PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST
This Document is for Fresno County Internal Use Only
Project: Sheriff Substation Bid Package 2
Contract No.: 21-S-01
Date: 2025-09-04
Contractor: BMY Construction Group,Inc.
Architect of Record: Roger Davidson
Change Order No.: #008
Construction Contract Dollar Amount(as awarded on 5/17/2022) $2,465,000.00
Director's Change Order Limit: $135,750.00
Change Order Allowance $246,500.00
Adjusted Change Order Allowance(per BAI 58 9/10/24) $446,500.00
Contract Time(Calendar Days): 60
Construction Start Date(NTP Issued 11/13/23): 2023-11-13
Original Construction Completion Date: 2024-01-12
Change Order Scope of Work:
PCO#008-Material Increase for Glass and Glazing
PCO#024-Contra Costa Time and Material Work
PCO#025-RLH Fire Sprinkler and Permits
PCO#026-Install Disconnects Switches for Units
PCO#027-Condensate Lines forAH 1-4 Overflow Pan Drain
Attachment(s):
Contractors PCO,Change Order Summary
Net Change Order Dollar Amount: $26,325.19
Net Calendar Days: 1 2
Total Change Order Dollar Amount To Date $400,926.85
Adjusted Contract Dollar Amount: $2,865,925.85
Director's Change Order Limit Balance: Exceeded
Change Order Allowance Balance: $45,574.15
Total Adjusted Calendar Days To Date: 132
Adjusted Construction Completion Date: 2024-05-23
Reviewed-
Cleared for Digitally signed by Jamie Sylvester
Approval Jamie Sylvester Jamie Sylvester Date:2025.09.05 15:19:09-07'00'
Principal Accountant,Public Works and Planning
_ Digitally signed by Barry Mast
Reviewed: Barry Mast Date:2025.09.0515:35:58-07'00'
Supervising Architect
Keith Eckert Digitally signed by Keith Eckert
Reviewed: Keith M.Eckert ll Date:2025.09.09 11:14:41-07'00'
Senior Engineering Technician,Project Manager
Mandee S. Sekhon Digitally signed by Mandeep S.Sekhon
Reviewed: Mandeep Sekhon P Date:2025.09.10 15:49:43-07'00'
Construction Division Engineer,Construction Manager
William M Kettler Digitally signed by William M.Kettler
M.Reviewed: William M.Kettler Date:2025.09.1016:31:13-07'00'
Deputy Director of Planning
Bernard Jimenez Digitally signed by Bernard Jimenez
Reviewed: Bernard Jimenez Date:2025.09.10 16:37:50-07'00'
Planning&Resource Management Officer
Steve White Digitally signed by Steve White
Approved: Steven E. White Date:2025.09.11 12:25:44-07'00'
Director of Public Works and Planning
Approved. Buddy Mendes
oa f Supervisors,Chainr�rf
Scan and forward Director Approved Copy to:
CAO Paul Nerland
PWP Business Office Jamie Sylvester
co
County of Fresno
Department of Public Works and Planning
p s56 p Development Services&Capital Projects Division
FR�gts Steven E.White,Director
COUNTY CHANGE ORDER REQUEST
Project: Sheriff Substation Bid Package 2
Contract No.: 21-S-01
Date: 9/4/2025
Contractor: BMY Construction Group,Inc.
5485 East Olive Avenue
Fresno,CA 93727-2541
(559)243-4200
Change Order No.: #008
Construction Contract Dollar Amount(as awarded on 5/17/2022) $2,465,000.00
Original Construction Completion Date: 2024-01-12
Change Order#008 is hereby approved by the County
Scope of Work:
PCO#008-Material Increase for Glass and Glazing
PCO#024-Contra Costa Time and Material Work
PCO#025-RLH Fire Sprinkler and Permits
PCO#026-Install Disconnects Switches for Units
PCO#027-Condensate Lines for AH 1-4 Overflow Pan Drain
Attachment(s):
Contractors PCO,Change Order Summary
Net Change Order Dollar Amount: $26,325.19
Net Calendar Days: 1 2
Adjusted Contract Dollar Amount: $2,865,925.85
Total Change Order Dollar Amount To Date: $400,925.85
Total Adjusted Calendar Days To Date: 1 132
Adjusted Construction Completion Date: 2024- 55-23
Keith Eckert Digitally signed by Keith Eckert
Keith M.Eckert ll Date:2025.09.04 13:24:11-07'00'
Project Manager
Date:
By sianina acceptance of this Change Order.the Contractor shall agree to the following:
1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order
2. The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full.
In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 21-S-01,Article VI shall apply.
Accepted By: BMY Construction Group,Inc. A� Q,/ /
Authorized Signature
Date: ��
CHANGE ORDER SUMMARY
Project: Sheriff Substation Bid Packaqe 2
.--I"
P. D Credit Adj. Days Potential Change Orders Included
Change Order
001 2023-12-20 $73,759.38 $0.00 32 4, 5
002 2024-01-29 $13,144.95 $0.00 10 7
003 2024-03-01 $17,246.41 $0.00 3 2, 9
004 2024-04-22 $97,206.02 $0.00 40 12.1, 13, 17
005 2024-05-16 $3,680.80 $0.00 3 10.1
006 2024-06-27 $27,240.25 $0.00 11 18, 19
007 2024-09-16 $142,322.85 $0.00 31 11.1, 14.1, 20.1, 21, 22, 23
008 2025-09-04 $26,325.19 $0.00 2 8, 24, 25, 26, 27
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
Totals $400,925.85 $0.00 132
ChangePotential Executed Add Credit Rejected Pending Adj. Days Description
Orders CO#
001 N/A
002 003 $15,269.48 0 Material & labor increase due to late start of project
003 $2,266.26 5 Room #SS113 clean and seal concrete
004 001 $10,551.27 7 D One Drywall addendum 4 (extra studs)
005 001 $63,208.11 25 Addendum 5 generator changes only
006 $56,930.36 7 American Inc. -Added roof drain
007 002 $13,144.95 10 Generator pad relocation
008 008 $1,105.31 0 Material Increase for Glass and Glazing
009 003 $1,976.93 3 Missing power R.1
010 $5,809.79 3 Power to mezzanine HVAC units
010.1 005 $3,680.80 3 Power to mezzanine HVAC units
011 $2,432.59 0 Remove drywell and add 2" condensate piping
011.1 007 $1,956.15 0 Remove drywell and add 2" condensate piping
012 $103,191.00 0 EPC
012.1 004 $61,380.00 36 EPC
013 004 $35,616.02 4 Nation -Added roof drains ASI 11-29-2023-01
014 $28,126.78 5 American Inc. --Change of scope
014.1 007 $28,126.78 5 American Inc. -Change of scope
015 $26,640.86 5 Equipment Yard -Added baserock
016 EPC Part 2
017 004 $210.00 0 Reinstall Mail Box T&M
018 006 $13,768.17 0 Contra Costa Electric- Labor Escalation
019 006 $13,472.08 11 Contra Costa Electric-T&M
020 $60,231.37 15 Concrete Work Correction
020.1 007 $56,474.50 15 Concrete Work Correction r1
021 007 $31,582.04 5 Electrical(Option A selected) Correction
022 007 $21,529.00 5 Erect-A-Step Modular Platform (Option B selected)
023 007 $2,654.38 1 Generator Terminations-Correction
024 008 $7,269.60 0 Contra Costa Time and Material Work
025 008 $9,454.52 0 RLH Fire Sprinkler and Permits
026 008 $3,254.98 2 Install Disconnects Switches for Units
027 008 $5,240.78 0 Condensate Lines for AH 1-4 Overflow Pan Drain
Totals $400,925.85 $0.00 $258,988.15 $26,640.86
PCO #008
CONSTRUCTION
GROUPINCORPORATED
BMY Construction Group Incorporated Project:22009-Fresno County Sheriff Substation Bid Package Contract
5485 East Olive Avenue #21-S-01
Fresno,California 93727-2541 1129 N Armstrong Ave
Phone: (559)243-4200 Fresno,California 93727
Fax:null
Prime Contract Potential Change Order #008: CE #014 - Material Increase -
Glass & Glazing
TO: The County of Fresno, Department of Public FROM: BMY Construction Group,Inc.
Works and Planning 5485 E.Olive Ave
2220 Tulare Street,8th Floor Fresno,California 93727
Fresno,California 93721
PCO NUMBER/REVISION: 008/0 CONTRACT: 22009-Fresno County Sheriff Substation
Bid Package Contract#21-S-01 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Nick Hostetler(BMY Construction
Group,Inc.)
STATUS: Pending-In Review CREATED DATE: 2/8/2024
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION: ACCOUNTING METHOD: Amount Based
THE REFERENCED PCO 30
WILL EXPIRE AFTER:
SCHEDULE IMPACT: PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: $1,105.31
POTENTIAL CHANGE ORDER TITLE:CE#014-Material Increase-Glass&Glazing
CHANGE REASON: Existing Condition
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#014-Material Increase-Glass&Glazing
ATTACHMENTS:
C5218 Fresno Sheriff Substation,PCO-01 Glazing Cost Escalation v2,sent 020824.0f
# Budget Code Description Amount
1 08-4113.PO Alumn Storefront/ATASAD.Purchase Material Increase-Glass&Glazing $1,033.00
Order
Subtotal: $1,033.00
Overhead(BMY):
$72.31
Grand Total: $1,105.31
BMY Construction Group Incorporated Page 1 of 2 Printed On:2/8/2024 12:30 PM
PCO #008
CONSTRUCTION
GROUPINCORPORATED
Keith Eckert(The County of Fresno, The County of Fresno,Department of BMY Construction Group,Inc.
Department of Public Works and Public Works and Planning
Planning)
2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave
Fresno,California 93721 Fresno,California 93721 Fresno,California 93727
ProcoreArchitectSignHere Pro—ArchitectSlgnedDate Procor.OwnerSignHere Pro co reOwnerSlgnedDate ProcoreGeneralContractorSignHere ProcoreGeneralConiractor5ignetlDate
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
BMY Construction Group Incorporated Page 2 of 2 Printed On:2/8/2024 12:30 PM
Change Request Proposal
Project: 5218/Fresno County Sheriff Sub Change request number: PCO-01
(name and 1129 North Armstrong Ave Description: Glazing Cost Escalation
address) Fresno,CA 93727
Customer: BMY Construction Group,Inc.
Notice to Proceed Status: Proposed
Submitted date: Origination date: 11/09/23
Received date:
Rough order of magnitude: 0.00
Quotation
Submitted date: 11/09/23
Due date:
Submitted amount: 1,033.00
Requested days delay: 0
Notes
Due to project delays,PCO-01 consists of Cost Escalation in glass material.
Original Quote#1325282 and Revised Quote#1374353 attached for reference.
Revenue Detail
Billing Item Description Revenue
PCO-01 Cost Escalation 1,033.00
Total Revenue For CR PCO-01 1,033.00
Approvals
Customer: BMY Construction Group, Inc. Contractor:Atascadero Glass, Inc.
Authorized Representative:
By: By:
Date: Date:
Print Date:02/08/24 Page 1 of 1
C5218 Fresno Sheriff Substation - PCO-01
Ref: Cost Escalation
I. Subcontractor Direct Costs - PCO-01
Additive Costs: Units Unit Cost Total
A. Labor
Fabrication 0 $85.00 $0
Fabrication 0 $120.00 $0
Installation 0 $85.00 $0
Installation 0 $120.00 $0
Travel 0 $85.00 $0
Travel 0 $120.00 $0
B. Material:
Revised Glazing Cost 1 $0.00 $3,229
0 $0.00 $0
0 $0.00 $0
C. Tax: 0.00% $0
D. Misc. Costs (non taxable)
Insurance $0.00
Freight $0.00
E. Sub-Subcontractor Costs
$0
F. Equipment
AGI Trucks $0
Rental Equiptment $0
G. Material Mark-Up 0% $0
H. Subtotal of Additive Costs: $3,229
Deductive Costs:
I. Labor
Fabrication 0 $85.00 $0
Installation 0 $85.00 $0
Travel 0 $85.00 $0
J. Material
Original Glazing Cost 1 $2,196.21 $2,196
0 $0.00 $0
0 $0.00 $0
K. Tax 0.00% $0.00
L. Equipment
AGI Trucks 0 $0.00 $0
M. Subtotal of Deductive Cost $2,196
N. Total Subcontractor Direct Costs + Mark-up $1,033
Glassfab Tempering Service, Inc. ORDER: 1374353
Raise Your Glass With Excellence ORDER DATE: 11/9/2023
Glassfab Tempering Services, Inc. ORDER CONTACT: ZACH
1448 Mariani Court SALES PERSON: AG
Tracy, CA 95376
GLASSFAB PH: 209-229-1060 ENTERED BY: W, Wesley
TEMPERING SERVICES,INC. FX: 209-229-1 061
www.GlassfabTempering.com
QUOTE
INVOICE INFORMATION SHIPPING INFORMATION
Atascadero Glass Inc. -ATA01 Atascadero Glass Inc.
8730 El Camino Real 8730 El Camino Real
Atascadero, Ca 93422 Atascadero, Ca 93422
PH: 805-466-2644 FX: 805-466-2795 PH: 805-466-2644 FX: 805-466-2795
SHIP VIA: Glassfab Truck
ROUTE: 008
ORDER ORDER DATE PO NUMBER CUSTOMER REF TERMS
1374353 11/9/2023 CLEAR TEMP FRESNO COUNTY SHERIFF SUBSTATION 1% 10 NET 30
PHASE 2-A
ITEM DESCRIPTION QTY T SIZE PER QTY I PER PRICE PRICE TOTAL
1 1/2"CUT-SIZE TEMPERED GLASS 249 $10.74 $2,674.26�
1/2"CLEAR
WEIGHT(UT/LI): 0.05lbs/11.24 Ibs ITEM TOTAL: $10.74 $2,674.26
TOTAL ORDERED QUANTITY: 249 SUBTOTAL: $2,674.26
TOTAL ITEMS: 249 CA-1 8.25%: $220.63
TOTAL WEIGHT: 11.24 Ibs CTY3 0.5%: $13.37
ORDERED SF: 0 SF SURCHARGE: $321.21
FREIGHT: $0.00
BOXING: $0.00
TOTAL: $3,229.47
COMMENT:
GTS standard terms and conditions apply.
GTS standard warranties apply.
Quote based on reasonable sizes and cutting yields.
This is a non-binding estimate only. The quote is valid for a period of 30 days.Subject to review after expiration.
Energy Surcharge in place at time of order applies.
Quote numbers should be included on all purchase orders to receive special quoted price.
11/9/2023 10:49:16 AM 1 of 1
Glassfab Tempering Service, Inc. ORDER: 1325282
Raise Your Glass With Excellence ORDER DATE: 4/12/2022
_ Glassfab Tempering Services, Inc. ORDER CONTACT:
i 1448 Mariani Court SALES PERSON: AG
Tracy, CA 95376 ENTERED BY: W, Wesley
GLASSFAB PH: 209-229-1060
TEMPERING SERVICES,INC. FX: 209-229-1 061
www.GlassfabTempering.com
QUOTE
INVOICE INFORMATION SHIPPING INFORMATION
Atascadero Glass Inc. -ATA01 Atascadero Glass Inc.
8730 El Camino Real 8730 El Camino Real
Atascadero, Ca 93422 Atascadero, Ca 93422
PH: 805-466-2644 FX: 805-466-2795 PH: 805-466-2644 FX: 805-466-2795
SHIP VIA: Glassfab Truck
ROUTE:
ORDER I ORDER DATE I PO NUMBER I CUSTOMER REF I TERMS
1325282 4/12/2022 CLEAR TEMP FRESNO COUNTY SHERIFF SUBSTATION 1% 10 NET 30
PHASE 2
ITEM DESCRIPTION I QTY I SIZE IPERQTYI PER PRICE I PRICE I TOTAL
1 1/2"CUT-SIZE TEMPERED GLASS 249 $7.43 $1,850.07�
1/2"CLEAR
WEIGHT(UT/LI): 0.05 Ibs/11.24 Ibs ITEM TOTAL: $7.43 $1,850.07
TOTAL ORDERED QUANTITY: 249 SUBTOTAL: $1,850.07
TOTAL ITEMS: 249 CA-1 8.25%: $152.63
TOTAL WEIGHT: 11.24 Ibs CTY3 0.5%: $9.25
ORDERED SF: 0 SF SURCHARGE: $184.26
FREIGHT: $0.00
BOXING: $0.00
TOTAL: $2,196.21
COMMENT:
PLEASE REFERENCE QUOTE NUMBER WHEN ORDERING TO ENSURE CORRECT QUOTED PRICE
4/12/2022 2:10:22 PM 1 of 1
PCO #024
CONSTRUCTION
GROUPINCORPORATED
BMY Construction Group, Inc. Project: 22009-Fresno County Sheriff Substation Bid Package Contract
5485 East Olive Avenue #21-S-01
Fresno,California 93727-2541 1129 N Armstrong Ave
Phone:(559)243-4200 Fresno,California 93727
Fax:null
Prime Contract Potential Change Order #024: CE #033 - Time and Material
Work
TO: The County of Fresno, Department of Public FROM: BMY Construction Group,Inc.
Works and Planning 5485 E.Olive Ave
2220 Tulare Street,8th Floor Fresno,California 93727
Fresno,California 93721
PCO NUMBER/REVISION: 024/0 CONTRACT: 22009-Fresno County Sheriff Substation
Bid Package Contract#21-S-01 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Nick Hostetler(BMY Construction
Group,Inc.)
STATUS: Pending-In Review CREATED DATE: 11/5/2024
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION: ACCOUNTING METHOD: Amount Based
THE REFERENCED PCO 30
WILL EXPIRE AFTER:
SCHEDULE IMPACT: PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: $7,269.60
POTENTIAL CHANGE ORDER TITLE:CE#033-Time and Material Work
CHANGE REASON:Correction
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#033-Time and Material Work
ATTACHMENTS:
73111 -CO#10 Proposal.pdf
# Budget Code Description Amount
1 26-OOOO.PO Electrical.Purchase Order T&M $5,774.92
Subtotal: $5,774.92
Overhead(Subcontractor 15%): $1,019.10
Subcontractor Total: $6,794.02
Overhead(BMY): $475.58
Grand Total: $7,269.60
BMY Construction Group, Inc. Page 1 of 2 Printed On: 11/5/2024 12:20 PM
PCO #024
CONSTRUCTION
GROUPINCORPORATED
Keith Eckert(The County of Fresno, The County of Fresno,Department of BMY Construction Group,Inc.
Department of Public Works and Public Works and Planning
Planning)
2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave
Fresno,California 93721 Fresno,California 93721 Fresno,California 93727
ProcoreArchitectSignHere Pro—ArchitectSlgnedDate Procor.OwnerSignHere Pro co reOwnerSlgnedDate ProcoreGeneralContractorSignHere ProcoreGeneralConiractor5ignetlDate
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
BMY Construction Group, Inc. Page 2 of 2 Printed On: 11/5/2024 12:20 PM
_ Contra Costa Electric Contra Costa Electric,Inc.
4690 E Carmen Ave
An EMCOR Company Fresno,CA 93703
Ph:559.252.1114
Fax:559.452.1013
Oct 5, 2024
Attn: Derek Brawley
Subject: Fresno Sherriffs Substation Bid Package 2 -Time and Material Work
CCE CO#10
We are pleased to offer for your consideration our Lump Sum Quotation for the above
referenced project.
The scope of work included in our proposal is for the Electrical changes only and is
tendered with qualifications except those listed in the drawings indicated above and
inclusions listed below:All work is subject to materials submittal approval and time
constraints of approved materials and vendors.Proposal is valid for 30 days.
Lump Sum $6,794.02
A. In general, our quotation will include the following:
• Time and Materials per direction of the County and BMY. See attached backup
documents.
B. We have excluded the following items from our scope of work:
• Providing performance and payment bond.
• Anything not specifically included is explicitly excluded.
We recognize that you have a choice when it comes to selecting contractors to work on your
projects and we thank you for giving Contra Costa Electric, Inc.the opportunity of bidding on
your work. If we can be of service to you on this or future projects,please feel free to contact me
at(559) 252-1114 or jfowler0emcor.net
Sincerely,
�6� 74Gf&T
Fresno Office
Contra Costa Electric,Inc.
An EMCOR Company
P7.
Ies
www.ccelectric.com
Page 1 of 1 D R#10000011625
Invoice Breakdown
Quantityl UNITS I Description of Labor Rate Total Cost
9 HRS 8/27/24 Added 3"data conduit out of data center $121.52 $ 1,093.68
12 HRS 9/25/24 Finished 3"data conduit out of data center $121.52 $ 1,458.24
11 HRS 9/30/24 Install tubing for def tank&plumb lines $121.52 $ 1,336.72
12 HRS 10/07/24 Install power and pull prefab cable for door access panels $121.52 $ 1,458.24
HRS $ -
HRS $
HRS $
HRS $
See attached T&M Daily Reports
Total Labor Cost $ 5,346.88
Quantity I UNITS Description of Material Rate Total Cost
12 Ea. BRDGPRT TWB-58 3"Plastic EMT Bushing $ 4.76000 $ 57.12
30 Ft. CO 3"X 10'EMT Conduit $ 7.02 $ 210.60
2 Ea. CF Elbow EMT 3 22-1/D $ 50.45 $ 100.90
6 Ea. BRDGPRT 1908 3"2-Hole Pipe Strap,Rigid,Steel $ 9.20000 $ 55.20
Material Subtotal $ 423.82
Tax 0.08500 $ 36.02
Mark-up 15% $ 68.98
Total Material Cost $ 528.82
Quantity UNITS Description of Equipment, Rentals, & Other Costs Rate Total Cost
1 Ea. 5K Telehandler Reach Lift 1-Day Rental $ 694.38 $ 694.38
Equipment, Rentals, & Other Costs Subtotal $ 694.38
Tax 0.08500 $ 104.16
Mark-up 15% $ 119.78
Total Equipment, Rentals & Other Costs: $ 918.32
OVERALL TOTAL FOR WORK PERFORMED $ 6,794.02
Page 1
c
Contra Costa Electric
An EMCOR Company
CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703
(559)252-1114•FAX(559)252-1177
CUSTOMER: PAGE No. [ ]
LOCATION: *WORK ORDER* JOB No. 13 ILI
DATE:
CONTRACT / P.O. No: JOB STATUS: PEN)/ COMPLETE
DESCRIPTION OF WORK:
DOT CC— `T V'C— 2
QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT
� 1 rh�CTL�
u M
P EQUIPMENT SUB TOTAL: $
DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX: % $
MK-UP: % $
FREIGHT: $
TOTAL MAT: $
LABOR
EQUIPMENT: $
DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT
OR DT RATE DELV. & P/U: S
9'S
MK-UP: % $
O A wwA LtIS:
S.TAX: % $
TOTAL EQIP: $
TOTAL
ST. TIME: $
TOTAL
TIME & 1/2: $
TOTAL
DBLE TIME $
TOTAL
LABOR: $
QUANTITY OF OVERTIME MEALS a = 7 �`� MEALS: $
CUSTOMERS REP. 1 ,rr �� �a1�G L d' _ DATE: W.O. TOTAL $
Contra Costa Electric
An EMCOR Company
CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703
(559)252-1114•FAX(559)252-1177
CUSTOMER: M U����� PAGE No. [ Z ]
LOCATION: 'WORK ORDER' JOB No. -13 111
IBC'-g=i�- S� �SIr�-r-1d-� 1J15�. '�Z DATE:
CONTRACT / P.O. No: JOB STATUS: OPEN PLET
DESCRIPTION OF WORK: A-onv-,l 'jjp 7
QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT
ll �
'Z'LoS C5 1►ibS
EQUIPMENT SUB TOTAL: $
DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX: —% $
MK-UP: % $
i
FREIGHT: $
TOTAL MAT: $
LABOR
EQUIPMENT: $
DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT
OR DT RATE DELV. & P/U: $
MK-UP: % $
0 A.Gvn iM.,,,-XI5 (e
S.TAX: % $
TOTAL EQIP: $
TOTAL
ST. TIME: $
TOTAL
TIME & 1/2: $
TOTAL
DBLE TIME $
TOTAL
LABOR: $
QUANTITY OF OVERTIME EALS I �MpEALS:
CUSTOMERS RE DATE: / ��� N.O. TOTAL $
Contra Costa Electric
An EMCOR Company
CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703
(559)252-1114•FAX(559)252-1177
CUSTOMER: rNUXO, oe fMg5.,,o xv PAGE No [ ]
LOCATION: Dym, Z may au -WORK ORDER* JOB No. "1 yl I
DATE:
CONTRACT / P.O. No: JOB STATUS: OPEN/COMPLETE
DESCRIPTION OF WORK: :W!5!24A.` !CEt•JuMOS :13 10- f=b+L- J2rz& >� L-m B Dalff 4.,aF.5
QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT
Mkoeo Ian
EQUIPMENT SUB TOTAL: $
DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX:�% $
iq MK-UP: % $
FREIGHT: $
TOTAL MAT: $
LABOR
EQUIPMENT: $
DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT
OR DT RATE DELV. & P/U: $
MK-UP: % $
S.TAX: % $
_ o J TOTAL EQIP:
TOTAL
ST. TIME: $
TOTAL
TIME & 1/2: S
TOTAL
DBLE TIME $
TOTAL
LABOR: $
QUANTITY OF OVERTIME MEALS MEALS: $
CUSTOMERS R _ DATE:/ 3° W.O. TOTAL $
Contra Costa Electric
An EMCOR Company
CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703
(559)252-1114•FAX(559)252-1177
CUSTOMER: _ P'W�000 �L $�"�Y PAGE No. [ ]
LOCATION: `WORK ORDER* JOB No. '13 11 1
DATE: (O
CONTRACT / P.O. No: JOB STATUS: OPEN / MPLET
DESCRIPTION OF WORK: Pzg&U=vid"— CQ 'TQL�P.a�a,FC� -�0"��� of —
Paa L-S i.J
QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT
L 5` �l 2" Ems- 4 e F
2 `/Z" 5041: F
,A-
1 S
5 T!Irl,G4o b
f Ss
3 p W*SA 6
3 CAL
�v QGio K�lR8'AhT.s
�6
4 svtf 7pW))at--- 5C aaL--,>5
EQUIPMENT SUB TOTAL: $�
DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX: % $
MK-UP: % $
FREIGHT: $
TOTAL MAT: $
LABOR
EQUIPMENT: $
DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT
OR DT RATE DELV. & P/U: $
ID rL
$ �VGwr► .S7
COS S—p C-9
S.TAX: % $
TOTAL EQIP: $
TOTAL
ST. TIME: $
TOTAL
TIME & 1/2: $
TOTAL
DBLE TIME $
TOTAL
LABOR: $
QUANTITY OF OVERTIME MEALS MEALS: $
CUSTOMERS RE DATE: �0/� W.O. TOTAL
PCO #025
CONSTRUCTION
GROUPINCORPORATED
BMY Construction Group, Inc. Project:22009-Fresno County Sheriff Substation Bid Package Contract
5485 East Olive Avenue #21-S-01
Fresno,California 93727-2541 1129 N Armstrong Ave
Phone: (559)243-4200 Fresno,California 93727
Fax:null
Prime Contract Potential Change Order #025: CE #034 - RLH - Fire
Sprinklers & Permits
TO: The County of Fresno, Department of Public FROM: BMY Construction Group,Inc.
Works and Planning 5485 E.Olive Ave
2220 Tulare Street,8th Floor Fresno,California 93727
Fresno,California 93721
PCO NUMBER/REVISION: 025/0 CONTRACT: 22009-Fresno County Sheriff Substation
Bid Package Contract#21-S-01 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Nick Hostetler(BMY Construction
Group,Inc.)
STATUS: Pending-In Review CREATED DATE: 12/6/2024
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION: ACCOUNTING METHOD: Amount Based
THE REFERENCED PCO 30
WILL EXPIRE AFTER:
SCHEDULE IMPACT: PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: $9,454.52
POTENTIAL CHANGE ORDER TITLE: CE#034-RLH-Fire Sprinklers&Permits
CHANGE REASON:Correction
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#034-RLH-Fire Sprinklers&Permits
Please see the attached change order for the above-mentioned project.This change order includes, Item#1,the original add for completing the fire
sprinkler TI in the IT work room and server room if sprinklers were determined to be required by Fresno City. I also included our additional permit fees to
keep the permits active as this project is still ongoing,the additional mobilization to finish the fire sprinkler TI work at the direction of Derek,and the two
site trips in November by RLH that the mechanical and/or fire alarm contractor did not show for us to facilitate the coordination necessary to complete
our scope of work.
ATTACHMENTS:
TI Sprinklers and Permit Fees 1-30-25.pdf
# I Budget Code Description Amount
1 121-1000.PO Fire Suppression/RLH.Purchase Order Fire Sprinklers&Permits $8,836.00
Subtotal: $8,836.00
Overhead(BMY) $618.52
Grand Total: $9,454.52
BMY Construction Group, Inc. Page 1 of 2 Printed On: 1/30/2025 09:49 AM
PCO #025
CONSTRUCTION
GROUPINCORPORATED
Keith Eckert(The County of Fresno, The County of Fresno,Department of BMY Construction Group,Inc.
Department of Public Works and Public Works and Planning
Planning)
2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave
Fresno,California 93721 Fresno,California 93721 Fresno,California 93727
ProcoreArchitectSignHere Pro—ArchitectSlgnedDate Procor.OwnerSignHere Procor 0—,SlgnedDate ProcoreGeneralContractorSignHere ProcoreGeneralConiractor5ignetlDate
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
BMY Construction Group, Inc. Page 2 of 2 Printed On: 1/30/2025 09:49 AM
UFire Sprinklers, Fire Alarms, Security Systems
Bakersfield San Franciso San Luis Obispo
PROJECT CHANGE ORDER- Sprinkler TI & Permit Fees
Date: 1/30/2025 Page 1 of 2
To: BMY Construction
Re: Fresno County Sheriff Sub Station Project
Fresno, CA.
WE HEREBY INCLUDE THE FOLLOWING IN OUR CHANGE ORDER DATED December 5, 2024.
1). Labor and material to add eight (8)fire sprinkler pendents in the existing IT/Data rooms as requested by the
AHJ. Design per NFPA and the Authority Having Jurisdiction. All new heads to be chrome pendent quick
response type with chrome escutcheons. Note that these sprinklers were not originally included in the proposal
because of the removal of the fire sprinkler notes in sheet A0.3 in the Addendum #2 drawings AND the verification
of"wet system will not be required" in the "Request for Clarification Responses_County of Fresno 4.12.22".
This proposal is based off adding ±8' of 1" arm over and drop per each new fire sprinkler head in the new ceiling.
2). Additional Permit Fees to keep permit active due to length of project.
3). Labor and material for additional mobilization to complete the above-mentioned work under item #1. This was
at the direction of the site superintendent as the requirement for the 6 sprinklers located in the IT Data was in
question by Fresno County. This was later resolved and determined required.
All work considered herein is to be conducted during the normal working hours of RLH Fire Protection at
prevailing wages.
All painting, cutting or patching, electrical work, alarm work, 5-year service, seismic upgrade and relocating main
piping is excluded from this quotation.
This proposal is based on our current liability insurance coverage of$1,000,000 Per Occurrence and $2,000,000
General Aggregate limit. The per occurrence of$1,000,000 is expanded by a $5,000,000 excess/umbrella over
General Liability, Auto, and Workers Compensation primary limits. Additional insured and Waivers of Subrogation
endorsements shall be provided on our standard Blanket Endorsement forms. Named Endorsements shall be
provided on a job-by-job basis if required.
WE HEREBY PROPOSE TO FURNISH THE ABOVE FOR THE SUM OF:
Eight Thousand Eight Hundred Thirty-Six Dollars and No Cents ($8,836.00)
The above price is broken down as follows:
1. 8 Head Sprinkler TI $5,776.00
2. Additional Permit Fees $1,500.00
3. Additional Mobilization $1,560.00
Total $8,836.00
RLH Fire Protection, Inc.
4300 Stine Rd. Suite 500 Bakersfield, CA 93313 Phone: (661) 322-9344 Fax: (661 322-6816 Lic. #777717
Fresno Sub Station —Change Order January 30, 2025
Page 2 of 2
TERMS: Net 30 days after receipt of invoice. This quotation is subject to review after thirty days.
Sincerely,
Ryan Muthana
Acceptance
The foregoing proposal is hereby accepted this day of , 2025, at price and terms stated herein,
and RLH Fire Protection is authorized to proceed with this work.
Signature: Title:
Print Name: Phone:
RLH Fire Protection
4300 Stine Rd. Suite 800 Bakersfield, CA 93313 Phone: (661) 322-9344 Fax: (661) 322-6816 Lic. #777717
PCO #026
CONSTRUCTION
GROUPINCORPORATED
BMY Construction Group, Inc. Project:22009-Fresno County Sheriff Substation Bid Package Contract
5485 East Olive Avenue #21-S-01
Fresno,California 93727-2541 1129 N Armstrong Ave
Phone: (559)243-4200 Fresno,California 93727
Fax:null
Prime Contract Potential Change Order #026: CE #036 - Contra Costa
Electric (T&M #11) Install Disconnects Switches for Units
TO: The County of Fresno, Department of Public FROM: BMY Construction Group,Inc.
Works and Planning 5485 E.Olive Ave
2220 Tulare Street,8th Floor Fresno,California 93727
Fresno,California 93721
PCO NUMBER/REVISION: 026/0 CONTRACT: 22009-Fresno County Sheriff Substation
Bid Package Contract#21-S-01 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Nick Hostetler(BMY Construction
Group,Inc.)
STATUS: Pending-In Review CREATED DATE: 1/31/2025
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION: ACCOUNTING METHOD: Amount Based
THE REFERENCED PCO 30
WILL EXPIRE AFTER:
SCHEDULE IMPACT: 2 days PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: $3,254.98
POTENTIAL CHANGE ORDER TITLE: CE#036-Contra Costa Electric(T&M#11)Install Disconnects Switches for Units
CHANGE REASON:Correction
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#036-Contra Costa Electric(T&M#11)Install Disconnects Switches for Units
12/23/2024 Install disconnect switches for air handlers
Install additional 18/2 cable between genset and remote monitoring
5.5 HRS 01/09/2025 Reterminate genset wiring
ATTACHMENTS:
73111 -CO#11 Proposal.pdf
# I Budget Code Description Amount
1 1 26-OOOO.PO Electrical.Purchase Order IT&M $3,042.04
Subtotal: $3,042.04
Overhead(BMY): $212.94
Grand Total: $3,254.98
BMY Construction Group, Inc. Page 1 of 2 Printed On: 1/31/2025 12:47 PM
PCO #026
CONSTRUCTION
GROUPINCORPORATED
Keith Eckert(The County of Fresno, The County of Fresno,Department of BMY Construction Group,Inc.
Department of Public Works and Public Works and Planning
Planning)
2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave
Fresno,California 93721 Fresno,California 93721 Fresno,California 93727
ProcoreArchitectSignHere Pro—ArchitectSlgnedDate Procor.OwnerSignHere Procor 0—,SlgnedDate ProcoreGeneralContractorSignHere ProcoreGeneralConiractor5ignetlDate
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
BMY Construction Group, Inc. Page 2 of 2 Printed On: 1/31/2025 12:47 PM
_ Contra Costa Electric Contra Costa Electric,Inc.
4690 E Carmen Ave
An EMCOR Company Fresno,CA 93703
Ph:559.252.1114
Fax:559.452.1013
January 29, 2024
Attn: Derek Brawley
Subject: Fresno Sherriffs Substation Bid Package 2 -Dec.&Jan.Time and Material Work
CCE CO#11
We are pleased to offer for your consideration our Lump Sum Quotation for the above
referenced project.
The scope of work included in our proposal is for the Electrical changes only and is
tendered with qualifications except those listed in the drawings indicated above and
inclusions listed below:All work is subject to materials submittal approval and time
constraints of approved materials and vendors.Proposal is valid for 30 days.
Lump Sum $3,042.04
A. In general, our quotation will include the following:
• Time and Materials per direction of the County and BMY. See attached backup
documents.
B. We have excluded the following items from our scope of work:
• Providing performance and payment bond.
• Anything not specifically included is explicitly excluded.
We recognize that you have a choice when it comes to selecting contractors to work on your
projects and we thank you for giving Contra Costa Electric, Inc.the opportunity of bidding on
your work. If we can be of service to you on this or future projects,please feel free to contact me
at(559) 252-1114 or jfowler0emcor.net
Sincerely,
�6� 74Gf&T
Fresno Office
Contra Costa Electric,Inc.
An EMCOR Company
P7.
Ies
www.ccelectric.com
Page 1 of 1 D R#10000011625
Invoice Breakdown
Quantityl UNITS I Description of Labor Rate Total Cost
4 HRS 12/23/2024 Install disconnect switches for air handlers $121.52 $ 486.08
10 HRS 01/08/2025 Install additional 18/2 cable between genset and remote monitoring $121.52 $ 1,215.20
5.5 HRS 01/09/2025 Reterminate genset wiring $121.52 $ 668.36
HRS $ -
HRS $
HRS $
HRS $
HRS $
See attached T&M Daily Reports
Total Labor Cost $ 2,369.64
Quantity I UNITS Description of Material Rate Total Cost
Material Subtotal $ -
Tax 0.08500 $ -
Mark-up 15% $ -
Total Material Cost $ -
Quantity UNITS Description of Equipment, Rentals, & Other Costs Rate Total Cost
1 Ea. 34'KNUCKLE BOOM DIESEL 4-Day Rental $ 508.43 $ 508.43
Equipment, Rentals, & Other Costs Subtotal $ 508.43
Tax 0.08500 $ 76.26
Mark-up 15% $ 87.70
Total Equipment, Rentals & Other Costs: $ 672.40
OVERALL TOTAL FOR WORK PERFORMED $ 3,042.04
Page 1
Contra Costa Electric
An EMCOR Company
CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703
(559)252-1114•FAX(559)252.1177
CUSTOMER: _ aQknA bF y- PAGE No. [ ]
LOCATION: S��Q�c� _�$_ I,�Iin►�`�` Z_ *WORK ORDER* JOB No. 1 311 V
DATE: ,1—/�
CONTRACT / P.O. No: . JOB STATUS: QPEN/CO PLETE
DESCRIPTION OF WORK: 'O%S z)Vc-qj swc-ra►as FoL Ai42 1=�3&,.ao%.Vv-S I ,tla�o+F
CU;t— 1 r; I-W a LT o�
QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT
20 J - 20 A-b-P
t-1S �i�slrU,2L S rT W Cw c is
EQUIPMENT SUB TOTAL: $
DATE QUAN. TYPEISIZE HRS RATE AMOUNT S.TAX: % S
ter a*smV-
MK-UP: % S
FREIGHT: $
TOTAL MAT: $
LABOR
EQUIPMENT: $
DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT
OR DT RATE DELV. & P/U: S
2 MK-UP: % S
1
NPP _ Q V-tw S'C Z
S.TAX: % $
TOTAL EQIP: $
4j 9,4 w 57 TOTAL
ST. TIME- $
11Q9 w4t TOTAL
TIME & 1/2: $
TOTAL
Wib f I DBLE TIME S
TOTAL
LABOR: S
QUANTITY OF OVERTIME MEALS MEALS: $
CUSTOMERS REP. DATE: -L-1-9 J Z' 77W.O. TOTAL$
1 = 1na
CONSTRUCTION
GROUP INCORPORATED
Date: 7.17.2025
Attn: Keith Eckert
2220 Tulare Street, 8th Floor
Fresno, California 93721
Re: Fresno County Sheriff Substation
BMY Job NO.22009
Subject: PCO#027—Condensate line for AH 1-4 Overflow Pan Drain Lines
Mr. Eckert,
BMY Construction Group, Inc. is submitting proposed change order#027 for additional work for the AH 1-
4 overflow pan drain lines.
BMY is requesting that the County of Fresno Department of Public Works issue a Change Order adding
$5,240.78 to the contract. This work was performed on a Time and Materials basis to avoid delaying the
project and to minimize the impact. BMY kindly requests a prompt review and approval of this proposed
Change Order(PCO)
We appreciate your assistance with this matter. If you have any questions or need any further information,
please do not hesitate to contact me.
Respectfully,
Nick Hostetler
Project Engineer
= PCO #027
CONSTRUCTION
GROUP INCORPORATED
BMY Construction Group, Inc. Project:22009-Fresno County Sheriff Substation Bid Package Contract
5485 East Olive Avenue #21-S-01
Fresno,California 93727-2541 1129 N Armstrong Ave
Phone:(559)243-4200 Fresno,California 93727
Fax:null
Prime Contract Potential Change Order #027: CE #037 - T&M Work- AH 1-4
Overflow Pan Drain Lines
TO: The County of Fresno, Department of Public FROM: BMY Construction Group, Inc.
Works and Planning 5485 E.Olive Ave
2220 Tulare Street,8th Floor Fresno,California 93727
Fresno,California 93721
PCO NUMBER/REVISION: 027/0 CONTRACT: 22009-Fresno County Sheriff Substation
Bid Package Contract#21-S-01 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Nick Hostetler(BMY Construction
Group,Inc.)
STATUS: Pending-In Review CREATED DATE: 7/17/2025
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION: ACCOUNTING METHOD: Amount Based
THE REFERENCED PCO 30
WILL EXPIRE AFTER:
SCHEDULE IMPACT: PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: $5,240.78
POTENTIAL CHANGE ORDER TITLE: CE#037-T&M Work-AH 1-4 Overflow Pan Drain Lines
CHANGE REASON:Correction
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#037-T&M Work-AH 1-4 Overflow Pan Drain Lines
We are pleased to offer the following specifications and pricing to make the following changes:
AH 1-4 Overflow Pan Drain Lines
1. Extend the existing AH 1-4 Overflow Pan Drain Lines to a new 1 '/2 Copper Header.
2.Mount the new 1 '% Copper Header and pipe it to the exterior.
3.Drill one 2 hole in the Exterior Wall.
4.Seal Hole with Silicone.
5. Install a new 1 '/z Exterior Wall Escutcheon.
5.Clean up
ATTACHMENTS:
30-07789 T&M Work-AH 1-4 Overflow Pan Drain Lines.pdf
# I Budget Code Description Amount
1 23-OOOO.PO HVAC/AMERICAN.Purchase Order IT&M $4,897.92
Subtotal: $4,897.92
Overhead and Profit(5.00%Includes Cost Type(9)): $244.90
General Liability(1.00%Includes Cost Type(9)): $48.98
Bond(1.00%Includes Cost Type(9)): $48.98
Grand Total: $5,240.78
BMY Construction Group, Inc. Page 1 of 2 Printed On:7/17/2025 07:11 AM
PCO #027
CONSTRUCTION
GROUPINCORPORATED
Keith Eckert(The County of Fresno, The County of Fresno,Department of BMY Construction Group,Inc.
Department of Public Works and Public Works and Planning
Planning)
2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave
Fresno,California 93721 Fresno,California 93721 Fresno,California 93727
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
BMY Construction Group, Inc. Page 2 of 2 Printed On:7/17/2025 07:11 AM
American Incorporated
1345 N.American Street
Visalia, CA 93291
Ph :559-651-1776
Change Request
To: Derek Brawley Number: 3
BMY CONSTRUCTION Date: 7/11/25
5485 E. OLIVE AVE Job: 30-07789 BMY-FRESNO CO SHERIFF SUBSTATN
FRESNO, CA 93727 Phone:
Ph: (559)243-4200 Fax: (559)222-2380
Description: T&M Work-AH 1-4 Overflow Pan Drain Lines
Reason: Change in Scope
We are pleased to offer the following specifications and pricing to make the following changes:
AH 1-4 Overflow Pan Drain Lines
1. Extend the existing AH 1-4 Overflow Pan Drain Lines to a new 1 '/2 Copper Header.
2. Mount the new 1 '/2 Copper Header and pipe it to the exterior.
3. Drill one 2 hole in the Exterior Wall.
4. Seal Hole with Silicone.
5. Install a new 1 '/2 Exterior Wall Escutcheon.
5. Clean up
Work performed by us:
Description Quantity Unit Unit Price Price
Labor-Plumbling Labor 18.00 $123.66 $2,225.88
Material-10'of strut Material 1.00 $20.00 $20.00
5 1 5/8"cush clamps Material 1.00 $23.75 $23.75
2 Mapp gas tanks Material 1.00 $36.52 $36.52
20'-%/d'Copper Type L Tube Material 1.00 $89.00 $89.00
60'-1 ''/2'Copper Type L Tube Material 1.00 $1,275.00 $1,275.00
1 -1 5/8"Wall Escutcheon Material 1.00 $3.85 $3.85
1 -1 ''/z'Copper Female adapter Material 1.00 $50.12 $50.12
1 - 1 ''/2'PVC Threaded Plug Material 1.00 $6.00 $6.00
4-1 ''/z'x%"copper tees Material 1.00 $320.00 $320.00
4-%"copper couplings$ Material 1.00 $12.00 $12.00
2-1 ''/z'copper 90s Material 1.00 $50.00 $50.00
1 tube of silicone Material 1.00 $7.00 $7.00
Subtotal: $4,119.12
Subtotal: $4,119.12
Sales Tax $1,893.24 8.50% $160.93
OH&P $4,119.12 15.00% $617.87
Total: $4,897.92
Page 1 of 2
American Incorporated
1345 N.American Street
Visalia, CA 93291
Ph :559-651-1776
Change Request
To: Derek Brawley Number: 3
BMY CONSTRUCTION Date: 7/11/25
5485 E. OLIVE AVE Job: 30-07789 BMY-FRESNO CO SHERIFF SUBSTATN
FRESNO, CA 93727 Phone:
Ph: (559)243-4200 Fax: (559)222-2380
If you have any questions, please contact me at(559)651-1776.
Submitted by: Dustin Owens Approved by:
AMERICAN INCORPORATED Date:
Page 2 of 2