Loading...
HomeMy WebLinkAbout2310C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER EDGE LINE STRIPING CHANGE ORDER NO. 2 VARIOUS LOCATIONS IN FRESNO COUNTY AUGUST 27, 2025 FEDERAL PROJECT NUMBER: HSIPL-5942(318) PAGE 1 OF 2 CONTRACT NO. 23-10-C TO: SPECIALIZED PAVEMENT MARKING, LLC.: Make the following change(s) to the plans and specifications or do work not in the plans and specifications for this contract. Because of the proposed change, ZERO (0) -WORKING DAYS will be granted to the allotted contract time. The revised date of completion for the contract is July 22, 2025. PART I: DECREASE ITEMS AT UNIT PRICES: Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Decreased Items: Item Total Total No. Description Unit Quantity Price Amount (0/6) o� 5 4" Thermoplastic Edge Line LF 13,476.00 $0.67 $9,028.92 (3.10) (3.10) Striping (Detail 27B) 6 4"Thermoplastic Edge Line LF 1,784.00 0.67 1,195.28 (20.99) (20.99) Striping (Detail 27C) TOTAL DECREASE: $10,224.20 TOTAL COST PART I: $10,224.20 DECREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: SUSPENSION OF CONTRACT This change was requested by the engineer. Continue to suspend the contract until the roadway preservation treatment for Location No. 6, Elm Avenue is complete (anticipated completion in July 2025), and the location may be striped thereafter. This contract suspension is being made according to Section 8-1.06, "Suspensions," of the Special Provisions. The first day of the suspension of contract was July 29, 2024, and it will run through July 10, 2025. This extended the project completion to July 22, 2025. TOTAL COST PART II: $0.00 (NO COST) TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS _Contractor-white We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor-Canary this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Bus.office-Green noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board-Pink _Const.Mgmt-Blue therefor the prices shown above. _RE/Arch.-Blue _Proj.Dev.-Goldenrod If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the _Contractor before specifications as to proceeding with the ordered work and filing a written protest within the time therein Approval-White specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER EDGE LINE STRIPING CHANGE ORDER NO. 2 VARIOUS LOCATIONS IN FRESNO COUNTY AUGUST 27, 2025 FEDERAL PROJECT NUMBER: HSIPL-5942(318) PAGE 2 OF 2 CONTRACT NO. 23-10-C NET COST THIS CHANGE ORDER: $10,224.20 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS i James Drews, Resident Engineer APPROVAL RECOMMENDED: SPECIALIZED PAVEMENT MARKING, LLC Contractor Mandeep S. Sekhon, PE Construction Engineer (7awes MaU y By James Malloy(Sep 16,202511: :22PDT) APPROVED BY: Digitally signed by Steve Division Manager Steve White White Date:2025.09.18 Title 07:03:51-07'00' Steven E. White, Director Sep 16,2025 Public Works and Planning Accepted Date: Date: Contractor-White We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor-Canary this proposal is approved,that we will provide all equipment,furnish all materials, except as may otherwise be Bus.office-Green noted above, and perform all services necessary for the work above specified,and will accept as full payment _Board-Pink _Const.Mgmt-Blue therefor the prices shown above. _RE/Arch.-Blue _Proj.Dev.-Goldenrod If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the _Contractor before specifications as to proceeding with the ordered work and filing a written protest within the time therein Approval-White specified.