HomeMy WebLinkAbout24S08 CCO 001 Stakeholders Set.pdf COtj County of Fresno
Department of Public Works and Planning
O is Development Services&Capital Projects Division
F��gS1 Steven E.White,Director
PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST
This Document is for Fresno County Internal Use Only
Project: DBH Olive Avenue Roof Replacement&Fagade Repairs
Contract No.: 24-S-08
Date: 2025-05-07
Contractor: Fortune-Ratliff General Contractor,Inc.
Architect: Robina Wright
Change Order No.: 001
Construction Contract Dollar Amount(BAI 73 2024-12-17) $3,165,830.00
Director's Change Order Limit: $170,791.50
Contract Time(Calendar Days): 137
Construction Start Date(NTP Issued 2025-03-05): 2025-03-05
Original Construction Completion Date: 2025-07-19
Change Order Scope of Work:
PCO#001-Sheet metal flashing at sofit ASI-01
PCO#002-RF109 0 panel patching
PCO#003-ODU platform per PR01 and RFI 12
Attachment(s):
Contractors PCO,Change Order Summary
Net Change Order Dollar Amount: $6,111.00
Net Calendar Days: 0
Total Change Order Dollar Amount To Date $6,111.00
Adjusted Contract Dollar Amount: $3,171,941.00
Director's Change Order Limit Balance: $164,680.50
Total Adjusted Calendar Days To Date: 0
Adjusted Construction Completion Date: L2025-07-19
Reviewed-
Cleared for Jamie Sylvester Digitally signed by Jamie Sylvester
Jamie Sylvester Yves Date:2025.05.08 11:33:06-07'00'
Approval Principal Accountant,Public Works&Planning
Digitally signed by Barry Mast
Reviewed: Barry Mast - Date:2025.05.08 15:39:29-07'00'
Supervising Architect,Architect of Record
Reviewed: Keith M.Eckert ll Keith Eckert 5.8.25
Senior Engineering Technician,Project Manager
Mandeep S. Sekhon Digitally signed by Mandeep S.Sekhon
Reviewed: Mandeep Sekhon . Date:2025.05.0909:42:06-07'00'
Construction Division Engineer, Construction Manager
William M Kettler Digitally signed by William M.Kettler
M.Reviewed: William M. Kettler Date:2025.05.09 12:29:42-07'00'
Deputy Director of Planning
Bernard Jimenez Digitally signed by Bernard Jimenez
Reviewed: Bernard Jimenez Date:2025.05.09 12:52:19-07'00'
Planning&Resource Management Officer
Steve White Digitally signed by Steve White
Approved: Steven E. White Date:2025.05.13 15:58:22-07'00'
Director of Public Works and Planning
Approved: Buddy Mendes Not Applicable
Board of Supervisors,Chairman
Scan and forward Director Approved Copy to:
CAO Paul Nerland
PWP Business Office Jamie Sylvester
COLS County of Fresno
19 Department of Public Works and Planning
1 y610 Development Services&Capital Projects Division
Steven E.White,Director
COUNTY CHANGE ORDER REQUEST
Project: DBH Olive Avenue Roof Replacement&Fagade Repairs
Contract No.: 24-S-08
Date: 2025-04-11
Contractor: Fortune-Ratliff General Contractor,Inc.
2485 East Olive Avenue
Fresno,CA 93727
(559)243 4200
Change Order No.: 001
Construction Contract Dollar Amount(BAI 73 2024-12-17) $3,165,830.00
Original Construction Completion Date: 2025-07-19
Change Order 001 is hereby approved by the County.
Scope of Work:
PCO#001-Sheet metal flashing at sofit ASI-01
PCO#002-RFI 09 0 panel patching
PCO#003-ODU platform per PR01 and RFI 12
Attachment(s):
Contractors PCO,Change Order Summary
Net Change Order Dollar Amount: $6,111.00
Net Calendar Days: �0
Adjusted Contract Dollar Amount: $3,171,941.00
Total Change Order Dollar Amount To Date: $6,111.00
Total Adjusted Calendar Days To Date: �0
Adjusted Construction Completion Date: 2025-07-19
Keith M. Eckert II Keith Eckert
Project Manager
4/15/25
Date:
By signing acceptance of this Change Order,the Contractor shall agree to the following:
1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in
this Change Order.
2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full.
In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05,Article VI shall apply.
Adam Myles Dlgltaly slgoed bYAdam MyeS
Accepted By. Fortune-Ratliff General Contractor,Inc. DN:c=us,E=adamm@tuna e,aumeem,cN=naamM es
Dale 2025 04 15 09'25'44-0]'00'
Authorized Signature
Date: 4/15/25
When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to:
Linda Guerra,Staff Analyst
lindazruerra((,,)fresnocountyca.gov
Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division
2220 Tulare Street,Eighth Floor
Fresno,CA. 93721
CHANGE ORDER SUMMARY
Project: DBH Olive Avenue Roof Replacement& Facade Repairs
-I Executed 1'qW. 1WFrAdd ($)
W'Ws Description
Change Order
s
1 2025-03-21 $6,111.00 $0.00 0 Includes PCO#1,2,3
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
$0.00 $0.00 0
Totals $6,111.00 $0.00 0
Proposed Executed
. . ( kredit Rejected Pending IT o
Change Orders CO#
1 1 $2,003.00 0 Sheet metal flashing at soffit ASI-01
2 1 $1,824.00 0 RFI 09_0 Panel Patching
3 1 $2,284.00 0 ODU Platform per PR01 and RFI 12
4 $3,406.00 0 RFI 07_0 Roof Conduit Removal
5 $2,445.00 0 RFI 08_0 Expansion Joints
6 $26,902.00 5 RFI 14_0 Parapet Plywood Demo
Totals $6,111.00 $0.00 $0.00 $32,753.00
FORTUNE/RATLIFF
` GENERAL CONTRACTORS, INC.
CA. LICFNSF 496147
DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 3/17/2025
Fresno, CA.
Attn: Keith Eckert $739.00/ Daily Rate CP# 1.0
:C: Mandeep Sekhon
Re: RFI 04 Response/ASI-01
Keith:
We herewith submit our Proposed Change Order to provide and install new sheet metal flashing at locations
where new soffit meets existing storefront systems to maintain existing installation of aluminum storefront
system per ASI-01. No added cost for labor.
SUB/SUPPLIER NAMES DESCRIPTION
ECI 770 LF of 20 GA flashing $ 1,778.70
SUB TOTAL $ - $ 1,778.70
Liability Insurance & BR 1.35% $ - $ 24.01
Subtotal SUB TOTAL $ - $ 1,802.71
P&P Bonds 1.00% $ - $ 18.03
Subtotal SUB TOTAL $ - $ 1,820.74
Fortune-Ratliff, Inc. OH & P 10% $ - $ 182.07
TOTAL CP $ - $ 2,003
Please review and advise as to the acceptance of this cost proposal. If you have any questions, please
do not hesitate to contact me.
Sincerely, Accepted by:
Keith Eckert, County of Fresno
By:
Adam Myles,Vice President Date:
352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878
RFI NO.: 4.0
FORTUNE/RATLIFF DATE: 3i4i2025
GENERAL CONTRACTORS, INC.
CA.LZ4_130wftm 49Cs147
REQUEST FOR INFORMATION
TO Keith Eckert ATTN: Keith Eckert
Senior Engineering Technician CC: Barry Mast
The County of Fresno
Department of Public Works and Planning
F/R JOB#: 2408
PROJECT: DBH Olive Ave.Roof Replacement&Fapde Repairs PROJECT NO.:
KEY DESCRIPTION: Soffit Removal
DRAWING: F10/A-801,F6/A-801 SPECIFICATION:
ATTACHED SHEETS: ❑ YES OR ❑ NO
QUESTION: Plans show existing soffit plywood above the existing storefront windows to be attached and behind the
aluminum storefront frames.The plywood cannot be removed without also removing the storefront frames. Please advise.
Need Answer By: ASAP
ADDITIONAL COST: ❑ YES OR ❑ NO
TIME DAYS
SUGGESTION:
Contractor Signature: C t,4f ZeWlik Project Superintendent
ATTACHED SHEETS: ❑ YES OR ❑ NO
REPLY:
u ty eS n a y a5
xi5ting plywood Soffit Shall remain above the aluminum Storefront 5y5tem to preserve existing Storefront
n5tallation. See attached ASI 01 - Soffits for revised removal and installation of 5offit5.
Change Order Required: ❑ Yes or ❑ No
Owner Representative Signature: Date:
c° County of Fresno
0,
O O DEPARTMENT OF PUBLIC WORKS AND PLANNING
1856
6 STEVEN E. WHITE, DIRECTOR
Architect's Supplemental Instructions
Date: March 10, 2025
Instruction Number: ASI 01 - Soffits
PROJECT: DBH Roof Replacement & Fagade Repairs
Project Address
Contract No.: 24-S-08
ARCHITECT: Barry Mast
CONTRACTOR: Fortune-Ratliff General Contractors, Inc.
352 W Bedford Ave Ste 107
Fresno, CA 93711
The work shall be carried out with the following Supplemental Instructions in accordance the with the Contract Documents without
any change in Contract Sum or Contract Time. Proceeding with the Work indicates your acknowledgement that there will be no
change in the Contract Sum or Contract Time.
DESCRIPTION:
Revise removal of existing soffit and installation of new soffit to maintain existing installation of
aluminum storefront system. This ASI supersedes details F6/A-801 and F10/A-801.
CAPITAL PROJECTS DIVISION
2220 Tulare Street,Eighth Floor I Fresno, California 93721 /Phone(559)600-5206/FAX(559)600-4548
The County of Fresno is an Equal Opportunity Employer
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I
K < K
I
Q I
-- EX15TING 5/5"GYPSUM BOARD O/
2X STUDS AND BATT INSULATION
I
EXISTING 2X FRAMING AND
J BLOCKING J
REMOVE 2X BLOCKING EXISTING HEADER
EXISTING 2X FRAMING AND
-- BLOCKING
EXISTING CONCRETE WALL a \ EXISTING 5/11"71-11 PLYWOOD
\ SOFFIT TO REMAIN
H EXISTING ALUMINUM STOREFRONT H
REMOVE EXl5TING 5/8"T1-11 REMOVE EXISTING 5/5"T1-11 SYSTEM
PLYWOOD 50FFIT TO EXTENT PLYWOOD SOFFIT TO EXTENT 1„
SHOWN SHOWN
REMOVE EX15TING TRIM
G G
I
F F
F1 DEMO VERTICAL DETAIL AT EXTERIOR SOFFIT
1
ARCHITECT
harry Lynn Mash Architect
G4�S�LCyIJ Califomia lrcenss Architect No.C36769
-2025
Fresno Cof unty Department of
E Devl Worksic elop t9ervpkes and E
C 39769 Capaxl Projects D..
N REN:12-31-2025 C• 2220 Tulare Street,BM Floor
9TF Off?
Fresno,California 93721
a �f CALF Office(559)600d N
Email.bmast&-nacountyca g.
- EXl5TING 5/6"GYPSUM BOARD O/
2X STUDS AND BATT IN5ULATION PROJECT:
DEPARTMENT OF BEHAVIORAL HEALTH
EXISTING 2X FRAMING AND ROOF REPLACEMENT&FACADE REPAIRS
D BLOCKING 5555 E Olive Ave,Fresno,CA 93727 D
EX15TING HEADER APN:45522312ST
EXISTING 2X FRAMING AND ISSUE DATE:2025-03-10
Q BLOCKING PROJECT NO.:T80317
FILE NAME:GACapitalWctive Projects\T80317-DBH Olive Bldg
Phase 1\50 Construction\ASIs\ASI 01-Soffits\24SO8 ASI 01-
FXI5TING CONCRETE WALL Q EXISTING 5/5"T1-11 PLYWOOD Soffits
NEW 2X BLOCKING J — J SOFFIT TO REMAIN SHEET TITLE:
I ASI 01 - SOFFITS
C NEW HARDIE SOFFIT NON-VENTED EXISTING ALUMINUM STOREFRONT C
NEW HARDIE SOFFIT VENTED GEDARMILL OR EQUAL O/WEATHER SYSTEM
CEDARMILL OR EQUAL BARRIER
PROVIDE GAP AND CAULK PER CONTINUOUS SEALANT
MANUFACTURER REGOMMENDAT ION
NEW GALVANIZED SHEET METAL
NEW--MOLD TRIM CLOSURE.PAINT TO MATCH SOFFIT
Public Works and Planning
Department COL��rt
B Capital Projects Division B
2220 Tulare Street,8th Floor
Fresno,California 93721
PRE`'
II
SHEET NUMBER:
A 1 A
Al NEW VERTICAL DETAIL AT EXTERIOR SOFFIT O 3" 6"
1 SHEET 1 OF 1
1 1 2 3 4 5 6 7 8 9 10 11 12 13 1 14 1 DRAWN BY:<INITIALS> PLOT DATE:2025-03-10
I�
I ggiilE
Mechanical Contractors • Duct Cleaning NADCA Certified • License No. 714317
Date: March 17, 2025 COl
To: Fortune/Ratliff General Contractor's Inc. DIR
#1000004409
SBA #1744008
Job: DBH Olive Ave Roof Replacement
Reference: RFI MOD 169
Material
770 ft of 20 gauge flashing $1,617.00
Per your dwg
Labor
10%Mark-Up 161.70
Total Cost $1,778.70
No labor
If you have any questions,please do not hesitate to call me at 559-323-9788 or Fax 559-323-976
Respectfully,
Ankle AitJ°W
Rick Millard
Rick@ecihvac.com
1500 Tollhouse Road,Suite 103 • Clovis, CA 93611 • (559) 323-9788 • Fax(559) 323-9762
FORTUNE/RATLIFF
` GENERAL CONTRACTORS, INC.
CA. LICFNSF 496147
PCO# 2_0
DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 3/25/2025
Fresno, CA.
Attn: Keith Eckert $739.00/ Daily Rate CP# 02
CC: Mandeep Sekhon Schedule Impact:
Re: RFI 09_0 Response
Keith:
We herewith submit our Proposed Change Order to provide and install panel patching at north entrance
and south entrance where signage removal left behind holes in the concrete panels per RFI 09 0 response.
SUB/SUPPLIER NAMES DESCRIPTION
Wm. B. Saleh Co. $ 1,620.00
SUB TOTAL $ - $ 1,620.00
Liability Insurance & BR 1.35% $ - $ 21.87
Subtotal SUB TOTAL $ - $ 1,641.87
P&P Bonds 1.00% $ - $ 16.42
Subtotal SUB TOTAL $ - $ 1,658.29
Fortune-Ratliff, Inc. OH & P 10% $ - $ 165.83
TOTAL CP $ - $ 1,824
Please review and advise as to the acceptance of this cost proposal. If you have any questions, please
do not hesitate to contact me.
Sincerely, Accepted by:
Keith Eckert, County of Fresno
By:
Adam Myles,Vice President Date:
352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878
Fresno Office
1364 N.Jackson
ft. B. 90 CO. Fresno, 9) 93703
Phone:(55 255-2046
FAX: (559)255-2907
Fj DISTINCTIVE PAINTING DIR No. 1000003170
PROPOSAL / CONTRACT
SBE CERTIFIED
To: Fortune Ratliff Date: March 25, 2025
Subject Job: Olive Ave DBH Roof Repairs
Panel Patching
We propose to furnish at the above job all labor,materials,equipment,supervision,Workers'Compensation Property Damage and Liability Insurance
necessary to complete in a thoroughly workmanlike manner all the work described below.
SCOPE OF WORK: Fill holes and depressions in the existing concrete
panels where signage was removed, this is in two
locations on the south side of the building.
Labor 16 hours @$100.00 $1,600.00
Material $ 20.00
TOTAL AMOUNT $1,620.00
STATE LICENSE NO. 268108 Wm. B. SALEH Co. : �\o\-
Ron Elia gm
ACCEPTANCE-The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as
specified.Payment will be made as outlined.
TERMS:This contract includes all the terms and conditions attached to this sheet and they are approved and accepted by the signatures below.
This proposal must be accepted within 30 days of the date hereof to become a valid contract.
If approved and accepted, please sign below and return a copy to our office.
Date of Acceptance: _ _ Signature: _
BAKERSFIELD 2361 Cepheus Court MONTEREY OFFICE: 407 Reservation Rd.,Suite 3
OFFICE: Bakersfield,CA 93308 Marina,CA 93933
Phone: (661)393-8842 Phone:831-384-1552
Fax(661)393-8138 Fax: 831-384-7620
FORTUNE/RATLIFF
` GENERAL CONTRACTORS, INC.
CA. LICFNSF 496147
PCO# 3_0
DBH Olive Ave. Roof Replacement& Fagade Repairs Date: 4/3/2025
Fresno, CA.
Attn: Keith Eckert $739.00/ Daily Rate CP# 03
CC: Mandeep Sekhon Schedule Impact:
Re: PR 01 ODU Platform Height
Keith:
We herewith submit our Proposed Change Order to provide and install changes to ODU platform framing
per PR 01 and RFI 12 Response.
SUB/SUPPLIER NAMES DESCRIPTION
Strausser Costruction ODU Platform Framing Changes $ 2,028.00
SUB TOTAL $ - $ 2,028.00
Liability Insurance & BR 1.35% $ - $ 27.38
Subtotal SUB TOTAL $ - $ 2,055.38
P&P Bonds 1.00% $ - $ 20.55
Subtotal SUB TOTAL $ - $ 2,075.93
Fortune-Ratliff, Inc. OH & P 10% $ - $ 207.59
TOTAL CP $ - $ 2,284
Please review and advise as to the acceptance of this cost proposal. If you have any questions, please
do not hesitate to contact me.
Sincerely, Accepted by:
Keith Eckert, County of Fresno
By:
Adam Myles,Vice President Date:
352 W.Bedford#107,Fresno,CA. 93711 - P.O.Box 26944,Fresno,CA. 93729 - Phone:(559)432-1306 Fax:(559)432-2878
STRAUSSER
CONSTRUCTION,INC.
Office (559)438-0083 2354W.Warner
Fax (559)438-0092 Fresno,CA 93711
Cell (559)647-3713 License#838251
Page 1 of 2
To: Fortune Ratliff Construction Inc Date: January 27, 2025
Attn: Quincy From: Michael Strausser
D I R#1000017893
Re: Olive Ave
Cost Proposal for RFI#12
Lumber$640.00
Simpson hardware&fasteners$84.00
Labor 10 man hrs X$112.00 per hr=$1,120.00
Subtotal$1,844.00
10%OH&P$184.00
Total$2,028.00
STRAUSSER
CONSTRUCTION,INC.
Office (559)438-0083 2354W.Warner
Fax (559)438-0092 Fresno,CA 93711
Cell (559)647-3713 License#838251
RFI NO.: 12 0
r�r% FORTUNE/RATLIFF DATE: 3/20/2025
GENERAL CONTRACTORS, INC.
CA.LICENSE I&S0f 147
REQUEST FOR INFORMATION
TO Keith Eckert ATTN: Keith Eckert
Senior Engineering Technician CC: Barry Mast
The County of Fresno
Department of Public Works and Planning
F/R JOB#: 2408
PROJECT: DBH Olive Ave.Roof Replacement&Fapde Repairs PROJECT NO.:
KEY DESCRIPTION: ODU Platform Curb Height
DRAWING: ASI-02,ASI-B01 SPECIFICATION:
ATTACHED SHEETS: ❑ YES OR ❑ NO
QUESTION: ASI-B01 details show 4x6 framing,which would protrude only 4"above the completed roof.Minimum
height for ODU curbs from top of completed roof should be 8".Please advise.
Need Answer By: ASAP
ADDITIONAL COST: [—] YES OR ❑ NO
TIME DAYS
SUGGESTION: Platform on deck should be constructed using 2x12 framing to stay above 8"after roof completion.
Contractor Signature: Cht' Ze.w4f-Project Superintendent
ATTACHED SHEETS: ® YES OR ❑ NO
REPLY:
ee attached proposal reque5t PR 01.
Change Order Required: ❑ Yes or ❑ No
Owner Representative Signature: Date:
c° County of Fresno
0,
O O DEPARTMENT OF PUBLIC WORKS AND PLANNING
1856
6 STEVEN E. WHITE, DIRECTOR
Proposal Request
Date: March 27, 2025
Request Number: PR 01 — ODU Platform Height
PROJECT: DBH Roof Replacement & Fagade Repairs
5555 E Olive Ave, Fresno, CA 93727
Contract No.: 24-S-08
ARCHITECT: Barry Mast
CONTRACTOR: Fortune-Ratliff General Contractors, Inc.
352 W Bedford Ave Ste 107
Fresno, CA 93711
The County requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to the
Contract Documents described herein.The Contractor shall submit the proposal within five(5)days or notify the Project Manager in
writing of the anticipated date of submission.
DESCRIPTION:
Revised typical ODU platform details to increase height to more than 8" above adjacent roof.
See attached drawing.
DEVELOPMENT SERVICES AND CAPITAL PROJECTS DIVISION
2220 Tulare Street, Sixth Floor/Fresno, California 93721 /Phone (559)600-5206/FAX(559)600-4548
The County of Fresno is an Equal Opportunity Employer
1 2 3 q p q 4 p p p p 5 p p p 6 7 1 8 9 10 11 12 13 14 15 i 6
FUTURE ODU.NOT PART OF THIS FUTURE ODU.NOT
CONTRACT PART OF THIS
CONTRACT.
K 28 3/4" 3 1/4" 14 3/16" 13 1/8" 14=3/16
5/4"5TRUGTURAL 1 PLYWOOD
SHEATHING W/10D AT 6"O.C.EDGE ® 4116 BLOCKING W/5IMP5011 LU546
NAILED AND 10D AT 12"O.G.FIELD, JOIST HANGER AT EACH END,
TYPICAL
e e TYPICAL
° 4X6 BLOCKING W/ J
SIMP50N LU546
4X6 BLOCKING, JOIST HANGER AT
TYPICAL EACH END,
TYPICAL
2X12 SHAPED 2X12 SHAPED
CURB CURB
5IMP50N ASS.TWO EACH 5IDE OF 5IMP50N ASS.TWO EACH SIDE OF
PLATFORM,TYPICAL EXISTING PLATFORM,TYPICAL EXISTING
PLYWOOD ROOF PLYWOOD ROOF
H SHEATHING SHEATHING H
G G
12' 12' 12" 12" 12" 12" 12" 12"
48" 48"
4X6 BRIDGING W/SIMPSON LU546 r4XGING W/SIMP50N LUS46
HANGER AT EACH END GER AT EACH ENDPROVIDE 5IMPSON LU526 AT PROVIDE SIMPSON LU526 ATEXISTING JOISTS UNDER PLATFORM EXISTING JOISTS UNDER PLATFORMFIF NOT EXISTING IFNOT EXISTINGF
EXISTING 2X6 JOISTS AT 24"O.G. 2X6 JOISTS AT 24"O.G.
I I
EXISTING 2-1/2"X19-1/4"BEAM AT EXISTING 2-1/2"X19-1/4"BEAM AT
8'-0"O.G. 8'-O"O.O.
E E
E1 SINGLE ODU CURB MOUNTING DETAIL 3" 6" E9 DOUBLE ODU CURB MOUNTING DETAIL 0 3 6" 1'
SHEET NOTES PROJECT:
48" 1. REFER TO ARCHITECTURAL AND MEGHANIGAL DEPARTMENT OF BEHAVIORAL HEALTH
DRAWING5 FOR EQUIPMENT,CURB LOCATIONS ROOF REPLACEMENT&FACADE REPAIRS
D AND FINISHES weAve,Fresno, D
APN:45522312ST
m 2. ODU ANCHOR DIMENSIONS SHOWN FOR
ISSUE DATE:2025-03-27
REFERENCE ONLY.VERIFY ANCHOR DIMENSIONS
AND REQUIRED CLEARANCES FOR EACH FUTURE PROJECT T8 24 FIR
r 48" ODU PER MECHANICAL ODU SCHEDULE. FILE NAME: 508 PR 01-ODU Platform HeigM.dwg
I I
ry �� Ilk. 24
� ODU 3 m m
SHEET TITLE:
ry F PR 01 - ODU
n �,I ODU-1 PLATFORM HEIGHT00
D
I I
v m
� I I
ovub I I
N
v Public Works and PlanningDepartment H� COL��rt
e Eg ` B
2220 Tulare Street,8th Floor
m •
Fresno,California 93721
O O
FRE`'
71MM
EET NUMBER:
A A
A5 ENLARGED ROOF PLAN A9 ENLARGED ROOF PLAN
SHEET 1 OF 1
1 2 3 4 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 13 14 1 DRAWN BY:<INITIALS> PLOT DATE:2025-03-27