Loading...
HomeMy WebLinkAbout2326C CCO 05.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ARPA WATER METER REPLACEMENTS CHANGE ORDER NO. 5 CONTRACT NO. 23-26-C JULY 25, 2025 PAGE 1 OF 2 TO: WEST VALLEY CONSTRUCTON COMPANY, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. INCREASE ITEMS AT UNIT BID PRICES This change was proposed by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, increase items at the unit bid prices. These bid items are being adjusted per the actual field placement. Increased Items: Total Item Description Unit Quantity Price Amount (0/.) TOTAL No. (0/6) 2-16A Water Meter Box(1324) EA 42.00 $550.00 $23,100.00 2,100.00 4,300.0 Replacement 2-16B Water Meter Box Lid EA 1.00 225.29 225.29 20.00 0.00 (1336) Replacement 2-25B Water Meter Box Lid EA 18.00 153.15 2,756.70 163.64 (23.68) (B30) Replacement 2-28A Water Meter Box Lid EA 1.00 108.00 108.00 9.09 50.00 (1316) Replacement 5 Water Meter EA 50.00 120.00 6,000.00 200.00 275.00 Replacement 6 Water Meter Box EA 1.00 465.00 465.00 8.33 (87.00) Replacement 15 Water Meter Box Lid EA 4.00 113.00 452.00 14.81 (20.51) (1316) Replacement 20 Water Meter Box Lid (139) EA 2.00 92.00 184.00 4.55 228.57 Replacement 23 Water Meter Retrofit EA 4.00 113.00 452.00 9.76 9.76 24 Water Meter Box Lid (139) EA 1.00 92.00 92.00 4.35 20.00 Replacement 25 Water Meter Box Lid EA 1.00 140.00 140.00 100.00 (96.00) (1324) Replacement 27 Water Meter Retrofit EA 3.00 113.00 339.00 4.48 4.48 TOTAL INCREASES: $34,313.99 Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ARPA WATER METER REPLACEMENTS CHANGE ORDER NO. 5 CONTRACT NO. 23-26-C JULY 25, 2025 PAGE 2OF2 This change did not impact the critical path for the project, so granting additional contract time was not warranted. NET COST THIS CHANGE ORDER: $34,313.99 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS .Po6utyS��uc�c.�ee� Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: West Valley Construction Co., Inc. Contractor Mandeep S. Sekhon, PE Construction Engineer By APPROVED BY: Digitally signed by Steve Assistant Vice President Steve White White Date:2025.08.25 Title 10:16:39-07'00' Steven E. White, Director Aug 18,2025 Public Works and Planning Accepted Date: Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.