HomeMy WebLinkAbout2418C CCO 01.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 01
DRAPER STREET TO CLAYTON AVENUE JUNE 18, 2025
STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 1 OF 5
CONTRACT NO. 24-18-C
TO: DON BERRY CONSTRUCTION, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the allotted contract
time.
PART I: REVISE PROJECT PLANS (DINUBA AVENUE INTERSECTION)
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheets 78 and 79 with the attached revised Plan Sheets 78A and 79A. The revision to the striping includes
removing and replacing the transition striping, which were placed in Phase 1 of the Golden State Boulevard
Project. Compensation for the additional striping will be made at unit bid prices of the pertaining bid items
(shown below), and compensation for the removal of the existing striping (includes sealing of the surface) will
be made at the agreed unit prices; $1.93 per linear foot for Detail 12, and $2.20 per linear foot for Details 25,
38, 38A, 39, and 39A, in accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and
Special Provisions.
Increased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount (0/0) (%)
56 6" White Thermoplastic Traffic LF 1,720.00 $2.20 $3,784.00 40.95 40.95
Striping (Detail 39, 39A)
58 4" White Thermoplastic Traffic LF 860.00 1.75 1,505.00 18.70 18.70
Striping (Detail 12, 27B, 38, 38A)
59 4" Yellow Thermoplastic Traffic LF 860.00 3.50 3,010.00 30.65 30.65
Striping (Detail 21, 25, 27, 35A)
TOTAL INCREASE: $8,299.00
A total of 860 linear feet of Detail 12 was removed, total compensation resulted in (860 x 1.93 = 1,659.80)
$1,659.80. Also, a total of 2,580 linear feet of Details 25, 38, 38A, 39, and 39A were removed, total
compensation resulted in (2,580 x 2.20 = 5,676) $5,676.
Total compensation for the additional striping resulted in $8,299, this amount will be paid through Bid Item Nos.
56, 58, and 59. Total compensation for the removal of the existing striping resulted in $7,335.80, this amount
will be paid as extra work.
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors therefore the prices shown above.
_Const.Management
RE/Arch.
_Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 01
DRAPER STREET TO CLAYTON AVENUE JUNE 18, 2025
STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 2 OF 5
CONTRACT NO. 24-18-C
TOTAL COST PART I: $16,634.80 INCREASE
TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS
PART II: REVISE PROJECT PLANS (SOUTH AVENUE INTERSECTION)
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheet 81 with the attached revised Plan Sheet 81A. The revision to the striping includes to blackout and
replace the transition striping, which were placed in Phase 1 of the Golden State Boulevard Project.
Compensation for the additional striping will be made at unit bid prices of the pertaining bid items (shown
below), and compensation to blackout the existing striping will be made at the agreed unit prices; $0.81 per
linear foot, in accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and Special
Provisions.
Increased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount el.) NO
54 4" White 2-Coat Paint Traffic LF 861.00 $0.70 $602.70 6.67 6.67
Striping (Detail 8, 12, 27B, 38,
38A)
55 6" White 2-Coat Paint Traffic LF 1,727.00 0.78 1,347.06 9.61 9.61
Striping (Detail 39, 39A)
57 4" Yellow 2-Coat Paint Traffic LF 520.00 1.30 676.00 5.31 5.31
Striping (Detail 21, 22, 24, 25, 29,
31, 32)
62 Thermoplastic Pavement Marking SF 200.00 5.35 1,070.00 3.40 3.40
TOTAL INCREASE: $3,695.76
A total of 1,113 linear feet of the existing striping was blacked out, total compensation resulted in (1,113 x 0.81
= 901.53) $901.53.
Total compensation for the additional striping resulted in $3,695.76, this amount will be paid through Bid Item
Nos. 54, 55, 57, and 62. Total compensation for the blackout of the existing striping resulted in $901.53, this
amount will be paid as extra work.
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors
_Const.management therefore the prices shown above.
_RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 01
DRAPER STREET TO CLAYTON AVENUE JUNE 18, 2025
STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 3 OF 5
CONTRACT NO. 24-18-C
TOTAL COST PART II: $4,597.29 INCREASE
TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS
PART III: INCREASE BID ITEM NO. 71 QUANTITIY AT UNIT BID PRICE
This payment adjustment was proposed by the engineer.
Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item
quantities to the actual quantities used.
Increased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount
71 Crack Treatments SQYD 435.00 $4.25 $1,848.75 17.65 17.65
TOTAL INCREASE: $1,848.75 INCREASE
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
TOTAL COST PART III: $1,848.75 INCREASE
TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS
PART IV: REMOVE AND REPLACE EXISITING STRIPING (ADAMS AVENUE INTERSECTION)
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, blackout the
existing striping at the Adams Avenue intersection which was placed in Phase 1 of the Golden State Boulevard
Project and place new striping to match the current project striping. Compensation for the additional striping
will be made at unit bid prices of the pertaining bid items (shown below), compensation to blackout the existing
striping will be made at the agreed unit price of$0.81 per linear foot, and compensation for removing the Type
I arrows pavement marking and sealing the surface will be made at a unit price of$3.30 per square foot, in
accordance with Section 9-1.03, "Payment Scope," of the Standard Specifications and Special Provisions.
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
_Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
—Board of Supervisors
_Const.Management therefore the prices shown above.
—RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 01
DRAPER STREET TO CLAYTON AVENUE JUNE 18, 2025
STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 4 OF 5
CONTRACT NO. 24-18-C
Increased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount °l iu)
54 4" White 2-Coat Paint Traffic LF 683.00 $0.70 $478.10 5.29 11.97
Striping (Detail 8, 12, 27B, 38,
38A)
55 6" White 2-Coat Paint Traffic LF 1,374.00 0.78 1,071.72 7.65 17.26
Striping (Detail 39, 39A)
57 4" Yellow 2-Coat Paint Traffic LF 609.00 1.30 791.70 6.21 11.52
Striping (Detail 21, 22, 24, 25, 29,
31, 32)
TOTAL INCREASE: $2,341.52
A total of 2,666 linear feet of existing striping was blacked out, compensation resulted in (2,666 x 0.81 =
2,159.46) $2,159.46. Also, a total of 30 square feet of Type I arrows was removed and surface was sealed,
compensation resulted in (30 x 3.30 = 99) $99.
Total compensation for the addition striping resulted in $2,341.52, this amount will be paid through Bid Item
Nos. 54, 55, and 57. Total compensation for the removal of the existing striping and pavement marking
resulted in $2,258.46, this amount will be paid as extra work.
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
TOTAL COST PART IV: $4,599.98 INCREASE
TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS
_Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors therefore the prices shown above.
_Const.Management
RE/Arch.
_Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE 2 CHANGE ORDER NO. 01
DRAPER STREET TO CLAYTON AVENUE JUNE 18, 2025
STATE PROJECT NUMBER: SB1 LPPL-5942(307) PAGE 5 OF 5
CONTRACT NO. 24-18-C
NET COST THIS CHANGE ORDER: $26,680.82
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
Jersephene Vang, Resident Engineer
APPROVAL RECOMMENDED:
Don Berry Construction, Inc.
Contractor Mandeep S. Sekhon, PE
Construction Engineer
Dwv De�.u¢e
By APPROVED BY:
Steve Digitally signed by
Steve White
CFO/SEC White Date:2025.06.26
Title 09:30:59-07'00'
Steven E. White, Director
Jun 25,2025 Public Works and Planning
Accepted Date:
Date:
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Management therefore the prices shown above.
_RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
�3sra
--------------------
X 12 3s
C)
x- ---0o0 a X- 25x x
25 tj 12
It ti 12' 12' _ GOLDEN STATE BLVD 12'
a W 12' 12' _ CONFORM TO Exist STRIPING 12' CONFORM TO Exist STRIPING
"(iS8-CLZ"UNE CONFORM TO Exist STRIPING 2"
00 368+00 7,2-; 373+00 374+00
� 7 6 5
I
W 12' 12' 12' 1 1
5t
r
25 12 39
b + 125�1
CONFORM TO-Exist STRIPING
h �
W
C
ti
O
CITY OF SELMA
GOLDEN STATE BLVD
SCALE.- 1"= 40' h o
O b
-F92.89_,,-47.901 Lt S l�—
�� CONFORM TO iFst,STRIP
IN � 1
+ + *A Rl-1
x x� x — x � x x x x x > x x R6-3 Q
o R1-1 a o 12
CONFORM TO Exist STRIPING
T 39A
GUS 39 CUSTOM
139r�125r1 112 r� 3g �
a M
LL 21 —— IE_______ ___ ___ _______ W
w2-1 GOLDEN STATE BLVD 1 1 12' 12 " N �— �- 12' 12' x
v W 13-1 P G7-1 CA 12' —� M ---a� �_--
- 12- - G58-SB3"UNE 12' w
o - SNS 4i8 O ------------- 40Q� 2't a
�I 598+00 599+00 400+00 401+00 402+00 403+00 4+00 uArr R6_1 �06+00 13f407+00
--
25 2'-5' -1 1
0 _ �.., 1
OF—
°° ------------ ------- --- ------ ---------- —_--- ----- ----_� 3f 13 2-165
fRESNO COUNTY — —
OI
d + �392k9� 40P 9� 4�1 9� 40�-00 113 �0 90 -- 11.a' nn 406+00 7+89- �?4+99
�I 1 12' -------- 121 ---� 12'
ha
a 39R I 12
4
y 2'
25 CUSTOcusro 112 L
2
WW -1
+ 3
25 12 39 Uti CONFORM TO ExistI iti
11
CUSTO 0 +CU
DATE RECORD DRAWING c PROJECT-PHASE 2 ��GSBp� yOf o�FowLpr, DEPARTMENT OFPUBLIC WORKSAND PLANNING
gpP DESIGNED CYNTHIA HORNER RESIDENT ENGINEER DATE ' � �9h GOLDEN STATE CORRIDOR- � � � � �' ,��
DRAWN: ERIKCHIN 12n21zo2q ."' Bisss r ECONOMIC DEVELOPMENT AND ® u� n SIGNING AND STRIPING
CHECKED: EDGAR NORIEGA B/ao/u INFRASTRUCTURE IMPROVEMENTS P
MARK THOMAS SUPERVISING ENGINEER DATE •A CI L�@e C� 1Q' C.,o,
t FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING CALLBEFGRE YGU DIG ,< � C/a '. GOLDEN STATE BOULEVARD �R� 9�1F0'R NAP �� DRAWING NO. $$-4 SHEET NO. 7$A TOTAL 1G9
4
L,,VFORAI,. O Exist STRIPING
12 W2W�—."139I
12' C17Y OF Sale
c 12' Gse-ses"LINE 12'GOLDEN STATE BLPD
T=
2': 41010! 411+00 412+00 2t 4 3+00 414l,00
a
'GSB-NB3"LINE < - -
_ 1 412:=aa 41 12' 1 -_414:_QQ
12' 1
q V 39_
12 USTOM CONFORM TO F.�zist STRIPING �y�1 112
h 25-_. ___
h iF;t
CITY OF SELMA
GOLDEN STATE BLVD
SCALE.- 1"= 40'
N It
• R5-1 R9 3 v
R2-1 R5-1A 4
• R4, A
k
STOMA ° —x—max- - v x —x x x x
x�—
�i R81 CA �^
0 39 W1J 12 e a 39A 3g R8 j A) - R-_50' 38 4'
36 ifif
A I 1 l l 14'3-163 Bt --
—�-
..g Imo- - 12.
la
6'
l CONFORM TO IXIS'T STRIPING 6' 6 ----
m n t GSB-SB4"UNE
ti �473+00 ��^�^0-- 478+00 +p0 483+00
y GOLDEN STATE BLVD
' z5 1 • �o a -Ne4 NNE—
CONFORM TO IXIST STRIPING
1 8 t 10'. CUSTOM VAR 3'-6'
ml 474+ 0 ' f+Z 476+1L�� 12' 478+00 47.9+0� 1, 12' + 00 4&2t00 48 t�0
n \ \ —>a 12' 12' 12' \ \
W
N 6" 6 \
- y L O' y \ � w 12 g �CAJ
12 R81 N R39R4
y o R5-1 W10-1 + R5-1 0
O R$-1A 38 U 27� 25 R5-1A CONFORM TO IXIST STRIPING 25 j
0 0
e R 1- 3s • RB 8
O° m 15-1P + o
m CITY OF FOWLER
b GOLDEN STATE BLVD
SCALE.- 1"= 40'
4
V DATE RECORD DRAWING ave1 PROJECT-PHASE 2 �,GsaU yOf S� FowL�q, DEPARTMENT OF PUBLIC WORKS AND PLANNING
� DESIGNED CYNTHIA HORNER RESIDENT ENGINEER DATE , � � R%
EDGAR A.Np21EGA� GOLDEN STATE CORRIDOR-
DRAWN: ERIKCHIN 1 '211212024 "N^, sisss INFRASTRUCTURE IMPROVEMENTS
ECONOMIC DEVELOPMENT AND u� I� SIGNING AND STRIPING
« * ®" 0
CHECKED: EDGAR NORIEGA MARK THOMAS SUPERVISING ENGINEER DATE �r CINL A� � tF' �•,o. m"'
S FOR RIGHT OF WAV DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING CALL BEFORE YOU DIG I I
GOLDEN STATE BOULEVARD �R� 9//F O'R NAP 19 DRAWING NO. SS-5 SHEET NO. 79A TOTAL iD9
4
ISLAND DETAIL "A"
• F RIGHT U
x1 xx o CONFORM TO IX1ST STRIPING
39 eo 25
121 u,-
1�251 38
O __ ____-_ 7f L
7 12' 1 12'f R=62' 8" WHITE STRIPE
4' i2t�a'f ® 5' O.C.
h
4+: GSB-S64 LINE
M GOLDEN STATE BLVD 33.49'Lt
� -lflB�JJTWE
12'f r +
12f 2f ISLAND DETAIL"A"
= v 7''.* ��1 STATIONING FROM 1 GSB—SB4"LINE
4 E. .k---391
R2-1
H 48 CA)
b
I
O
g CITY OF FOWLER
GOLDEN STATE BLVD
SCALE.- 1"= 40'
+
i 0 7i1iJ ��
"GSB—SB4"+48.39, 53.94' Lt CU r�
������� CONFORM TO Exist STR/P/NG yr F� + X
0® � h n 121 ,yy + • +
* + + W CJ 4 C?C3 00 0 a � R81(C�d) °� W ;��: � i v R�1 1-8
CONFORM TO EXIST STRIPING— - o x o o X x x X X X X x 0 .o
•1A ° o o�° o 0 0 ®o o o+° o °°+ o R2-1 0+ + e 21 \\V o= R �i RS-1A
0
CUSTOM R5 )A N
0 ° a o ° o a 39 o 0 0 0 0 o
o 0 ° o 0 0
0 0
0 38 x
— Yor 10'f-18'f �� � ® W
0 112 r l \ Yor 8'1-12'1 12'f y
C 125 \ 12' R-3000.00" 12' t— 12' �— 12 O
r
\L R=2988.00' 12 1-
y u 0 f 12' GSB-SB4"LINE 12' 4't +
1q 547+00 uor a'-4t +00 544+00 545+00 546+00 547+00 548 00 549+00 550+00 uor 2f-4'�7+00
y CONFORM TO EIIST STRIPING R GOLDEN STATE BLVD .2 f �SNS
" LINE 1•f f ---
________ _-- 1 S GSB-NB4"
h 1 741fQ0 542+00 1 543+00 544+00 545+00 6� 47�Q 12'??r^;!' 549+00� �55 + 0 12'1 12'—————
n I I 12' 2' 12'� 12' 12' 2'
N
1 U I T 7 4'f o -__ .p Yor 5 f-8'f
3s I R5—
J9 1 12 25
J 12 R5-1A �1?81
t j12�1 • • � Iz1 39 • ��
�'o h CUSTO „+ R5L 1 •
c • � + � * R5—lA R2—
v R5-1 0R15 R48 CA
c G7-1l(I ) —
R1-1
R6-3A
4
Ci DATE RECORD DRAWING +'iI PROJECT-PHASE 2 ;�,GsBp yOf S� FpwL�q, DEPARTMENT OF PUBLIC WORKS AND PLANNING
� DESIGNED CYNTHIA HORNER RESIDENT ENGINEER DATE , �
EDGMt A.Np11EGA� GOLDEN STATE CORRIDOR- I
DRAWN: ERIKCHIN 1 12I12/2024 "N^. B 3o 2;61555 ECONOMIC DEVELOPMENT AND INFRASTRUCTURE IMPROVEMENTS
u� I� SIGNING AND STRIPING
« Bm. * ®" 0
CHECKED: EDGAR NORIEGA MARK THOMAS SUPERVISING ENGINEER DATE �r CIVIL �� C� tF' �•,o. m"'
SFOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING CALL BEFGRE YGU DIG F OF CAS\``& GOLDEN STATE BOULEVARD �R� 9I/F 0'R NAP Y� DRAWING NO. SS-7 SHEET NO. 81A TOTAL 109
4