HomeMy WebLinkAbout2313C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER CSA 30 & 32 WELL SITE IMPROVEMENTS AND CHANGE ORDER NO. 2 MANGANESE TREATMENT JUNE 17, 2025 COUNTY SERVICE AREAS 30 & 32 EL PORVENIR & CANTUA CREEK PAGE 1 OF 1 COUNTY OF FRESNO WESTSIDE GROUNDWATER PROJECT SWRCB PROJECT NUMBER: 1000359-005C CONTRACT NO. 23-13-C TO: SYBLON REID CONTRACTORS: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), THREE (3) -WORKING DAYS will be added to the contract time for the First Order of Work. The completion date for the First Order of Work is May 2, 2025. PERFORM LEAD AND ASBESTOS TESTING This change was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications. Provide lead and asbestos testing at both CSA 30 & CSA 32 project sites ahead of demolition activities to verify if additional safety measures will need to be implemented. The contractor provided a vendor invoice and will be compensated for proper mark-ups. Payment for this change will be made at specialist billing according to Section 9-1.03, "Payment Scope," of the Special Provisions, resulting in an increase of$3,421. NET COST THIS CHANGE ORDER: $3,421 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: THREE (3) -WORKING DAYS (FIRST ORDER OF WORK) f JAMES DREWS, Resident Engineer APPROVAL RECOMMENDED: SYBLON REID CONTRACTORS - u ^ Contractor MANDEEP S. SEKHON, PE Construction Engineer wf�l%s�ott By Will Scott(Jun 18,2025 11:10 PDT) APPROVED BY: Digitally signed by Steve President,Syblon Reid Co., Partner Steve White White Date:2025.06.18 Title 14:19:30-07'00' STEVEN E. WHITE, Director Jun 18,2025 Public Works and Planning Accepted Date: Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.