HomeMy WebLinkAbout2403C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ELKHORN RECHARGE FACILITY CHANGE ORDER NO. 2 500 E. ELKHORN AVE. CARUTHERS, CA 93609 JUNE 30, 2025 CONTRACT NO. 24-03-C PAGE 1 OF 2 TO: G&J HEAVY HAUL, INC.: Make the following change(s) to the plans and specifications or do work not in the plans and specifications for this contract. Because of the proposed change(s), 10 -WORKING DAYS will be granted to the allotted contract time. The revised project completion date is August 28, 2025. PART I: INSTALL ADDITIONAL FENCE - EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, furnish and install approximately 8,930 linear feet of 6-feet tall chain-link fence, with three (3) strands of barbwire as shown on the attached plan sheet. Perform all work according to Section 80, "Fences," of the Standard Specifications, and Section 32 31 00, "Fencing," of the Technical Specifications, as directed by the Resident Engineer. Payment for this work will be made as an agreed lumpsum price of$236,724.77, according to Section 9-1.03, "Payment Scope," of the Special Provisions. This amount will be paid as extra work. A total of 10 -working days will be added to the contract time for the above referenced extra work. TOTAL COST PART I: $236,724.77 INCREASE TOTAL TIME EXTENSION PART I: 10 -WORKING DAYS PART II: INCREASE ITEMS AT UNIT PRICES This change was proposed by the engineer. Item quantities in the bid book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Increased Items: Item Total Total No. Description Unit Quantity Price Amount /o) o� A32 Excavation to Ultimate Depth CY 20,130.00 $2.64 $53,143.20 9.98 9.98 and Placement of Excess Basin Material TOTAL INCREASE: $53,143.20 This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors therefore the prices shown above. _Const.Mgmt _RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ELKHORN RECHARGE FACILITY CHANGE ORDER NO. 2 500 E. ELKHORN AVE. CARUTHERS, CA 93609 JUNE 30, 2025 CONTRACT NO. 24-03-C PAGE 2 OF 2 TOTAL COST PART II: $53,143.20 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS NET COST THIS CHANGE ORDER: $289,867.97 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: 10 -WORKING DAYS Mark Celaya, Resident Engineer APPROVAL RECOMMENDED: G&J Heavy Haul, Inc. Contractor Mandeep S. Sekhon, PE 3esse Anher Construction Engineer By Jesse Archer(Aug 2G,2025 10:53:07 PDT) APPROVED BY: Digitally signed by Steve Vice President Steve White White Date:2025.09.08 Title 11:10:51-07'00' Steven E. White, Director 26/08/2025 Public Works and Planning Accepted Date: Date: Contractor We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified, and will accept as full payment Board of Supervisors therefore the prices shown above. _Const.Mgmt RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. -6_ . , yf ` — \/ !( || \ k{\\\7 _ 2§ ! \ | \ \ kICLICL ==E! • � k/735 \§ \ \ ! ;2/,�# ;; — u [ ;f|\/ §� },■e�ag \} \ { ! [ G ° §- IL—i ..� U) , ! a»�#a¥s@ ] �. . ---- . -- -- cl ! .. . � \ k, ~ * \ \ � \ . o 0 ; ` ± ; ! b) \ Cr)L) /\ § ƒ / j, \ , j i 4 ' \ pLLJ ---- � -- -----_� . _ --- a72m3A¥aGm 13NN NVgmm � /` g � i ! cn / </\ zik v ` • W \ k . / 4% W (/ /)\)L {�|]! Ee / ) 7!�! 6 / )) �||{{ 77 � ----------- -��——�------ --------- | em#m, \ ; ! ( }{ �