HomeMy WebLinkAbout24S01 ECC Educational Building CCO 001.pdf c°°`'�� County of Fresno
4' Department of Public Works and Planning
O� t896 O Development Services&Capital Projects Division
P[Z$c�� Steven E.White,Director
PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST
This Document is for Fresno County Internal Use Only
Project: ECC Educational Building
Contract No.: 24-S-01
Date: 2025-06-17
Contractor: GC Builders
Architect: Hoque Khan
Change Order No.: #001
Construction Contract Dollar Amount(as awarded on 2024-10-22) $2,753,499.00
Director's Change Order Limit: $150,175.00
Change Order Allowance $150,175.00
Contract Time(Calendar Days): 270
Construction Start Date(NTP Issued 2025-01-08): 2025-01-10
Original Construction Completion Date: 2025-10-07
Change Order Scope of Work:
PCO#001-Relocate HVAC louver at South Elevation
PCO#002.1-Add Support at Entry Framing
Attachment(S)7
Contractors PCO,Change Order Summary
Net Change Order Dollar Amount: $6,461.64
Net Calendar Days: 2
Total Change Order Dollar Amount To Date $6,461.64
Adjusted Contract Dollar Amount: $2,759,960.64
Director's Change Order Limit Balance: $143,713.36
Change Order Allowance Balance: $143,713.36
Total Adjusted Calendar Days To Date: 2
Adjusted Construction Completion Date: 2025-10-09
Reviewed-
Cleared for Jamie Sylvester Digitally signed by Jamie Sylvester
Approval Jamie Sylvester Date:2025.06.17 16:48:16-07'00'
Principal Accountant,Public Works and Planning
Date: 2025.08.08
Reviewed: Hoque Khan 14.1R'f1R-07,nn,
Architect,Architect of Record
Keith Eckert Digitally signed by Keith Eckert
Reviewed: Keith M.Eckert ll Date:2025.08.22 12:22:19-07'00'
Senior Engineering Technician,Project Manager
p SPkhOn Digitally signed by Mandeep S.Sekhon
Reviewed: Mandeep Mandee S. S Sekhon Date:2025.08.2509:12:18-07'00'
Construction Division Engineer,Construction Manager
M. Kettler Date:
signed by William M.Kettler
William
Reviewed: William M.KettlerK Date:2025.08.25 09:30:51-07'00'
Deputy Director of Planning
Bernard Jimenez Digitally signed by Bernard Jimenez
Reviewed: Bernard Jimenez Date:2025.08.25 10:26:57-07-00'
Planning&Resource Management Officer
Steve White Digitally signed by Steve White
Approved: Steven E. White Date:2025.08.25 17:03:19-07'00'
Director of Public Works and Planning
Approved: Buddy Mendes Not Applicable
Board of Supervisors,Chairman
Scan and forward Director Approved Copy to:
CAO Paul Nerland
PWP Business Office Jamie Sylvester
c°U County of Fresno
Department of Public Works and Planning
O t856 O Development Services&Capital Projects Division
PR c�11 Steven E.White,Director
F,_
COUNTY CHANGE ORDER REQUEST
Project: ECC Educational Building
Contract No.: 24-S-01
Date: 6/10/2025
Contractor: GC Builders
3366 W Sussex
Fresno,CA 93722
(559)840-0480
Change Order No.: #001
Construction Contract Dollar Amount(as awarded on 2024-10-22) $2,753,499.00
Original Construction Completion Date: 2025-10-07
#001 is hereby approved by the County.
Scope of Work:
PCO#001-Relocate HVAC louver at South Elevation
PCO#002.1-Add Support at Entry Framing
Attachment(s):
Contractors PCO,Change Order Summary
Net Change Order Dollar Amount: $6,461.64
Net Calendar Days: 2
Adjusted Contract Dollar Amount: $2,759,960.64
Total Change Order Dollar Amount To Date: $6,461.64
Total Adjusted Calendar Days To Date: 2
Adjusted Construction Completion Date: 2025-10-09
Keith M.Eckert 11 Keith Eckert
Project Manager
Date 6/11/25
By signing acceptance of this Change Order,the Contractor shall agree to the following:
1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in
this Change Order.
2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full.
In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 24-S-01,Article VI shall apply.
Accepted By., GC Builders
Authorized Signature
Date: 6/11/25
When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to:
Linda Guerra,Staff Analyst
lindaguerraWre snocountvca.aov
Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division
2220 Tulare Street,Eighth Floor
Fresno,CA. 93721
CHANGE ORDER SUMMARY
Project: ECC Educational Buildinq
-I Executed lqmqvpr
Change Order Add Credit Adj.
Days Potential Change Orders
001 2025-06-10 $6,461.64 $0.00 2 001,002.1
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
Totals $6,461.64 $0.00 2
Potential
. . Credit . PendingChange • F=IL
� .
001 001 $3,340.59 1 Relocate HVAC louver at South Elevation
002 $6,241.04 1 Additional Steel Support for RFI 57 Response
002.1 001 $3,121.05 1 Add Support at Entry Framing
Totals $6,461.64 $0.00 $6,241.04 $0.00
GERARDO CAMPOS
GCr3 BulL>Jt;xs
SIC 933222
COR NO 001 CHANGE ORDER REQUEST
PROJECT: Environmental Compliance Center Ed Bldg Contract#:24-S-01
CONTRACTOR: GC Builders DATE 5/20/2025
ARCHITECT: Hoque Khan
OWNER: The County of Fresno
DESCRIPTION OF CHANGE: Relocate HVAC Louver at South Elevation
Per attached drawing and RFI 54 response, relocate single HVAC louver at south elevation.
TIME EXTENSION OF CHANGE: 1 Day(s)
Description Labor Material Equip Sub Total
Relocate Louver $ 3,150.01
$ -
$ -
SUBTOTAL COR AMOUNT Subtotal $ 3,150.01
Contractor OH&P 5% 1 $ 157.50
SUBTOTAL COR AMOUNT Subtotal $ 3,307.51
1%Bond Mark Up $ 33.08
TOTAL COR AMOUNT Total $ 3,340.59
6 eVCW to Caunrios
GC Builders Date
Page 1 of 1
REQUEST FOR CHANGE ORDER
Ref.# CO-001
ar LO� GC #
_ Date May 19, 2025
tFRAME-2-FIIVISH131111�I Job# 24-10081
To: GCBI DBA GC Builders Project: Environmental Compliance Center Ed. Buildi
3003 Monroes Avenue 1327 W Dan Ronquillo Dr.
Fresno, CA 93706
Fresno, CA 93723
Description: South Elevation-HVAC Single Louver Relocation
South Elevation - HVAC Louver Relocation
Labor #of Men Qty Hrs Total Hrs Rate Total
Framing Welding-Welding of Jamb Studs 1 2.00 Hrs 2.00 126.94 $253.88
Demolition 2 4.00 Hrs 8.00 126.94 $1,015.52
Ext Framing 2 4.50 Hrs 9.00 126.94 $1,142.46
Misc Clean Up 1 1.00 Hrs 1.00 126.94 $126.94
Total Labor $2,538.80
Material Size Quantity UOM Unit Price Total
WELDING WIRE .035 1.00 EA 104.02 EA $104.02
60OS162-43(33 KSI) 14'-0" 4.00 PCs 1.72 LF $96.32
Total Material $200.34
Subtotal for Detail $2,739.14
Labor Total: $2,538.80
AUTHORIZED BY: Kasey Earls Material Total: $200.34
ON BEHALF OF: GCBI DBA GC Builders Sub Total: $2,739.14
PROJECT MANAGER:Shawn J. Curry ica Mark Up: $410.87 15.ble
ESTIMATOR: Randy R.Thompson
Total: $3,150.01+ATalxesle
3562 S.Elm Avenue,Fresno,California,93706 T:559-486-0584 Fax:559-486-0511 www.tarltonandson.com
Run on: May 20,2025 12:47 PM
El
--� I NONE■I■■■■■■■■■■. A■■
'Fee■■e■■eeA��=
dIliIII.S.-i -
GERARDO CAMPOS
'GCIa u ,
R.F.I NO. 54 REQUEST FOR INFORMATION
PROJECT: ECC Educational Building Project No: 2024-13
CONTRACTOR: GCB1 Inc. dba GC Builders DATE: 5 / 1 2 / 2 5
ARCHITECT: Zahidul Hoque Khan
INSPECTOR:
RFI SUBJECT: Exhaust Louver Elevations
On Plan Sheet M2.0 the two louvers at grid line B will not be able to match the elevation per plan sheet A-
5.0 south elevation. This is due to the steel structure. The beams are at different elevations. The louver
from EF-1will be at 10' to the bottom and the louver from EF-4 will be at approximately 11'1" to the bottom.
Please advise how to proceed.
Anticipated Cost Impact ❑ Yes ❑ NO
SIGNED BY: Kasey Earls DATE: 5/12/25
kasey@gc-builders.com
RESPONSE:
County Response:
If all the louvers (two in Grid B, one in Grid 4, and two in Grid 1, as indicated on Sheet M-2.0) can
be relocated to a height of 11'-1" from the F.F. to the bottom of the louver, this is acceptable.
If this is not possible, the County will explore alternative solutions once notified.
ATTACHMENTS: ( ) Specifications: Drawing No:
AOR
SIGNED BY: —TITLE : DATE 05/13/2025
REQUEST FOR INFORMATION
PROJECT NAME: Envrionmental Compliance Education Bldg. RESPOND BY: ASAP
Contract: GC'S RFI NO.
Job No: SUB'S RFI NO. 1
TO: GC Builders FROM: NOLTE SHEET METAL, INC.
TEL: 559-275-1246
FAX: 559-275-2114
RESPONSE BY:
Construction Manager Mechanical
Architect Plumbing
Engineer Electrical
Structural Eng. Consultants:
Other Consultants:
CONTRACTOR: Nolte Sheet Metal, Inc. CONTACT Ernie Nolte
SUBJECT: Exhaust Louver Elevations
CATEGORY:
NEED FOR CLARIFICATION OMISSION
UNFORESEEN CONDITION COORDINATION PROBLEM
CONFLICT WITHIN DOCUMENTS OTHER
SPEC. SECTION PARAGRAPH NO. DRAWING NO. DETAIL NO.
IM1.0
DESCRIPTION:
On plan sheet M2.0 the two louvers at frid line B will not be able to match the elevation
per plan sheet A-5.0 south elevation. This is due to the steel structure. The beams are at different
elevations. The louver from EF-1 will be at 10' to the bottom and the louver from EF-4 will be at
approximately 11'1" to the bottom.
Please advise on how to proceed with these elevations.
ATTACHMENTS:
COST IMPACT: $ EST. TIME IMPACT: EST.
CONTRACTOR Nolte Sheet Metal, Inc. DATE:
SIGNATURE: John Nolte 5/12/2025
RESPONSE:
ATTACHMENTS:
SIGNATURE: DATE:
GERARDO CAMPOS
BUILDERS
GC�3.
COR NO 002R CHANGE ORDER REQUEST
PROJECT: Environmental Compliance Center Ed Bldg Contract#:24-S-01
CONTRACTOR: GC Builders DATE 6/3/2025
ARCHITECT: Hoque Khan
OWNER: The County of Fresno
DESCRIPTION OF CHANGE: Additional Steel Support for RFI 57 Response
Per RFI 57 response, Option 2 was chosen to fabricate and install additional HSS support at Framing at Entry
due sagging.Subcontractor has agreed to split the original cost with the County.
TIME EXTENSION OF CHANGE: 1 Day(s)
Description Labor Material Equip Sub Total
Additional Steel Support(Cost Split w/Fresno Count $ 2,943.00
SUBTOTAL COR AMOUNT Subtotal $ 2,943.00
Contractor OH&P 5% $ 147.15
SUBTOTAL COR AMOUNT Subtotal $ 3,090.15
1%Bond Mark Up $ 30.90
TOTAL COR AMOUNT I TotaLl $ 3,121.05
otrOWV o Canlfios 6/3/25
GC Builders Date
MEYERS
L 1 CONSTRUCTORS itv ,
Meyers Constructors Inc. Date : 6/3/2025
Page 1 of 1
CO #: 1
Job #: 24-347
Environmental CC Educational Bldg Fresno
Job Location: 1327 W. Dan Ronquillo Drive,
Fresno, CA 93706
Change Order Request
To: Chris Giannetta
GC Builders
Additional Steel Support Framing
Change Requested By: Chris Gianetta
Sent Via: E-mail
Description of Change:
Per RFI-057 Option #2, Fabricate and Install Additional HSS Support Framing at Entry. Cost of this CO to be
split between Project and MCI
The change will cause an increase of$2,943.00 to the contract amount.
A signature below indicates acceptance of all changes shown herein. Any work associated with this change
will begin upon receipt of a signed copy of this C.O. in our office. Please respond by 6/5/2025.
If the requested response time is not met, the project may be delayed.
YaA&� 5mz&
Accepted By Myers Constructors Inc.
' Po Box CHANGE ORDER# 1A
MEYERS
Fresno,CA 93650 DATE: 6/3/2025
A-,&' I CONSTRUCTORS INC 40488 Brickyard Drive JOB# 24-347
Madera,CA 93636 JOB NAME: ECC Educational Building
Lic. 1004811 O:(559)473-0014 F:(559)570-0414 CONTRACTOR: GC Builders
ADD/DELETE: ADD
TAX RATE Per COUNTY 8.35%
CHANGE ORDER PROPOSAL
DESCRIPTION OF CHANGE: Per RFI-057 Option#2,Fabricate and Install Additional HSS Support Framing at Entry.Cost of this CO
to be split between Project and MCI
EXCLUSIONS AND CLARIFICATIONS: Demolition
TOTAL
LABOR DESCRIPTION NOTE #OF MEN QTY HRS HRS RATE TOTAL
Design Engineer 1 8 8 $ 106.40 $ 851.20
Beam Line Processing 1 1 1 $ 200.00 $ 200.00
Shop Fabrication 1 4 4 $ 84.38 $ 337.52
Iron Worker Area 4 2 8 16 $ 114.82 $ 1,837.12
Shop Primer Painter 1 1 1 $ 95.74 $ 95.74
MATERIAL DESCRIPTION NOTE QTY UOM UNITS UNIT PRICE TAX TOTAL w/TAX
HSS 1 EA 1 $ 497.750 8.35% $ 539.31
Hardware 1 EA 1 $ 40.000 8.35% $ 43.34
Consumables 1 EA 1 $ 50.000 8.35% $ 54.18
EQUIPMENT DESCRIPTION NOTE QTY UOM UNIT PRICE TAX TOTAL w/TAX
Welding Utility Truck 1 DAY $ 633.00 $ 633.00
Reach Fork 8000# 1 DAY $ 650.00 8.35% $ 704.28
SUB/OTHER DESCRIPTION NOTE QTY UOM UNIT PRICE TAX TOTAL w/TAX
Cost Split -1 EA $ 2,443.50 8.35% $ (2,647.53)
Additional Working Days to Contract 1 Labor Total: $ 3,322
Material Total: $ 637
CREATED BY: EM Equipment Total: $ 1,337
REQUESTED BY: CG Sub/Other Total: $ (2,648)
ON BEHALF OF: GC Builders 10% Overhead&Profit $ 294
This quote is good for 30 days and assuming MCI is on site performing contract work. If MCI work is complete and CO work Total: $ 2�943
requires dedicated moblization,then moblization charges will occur. MCI reserves the right to update pricing labor,
material,and equipment pricing once quote has expired or in the case of force majeur. Amount rounded to next whole dollar for accounting purposes
61312025 11:44
GEWDO CAMPOS
BUILDERS
LC 933222
R.F.I NO. 57 REQUEST FOR INFORMATION
PROJECT: ECC Educational Building Project No: 2024-13
CONTRACTOR: GCB1 Inc. dba GC Builders DATE: 5 / 2 1 / 2 5
ARCHITECT: Zahidul Hoque Khan
INSPECTOR:
RFI SUBJECT: Entrance Roof Sag
At the Entrance Roof the thin tube steel holding up a full tube steel spanning across from thin tube steel to thin tube
steel as shown in the picture, has a "Sag" in it due to the weight of the full tube steel spanning across. The West end
has a "sag" of approximately Y2" to 5/8" while the East end has an approximate "sag" of%" to 13/16". We still must
add framing on top of the full tube steel as well as Y2" plywood and roofing materials. Our concern is with only the
weight of the full tube steel once we add all above listed components we will only be adding to the weight and
possibly create more of a "sag". Please advise how to proceed. Please design an appropriate solution to eliminate the
"sag" and allow exterior framing to be completed as this is the only area left to complete on the exterior.
- r
F
Anticipated Cost Impact ❑ Yes ❑ NO
SIGNED BY: Kasey Earls DATE: 5/21/25
kasey@gc-builders.com
RESPONSE:
SEE REPAIR DETAIL ATTACHED.
DETAIL F AND G ON SHEET S5.0 SHOWS THE THICKNESS TO BE 1/4"
ATTACHMENTS: ( ) Specifications: Drawing No:
SIGNED BY: CP1zi2mot-;�2 TITLE : Senior Engineer DATE 05/22/2025
COUNTY OF FRESNO
DEPARTMENT OF PUBLIC WORKS AND PLANNING
c S
5
� (f9
2 >
{
7 §§
i
j
i
} /J,
F
1
`s
s
s
72
le-
3 �
REPAIR DETAIL
� f
q�} c
S �
7� �n 40OS162-43 @
V90 • I I 16" O.C.
SIDS I I '
I 1
i I ROOF SHEATHING
I 800S162-43 @ 24" O.C.
I
I
i
I I 1"" SIMPSON L7
1/8 I I HSS2X8X4 HSS8X4X�" RAFTER TO BENT PLATE
POST (TYP.)
HSS4X4Xg' POST
WITH 1/4' CLOSURE PLATE C2��jppC,�fo2-h3
I SEAL WELDED (TYP.) �y
DETAILS SHOWS BM-2 TO
F Detail BE 1/4"THICK
S5.0 Scale: 1"=1'-0"
2'-0"
I I
;4%v9 Leo OR
I I
I I
I
HSS8X4XJ"
I I
1/8 I I 1/g P ST2X8X4""
I I ) DETAILS SHOWS BM-2 TO
I I BE 1/4"THICK
I I
I
HSS4X4Xg' POST
G Detail
S5.0 Scale: 1"=1'-0"