: $23,394.00 Net Calendar Days: 1 0 Total Change Order Dollar Amount To Date $124,319.00 Adjusted Contract Dollar Amount: $3,290,149.00 Director's Change Order Limit Balance: $46,472.50 Total Adjusted Calendar Days To Date: 10 Adjusted Construction Completion Date: 07/29/25 Reviewed- Cleared for Jamie Sylvester Digitally signed by Jamie Sylvester Approval Jamie Sylvester Date:2025.09.29 15:46:13-07'00' Principal Accountant, Public Works&Planning -, t Digitally signed by Barry Mast Reviewed: Barry Mast J' Date:2025.09.30 07:56:07-07'00' Supervising Architect,Architect of Record Reviewed: Keith M. Eckert 11 Keith M. Eckert 11 9.30.25 Senior Engineering Technician, Project Manager p S. Sekhon Digitally signed by Mandeep S.Sekhon Mandeep Reviewed: Mandeep Sekhon J Date:2025.10.01 11:34:03-07'00' Construction Division Engineer, Construction Manager William M. Kettler Digitally signed by William M.Kettler Reviewed: William M. Kettler Date:2025.10.01 13:06:10-07'00' Deputy Director of Planning Bernard J imeneZ Digitally signed by Bernard Jimenez Reviewed: Bernard Jimenez Date:2025.10.01 14:18:40-07'00' Planning&Resource Management Officer Steve White Digitally signed by Steve White Approved: Steven E. White Date:2025.10.01 14:25:40-07'00' Director of Public Works and Planning Approved: Buddy Mendes Not Applicable Board of Supervisors, Chairman Scan and forward Director Approved Copy to: CAO Paul Nerland pwpecontracts@fresnocountyca.gov c°U County of Fresno (9 Department of Public Works and Planning O� O Development Services&Capital Projects Division FR�gcl Steven E.White,Director COUNTY CHANGE ORDER REQUEST Project: DBH Olive Avenue Roof Replacement&Fagade Repairs Contract No.: 24-S-08 D-25-017 Date: 2025-09-04 Contractor: Fortune-Ratliff General Contractor,Inc. 2485 East Olive Avenue Fresno,CA 93727 (559)243-4200 Change Order No.: 004 Construction Contract Dollar Amount(BAI 73 2024-12-17) $3,165,830.00 Original Construction Completion Date: 2025-07-19 Change Order 004 is hereby approved by the County. Scope of Work: PCO#010-May Damaged Plywood&Joist Replacement PCO#012-Hardie Soft Panel Caulking PCO#013-June Damaged Plywood&Joist Replacement PCO#014.1-T&M for Glulam Repairs and Window Board-Up PCO#015-RFI 21_0 Caulking at Soffit-Brick Transition Attachment(s): Contractors PCO,Change Order Summary Net Change Order Dollar Amount: $23,394.00 Net Calendar Days: 1 0 Adjusted Contract Dollar Amount: $3,290,149.00 Total Change Order Dollar Amount To Date: $124,319.00 Total Adjusted Calendar Days To Date: 1 10 Adjusted Construction Completion Date: 2025-07-29 Keith Eckert Digitally signed by Keith Eckert Keith M.Eckert 11 Date:2025.09.04 13:30:42-07'00' Project Manager Date: 9/4/25 By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 24-S-08,Article VI shall apply. Adam Myles D':C=S,E=by Atlam Myles DI C=US,E=atlamm.Myl eatliH com,CN=Atlam Myles Accepted By: Fortune-Ratliff General Contractor,Inc. y Dete:2025.09.0514:38:15-0r00 Authorized Signature Date: 9/5/25 CHANGE ORDER SUMMARY Project: DBH Olive Avenue Roof Replacement & Facade Repairs Executed Change Order D. , "IrDays Descri 1 2025-03-21 $6,111.00 $0.00 0 Includes PCO# 1, 2, 3 2 2025-04-23 $90,988.00 $0.00 10 Includes PCO#4.1, 5, 6.1, 7 3 2025-05-15 $3,826.00 $0.00 0 Includes PCO#8, 9 4 2025-09-04 $23,394.00 $0.00 0 Includes PCO# 10, 12, 13, 14.1, 15 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 Totals $124,319.00 $0.00 10 ChangeProposed Executed Add Credit Rejected Pending Adj. Days Description Orders CO# 1 1 $2,003.00 0 Sheet metal flashing at soffit ASI-01 2 1 $1,824.00 0 RFI 090 Panel Patching 3 1 $2,284.00 0 ODU Platform per PR01 and RFI 12 4 $3,406.00 0 RFI 070 Roof Conduit Removal 4.1 2 $3,104.00 0 RFI 07 0 Roof Conduit Removal 5 2 $2,445.00 0 RFI 08 0 Expansion Joints 6 $26,902.00 5 RFI 14 0 Parapet Plywood Demo 6.1 2 $25,679.00 5 RFI 14 0 Parapet Plywood Demo 7 2 $59,760.00 5 Replacement of Roof Drains&Overflow Drains 8 3 $1,601.00 0 Damaged Plywood &Joist Replacement 9 3 $2,225.00 0 RFI 16 0 Parapet Cap Flashing 10 4 $4,439.00 0 May Damaged Plywood &Joist Replacement 11 $21,496.00 0 RFI 170 Walkway Pads Layout Change 12 4 $5,000.00 0 Hardie Soffit Panel Caulking 13 4 $5,073.00 0 June Damaged Plywood &Joist Replacement 14 $7,203.00 0 T&M for Glulam repairs and Window Board-Up 14.1 4 $5,185.00 0 T&M for Glulam repairs and Window Board-Up 15 4 $3,697.00 0 Caulking at Sofit-Brick Transition Totals $124,319.00 $0.00 $59,007.00 $0.00 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA- LICFNSF 496147 PCO# 10_0 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 5/29/2025 Fresno, CA. Attn: Keith Eckert $739.00/Daily Rate CP# 10 CC: Mandeep Sekhon Schedule Impact (Days): 0 Re: Damaged Plywood &Joist Replacement- May 2025 Keith: We herewith submit our Proposed Change Order to provide and install replacement of damaged plywood and joists uncovered during existing roofing demolition per Absolute Urethane's attached proposals and previously approved unit costs.This covers plywood &joist replacement for the month of May 2025. Costs for future plywood &joist replacement will be submitted monthly. SUB/SUPPLIER NAMES DESCRIPTION Absolute Urethane Replace five (5)joists $ 750.00 Absolute Urethane leplace thirteen (13) plywood sheet $ 3,380.00 SUB TOTAL $ - $ 4,130.00 Liability Insurance & BR 1.35% $ - $ 55.76 Subtotal SUB TOTAL $ - $ 4,185.76 P&P Bonds 1.00% $ - $ 41.86 Subtotal SUB TOTAL $ - $ 4,227.61 Fortune-Ratliff, Inc. OH & P 5% $ - $ 211.38 TOTAL CP $ - $ 4,439 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 ABSOLUTE Absolute Estimate URETHANE 6614 S Elm Ave LIC41088088 Fresno, CA 93706 Date Estimate# 5/21/2025 250053CO5 Name/Address Ship To 352 W.Bedford,#107 5555 E.Olive Ave Fresno,CA 93711 Fresno,Ca 93727 P.O Box 26944 Fresno CA 93729 Project DBH Olive Ave Description Qty Rate Total Replacement of 2x6 and 2x4 on lower pop outs 750.00 750.00 5 8ft PC x$150=$750 Total $750.00 Absolute Change Order 6614 S Elm Ave Fresno, CA 93706 Date Estimate# 5/21/2025 250053CO4 Name/Address Ship To 352 W.Bedford,#107 5555 E.Olive Ave Fresno,CA 93711 Fresno,Ca 93727 P.O Box 26944 Fresno CA 93729 Project DBH Olive Ave Description Qty Rate Total Replacement of Plywood May-13 sheets(Roof and lower pop outs) 3,380.00 3,380.00 13 sheets x$260=$3,380 Total $3,380.00 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA- LICFNSF 496147 PCO# 12_0 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 6/9/2025 Fresno, CA. Attn: Keith Eckert $739.00/ Daily Rate CP# 12 CC: Mandeep Sekhon Schedule Impact (Days): 0 Re: Hardie Soffit Panel Caulking Keith: We herewith submit our Proposed Change Order to provide and install caulking at Hardie soffit paneling per County of Fresno's request. SUB/SUPPLIER NAMES DESCRIPTION Wm. B. Saleh Co. Caulking @ Hardie Soffit Panels $ 4,652.00 SUB TOTAL $ - $ 4,652.00 Liability Insurance & BR 1.35% $ - $ 62.80 Subtotal SUB TOTAL $ - $ 4,714.80 P&P Bonds 1.00% $ - $ 47.15 Subtotal SUB TOTAL $ - $ 4,761.95 Fortune-Ratliff, Inc. OH & P 5% $ - $ 238.10 TOTAL CP $ - $ 5,000 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 Quincy King From: Eckert, Keith <keckert@fresnocountyca.gov> Sent: Tuesday,June 3, 2025 10:04 AM To: Quincy King Cc: Adam Myles; Chris Lewis; Mather, Dan; Sekhon, Mandeep Subject: 24508 DBH Building Reroof Follow Up Flag: Follow up Flag Status: Flagged Sir, Could you get me a cost proposal for caulking the joints of the hardie board under the soffits? Let me know if you need something more formal. Thankyou, Keith M. Eckert III Senior Engineering Technician r r Department of Public Works and Planning I Construction r �r 2220 Tulare St. 7th Floor Fresno, CA 93721 It1Y K NYMAf urn RAWK: Main Office: (559)600-4154 Direct: (559) 862-5024 Email:keckert@fresnocountyCA.gov Your input matters!Customer Service Survey 1 Fresno Office 1364 N. Jackson ft. B. SEH CO. Fresno, CA 93703 Phone:(559)9)255-2046 FAX: (559)255-2907 P2 DISTINCTIVE PAINTING DIR No. 1000003170 PROPOSAU CONTRACT SBE CERTIFIED To: Fortune Ratliff Date: June 9, 2025 Attn: Quincy Subject Job: DBH Olive Ave. Roof Replacement We propose to furnish at the above job all labor,materials,equipment,supervision,Workers'Compensation Property Damage and Liability Insurance necessary to complete in a thoroughly workmanlike manner all the work described below. SCOPE OF WORK: Cost to caulk the butt ends of the Hardi Plywood Soffits, as per Chris at the jobsite. Labor 44 hours @ $100.00 $4,400.00 Material 42 tubes @ $6.00 S 252.00 BID AMOUNT $4,652.00 STATE LICENSE NO. 268108 Wm. B. SALEH Co. : 'Qo�\ �W\ Ron Elia gm ACCEPTANCE-The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined. TERMS:This contract includes all the terms and conditions attached to this sheet and they are approved and accepted by the signatures below. This proposal must be accepted within 30 days of the date hereof to become a valid contract. If approved and accepted,please sign below and return a copy to our office. Date of Acceptance: Signature: BAKERSFIELD 2361 Cepheus Court MONTEREY OFFICE: 407 Reservation Rd.,Suite 3 OFFICE: Bakersfield,CA 93308 Marina,CA 93933 Phone: (661)393-8842 Phone:831-384-1552 Fax(661)393-8138 Fax: 831-384-7620 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA- LICFNSF 496147 PCO# 13_0 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 6/25/2025 Fresno, CA. Attn: Keith Eckert $739.00/Daily Rate CP# 13 CC: Mandeep Sekhon Schedule Impact (Days): 0 Re: Damaged Plywood &Joist Replacement-June 2025 Keith: We herewith submit our Proposed Change Order to provide and install replacement of damaged plywood and joists uncovered during existing roofing demolition per Absolute Urethane's attached proposals and previously approved unit costs.This covers plywood &joist replacement for the month of June 2025. SUB/SUPPLIER NAMES DESCRIPTION Absolute Urethane Replace ftwo (2)joists $ 300.00 Replace seventeen (17) plywood Absolute Urethane sheets $ 4,420.00 SUB TOTAL $ - $ 4,720.00 Liability Insurance & BR 1.35% $ - $ 63.72 Subtotal SUB TOTAL $ - $ 4,783.72 P&P Bonds 1.00% $ - $ 47.84 Subtotal SUB TOTAL $ - $ 4,831.56 Fortune-Ratliff, Inc. OH & P 5% $ - $ 241.58 TOTAL CP $ - $ 5,073 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 ABSOLUTE Absolute Estimate URETHANE 6614 S Elm Ave LIC41088088 Fresno, CA 93706 Date Estimate# 6/24/2025 250053CO8 Name/Address Ship To 352 W.Bedford,#107 5555 E.Olive Ave Fresno,CA 93711 Fresno,Ca 93727 P.O Box 26944 Fresno CA 93729 Project DBH Olive Ave Description Qty Rate Total replacement of joist in June 300.00 300.00 2 joist @ 150 per=$300 Total $300.00 Absolute Change Order 6614 S Elm Ave Fresno, CA 93706 Date Estimate# 6/24/2025 250053CO7 Name/Address Ship To 352 W.Bedford,#107 5555 E.Olive Ave Fresno,CA 93711 Fresno,Ca 93727 P.O Box 26944 Fresno CA 93729 Project DBH Olive Ave Description Qty Rate Total remove and replace 4x8 sheet of ply wood June 4,420.00 4,420.00 17 sheets x 260=$4,420.00 Total $4,420.00 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA. LICENSE 496147 PCO# 14 n1 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 7/28/2025 Fresno, CA. Attn: Keith Eckert $739.00/Daily Rate CP# 14R1 CC: Mandeep Sekhon Schedule Impact(Days): 0 Re: T&M for Glulam Repair and Window Board-Up REVISED 7/28/25 Keith: We herewith submit our Proposed Change Order to provide and install repairs for existing rotting glulam beam per RFI 19 0 response and board-up broken windows per attached recommendation from Dan Mather.All associated work was completed on a time and materials basis as requested. SUB/SUPPLIER NAMES DESCRIPTION Strausser Construction Glulam repairs &window board-up $ 4,824.00 SUB TOTAL $ - $ 4,824.00 Liability Insurance & BR 1.35% $ - $ 65.12 Subtotal SUB TOTAL $ - $ 4,889.12 P&P Bonds 1.00% $ - $ 48.89 Subtotal SUB TOTAL $ - $ 4,938.02 Fortune-Ratliff, Inc. OH & P 5% $ - $ 246.90 TOTAL CP 1 $ - $ 5,185 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: APPROVED 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)43 By Barry Mast at 11:48 am, Aug 27, 2025 STRAUSSER CONSTRUCTION,INC. Office (559)438-0083 2354W.War r Fax (559)438-0092 Fresno,CA 711 Cell (559)64Z-3Z 13 License 38251 Page 1 of 2 To: Fortune Ratliff Construction Inc Date: January 27, 2025 Attn: Quincy VOID From: Michael5trausser DIR#1000017893 Re: Olive Ave Cost Proposal for Glu-lam repair(RFI 19)&s guarding exterior broken windows Lumber&plywood$580.00 Copper green,epoxy,and rious fasteners$137.00 Labor 48 man hrs X 12.00 per hr=$5,376.00 Subtotal$6 3.00 10% &P$609.00 Total$6,702.00 STRAUSSER CONSTRUCTION,INC. Office (559)438-0083 2354 W.Warner Fax (559)438-0092 Fresno,CA 93Z 11 Cell (559)64T-3T 13 License#838251 Page 1 of 2 To: Fortune Ratliff Construction Inc Date: July 28,2025 Attn: Quincy From: Michael Strausser D I R#1000017893 Re: Olive Ave Cost Proposal for Glu-lam repair(RFI 19)&safeguarding exterior broken windows Lumber&plywood$580.00 Copper green,epoxy,and various fasteners$137.00 Labor 33 man hrs X$112.00 per hr=$3,69600 Subtotal$4,413.00 10%OH&P$441.00 Total$4,824.00 RFI NO.: 19 0 FORTUNE/RATLIFF DATE: 5/29/2025 GENERAL CONTRACTORS, INC. CA.LICENSE 4.1 147 REQUEST FOR INFORMATION TO Keith Eckert ATTN: Keith Eckert Senior Engineering Technician CC: Barry Mast The County of Fresno Department of Public Works and Planning F/R JOB#: 2408 PROJECT: DBH Olive Ave.Roof Replacement&Fagade Repairs PROJECT NO.: KEY DESCRIPTION: Existing Rotting Glulam Beam DRAWING: SPECIFICATION: ATTACHED SHEETS: ® YES OR ❑ NO QUESTION: An existing lulam beam with significant rotting on top was uncovered during demolition at gridlines 4& A.Please see attached photos and advise. Need Answer By: ASAP ADDITIONAL COST: ® YES OR [-] NO TIME DAYS SUGGESTION: See attached detail and safety data sheet per on-site discussion with Dan Mather. Contractor Signature: CAvY ZeV4- Project Superintendent ATTACHED SHEETS: ❑ YES OR ❑ NO REPLY: County Response (Barry Mast 2025-05-2q) 5ugge5tion acceptable. Please proceed per Vu-Lam Beam Repair detail, page 4. Change Order Required: ❑ Yes or ❑ No Owner Representative Signature: Date: or 'ok, Al ,;R-�.e•-- \\\ �c _" ��' _ - ram' X .� F •� I V r 1 _ ref- +.w.► H f -9 a-,WV �.rq• •Ire.-Q��'w�� L ^� �- -i. �•rr � L `� .—���—��A �v.A^ �� .' \ `i4+� `��-•V`w _ � i/•?Y`. y'' i. �"'';,'/"tom yi/ .`*:if v - \ ^ s Ate . — ._ tFl►�!s.�}�.� r ��'- Ilk � $-� •4 A �� - t- '.ir r-•YyvlbL`,_.: "1 a• T S i� (! M ,..►"�� "SUM '� Z�f��'y � _ � �rr/r+w.3c'>"`.�___ '_` _r�r' -���/ .� t�i�� 1 1 ' �. .'� �•� _...�-�� NNW 1 �Lu-[.v. &Atv\ I F-F 5=a' .. 5%6r 3a P�lu-Cap Sea► W4eS r effMAI• er G wood Pre, �v �a erne_ �►nsht►� eKJ rJfit- l��2 1 , ay-6 COUP h� fr County of Fresno 160 FRESH DEPARTMENT OF PUBLIC WORKS AND PLANNING STEVEN E. WHITE, DIRECTOR RE Comments: RFI 19_0 - Existing Rotting Glulam Beam - DBH Olive Ave. Roof Replacement Applicable Construction Documents: N/A By: D Mather Date: 5/29/2025 Condition verified and documented in 5/28/25 daily report. Recommend proceeding on a Time and Material basis to also include OSB "board up" of the three broke windows following same or equal based solution attached. Note: Construction adhesive product data information will need review to verify compatibility with recommended copper napthenate treatment. Repair scope should include: • Removal of damaged drywall. • Replacement of dryrot damaged 2x6 purlin and blocking. • Replacement of damaged or missing R-19 batt insulation, properly supported. • Glulam beam repair per accepted shop drawing. • Coordination with County staff to document time and materials required to complete. . 4r- i I � l 9r � II .1. . . v i Dryrot damaged area at northwest roof Damage depth probed. 1/4" — 1-1/2" depth Drain, second from west wall. observed. DEVELOPMENT SERVICES AND CAPITAL PROJECTS DIVISION 2220 Tulare Street,Sixth Floor/Fresno,California 93721 /Phone(559)600-5206 The County of Fresno is an Equal Employment Opportunity Employer • fr County of Fresno DEPARTMENT OF PUBLIC WORKS AND PLANNING STEVEN E. WHITE, DIRECTOR :1 DBH Reroof • - Recommendation to secure windows vandalized after work hours. �L G 1 •. metal stud extensions to window e • , im ---11-- 20 ga metal track ver frame. I � • fastened to metal track. 1- 1/2 sheets per opening for widow height. w 4 � •� S +r'i�. DEVELOPMENT PROJECTS DIVISION 1 Tulare Street,Sixth Floor/Fresno,California 93721 / - • • 611 1• CountyThe of • is an Equal • • Opportunity Employer U DAILY JOB REPORT DATE: 6-2-25 SMTWTFS JOB NAME: DBH Olive Ave Roof Replacement and Fagade Repairs PROJECT: 2408 WEATHER CONDITIONS: Sunny/ Hot SAFETY MEETING HELD: YES VO X WORK PERFORMED TODAY: Absolute Urethane showed to complete detail work in area three today. Crew will come back on Thursday to start the last quarter of the roof structure. Strausser Const.showed to cont.mechanical curb framing in the last quarter. Crew also started the repair of the Glu-Lam beam as per detailed repair. We did not find any dryrot below an inch and a half. Beam was treated with preservative and left to dry until tomorrow. Saleh Painting showed to cont.exterior wall painting of concrete panels. Crew has started the south side for masking and primer installation. PLANS FOR TOMORROW: Rough Frame Mechanical Curbs Glu-Lam Beam Repair Mechanical Curb Installation-Metal Curbs Building Painting CONVERSATIONS AND COMMENTS: EQUIPMENT RENTAL: RETURNED/RECEIVED RENTAL# ('Bold"One) (Description) WORKMEN ON JOB THIS DATE Subcontractor Title In Employees Out Hrs. Scope PPE Absolute Urethane 3 8 New Roof Installation Strausser Const. 3 8 Rough Frame Mech.Curbs Saleh Painting 2 8 Building Painting Superintendent: Chris Lewis U DAILY JOB REPORT DATE: 6-3-25 SMTWTFS JOB NAME: DBH Olive Ave Roof Replacement and Fagade Repairs PROJECT: 2408 WEATHER CONDITIONS: Sunny/ Hot SAFETY MEETING HELD: YES VO X WORK PERFORMED TODAY: Absolute Urethane showed to cont.new roof installation. Crews were installing the mechanical walkway material along platforms in areas of completed roofing. Crew also installed parapet sheet metal caps along west side walls,not complete. Strausser Const.cont.rough framing of mechanical platforms and other misc.items to prepare for roof inspection tomorrow. ECI Mechanical showed to mount remaining metal platforms in the last quarter area. Saleh Painting cont.painting of the south side with a primer coat on almost half of the side. Strausser Const.also completed the dry-rot repair of a Glu-Lam beam today while Dan Mather and myself watched the attachment to complete the repair. PLANS FOR TOMORROW: New Roof Installation Rough Frame Misc. New Roof Drain Installation Roof Inspection-County Inspector CONVERSATIONS AND COMMENTS: EQUIPMENT RENTAL: RETURNED/RECEIVED RENTAL# ('Bold"One) (Description) WORKMEN ON JOB THIS DATE Subcontractor Title In Employees Out Hrs. Scope PPE Absolute Urethane 6 8 New Roof Installation Strausser Const. 3 8 Rough Frame Mech.&Misc. ECI Mechanical 2 3 Metal Curb Install Saleh Painting 2 8 Building Painting Superintendent: Chris Lewis U DAILY JOB REPORT DATE: 6-4-25 SMTWTFS JOB NAME: DBH Olive Ave Roof Replacement and Fagade Repairs PROJECT: 2408 WEATHER CONDITIONS: Sunny/ Hot SAFETY MEETING HELD: YES VO X WORK PERFORMED TODAY: Absolute Urethane showed to cont.installing walking path materials as per plan. Crew also worked on detail work on completed roofing areas. Crew also cont.installation of parapet cap flashing on high roof areas. Strausser Const.showed to complete all rough framing of the complete roof structure. All misc.items have been completed and ready for todays inspection by Fresno County. Crew also completed the broken windows repair on the south side of the building. Fresno Plumbing showed to complete the new roof drain installation. All new drains have been installed and pressure tested for pipe only. We did receive an inspection today for the ponding test at the roof drains in area three by Fresno County. An inspection was also received for the remaining roof nail and curb attachment in the fourth quarter area.Roof structure is complete for inspec PLANS FOR TOMORROW: New Roof Installation-Fourth Quarter Begin Building Painting CONVERSATIONS AND COMMENTS: EQUIPMENT RENTAL: RETURNED/RECEIVED RENTAL# ('Bold"One) (Description) WORKMEN ON JOB THIS DATE Subcontractor Title In Employees Out Hrs. Scope PPE Absolute Urethane 6 8 Roof Walking Path/Metal Caps Strausser Const. 3 8 Misc. Frame/Window Repair Fresno Plumbing 2 8 New Drain Installation Superintendent: Chris Lewis FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA- LICFNSF 496147 PCO# 15_0 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 7/15/2025 Fresno, CA. Attn: Keith Eckert $739.00/ Daily Rate CP# 15 CC: Mandeep Sekhon Schedule Impact (Days): 0 Re: RFI 21_0 Caulking at Soffit-Brick Transition Keith: We herewith submit our Proposed Change Order to provide and install caulking at the soffit to brick transition in response to RFI 21 0 response. SUB/SUPPLIER NAMES DESCRIPTION Wm. B. Saleh Co. Caulking at Soffit-Brick Transition $ 3,440.00 SUB TOTAL $ - $ 3,440.00 Liability Insurance & BR 1.35% $ - $ 46.44 Subtotal SUB TOTAL $ - $ 3,486.44 P&P Bonds 1.00% $ - $ 34.86 Subtotal SUB TOTAL $ - $ 3,521.30 Fortune-Ratliff, Inc. OH & P 5% $ - $ 176.07 TOTAL CP $ - $ 3,697 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 Fresno Office 1364 N.Jackson M. B. SHL(H CO. Fresno, 9) 93703 Phone:(55 255-2046 FAX: (559)255-2907 DISTINCTIVE PAINTING DIR No. 1000003170 PROPOSAL / CONTRACT SBE CERTIFIED To: Fortune Ratliff Date: July 15, 2025 Attn: Chris Subject Job: Olive Ave DBH Roof Repairs We propose to furnish at the above job all labor,materials,equipment,supervision,Workers'Compensation Property Damage and Liability Insurance necessary to complete in a thoroughly workmanlike manner all the work described below. SCOPE OF WORK: ADDED Work to caulk underside of wood soffits, where it meets red brick wall. Labor 32 hours @$100.00 $3,200.00 Material 24 tubes @$10.00 $ _240.00 BID AMOUNT $3,440.00 r STATE LICENSE NO. 268108 Wm. B. SALEH Co. : Ron Elia gm ACCEPTANCE-The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified. Payment will be made as outlined. TERMS:This contract includes all the terms and conditions attached to this sheet and they are approved and accepted by the signatures below. This proposal must be accepted within 30 days of the date hereof to become a valid contract. If approved and accepted,please sign below and return a copy to our office. Date of Acceptance: Signature: BAKERSFIELD 2361 Cepheus Court MONTEREY OFFICE: 407 Reservation Rd.,Suite 3 OFFICE: Bakersfield,CA 93308 Marina,CA 93933 Phone: (661)393-8842 Phone: 831-384-1552 Fax(661)393-8138 Fax: 831-384-7620