Loading...
HomeMy WebLinkAbout24S09 DBH Olive Bldg Phase 2 CCO 001 - signed.pdf co U County of Fresno Department of Public Works and Planning Development Services&Capital Projects Division Steven E.White, Director 0 1$5 CONTRACT CHANGE ORDER Project: DBH Olive Avenue Campus Remodel Contractor: BMY Construction Group, Inc. Contract No.: 24-S-09 Address: 5485 E.Olive Ave., Fresno,CA 93727 Date: 2025-09-18 Architect: Barry Mast Change Order No.: 1 Construction Contract Dollar Amount(as awarded on 2025-04-22) $17,687,000.00 Director's Change Order Limit: $210,000.00 Change Order Allowance $1,2389090.00 Construction Start Date(NTP Issued 2025-07-25): 2025-07-28 Contract Time(Working Days): 250 Original Construction Completion Date: 2026-07-28 Change Order Scope of Work: PCO#001-Arc Flash Testing 8 Days $14,490.00 PCO#002-New Sprinker Heads and Trim 0 Days $3,563.91 Attachment(s): Change Order Summary,Contractors PCO,Subcontractor's Price Proposal Net Change Order Dollar Amount: $189053.91 Net Working Days: 1 8 Total Change Order Dollar Amount To Date $189053.91 Adjusted Contract Dollar Amount: $17,705,053.91 Director's Change Order Limit Balance: $191,946.09 Change Order Allowance Balance: $1,2209036.09 Total Adjusted Working Days To Date: 8 Adjusted Construction Completion Date: 2026-08-07 By signing acceptance of this Change Order, the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2. The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 24-S-09,Article VI shall apply. �y�Me�eirrrs� Reviewed: BMY Construction Group, Inc. Dylan P.,ece rOs,Sep o.20 S1050 PD General Contractor Reviewed: Keith M. Eckert 11 �s�= Kciti Fckrrt iScp lH.Ji JT PDT Senior Engineering Technician, Project Manager lamie Sylvester Reviewed-Cleared for Approval Jamie Sylvester Jamie Sylvester(S,19,20250920147 PDT'. Principal Accountant Reviewed: Barry Mast 7D Supervising Architect,Architect of Record Reviewed: Mandeep Sekhon Construction Division Engineer, Construction Manager Reviewed: William M. Kettler Deputy Director of Planning /J OAN/'A/J�. /LNdif,O.�/ Reviewed: Bernard Jimenez Dernard n„ene=;SeP24.2� _1442I PI, Planning&Resource Management Officer seeveil White Approved: Steven E. White Sten,Wh,—S,p 4,2025155413 PDT; Director of Public Works and Planning Approved: Ernest"Buddy"Mendes Not Applicable Board of Supervisors, Chairman CONTRACT CHANGE ORDER SUMMARY Project: DBH Olive Avenue Campus Remodel Change Order 'Wor •. Days Potential Change Orders 1 2025-09-18 $18,053.91 $0.00 8 Includes PCO: 1,2 Totals $18,053.91 $0.00 8 Potential Change Orders C $) redit Rejected Pending Adj. Da Description 1 1 $14,490.00 8 Arc Flash Study 2 1 $3,563.91 0 New Sprinker Heads and Trim Totals $18,053.91 $0.00 $0.00 $0.00 CONSTRUCTION GROUP INCORPORATED August 12, 2025 The County of Fresno Attn: Keith Eckert 2220 Tulare St Fresno, CA 93721 Re: DBH Olive Ave. Campus Remodel BMY JOB NO.23026 Subject: PCO#001 Arc Flash Report Mr. Eckert, BMY Construction Group, Inc. (BMY) is providing the following PCO for the purpose of conducting arc flash testing. BMY is requesting that the County of Fresno issue a Change Order, adding $14,490.00 to the contract price. In order to perform the work, BMY is requiring a time extension of 8 working days. This PCO is valid for 30 days. Due to the unprecedented times in our industry, with volatile material pricing and delivery, it is of the utmost importance that this PCO be processed quickly. Our industry is currently having supply issues. The cost of material is on a consistent rise, and it is not as readily available, with lead times getting longer. This may directly impact your project. BMY is working diligently to process requested changes quickly, keep material pricing down, and get materials and products.At this time, we need your assistance with timely approvals so we can minimize project impacts. We appreciate your assistance with this matter. If you have any questions or need any further information, please do not hesitate to contact me. Respectfully, Chris Prince Project Engineer CC: Dylan Medeiros Page 1 of 1 5485 East Olive Avenue • Fresno, CA 93727 • Phone (559) 243-4200 • Fax (559) 222-2380 Lic No. 686178 PCO #001 CONSTRUCTION GROUPINCORPORATED BMY Construction Group,Inc. Project: 25007-DBH OLIVE AVENUE CAMPUS REMODEL 5485 East Olive Avenue 5555 E Olive Ave Fresno,California 93727-2541 Fresno,California 93727 Phone:(559)243-4200 Fax:null Prime Contract Potential Change Order #001 : CE #001 - Arc Flash Study TO: The County of Fresno,Department of Public FROM: BMY Construction Group, Inc. Works and Planning 5485 E.Olive Ave 2220 Tulare Street,8th Floor Fresno,California 93727 Fresno,California 93721 PCO NUMBER/REVISION: 001 /0 CONTRACT: CONTRACT#24-S-09/BMY Project #25007-DBH OLIVE AVENUE CAMPUS REMODEL REQUEST RECEIVED FROM: Cesar Moreno(Bergelectric Corp.) CREATED BY: Chris Prince(BMY Construction Group, Inc.) STATUS: Pending-In Review CREATED DATE: 7/24/2025 REFERENCE: PRIME CONTRACT #001 -July Approved PCO's CHANGE ORDER: FIELD CHANGE: No LOCATION: DBH Olive ACCOUNTING METHOD: Amount Based THE REFERENCED PCO 30 Days WILL EXPIRE AFTER: SCHEDULE IMPACT: 8 days PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $14,490.00 POTENTIAL CHANGE ORDER TITLE: CE#001 -Arc Flash Study CHANGE REASON: Client Request POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #001 - Arc Flash Study Since the building hasn't been occupied for a long time, an arc flash study is required before any electrical work can begin. BMY is requiring a time extension of 8 working days. ATTACHMENTS: 24SO9 PCO 001_0 Arch Flash Testing CR f # Budget Code Description Amount 1 26-OOOO.S Electrical/BERG Arch Flash Study $13,800.00 Subtotal: $13,800.00 Fee(3.00%Applies to All Line Items): $414.00 Insurance(1.00%Applies to All Line Items): $138.00 Bond(1.00%Applies to All Line Items): $138.00 Grand Total: $14,490.00 BMY Construction Group,Inc. Page 1 of 2 Printed On:8/12/2025 02:53 PM PCO #001 CONSTRUCTION GROUPINCORPORATED Keith Eckert(The County of Fresno, The County of Fresno,Department of BMY Construction Group,Inc. Department of Public Works and Public Works and Planning Planning) 2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave Fresno,California 93721 Fresno,California 93721 Fresno,California 93727 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE BMY Construction Group, Inc. Page 2 of 2 Printed On:8/12/2025 02:53 PM bBergelectric Date: August 06,2025 Dylan Medeiros BMY Construction Group Inc. 5485 E Olive Ave, Fresno, CA, 93727 Project: DBH Olive Ave. Campus Remodel(PWS) Berg Work Order# 132778 Customer Contract: N/A Subject: Berg Change Order#001 Description: Existing Equipment Arc Flash Study Dear Dylan Medeiros: Enclosed is one copy of our cost breakdown sheets covering the electrical work for the subject change. Please forward your approved change order adding $13,800.00 to our contract for the above referenced change order and a 0 man day time extension. See attached list of exclusions and clarifications. The status of the work contained in this change order is: Work on Hold Pending Direction X Completed Work Work in Progress Time Extension Required Written Notice To Proceed is Required This proposal is based on the usual elements such as labor, materials, and normal markup and does not include any amount for interference, disruptions, rescheduling, change in the sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for any of these items should we be faced with performing our work under any of these conditions. This change proposal is limited to modifications involving our original scope of work. This cost proposal supercedes all previously submitted cost proposals relating to this same work. This quote is valid for 30 calendar days from the submission date and void thereafter. Work which may be required to complete this change order which the work of other trades and/or not specifically itemized herein is not a part of this change proposal. As Contractors,we reserve the right to correct our quote for errors or omissions. Please reference the Berg change order number listed above when issuing a sub-contract modification for this subject change. Sincerely, BERGELECTRIC CORPORATION Cesar Moreno Project Manager Bergelectric Corp. Contractors & Engineers 11 August 6,2025 Project: DBH Olive Ave.Campus Remodel 5555 E.Olive Ave Fresno, CA 93727 Subject: RFI 003/PR 01 Arc Flash Study Scope of Change: The attached proposal is based on RFI 003/PR 01 which asked Berg to provide a proposal for an arc flash study for the existing equipment. The attached includes all sub and Berg costs for this study. Clarifications: 1) See attached documentation for breakdown of costs for labor Exclusions: 1) Overtime, Double time&shift work 2) Standard Contract Exclusions apply Labor Adjustments Foremen and General Forman. ■ Includes added plan review,field review of currently installed systems against prior plans, redesign coordination, as built or red-line drawings,test and checkout, commissioning, as well as mark ups for detailing and estimating coordination. 2. Recap sheet shows Per Diem at 100%for the percentage of the crew who is receiving Per Diem. Material Adjustments: 1) Misc. Material is estimated at 3%of material cost to include materials that are not easily quantifiable to include but not limited to augers, back brace, batteries, buckets, cleaning solvents,cutting oil, dies, drill bits, eye protection,first aid (kit), garbage collectors (trash cans, bins, etc.), hacksaw blades, hand gloves, hard hats, hoses, knockout seals, lubricant(WD-40), marking paint, material due to unforeseen and routing changes (ie 4 sq pull boxes,couplings and routing changes, cuts,etc.), pulling soap, PVC cement, rags,silicone, string,tape(electrical, marking, duct, masking),temporary supports (wood), visqueen (plastic product protection),water&ice,tie wire,and zip ties. Due to the size,complexity, as well as the production factor of this change the misc. material factor has not been included on this change. 2) Small tool is estimated at 4%of labor cost to include tools that are commonly utilized on the project and frequently need to be replaced due the repetitive use to include but not limited to: brooms, brushes, burke bars, come-along, conduit benders,crowbar, digging bar, drill motors,forming stakes, grinders, hammer, hand knockout sets, hand pipe cutters, hand saws, hand threader, hand truck, hand wire bender, heater, heater—PVC, high voltage gloves and matts, loop wire insertion tool, measuring tape, pick pipe wrench, power actuated tools, power cords and adapter,screw drivers,shovels, socket sets, stud puncher,traffic control,vacuum,wire cutters,wire strippers, and wrenches. • All change order requests are priced using industry standard Accubid 11 or higher version software. 750 W. Pinedale Avenue, Fresno CA 93711 Tel 559.860.2590 1 C10-85046 • Material costs are maintained and updated electronically to Accubid via TradeService;a Trimble company. Material cost changes are automatically uploaded once a week to ensure current market pricing is utilized. • Submitted cost is valid for 30 days;after 30 days costs may be subject to change and will be revised as necessary. • The estimated material quantities are input into estimating software to establish the material costs and labor hours. Material pricing has been adjusted to incorporate just-in-time deliveries due to storage and handling limitations presented by the building site, crane/pick deliver requirements, and the lack of material storage available on site. Basic material pricing is tracked via TradeService material pricing software and labor hours are quantified through Accubid estimating software which references the current year's NECA manual of labor units. Large equipment and/or major system changes are forwarded to the respective vendor or manufacturer and a revised bill of material with associated pricing is reissued. • The above interpretation of the change in our scope of work is based solely on the documents as noted above. Any additional electrical work necessitated by revisions to the architectural, structural, mechanical, documents and drawings of this change if any,and not specifically noted on the aforementioned documents are expressly excluded from the above listed interpretation. Further,this change proposal pricing does not include any costs for changes in sequence, delays, disruptions, rescheduling,time extensions or accelerations to the work and extended overhead beyond those specific items as listed and priced in this proposal. Bergelectric Corp.expressly reserves the right to compensation and notice of potential claim made,for any and all of the aforementioned costs and related items noted as not being included in this cost proposal. 750 W. Pinedale Avenue, Fresno CA 93711 Tel 559.860.2590 1 C10-85046 bBergelectric REQUEST FOR 11333 Sunrise Park Drive I Rancho Cordova,CA 195742 CHANGE ORDER Dylan Medeiros Phone#: 559-417-8643 Project: DBH Olive Ave.Campus Remodel(PWS) 5485 E Olive Ave, Fax#: 5555 E Olive Ave.,Fresno,CA,93727 Fresno,CA,93727 P.M.: Moreno,Cesar Berg Work Order#: 132778 Berg C/O# 001 G.C.Ref.# Description Existing Equipment Arc Flash Study Date:08/06/2025 Lump Sum Change Order Sheet No. Material Pricing Sheets Material Cost Direct Labor Hours 1 2 3 4 5 6 7 8 9 10 Other Labor Costs Hours Rate Total Total Listed Material $0.00 TOTALS 0.00 $0.00 Misc.Material 1 3.00% $0.00 Sub-Total $0.00 Sales Tax 8.35% $0.00 Material Cost $0.00 Labor Costs Direct Labor Hours 0.00 Multiply by Labor Rate Direct Labor Cost $0.00 Other Labor Costs $0.00 Sub-Total $0.00 Mark-up15.00°/u $0.00 TOTALS $0.00 Job Expenses Rental Costs TOTALS Description Duration Unit Rate Total Total Rental Costs $0.00 Subtotal Total Material Costs $0.00 Rental Tax 8.35% $0.00 Total Job Expense $0.00 TOTALS $0.00 Sub-Total $0.00 Mark-up 15.00% $0.00 Subcontractor Costs Sub-Total $0.00 Subcontractor Total Total Subcontractor Cost $12 000.00 Power Engineering Experts $12,000.00 Mark-up 15.00% $1,800.00 Subcontractor Total $13,800.00 C.O.Sub-Total $13,800.00 Bond 1 0.00% $0.00 TOTALS $12,000.00 SELLING PRICE $13,800.00 The listed price is good for 30 Day Comments:We request a time extension of 0 days. CONSTRUCTION GROUP INCORPORATED September 8, 2025 The County of Fresno Attn: Keith Eckert 2220 Tulare St Fresno, CA 93721 Re: DBH Olive Ave. Campus Remodel BMY JOB NO.25007 Subject: PCO#002 Exterior Sprinkler Heads and Trim Mr. Eckert, BMY Construction Group, Inc. (BMY) is providing the following PCO for new exterior fire sprinkler heads and trim. BMY is requesting that the County of Fresno issue a Change Order, adding $3,563.91 to the contract price. In order to perform the work, BMY is requiring a time extension of 0 working days. This PCO is valid for 30 days. Due to the unprecedented times in our industry, with volatile material pricing and delivery, it is of the utmost importance that this PCO be processed quickly. Our industry is currently having supply issues. The cost of material is on a consistent rise, and it is not as readily available, with lead times getting longer. This may directly impact your project. BMY is working diligently to process requested changes quickly, keep material pricing down, and get materials and products.At this time, we need your assistance with timely approvals so we can minimize project impacts. We appreciate your assistance with this matter. If you have any questions or need any further information, please do not hesitate to contact me. Respectfully, Chris Prince Project Engineer CC: Dylan Medeiros Page 1 of 1 5485 East Olive Avenue • Fresno, CA 93727 • Phone (559) 243-4200 • Fax (559) 222-2380 Lic No. 686178 = PCO #002 CONSTRUCTION GROUP INCORPORATED BMY Construction Group, Inc. Project:25007-DBH OLIVE AVENUE CAMPUS REMODEL 5485 East Olive Avenue 5555 E Olive Ave Fresno,California 93727-2541 Fresno,California 93727 Phone:(559)243-4200 Fax:null Prime Contract Potential Change Order #002: CE #005 - New Sprinkler Heads and Trim TO: The County of Fresno, Department of Public FROM: BMY Construction Group, Inc. Works and Planning 5485 E.Olive Ave 2220 Tulare Street,8th Floor Fresno,California 93727 Fresno,California 93721 PCO NUMBER/REVISION: 002/0 CONTRACT: CONTRACT#24-S-09/BMY Project #25007-DBH OLIVE AVENUE CAMPUS REMODEL REQUEST RECEIVED FROM: Josh Johnson(Johnson Fire Protection) CREATED BY: Chris Prince(BMY Construction Group, Inc.) STATUS: Pending-In Review CREATED DATE: 9/8/2025 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: DBH Olive ACCOUNTING METHOD: Amount Based THE REFERENCED PCO 30 Days WILL EXPIRE AFTER: SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $3,563.91 POTENTIAL CHANGE ORDER TITLE: CE#005-New Sprinkler Heads and Trim CHANGE REASON: Existing Condition POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#005-New Sprinkler Heads and Trim We are highly recommending that the sprinklers be changed due to excessive corrosion due to the exterior environment. Frankly the sprinklers are far worse than the trim.At the next 5-year inspection they will most likely fail as a result and require changing anyway.Would be far cheaper to do it during the construction phase than when the facility is up and running. In Addition,OSFM states that when a sprinkler is removed for any reason it cannot be re-installed.All of the existing heads will be subject to this as all heads require removal to replace the sprinkler trim. ATTACHMENTS: 24SO9 PCO 002_0 Fire Sprinkler CP.pdf # I Budget Code Description Amount 1 21-OOOO.S Fire Sprinklers/JOHNSON New Heads and Trim $3,394.20 Subtotal: $3,394.20 Fee(3.00%Applies to All Line Items): $101.83 Insurance(1.00%Applies to All Line Items): $33.94 Bond(1.00%Applies to All Line Items): $33.94 Grand Total: $3,563.91 BMY Construction Group, Inc. Page 1 of 2 Printed On:9/8/2025 10:45 AM PCO #002 CONSTRUCTION GROUPINCORPORATED Keith Eckert(The County of Fresno, The County of Fresno,Department of BMY Construction Group,Inc. Department of Public Works and Public Works and Planning Planning) 2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave Fresno,California 93721 Fresno,California 93721 Fresno,California 93727 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE BMY Construction Group, Inc. Page 2 of 2 Printed On:9/8/2025 10:45 AM JOHNSON 732 N. Elko Street Visalia, Ca 93291 FIRE (559)651-1882 PROTECTION >eptember 1st 202! Change Order Request Change Order# 1 To: BMY Construction Group REQUEST TYPE 5485 E. Olive Ave CHANGE ORDER ✓ Fresno, CA EXTRA WORK BACK CHARGE OTHER Contact: PM &SUPERINTENDENT Project: DBH TI Summary PER OWNER REQUEST, ADD THE EXTERIOR FRESNO, CA OVERHANGS SPRINKLERS TO DRAWINGS AND CHANGE TO NEW HEADS AND TRIM Labor Hours Foreman 1 8.00 $125.00 $1,000.00 Journeyman 1 0.00 $105.00 $0.00 Apprentice 8.00 $95.00 $760.00 Labor Total $1,760.00 Materials Item Quantity Cost per PI pe 0.00 $0.00 $0.00 Fittings 0 $0.00 $0.00 Alum Trim 64 $7.13 $456.32 Sprinklers 64 $12.88 $824.32 Material Total $1,280.64 Lift Equipment Days Cost per day 0 0 $0.00 $0.00 0 0 $0.00 $0.00 Lift Total $0.00 Supervision &Admin Costs $45.00 Subtotal $3,085.64 OH/Prof $308.56 Total Change Order Amount: $ 3,394.20 Please Sign Here if Terms are Acceptable: Print Date