HomeMy WebLinkAbout2313C CCO 04.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
CSA 30 & 32 WELL SITE IMPROVEMENTS AND CHANGE ORDER NO. 4
MANGANESE TREATMENT AUGUST 21, 2025
COUNTY SERVICE AREAS 30 & 32 EL PORVENIR & CANTUA CREEK PAGE 1 OF 2
COUNTY OF FRESNO WESTSIDE GROUNDWATER PROJECT
STATE WATER RESOURCES CONTROL BOARD—
PROJECT NUMBER: 1000359-005C
CONTRACT NO. 23-13-C
TO: SYBLON REID CONTRACTORS:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time.
PART I: UPGRADE THE MCC AND ATS ENCLOSURES FROM NEMA-1 TO NEMA-3R RATINGS AT
CSA 32 SITE—EXTRA WORK
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, upgrade the
Motor Control Center (MCC) and Automatic Transfer Switch (ATS) enclosures form NEMA-1 to NEMA-3R.
All upgraded equipment shall comply with Standard Specifications, Special Provisions, and other applicable
electrical and mechanical standards. Compensation for these upgrades will be made at an agreed lumpsum
price of$44,952.35 (MCC enclosure at $33,996.30 and ATS enclosure at $10,956.05) according to Section
9-1.03, "Payment Scope," of the Special Provisions. This agreed price includes compensation for all materials,
labor, equipment, tools, incidentals, markups, profits, and overhead costs, no additional compensation will be
made thereafter. This amount will be paid through Bid Item No. 59, Supplemental Work, with no net
increase to the contract.
This change did not impact the critical path of the project, therefore, granting additional contract time was not
warranted.
TOTAL COST PART I: $0.00 (PAID IN BID ITEM NO. 59)
TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS
PART II: FURNISH AND INSTALL UPGRADED FIBER OPTIC EQUIPMENT IN MCC2-PLC, RIO-3200,
AND RIO-3201 AT CSA 30 AND CSA 32 SITES— EXTRA WORK
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, provide and
install upgraded fiber optic equipment in MCC2-PLC, RIO-3200, and RIO-3201 at both CSA 30 and CSA 32
sites. All upgraded equipment shall comply with Standard Specifications, Special Provisions, and other
applicable electrical and mechanical standards. Compensation for this upgrade will be made at an agreed
lumpsum price of$9,677.25, according to Section 9-1.03, "Payment Scope," of the Special Provisions. This
agreed price includes compensation for all materials, labor, equipment, tools, incidentals, markups, profits, and
overhead costs, no additional compensation will be made thereafter.
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors
_Const.Management therefore the prices shown above.
_RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
CSA 30 & 32 WELL SITE IMPROVEMENTS AND CHANGE ORDER NO. 4
MANGANESE TREATMENT AUGUST 21, 2025
COUNTY SERVICE AREAS 30 & 32 EL PORVENIR & CANTUA CREEK PAGE 2 OF 2
COUNTY OF FRESNO WESTSIDE GROUNDWATER PROJECT
STATE WATER RESOURCES CONTROL BOARD—
PROJECT NUMBER: 1000359-005C
CONTRACT NO. 23-13-C
This amount will be paid through Bid Item No. 59, Supplemental Work, with no net increase to the
contract.
This change did not impact the critical path of the project, therefore, granting additional contract time was not
warranted.
TOTAL COST PART II: $0.00 (PAID IN BID ITEM NO. 59)
TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS
NET COST THIS CHANGE ORDER: $0.00 (PAID IN BID ITEM NO. 59)
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
JAMES DREWS, Resident Engineer
APPROVAL RECOMMENDED:
SYBLON REID CONTRACTORS �� `�
Contractor MANDEEP S. SEKHON, PE
Construction Engineer
By wiascott APPROVED BY:
Digitally signed by Steve
White
Syblon Reid Construction Inc. Partner Steve White Date:
Title 115:4 30— 7 0700'7
STEVEN E. WHITE, Director
Aug 27,2025 Public Works and Planning
Accepted Date:
Date:
_Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors
_Const.management therefore the prices shown above.
_RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.