FRESNO COUNTY WESTSIDE GROUND WATER PROJECT CHANGE ORDER NO. 3
EL PORVENIR(CSA 30) &CANTUA CREEk(CSA 32) CONTRACT NO. 18-07-C I
PILOT HOLE TESTING AND PRODUCTION September 5, 2019
PAGE 1 OF 1
TO: ZIM INDUSTRIES INC.: You are hereby directed to make the herein described changes from the
plans and specifications or do the following described work not included in the plans and specifications
on this contract. By reason of the proposed change, SEVEN WORKING days will be granted to the j
allotted contract time.
PART I: DELETE PART III OF CONTRACT CHANGE ORDER NO. 1
Delete the entire Part II I of Contract Change Order No. 1.
TOTAL COST PART I: $0.00 (NO COST)
I I ;
PART4V! GRANT TIME EXTENSION FOR WELL DESIGN: i
i
Grant a time extension of seven working days for a delay in the well design process. This time
extension is granted in accordance with Section 8-1.07B, "Time Adjustments," of the project Special i
Provisions.
TOTAL COST PART II: $0.00 (NO COST)
TOTAL TIME EXTENSION PART II: SEVEN WORKING DAYS
NET COSTS THIS CHANGE ORDER: ($0.00) NO COST
NET TIME EXTENSION THIS CCO: SEVEN WORKING DAYS
z-� LaRue Goossen, Resident Engineer
' APPROVAL RECOMMENDED:
- � IM INDUSTRIES INC.
-ntractor
STEVE DEIS, Construction E eer
Title: s/ —P / Se-C t&tV N
STEVEN E. WHI E, Director
Accepted Date: �/� Public Works and Planning
� /
Date: ! I
_Contractor-White We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,If
—Auditor-Canary this proposal Is approved,that we will provide all equipment,furnish all materialsi except as may otherwise be
_Bus,office-Green noted above and erform all services necessary for the work above s ecified,and will accept as full payment
_Hoard-pink � p rY p
—Const.Mgmt-Blue therefor the prices shown above.
RE/Arch.-Blue
_Pro).Dev.-Goldenrod If the Contractor does not sign acceptance of this order,his attention Is directed to the requirements of the
contractor before specifications as to proceeding with the ordered work and filing a written protest within the time therein
Approval-White specified.