HomeMy WebLinkAbout2415C CCO 04.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER CSA 1 TAMARACK WATER INFRASTRUCTURE CHANGE ORDER NO. 4 REPLACEMENT SEPTEMBER 11, 2025 CONTRACT NO. 24-15-C PAGE 1 OF 2 TO: DG CONCTRUCTION, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. PART I: ADJUST COMPENSATION FOR THE USE OF PEA GRAVEL INSTEAD OF SAND FOR PIPE BEDDING This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, use 3/8"-1/2" pea gravel as the placement for bedding in the bottom of trench instead of sand bedding to place 6-inch HDPE pipe on Flintridge Road and Cordwood Road. Payment for the additional cost will be paid at an agreed unit price of$35.00 per ton for the difference of cost of pea-gravel ($52.00 per ton pea-gravel)to sand ($17.00 per ton) being placed, according to Section 9-1.03, "Payment Scope," of the Special Provisions. A total of 66.86 tons of 3/8"-1/2" pea gravel was delivered to the job site; the additional compensation resulted in (66.86 tons x $35.00 per ton = $2,340.10). This amount covers trucking, labor, and placing material. Total compensation for this work resulted in a $2,340.10 increase, this amount will be paid through Bid Item No. 1, Supplemental Work with no net increase to the contract amount. This work did not impact the critical path for the project, so granting additional contract time was not warranted TOTAL COST PART I: $0.00 (PAID IN BID ITEM NO. 1) TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: EXCAVATE SEWER LATERAL AND REPAIR—EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, excavate the sewer lateral at Sta. 18+90 (Cordwood Road) to repair a broken sewer lateral. Perform all work according to the applicable sections of the Special Provisions and/or Standard Specifications, as directed by the Resident Engineer. Payment for this work will be made as extra work at Force Account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in a $2,902.38 increase, this amount will be paid through Bid Item No. 1, Supplemental Work with no net increase to the contract amount. Two (2) working days will be added to the contract time for the above referenced extra work, in accordance with Section 8-1.07B, "Time Adjustments," of the Project Specifications. Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment, furnish all materials,except as may otherwise be noted above, Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors _Const.Management prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER CSA 1 TAMARACK WATER INFRASTRUCTURE CHANGE ORDER NO. 4 REPLACEMENT SEPTEMBER 11, 2025 CONTRACT NO. 24-15-C PAGE 2 OF 2 TOTAL COST PART II: $0.00 (PAID IN BID ITEM NO. 1) TOTAL TIME EXTENSION PART II: TWO (2) -WORKING DAYS NET COST THIS CHANGE ORDER: $0.00 (PAID IN BID ITEM NO. 1) NET TIME EXTENSION THIS CHANGE ORDER: TWO (2) -WORKING DAYS �o6ontyYutc�C.�ae� Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: DG Construction, Inc. 04�-�ak' Contractor Mandeep S. Sekhon, PE Construction Engineer By a � APPROVED BY: Digitally signed by Steve President Steve White White Date:2025.09.23 Title 14:38:32-07'00' Steven E. White, Director Accepted Date: Sep 16,2025 Public Works and Planning Date: _Contractor We,the above signed contractor,have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors rites shown above. _Const.Management p _RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.