HomeMy WebLinkAbout2328C CCO 02.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
COUNTY SERVICE AREA 44C CHANGE ORDER NO. 2
WATER DISTRIBUTION FACILITY IMPROVEMENTS SEPTEMBER 9, 2025
CONTRACT NO. 23-28-C PAGE 1 OF 2
TO: WEST VALLEY CONSTRUCTION COMPANY, INC.:
Make the following change(s) to the plans and specifications or do work not in the plans and specifications
for this contract. Because of the proposed change(s), ZERO (0) -WORKING DAYS will be granted to the
allotted contract time.
FURNISH AND INSTALL TWO (2)ADDITIONAL 4-INCH GATE VALVES AND ONE (1) 4-INCH DUCTILE
IRON COUPLING — EXTRA WORK
This change was requested by the contractor.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, furnish and
install two (2) additional 4-inch gate valves to isolate the existing well and one (1) 4-inch ductile iron coupling to
reconnect the water lines following the abandonment of the existing water tank and hydropneumatic tank.
Perform all work according to the applicable sections of the Standard Specification and Project Specifications.
The compensation adjustment will be made at an agreed lumpsum price of$5,200.00 according to Section 9-
1.03, "Payment Scope," of the Special Provisions. This additional compensation includes compensation for
material labor, equipment, overhead costs, profits and markups, and incidentals for performing the above
referenced work, no additional compensation will be made thereafter. This compensation adjustment amount
of$5,200.00 will be paid through Bid Item No.1, Supplemental Work, with no net increase to the contract.
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business Office noted above,and perform all services necessary for the work above specified, and will accept as full payment
Board of Supervisors therefore the prices shown above.
_Const.Mgmt
RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
COUNTY SERVICE AREA 44C CHANGE ORDER NO. 2
WATER DISTRIBUTION FACILITY IMPROVEMENTS SEPTEMBER 9, 2025
CONTRACT NO. 23-28-C PAGE 2 OF 2
NET COST THIS CHANGE ORDER: $0.00 (PAID IN BID ITEM NO. 1)
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
James Drews, Resident Engineer
APPROVAL RECOMMENDED:
WEST VALLEY CONSTRUCTION CO., INC.
Contractor Mandeep S. Sekhon, PE
Construction Engineer
By APPROVED BY:
} V V Digitally signed by Steve
W hlte White
Steve
Assistant Vice President Date:2025.09.16
Title 12:23:35-07'00'
Steven E. White, Director
Sep 12,2025 Public Works and Planning
Accepted Date:
Date:
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business Office noted above, and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Mgmt therefore the prices shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.