HomeMy WebLinkAbout24S08 CCO 002 Stakeholders Set.pdf COtj County of Fresno Department of Public Works and Planning O is Development Services&Capital Projects Division F��gS1 Steven E.White,Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: DBH Olive Avenue Roof Replacement&Fagade Repairs Contract No.: 24-S-08 Date: 2025-05-07 Contractor: Fortune-Ratliff General Contractor,Inc. Architect: Robina Wright Change Order No.: 002 Construction Contract Dollar Amount(BAI 73 2024-12-17) $3,165,830.00 Director's Change Order Limit: $170,791.50 Contract Time(Calendar Days): 137 Construction Start Date(NTP Issued 2025-03-05): 2025-03-05 Original Construction Completion Date: 2025-07-19 Change Order Scope of Work: PCO#004.1-RFI 07 0 Roof Conduit Removal PCO#005-RF108 0 Expansion Joints PCO#006.1-RFI 14_0 Parapet Plywood Demo Revised PCO#007-Replacement of Roof Drains&Overflow Drains Attachment(s): Contractors PCO,Change Order Summary Net Change Order Dollar Amount: $90,988.00 Net Calendar Days: 1 10 Total Change Order Dollar Amount To Date $97,099.00 Adjusted Contract Dollar Amount: $3,262,929.00 Director's Change Order Limit Balance: $73,692.50 Total Adjusted Calendar Days To Date: 10 Adjusted Construction Completion Date: 07/29/25 Reviewed- Cleared for Jamie Sylvester Digitally signed by Jamie Sylvester Approval Jamie Sylvester Date:2025.05.08 11:36:24-07'00' Principal Accountant,Public Works&Planning Digitally signed by Barry Mast Reviewed: Barry Mast Date:2025.05.08 15:42:03-07'00' Supervising Architect,Architect of Record Reviewed: Keith M.Eckert 11 Keith Eckert 5.8.25 Senior Engineering Technician,Project Manager Mandeep S. SekhOn Digitally signed by Mandeep S.Sekhon Reviewed: Mandeep Sekhon . Date:2025.05.0909:42:40-07'00' Construction Division Engineer, Construction Manager William M. Kettler Digitally signed by William M.Kettler Reviewed: William M. Kettler K l Date:2025.05.09 12:30:30-07'00' Deputy Director of Planning Bernard Jimenez Date: signed by Bernard Jimenez Reviewed: Bernard Jimenez Date:2025.05.09 12:53:03-07'00' Planning&Resource Management Officer Steve White Digitally signed by Steve White Approved: Steven E. White Date:2025.05.13 15:59:00-07'00' Director of Public Works and Planning Approved: Buddy Mendes Not Applicable Board of Supervisors,Chairman Scan and forward Director Approved Copy to: CAO Paul Nerland PWP Business Office Jamie Sylvester c°U County of Fresno Department of Public Works and Planning t856 O Development Services&Capital Projects Division PR g� Steven E.White,Director COUNTY CHANGE ORDER REQUEST Project: DBH Olive Avenue Roof Replacement&Fagade Repairs Contract No.: 24-S-08 Date: 2025-04-23 Contractor: Fortune-Ratliff General Contractor,Inc. 2485 East Olive Avenue Fresno,CA 93727 (559)243-4200 Change Order No.: 002 Construction Contract Dollar Amount(BAI 73 2024-12-17) $3,165,830.00 Original Construction Completion Date: 2025-07-19 Change Order 002 is hereby approved by the County. Scope of Work: PCO#004.1 -RFI 070 Roof Conduit Removal PCO#005-RFI 08_0 Expansion Joints PCO#006.1 -RFI 14_0 Parapet Plywood Demo Revised PCO#007-Replacement of Roof Drains&Overflow Drains Attachment(s): Contractors PCO,Change Order Summary Net Change Order Dollar Amount: $90,988.00 Net Calendar Days: 10 Adjusted Contract Dollar Amount: $3,262,929.00 Total Change Order Dollar Amount To Date: $97,099.00 Total Adjusted Calendar Days To Date: 10 Adjusted Construction Completion Date: 2025-07-29 Keith M.Eckert 11 Keith Eckert Project Manager Date: 4.29.25 By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2. The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05,Article VI shall apply. Adam Myles Dgi a2025 atl by Atlam Mylas DN-D=US,E=atlamm Mylr e,a�liR com,CN=Htlam Myles Accepted By: Fortune-Ratliff General Contractor,Inc. Day zossoaaoi*^@z b,b, Authorized Signature Date: 4/30/25 When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to: Linda Guerra,Staff Analyst lindaguerraWresnocountyea.gov Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division 2220 Tulare Street,Eighth Floor Fresno,CA. 93721 CHANGE ORDER SUMMARY Project: DBH Olive Avenue Roof Replacement& Facade Repairs -I Executed 1'qW. 1WFrAdd ($) W'Ws Description Change Order s 1 2025-03-21 $6,111.00 $0.00 0 Includes PCO#1,2,3 2 2025-04-23 $90,988.00 $0.00 10 Includes PCO#4.1,5,6.1,7 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 Totals $97,099.00 $0.00 10 Proposed Executed . . ( kredit Rejected Pending IT o Change Orders CO# 1 1 $2,003.00 0 Sheet metal flashing at soffit ASI-01 2 1 $1,824.00 0 RFI 09_0 Panel Patching 3 1 $2,284.00 0 ODU Platform per PR01 and RFI 12 4 $3,406.00 0 RFI 07_0 Roof Conduit Removal 4.1 2 $3,104.00 0 RFI 07_0 Roof Conduit Removal 5 2 $2,445.00 0 RFI 08_0 Expansion Joints 6 $26,902.00 5 RFI 14_0 Parapet Plywood Demo 6.1 2 $25,679.00 5 RFI 14_0 Parapet Plywood Demo 7 2 $59,760.00 5 Replacement of Roof Drains&Overflow Drains Totals $97,099.00 $0.00 $30,308.00 $0.00 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA. LICFNSF 496147 PCO# 4_1 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 4/21/2025 Fresno, CA. Attn: Keith Eckert $739.00/Daily Rate CP# 04R1 CC: Mandeep Sekhon Schedule Impact: Re: RFI 070 Roof Conduit Removal Keith: We herewith submit our Proposed Change Order to provide demolition of the 2 inch conduit traversing the roof per RFI 07 0 response SUB/SUPPLIER NAMES DESCRIPTION ECI Conduit Removal $ 2,887.50 SUB TOTAL $ - $ 2,887.50 Liability Insurance & BR 1.35% $ - $ 38.98 Subtotal SUB TOTAL $ - $ 2,926.48 P&P Bonds 1.00% $ - $ 29.26 Subtotal SUB TOTAL $ - $ 2,955.75 Fortune-Ratliff, Inc. OH & P 5% $ - $ 147.79 TOTAL CP 1 $ - $ 3,104 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno i By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 Mechanical Contractors • Duct Cleaning NADCA Certified • License No. 714317 Revised 4/21/25 Date: April 8, 2025 CO2 To: Fortune/Ratliff General Contractor's Inc. DIR #1000004409 SBA #1744008 Job: DBH Olive Ave. Roof Replacement Reference: RFI 7.0 Sub contractor to disconnect wire and conduit located on the roof per RFI 7.0 $2,750.00 5%Mark-Up A 137.50 Total Cost $2,887.50 Exclude removal of existing transformer If you have any questions,please do not hesitate to call me at 559-323-9788 or Fax 559-323-976 Respectfully, AVId/ff1Ward Rick Millard Rick@ecihvac.com 1500 Tollhouse Road,Suite 103 9 Clovis, CA 93611 9 (559) 323-9788 • Fax(559) 323-9762 c%ae.* UC 661442 Address 17716 ROAD 38 MADE" G. 93636 PHONE Ofr. # 1000010651 Email sttvens36.l977¢ftmoi!_iunt Change Order Project: DBH Olive Ave. Roof Replacement & Facade Repairs. DATE.- 4171202S As per RFI #7 Dated 3/5/25. Provide labor to disconnect and remove one 2"electrical conduit,wiring and two 3R pull boxes located on roof. The work includes disconnecting wiring from the main switchboard breaker on the feed side to the disconnect located the far side of building. Equipment on site will be available to bring piping off the roof. Labor and material: $2,500.00 Subtotal $21500.00 10%markup $250.00 Total Cost $2,750.00 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA. LICFNSF 496147 PCO# 5_0 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 4/8/2025 Fresno, CA. Attn: Keith Eckert $739.00/ Daily Rate CP# 05 CC: Mandeep Sekhon Schedule Impact: Re: RFI 08_0 Expansion Joints Keith: We herewith submit our Proposed Change Order to provide and install soffit expansion joints and vertical expansion joints at the concrete panels at the north and south entrances per RFI 08 0 response. SUB/SUPPLIER NAMES DESCRIPTION Fortune-Ratliff Expansion Joints $ 2,171.00 r = $ ( L SUB TOTAL $ - $ 2,171.00 Liability Insurance & BR 1.35% $ - $ 29.31 Subtotal SUB TOTAL $ - $ 2,200.31 P&P Bonds 1.00% $ - $ 22.00 Subtotal SUB TOTAL $ - $ 2,222.31 Fortune-Ratliff, Inc. OH & P 10% $ - $ 222.23 TOTAL CP $ - $ 2,445 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno i By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 CONSTRUCTION SPECIALTIES, INC 3 Werner Way Suite 100 Construction Specialties® Lebanon, NJ 08833 United States T: 800.233.8493 Quote Expansion Joint Solutions Quote Number: K10540_01 Quote Issue Date: 24 March 2025 Quote Expiration: 02 June 2025 Release Through: 30 November 2025 PROJECT INFORMATION Project: DBH Olive Ave Roof Replacement Location: Fresno, California Customer: Fortune/Ratliff Inc Location: Fresno, California Architect: Location: Representative:MCQUARRIE ASSOCIATES, INC. 220 Montgomery St San Francisco, CA 94104 Phone: 415-495-4475 e-mail: Stephan@mcgsf.com QUOTE TYPE The following price is based on furnishing the types, quantities, and sizes listed herein. If ultimate quantities or types deviate from those listed, price is subject to increase or decrease proportionately. All PO's are to be made out to Construction Specialties, Inc. without exception. QUOTE SCOPE Specification Section: None Drawing Date: None Alternate: None Addenda: None ProductA ASM-100X- 1" (25mm)Allway flat wall/ceiling system. Model includes Polyethylene Vapor Barrier. . 20 IFT �VF-150 - 1-1/2"Vertical Foam exterior seal with silicone face supplied in Sikasil WS-295 colors. 24 FT Supplied in 6.56LF stock lengths. 2-1/4" seal depth 26.24 I/f supplied to cover quantity required. $2,171 USD Material Furnished Only FCA Freight Included. Tax Not Included. QUOTE NOTES Pricing Options: Qualifying Notes: 1. Unless otherwise noted, this quotation is based on providing standard finishes and gasket colors for all materials. 2. For installation instructions log onto www.c-sgroup.com 3. Quotation based on providing stock length material unless specifically noted as Cut-to-size. 4. Construction Specialties reserves the right to adjust prices at any time due to increases in costs due to the effects of inflation, duties, tariffs, and other factors outside its control. Exclusion Notes: CS Terms&Conditions apply,visit:c-sgroup.com/terms-and-conditions for more information. I Questions?800.233.8493 Project: DBH Olive Ave Roof Replacement Opportunity No:001378354 Quotation No:K10540_01 page 1 of 2 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA. LICFNSF 496147 PCO# 6_1 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 4/14/2025 Fresno, CA. Attn: Keith Eckert $739.00/ Daily Rate CP# 061111 CC: Mandeep Sekhon Schedule Impact (Days): 5 Re: RFI 14_0 Parapet Plywood Demolition Keith: We herewith submit our Proposed Change Order to provide additional demolition of the damaged plywood discovered at the parapet walls per RFI 14 0 response.The added demolition will delay new roofing installation, extending the project schedule by 5 working days. SUB/SUPPLIER NAMES DESCRIPTION Kroeker Parapet Plywood Demolition $ 23,891.25 SUB TOTAL $ - $ 23,891.25 Liability Insurance & BR 1.35% $ - $ 322.53 Subtotal SUB TOTAL $ - $ 24,213.78 P&P Bonds 1.00% $ - $ 242.14 Subtotal SUB TOTAL $ - $ 24,455.92 Fortune-Ratliff, Inc. OH & P 5% $ - $ 1,222.80 TOTAL CP $ - $ 25,679 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 RFI NO.: 14 0 r�r% FORTUNE/RATLIFF DATE: 4/4/2025 GENERAL CONTRACTORS, INC. CA.LICENSE I&S0f 147 REQUEST FOR INFORMATION TO Keith Eckert ATTN: Keith Eckert Senior Engineering Technician CC: Barry Mast The County of Fresno Department of Public Works and Planning F/R JOB#: 2408 PROJECT: DBH Olive Ave.Roof Replacement&Fapde Repairs PROJECT NO.: KEY DESCRIPTION: Parapet Wall Plywood DRAWING: SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: Rotten plywood was discovered at the higher wall parapets and"pop-out"walls after removal of the parapet roofing materials.Please see attached and advise. Need Answer By: ASAP ADDITIONAL COST: ❑ YES OR ❑ NO TIME DAYS SUGGESTION: Remove all plywood at concrete walls. Contractor Signature: Cht' Ze-W4V Project Superintendent ATTACHED SHEETS: ❑ YES OR ❑ NO REPLY: o f s n Bar M a 5- 4- 0) Agreed. Please remove all plywood at concrete wally and proceed with roofing application as described below. Please rovide a cost proposal a5 needed. Change Order Required: ❑ Yes or ❑ No Owner Representative Signature: Date: Tremco Incorporated 3735 Green Road • Beachwood, Ohio 44122• 800-821-0247 TR&rlsycoo April 3, 2025 Attn: Eric Plaza 6614 S. Elm Ave Fresno, CA 93706 Re: DBH Olive Ave Parapet Wall Inspection Findings and Recommendations Following the recent site inspection at DBH Olive Ave, we have documented an issue with the current installation of the plywood on the parapet wall. It was observed that the plywood does not extend fully to the existing decking and has been installed using mechanical attachment to the concrete wall. Due to the gap between the plywood wall and the extent of dry rot present, we recommend the removal of the existing plywood. In its place, we propose the installation of Tremply KEE Single Ply membrane, which will be adhered directly to the existing concrete wall. This is an approved application per Tremco guidelines and will not affect the warranty after completion. We trust this solution will address the identified issues effectively. Please let us know if you require any further information or if you would like to discuss this recommendation in more detail. Respectfully, Tim Demichillie Tremco Incorporated Roofing and Building Maintenance Division Direct: (559) 930-7403 Tdemichillie@tremcoinc.com K ' E Ar"" RI: KER, iN DEMOLITION AND RECYCLING CONTRACTORS CA LIC.#621866 A C10 C12 C21 C57 C61/D06 HAZ ASB•AZ LIC. #ROC296654•NV LIC.#0070772•NM LIC. #374205 DIR# 1000006246 April 10, 2025 To: Fortune Ratliff Attn: Chris Re: DBH Olive Roof PCO #1 3 Laborer's $90.00 per hour for 120 hours=$10,800.00 1 Foreman @ $110.00 per hour for 40 Hours=$4,400.00 Telle-handler for 5 days=$2,375 4 Bins @ $800.00 each including Dump charges= $3,200.00 15%OHP=$3,116.25 Total Due This Change Price: $23,891.25 Best Regards, Print Signature Lam-7-~ Estimator Date '�G GENEq,�C 4627 S. Chestnut Ave. • Fresno, CA 93725-9370 1,,� uc4o p Tel (559) 237-3764 (FROG) • Fax (559) 268-3366 (DEMO) W, s� Toll Free (800) J KROEKER (557-6353) Q` �°`"MER\G'. www.kroekerinc.com "'' FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA. LICENSE:496147 PCO# 7_0 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 4/18/2025 Fresno, CA. Attn: Keith Eckert $739.00/ Daily Rate CP# 07 CC: Mandeep Sekhon Schedule Impact (Days): Hs Re: PR-02 Replacement of Roof Drains& Overflow Drains Keith: We herewith submit our Proposed Change Order to provide and install new roof drains and overflow drains in response to the County of Fresno's Proposal Request 02. Cost includes replacement of all sixteen (16) existing roof drains and overflow drains. SUB/SUPPLIER NAMES DESCRIPTION Fresno Plumbing& Heating Roof Drain Replacement $ 55,600.00 SUB TOTAL $ - $ 55,600.00 Liability Insurance & BR 1.35% $ - $ 750.60 Subtotal SUB TOTAL $ - $ 56,350.60 P&P Bonds 1.00% $ - $ 563.51 Subtotal SUB TOTAL $ - $ 56,914.11 Fortune-Ratliff, Inc. OH & P 5% $ - $ 2,845.71 TOTAL CP $ - $ 59,760 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 PLU KING A NEATIN ,INC_ 4/18/2025 2585 N. LARKIN AVE. (559)294-0200 FRESNO, CALIF. 93727 License #424352 SUBMITTED TO: WORK TO BE PERFORMED AT: FORTUNE-RATLIFF FRESNO COUNTY BUILDING 352 W.BEDFORD AVE#107 5555 E.OLIVE AVE. FRESNO,CA 93711 FRESNO,CA 93727 PHONE: (559)269-3682 PROPOSAL: SS25173-2 FAX: ESTIMATOR: SHAYNE EMAIL: estimating@fortaneratliff.com ATTN:ADAM We propose to furnish all the materials and labor necessary for the completion of rough,top out and finish plumbing and as follows: PREVAILING WAGE/NORMAL BUSINESS HOURS/PER UNIT PRICE 1. FPH TO SAFE OF THE EXISTING ROOF DRAIN PIPING AS NEEDED. 2. INSTALL(1)NEW 4"FRANK PATTERN CAST IRON COMBO ROOF DRAIN OR EQUAL. 3. FPH TO REPAIR TO ANY VISABLE PROBLEMS AS NEEDED. a. PROVIDE NEW STEEL CLAMPS AS NEEDED. b. REPAIR LEAKS AT THE INTERIOR BUILDING DRAIN AND OVERFLOW PIPES. 4. RECONNECT THE EXISTING DRAIN AND OVERFLOW PIPES TO THE NEW COMBO DRAIN BODY. 5. FPH TO REMOBILIZE AS NEEDED. 6. FPH TO REASSEMBLE THE DRAIN&OVERFLOW PIPES TO FIT THE NEW COMBO DRAIN AS NEEDED. 7. FPH TO FLOOD TEST THE NEW ROOF DRAIN WELL AND RECONNECTED PIPE ASSEMBLY. EXCLUSIONS. PERMITS,FEES OR ASSESSMENTS PATCH BACK OF ANY TYPE ROOF PATCH OR SEAL OF ANY TYPE ASBESTOS REMOVAL SITE ROOF DRAINS UNLESS NOTED ABOVE CONDENSATES VOLTAGE OR LOW VOLTAGE OF ANY TYPE HVAC, SHEETMETAL OR GUTTER/SCUPPERS/PANS GAS @ ROOF TOP UNITS ROOF DRAINS SITE DRAINS All work to be in accordance with the codes affecting the work. Price is to include all applicable taxes and tools necessary to complete the work in a workmanlike manner. All material is guaranteed to be as specified,and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of. PER UNIT PRICE: THREE THOUSAND FOUR HUNDRED SEVENTY-FIVE DOLLARS...$3,475.00 TOTAL OF(16)=FIFTY-FIVE THOUSAND SIX HUNDRED DOLLARS...$55,600.00 LABOR: THIRTY-ONE THOUSAND FIVE HUNDRED SEVEN DOLLARS...$31,507.00 MATERIAL: FIFTEEN THOUSAND SEVEN HUNDRED FIFTY-THREE DOLLARS...$15,753.00 PROFIT: EIGHT THOUSAND THREE HUNDRED FOURTY DOLLARS...$8,340.00 PLU KING A NEATIN ,INC_ 4/18/2025 2585 N. LARKIN AVE. (559)294-0200 FRESNO, CALIF. 93727 License #424352 SIGNATURE.................................................. DATE..................................................... NOTE: INCREASES IN PRICES OF MATERIALS- Based upon current rapid increases in prices of materials,this proposal is based upon the cost of materials on the date that the proposal is made. In the event that the aggregate total of the cost of materials increases 10%over the cost of the materials on the date the proposal is made,Owner agrees to be responsible for all increased costs of materials and will execute all change orders authorizing an increase in the contract price to accommodate the increases in the cost of the materials. MATERIALS UNAVAILABLE In addition,some materials are either back ordered or not available. In the event that any item is back ordered or cannot be acquired, Owner agrees that the time in which the backordered or unavailable item is not available will not be counted against contractor in terms of determining completion dates. Contractor agrees to timely notify Owner of all unavailability of materials and will provide an estimated date of receipt of the materials. LABOR SHORTAGE The construction business is currently experiencing a shortage of trained labor to perform the work. Contractor shall endeavor to provide sufficient workforce to timely complete the project. However,in the event that a sufficient workforce cannot be maintained, the increase in time to complete the project shall not be counted against Contractor in terms of determining completion dates. Contractor agrees to timely notify Owner of all labor shortages and will provide a revised estimated completion date to Owner. Any alteration or deviation from above specifications involving extra cost,will be executed only upon written orders,and will become an extra charge over and above the estimate. All agreements are contingent upon strikes,accidents or delays beyond our control. Owner shall carry fire,tornado and other necessary insurance upon above work. Worker's compensation and public liability insurance on above will be taken out by Fresno Plumbing&Heating,Inc. Respectfully Submitted Per Fresno Plumbing&Heating,Inc. State License No. 424352 Note—This proposal may be withdrawn by us if not accepted within 30 days. Client agrees to pay attorney& court fees in the event this bill is referred to an attorney for collection. Contractors are required by law to be licensed and regulated by the Contractor's State License Board. Any questions concerning a contractor may be referred to the Registrar, Contractors State License Board, (3132 Bradshaw Rd.; Sacramento,California. (Mailing address P. 0.Box 26000,Sacramento,Calif.95826). co County of Fresno DEPARTMENT OF PUBLIC WORKS AND PLANNING O� 1$5O STEVEN E. WHITE, DIRECTOR Proposal Request Date: April 16, 2025 Instruction Number: PR 02 — Replacement of roof drains and overflow drains PROJECT: DBH Roof Replacement & Facade Repairs 5555 E Olive Ave, Fresno, CA 93727 Contract No.: 24-S-08 ARCHITECT: Barry Mast CONTRACTOR: Fortune-Ratliff General Contractors, Inc. 352 W Bedford Ave Ste 107 Fresno, CA 93711 The County requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein.The Contractor shall submit the proposal within five(5)days or notify the Project Manager in writing of the anticipated date of submission. DESCRIPTION: Please provide a proposal, in accordance with project documents, for the following: 1. Remove and replace all roof drains and overflow drains; 16 roof drains and 16 overflow drains (Contractor shall verify quantity). 2. Provide new piping as necessary to connect roof drains to existing drain piping. 3. Provide and secure new piping as necessary to connect overflow drains to daylight at soffit below. 4. Provide either individual or a combination assembly of cast iron roof drain and overflow (secondary) roof drain with cast iron dome strainers as required by CPC 1102.2. The cost proposal shall clearly identify materials, labor, and any administrative costs. It shall also reflect potential savings for labor required to clean the existing roof drains for installation of the new roof. DEVELOPMENT SERVICES AND CAPITAL PROJECTS DIVISION 2220 Tulare Street, Sixth Floor/Fresno, California 93721 /Phone (559)600-5206/FAX(559)600-4548 The County of Fresno is an Equal Opportunity Employer RFI NO.: 15 0 FORTUNE/RATLIFF DATE: 4/14/2025 GENERAL CONTRACTORS, INC. CA.LICENSE 4<JE'14? REQUEST FOR INFORMATION TO Keith Eckert ATTN: Keith Eckert Senior Engineering Technician CC: Barry Mast The County of Fresno Department of Public Works and Planning F/R JOB#: 2408 PROJECT: DBH Olive Ave.Roof Replacement&Fagade Repairs PROJECT NO.: KEY DESCRIPTION: Roof Drains Clamping Rings and Drain Covers DRAWING: A10/A-802 SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: Plans and Tremco specs note that all drains,including overflow drains,have existing approved clamping rings and drain covers.Existing overflow drains do not have clamping rings or drain covers.Please see attached and advise. Need Answer By: ASAP ADDITIONAL COST: ® YES OR ❑ NO TIME DAYS SUGGESTION: Contractor Signature: Chl[-ZeW4f- Project Superintendent ATTACHED SHEETS: ❑ YES OR ❑ NO "t5 n Bar M a 5- 4-16 ounty Architect recommends removal and replacement of all existing roof drains and overflow drains to meet the eauirements of the Code and roofing manufacturer. Existing roof drains are highly corroded and existing overflow drain are installed without clamping rings and drain covers a5 needed. See attached Proposal Request 02. Change Order Required: ❑ Yes or ❑ No Owner Representative Signature: Date: i I1, i } =��...�. .! �r , _�..._.�.-_�• _ __ _...__ � '_:=tea. - _. __t,•�c, _ .���-. �. r� ,.�. _ S., J � �� � � ,..y�,.•, �„�. ."w � �.��,��,., t" 'tii ��� �;�r �, 9G� i ��' �� t� +� 'j' i ') n ��� ', � `�aiJ.�, �'; ' " � I � ,�� i � ,- . \ �Y . .�. #'` � ',c � � Amy► _, ... .,. ,. • 1 r �. ... _ "",� t wy�V i"'. f - Y .Ak • _ i . k. J � I 1 /•C ' � U � �i-�I � �y`�lt Q'f?N�t ylj� „ V�, �t , � � � r t Sri t;-"Zt, c r n 30, ' .. +- � ,i i}.. �•�1�R.y,. 1� 1. t 4 .\ -• Ale- AP Ap mi � r � �=�1 �- �� r�=jam, ,` •: � _,`r.�, ��• k - - - rj ,R• as•r t Y � I 1 :ice-'r7•4'2•' S�d�:•!`'�..idy S�. . .. . .