HomeMy WebLinkAbout24S08 CCO 001 Stakeholders Set.pdf COtj County of Fresno Department of Public Works and Planning O is Development Services&Capital Projects Division F��gS1 Steven E.White,Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: DBH Olive Avenue Roof Replacement&Fagade Repairs Contract No.: 24-S-08 Date: 2025-05-07 Contractor: Fortune-Ratliff General Contractor,Inc. Architect: Robina Wright Change Order No.: 001 Construction Contract Dollar Amount(BAI 73 2024-12-17) $3,165,830.00 Director's Change Order Limit: $170,791.50 Contract Time(Calendar Days): 137 Construction Start Date(NTP Issued 2025-03-05): 2025-03-05 Original Construction Completion Date: 2025-07-19 Change Order Scope of Work: PCO#001-Sheet metal flashing at sofit ASI-01 PCO#002-RF109 0 panel patching PCO#003-ODU platform per PR01 and RFI 12 Attachment(s): Contractors PCO,Change Order Summary Net Change Order Dollar Amount: $6,111.00 Net Calendar Days: 0 Total Change Order Dollar Amount To Date $6,111.00 Adjusted Contract Dollar Amount: $3,171,941.00 Director's Change Order Limit Balance: $164,680.50 Total Adjusted Calendar Days To Date: 0 Adjusted Construction Completion Date: L2025-07-19 Reviewed- Cleared for Jamie Sylvester Digitally signed by Jamie Sylvester Jamie Sylvester Yves Date:2025.05.08 11:33:06-07'00' Approval Principal Accountant,Public Works&Planning Digitally signed by Barry Mast Reviewed: Barry Mast - Date:2025.05.08 15:39:29-07'00' Supervising Architect,Architect of Record Reviewed: Keith M.Eckert ll Keith Eckert 5.8.25 Senior Engineering Technician,Project Manager Mandeep S. Sekhon Digitally signed by Mandeep S.Sekhon Reviewed: Mandeep Sekhon . Date:2025.05.0909:42:06-07'00' Construction Division Engineer, Construction Manager William M Kettler Digitally signed by William M.Kettler M.Reviewed: William M. Kettler Date:2025.05.09 12:29:42-07'00' Deputy Director of Planning Bernard Jimenez Digitally signed by Bernard Jimenez Reviewed: Bernard Jimenez Date:2025.05.09 12:52:19-07'00' Planning&Resource Management Officer Steve White Digitally signed by Steve White Approved: Steven E. White Date:2025.05.13 15:58:22-07'00' Director of Public Works and Planning Approved: Buddy Mendes Not Applicable Board of Supervisors,Chairman Scan and forward Director Approved Copy to: CAO Paul Nerland PWP Business Office Jamie Sylvester COLS County of Fresno 19 Department of Public Works and Planning 1 y610 Development Services&Capital Projects Division Steven E.White,Director COUNTY CHANGE ORDER REQUEST Project: DBH Olive Avenue Roof Replacement&Fagade Repairs Contract No.: 24-S-08 Date: 2025-04-11 Contractor: Fortune-Ratliff General Contractor,Inc. 2485 East Olive Avenue Fresno,CA 93727 (559)243 4200 Change Order No.: 001 Construction Contract Dollar Amount(BAI 73 2024-12-17) $3,165,830.00 Original Construction Completion Date: 2025-07-19 Change Order 001 is hereby approved by the County. Scope of Work: PCO#001-Sheet metal flashing at sofit ASI-01 PCO#002-RFI 09 0 panel patching PCO#003-ODU platform per PR01 and RFI 12 Attachment(s): Contractors PCO,Change Order Summary Net Change Order Dollar Amount: $6,111.00 Net Calendar Days: �0 Adjusted Contract Dollar Amount: $3,171,941.00 Total Change Order Dollar Amount To Date: $6,111.00 Total Adjusted Calendar Days To Date: �0 Adjusted Construction Completion Date: 2025-07-19 Keith M. Eckert II Keith Eckert Project Manager 4/15/25 Date: By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05,Article VI shall apply. Adam Myles Dlgltaly slgoed bYAdam MyeS Accepted By. Fortune-Ratliff General Contractor,Inc. DN:c=us,E=adamm@tuna e,aumeem,cN=naamM es Dale 2025 04 15 09'25'44-0]'00' Authorized Signature Date: 4/15/25 When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to: Linda Guerra,Staff Analyst lindazruerra((,,)fresnocountyca.gov Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division 2220 Tulare Street,Eighth Floor Fresno,CA. 93721 CHANGE ORDER SUMMARY Project: DBH Olive Avenue Roof Replacement& Facade Repairs -I Executed 1'qW. 1WFrAdd ($) W'Ws Description Change Order s 1 2025-03-21 $6,111.00 $0.00 0 Includes PCO#1,2,3 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 Totals $6,111.00 $0.00 0 Proposed Executed . . ( kredit Rejected Pending IT o Change Orders CO# 1 1 $2,003.00 0 Sheet metal flashing at soffit ASI-01 2 1 $1,824.00 0 RFI 09_0 Panel Patching 3 1 $2,284.00 0 ODU Platform per PR01 and RFI 12 4 $3,406.00 0 RFI 07_0 Roof Conduit Removal 5 $2,445.00 0 RFI 08_0 Expansion Joints 6 $26,902.00 5 RFI 14_0 Parapet Plywood Demo Totals $6,111.00 $0.00 $0.00 $32,753.00 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA. LICFNSF 496147 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 3/17/2025 Fresno, CA. Attn: Keith Eckert $739.00/ Daily Rate CP# 1.0 :C: Mandeep Sekhon Re: RFI 04 Response/ASI-01 Keith: We herewith submit our Proposed Change Order to provide and install new sheet metal flashing at locations where new soffit meets existing storefront systems to maintain existing installation of aluminum storefront system per ASI-01. No added cost for labor. SUB/SUPPLIER NAMES DESCRIPTION ECI 770 LF of 20 GA flashing $ 1,778.70 SUB TOTAL $ - $ 1,778.70 Liability Insurance & BR 1.35% $ - $ 24.01 Subtotal SUB TOTAL $ - $ 1,802.71 P&P Bonds 1.00% $ - $ 18.03 Subtotal SUB TOTAL $ - $ 1,820.74 Fortune-Ratliff, Inc. OH & P 10% $ - $ 182.07 TOTAL CP $ - $ 2,003 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 RFI NO.: 4.0 FORTUNE/RATLIFF DATE: 3i4i2025 GENERAL CONTRACTORS, INC. CA.LZ4_130wftm 49Cs147 REQUEST FOR INFORMATION TO Keith Eckert ATTN: Keith Eckert Senior Engineering Technician CC: Barry Mast The County of Fresno Department of Public Works and Planning F/R JOB#: 2408 PROJECT: DBH Olive Ave.Roof Replacement&Fapde Repairs PROJECT NO.: KEY DESCRIPTION: Soffit Removal DRAWING: F10/A-801,F6/A-801 SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: Plans show existing soffit plywood above the existing storefront windows to be attached and behind the aluminum storefront frames.The plywood cannot be removed without also removing the storefront frames. Please advise. Need Answer By: ASAP ADDITIONAL COST: ❑ YES OR ❑ NO TIME DAYS SUGGESTION: Contractor Signature: C t,4f ZeWlik Project Superintendent ATTACHED SHEETS: ❑ YES OR ❑ NO REPLY: u ty eS n a y a5 xi5ting plywood Soffit Shall remain above the aluminum Storefront 5y5tem to preserve existing Storefront n5tallation. See attached ASI 01 - Soffits for revised removal and installation of 5offit5. Change Order Required: ❑ Yes or ❑ No Owner Representative Signature: Date: c° County of Fresno 0, O O DEPARTMENT OF PUBLIC WORKS AND PLANNING 1856 6 STEVEN E. WHITE, DIRECTOR Architect's Supplemental Instructions Date: March 10, 2025 Instruction Number: ASI 01 - Soffits PROJECT: DBH Roof Replacement & Fagade Repairs Project Address Contract No.: 24-S-08 ARCHITECT: Barry Mast CONTRACTOR: Fortune-Ratliff General Contractors, Inc. 352 W Bedford Ave Ste 107 Fresno, CA 93711 The work shall be carried out with the following Supplemental Instructions in accordance the with the Contract Documents without any change in Contract Sum or Contract Time. Proceeding with the Work indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. DESCRIPTION: Revise removal of existing soffit and installation of new soffit to maintain existing installation of aluminum storefront system. This ASI supersedes details F6/A-801 and F10/A-801. CAPITAL PROJECTS DIVISION 2220 Tulare Street,Eighth Floor I Fresno, California 93721 /Phone(559)600-5206/FAX(559)600-4548 The County of Fresno is an Equal Opportunity Employer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 I K < K I Q I -- EX15TING 5/5"GYPSUM BOARD O/ 2X STUDS AND BATT INSULATION I EXISTING 2X FRAMING AND J BLOCKING J REMOVE 2X BLOCKING EXISTING HEADER EXISTING 2X FRAMING AND -- BLOCKING EXISTING CONCRETE WALL a \ EXISTING 5/11"71-11 PLYWOOD \ SOFFIT TO REMAIN H EXISTING ALUMINUM STOREFRONT H REMOVE EXl5TING 5/8"T1-11 REMOVE EXISTING 5/5"T1-11 SYSTEM PLYWOOD 50FFIT TO EXTENT PLYWOOD SOFFIT TO EXTENT 1„ SHOWN SHOWN REMOVE EX15TING TRIM G G I F F F1 DEMO VERTICAL DETAIL AT EXTERIOR SOFFIT 1 ARCHITECT harry Lynn Mash Architect G4�S�LCyIJ Califomia lrcenss Architect No.C36769 -2025 Fresno Cof unty Department of E Devl Worksic elop t9ervpkes and E C 39769 Capaxl Projects D.. N REN:12-31-2025 C• 2220 Tulare Street,BM Floor 9TF Off? Fresno,California 93721 a �f CALF Office(559)600d N Email.bmast&-nacountyca g. - EXl5TING 5/6"GYPSUM BOARD O/ 2X STUDS AND BATT IN5ULATION PROJECT: DEPARTMENT OF BEHAVIORAL HEALTH EXISTING 2X FRAMING AND ROOF REPLACEMENT&FACADE REPAIRS D BLOCKING 5555 E Olive Ave,Fresno,CA 93727 D EX15TING HEADER APN:45522312ST EXISTING 2X FRAMING AND ISSUE DATE:2025-03-10 Q BLOCKING PROJECT NO.:T80317 FILE NAME:GACapitalWctive Projects\T80317-DBH Olive Bldg Phase 1\50 Construction\ASIs\ASI 01-Soffits\24SO8 ASI 01- FXI5TING CONCRETE WALL Q EXISTING 5/5"T1-11 PLYWOOD Soffits NEW 2X BLOCKING J — J SOFFIT TO REMAIN SHEET TITLE: I ASI 01 - SOFFITS C NEW HARDIE SOFFIT NON-VENTED EXISTING ALUMINUM STOREFRONT C NEW HARDIE SOFFIT VENTED GEDARMILL OR EQUAL O/WEATHER SYSTEM CEDARMILL OR EQUAL BARRIER PROVIDE GAP AND CAULK PER CONTINUOUS SEALANT MANUFACTURER REGOMMENDAT ION NEW GALVANIZED SHEET METAL NEW--MOLD TRIM CLOSURE.PAINT TO MATCH SOFFIT Public Works and Planning Department COL��rt B Capital Projects Division B 2220 Tulare Street,8th Floor Fresno,California 93721 PRE`' II SHEET NUMBER: A 1 A Al NEW VERTICAL DETAIL AT EXTERIOR SOFFIT O 3" 6" 1 SHEET 1 OF 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 1 14 1 DRAWN BY:<INITIALS> PLOT DATE:2025-03-10 I� I ggiilE Mechanical Contractors • Duct Cleaning NADCA Certified • License No. 714317 Date: March 17, 2025 COl To: Fortune/Ratliff General Contractor's Inc. DIR #1000004409 SBA #1744008 Job: DBH Olive Ave Roof Replacement Reference: RFI MOD 169 Material 770 ft of 20 gauge flashing $1,617.00 Per your dwg Labor 10%Mark-Up 161.70 Total Cost $1,778.70 No labor If you have any questions,please do not hesitate to call me at 559-323-9788 or Fax 559-323-976 Respectfully, Ankle AitJ°W Rick Millard Rick@ecihvac.com 1500 Tollhouse Road,Suite 103 • Clovis, CA 93611 • (559) 323-9788 • Fax(559) 323-9762 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA. LICFNSF 496147 PCO# 2_0 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 3/25/2025 Fresno, CA. Attn: Keith Eckert $739.00/ Daily Rate CP# 02 CC: Mandeep Sekhon Schedule Impact: Re: RFI 09_0 Response Keith: We herewith submit our Proposed Change Order to provide and install panel patching at north entrance and south entrance where signage removal left behind holes in the concrete panels per RFI 09 0 response. SUB/SUPPLIER NAMES DESCRIPTION Wm. B. Saleh Co. $ 1,620.00 SUB TOTAL $ - $ 1,620.00 Liability Insurance & BR 1.35% $ - $ 21.87 Subtotal SUB TOTAL $ - $ 1,641.87 P&P Bonds 1.00% $ - $ 16.42 Subtotal SUB TOTAL $ - $ 1,658.29 Fortune-Ratliff, Inc. OH & P 10% $ - $ 165.83 TOTAL CP $ - $ 1,824 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 Fresno Office 1364 N.Jackson ft. B. 90 CO. Fresno, 9) 93703 Phone:(55 255-2046 FAX: (559)255-2907 Fj DISTINCTIVE PAINTING DIR No. 1000003170 PROPOSAL / CONTRACT SBE CERTIFIED To: Fortune Ratliff Date: March 25, 2025 Subject Job: Olive Ave DBH Roof Repairs Panel Patching We propose to furnish at the above job all labor,materials,equipment,supervision,Workers'Compensation Property Damage and Liability Insurance necessary to complete in a thoroughly workmanlike manner all the work described below. SCOPE OF WORK: Fill holes and depressions in the existing concrete panels where signage was removed, this is in two locations on the south side of the building. Labor 16 hours @$100.00 $1,600.00 Material $ 20.00 TOTAL AMOUNT $1,620.00 STATE LICENSE NO. 268108 Wm. B. SALEH Co. : �\o\- Ron Elia gm ACCEPTANCE-The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined. TERMS:This contract includes all the terms and conditions attached to this sheet and they are approved and accepted by the signatures below. This proposal must be accepted within 30 days of the date hereof to become a valid contract. If approved and accepted, please sign below and return a copy to our office. Date of Acceptance: _ _ Signature: _ BAKERSFIELD 2361 Cepheus Court MONTEREY OFFICE: 407 Reservation Rd.,Suite 3 OFFICE: Bakersfield,CA 93308 Marina,CA 93933 Phone: (661)393-8842 Phone:831-384-1552 Fax(661)393-8138 Fax: 831-384-7620 FORTUNE/RATLIFF ` GENERAL CONTRACTORS, INC. CA. LICFNSF 496147 PCO# 3_0 DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 4/3/2025 Fresno, CA. Attn: Keith Eckert $739.00/ Daily Rate CP# 03 CC: Mandeep Sekhon Schedule Impact: Re: PR 01 ODU Platform Height Keith: We herewith submit our Proposed Change Order to provide and install changes to ODU platform framing per PR 01 and RFI 12 Response. SUB/SUPPLIER NAMES DESCRIPTION Strausser Costruction ODU Platform Framing Changes $ 2,028.00 SUB TOTAL $ - $ 2,028.00 Liability Insurance & BR 1.35% $ - $ 27.38 Subtotal SUB TOTAL $ - $ 2,055.38 P&P Bonds 1.00% $ - $ 20.55 Subtotal SUB TOTAL $ - $ 2,075.93 Fortune-Ratliff, Inc. OH & P 10% $ - $ 207.59 TOTAL CP $ - $ 2,284 Please review and advise as to the acceptance of this cost proposal. If you have any questions, please do not hesitate to contact me. Sincerely, Accepted by: Keith Eckert, County of Fresno By: Adam Myles,Vice President Date: 352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878 STRAUSSER CONSTRUCTION,INC. Office (559)438-0083 2354W.Warner Fax (559)438-0092 Fresno,CA 93711 Cell (559)647-3713 License#838251 Page 1 of 2 To: Fortune Ratliff Construction Inc Date: January 27, 2025 Attn: Quincy From: Michael Strausser D I R#1000017893 Re: Olive Ave Cost Proposal for RFI#12 Lumber$640.00 Simpson hardware&fasteners$84.00 Labor 10 man hrs X$112.00 per hr=$1,120.00 Subtotal$1,844.00 10%OH&P$184.00 Total$2,028.00 STRAUSSER CONSTRUCTION,INC. Office (559)438-0083 2354W.Warner Fax (559)438-0092 Fresno,CA 93711 Cell (559)647-3713 License#838251 RFI NO.: 12 0 r�r% FORTUNE/RATLIFF DATE: 3/20/2025 GENERAL CONTRACTORS, INC. CA.LICENSE I&S0f 147 REQUEST FOR INFORMATION TO Keith Eckert ATTN: Keith Eckert Senior Engineering Technician CC: Barry Mast The County of Fresno Department of Public Works and Planning F/R JOB#: 2408 PROJECT: DBH Olive Ave.Roof Replacement&Fapde Repairs PROJECT NO.: KEY DESCRIPTION: ODU Platform Curb Height DRAWING: ASI-02,ASI-B01 SPECIFICATION: ATTACHED SHEETS: ❑ YES OR ❑ NO QUESTION: ASI-B01 details show 4x6 framing,which would protrude only 4"above the completed roof.Minimum height for ODU curbs from top of completed roof should be 8".Please advise. Need Answer By: ASAP ADDITIONAL COST: [—] YES OR ❑ NO TIME DAYS SUGGESTION: Platform on deck should be constructed using 2x12 framing to stay above 8"after roof completion. Contractor Signature: Cht' Ze.w4f-Project Superintendent ATTACHED SHEETS: ® YES OR ❑ NO REPLY: ee attached proposal reque5t PR 01. Change Order Required: ❑ Yes or ❑ No Owner Representative Signature: Date: c° County of Fresno 0, O O DEPARTMENT OF PUBLIC WORKS AND PLANNING 1856 6 STEVEN E. WHITE, DIRECTOR Proposal Request Date: March 27, 2025 Request Number: PR 01 — ODU Platform Height PROJECT: DBH Roof Replacement & Fagade Repairs 5555 E Olive Ave, Fresno, CA 93727 Contract No.: 24-S-08 ARCHITECT: Barry Mast CONTRACTOR: Fortune-Ratliff General Contractors, Inc. 352 W Bedford Ave Ste 107 Fresno, CA 93711 The County requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein.The Contractor shall submit the proposal within five(5)days or notify the Project Manager in writing of the anticipated date of submission. DESCRIPTION: Revised typical ODU platform details to increase height to more than 8" above adjacent roof. See attached drawing. DEVELOPMENT SERVICES AND CAPITAL PROJECTS DIVISION 2220 Tulare Street, Sixth Floor/Fresno, California 93721 /Phone (559)600-5206/FAX(559)600-4548 The County of Fresno is an Equal Opportunity Employer 1 2 3 q p q 4 p p p p 5 p p p 6 7 1 8 9 10 11 12 13 14 15 i 6 FUTURE ODU.NOT PART OF THIS FUTURE ODU.NOT CONTRACT PART OF THIS CONTRACT. K 28 3/4" 3 1/4" 14 3/16" 13 1/8" 14=3/16 5/4"5TRUGTURAL 1 PLYWOOD SHEATHING W/10D AT 6"O.C.EDGE ® 4116 BLOCKING W/5IMP5011 LU546 NAILED AND 10D AT 12"O.G.FIELD, JOIST HANGER AT EACH END, TYPICAL e e TYPICAL ° 4X6 BLOCKING W/ J SIMP50N LU546 4X6 BLOCKING, JOIST HANGER AT TYPICAL EACH END, TYPICAL 2X12 SHAPED 2X12 SHAPED CURB CURB 5IMP50N ASS.TWO EACH 5IDE OF 5IMP50N ASS.TWO EACH SIDE OF PLATFORM,TYPICAL EXISTING PLATFORM,TYPICAL EXISTING PLYWOOD ROOF PLYWOOD ROOF H SHEATHING SHEATHING H G G 12' 12' 12" 12" 12" 12" 12" 12" 48" 48" 4X6 BRIDGING W/SIMPSON LU546 r4XGING W/SIMP50N LUS46 HANGER AT EACH END GER AT EACH ENDPROVIDE 5IMPSON LU526 AT PROVIDE SIMPSON LU526 ATEXISTING JOISTS UNDER PLATFORM EXISTING JOISTS UNDER PLATFORMFIF NOT EXISTING IFNOT EXISTINGF EXISTING 2X6 JOISTS AT 24"O.G. 2X6 JOISTS AT 24"O.G. I I EXISTING 2-1/2"X19-1/4"BEAM AT EXISTING 2-1/2"X19-1/4"BEAM AT 8'-0"O.G. 8'-O"O.O. E E E1 SINGLE ODU CURB MOUNTING DETAIL 3" 6" E9 DOUBLE ODU CURB MOUNTING DETAIL 0 3 6" 1' SHEET NOTES PROJECT: 48" 1. REFER TO ARCHITECTURAL AND MEGHANIGAL DEPARTMENT OF BEHAVIORAL HEALTH DRAWING5 FOR EQUIPMENT,CURB LOCATIONS ROOF REPLACEMENT&FACADE REPAIRS D AND FINISHES weAve,Fresno, D APN:45522312ST m 2. ODU ANCHOR DIMENSIONS SHOWN FOR ISSUE DATE:2025-03-27 REFERENCE ONLY.VERIFY ANCHOR DIMENSIONS AND REQUIRED CLEARANCES FOR EACH FUTURE PROJECT T8 24 FIR r 48" ODU PER MECHANICAL ODU SCHEDULE. FILE NAME: 508 PR 01-ODU Platform HeigM.dwg I I ry �� Ilk. 24 � ODU 3 m m SHEET TITLE: ry F PR 01 - ODU n �,I ODU-1 PLATFORM HEIGHT00 D I I v m � I I ovub I I N v Public Works and PlanningDepartment H� COL��rt e Eg ` B 2220 Tulare Street,8th Floor m • Fresno,California 93721 O O FRE`' 71MM EET NUMBER: A A A5 ENLARGED ROOF PLAN A9 ENLARGED ROOF PLAN SHEET 1 OF 1 1 2 3 4 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 13 14 1 DRAWN BY:<INITIALS> PLOT DATE:2025-03-27