HomeMy WebLinkAbout1807C CCO02.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
FRESNO COUNTY WESTSIDE GROUND WATER PROJECT CHANGE ORDER NO.2
EL PORVENIR(CSA 30) and CANTUA CREEK(CSA 32) CONTRACT NO. 18-07-C
PILOT HOLE TESTING AND PRODUCTION JULY 31,2019
WELL CONSTRUCTION PAGE 1 OF 2
TO: ZIM INDUSTRIES INC.: You are hereby directed to make the herein described changes from the
plans and specifications or do the following described work not included in the plans and specifications
on this contract. By reason of the proposed change, 37 WORKING days will be granted to the allotted
contract time.
PART I: GRANT TIME EXTENSION FOR WEATHER DAYS:
Grant a time extension of five working days for unsuitable working conditions due to rain or wet surface
conditions.
Weather Day Extension SummarylReference
Weather Day March 18 2019 1 Working Day
Weather Day March 19 2019 1 Working Day
Weather Day March 20 2019 1 Working Day
Weather Day March 212019 1 Working Day
Weather Day March 22 2019 1 Working Day
Total Weather Days 5 Working Days
TOTAL TIME EXTENSION PART 1: FIVE WORKING DAYS
TOTAL COST PART 1: $0.09(NO COST)
i PART It: GRANT TIME EXTENSION FOR PERMITTING PROCESS DELAYS:
Grant a time extension of14 working days for delays caused in the permitting process. This time
extension if granted in accordance with Section 8-1.07B,"Time Adjustments," of the project Special
Provisions.
TOTAL TIME EXTENSION PART 11: 14 WORKING DAYS
TOTAL COST PART II: $0.00(NO COST)
i
PART III: GRANT TIME EXTENSION FOR WATER ACESS:
Grant a time extension of three working days for delays cause by tack of available water supply. ThiS
time extension if granted in accordance with Section 8-1.076, "Time Adjustments,"of the project Special
Provisions.
I TOTAL TIME EXTENSION PART III:THREE WORKING DAYS
TOTAL COST PART 111: $0.00(NO COST)
i
i
Cnnlrador..White We,!Ae tau-M(tnM wncraclo r,nave g1VOR WfOtW Ct)r151ACratl Dr:to the change plppQSCd dnd nereQy d9fe@,tf
Auditor-Canary this proposal is approved,that vvo will provide all equipment,rurnl5h alf materials,except as may otherwise be
_Bus,ontce-Green noted above,and perform all services necessary for the work above spedoed,and W)fl a cept a$full payment
eonst. gmt h terefor cne._cost.rrtgmt-eiue prates Shown above.
-.,-RE/AIM.-afJe
�,F,vJ.Ope.•QUIl7enn)0 if the Contractor does not sign acceptance or this order,his attention is direcuzd to the rEquirement s of the
_Cnetaclor White
Spe IRW(ans eS t0 Proceeding with the ordered work end Filing a written o:
�PArovil-Wt,Itc
tl specined. pr est witnln the tome therein
I I
f
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
FRESNO COUNTY WESTSIDE GROUND WATER PROJECT CHANGE ORDER NO. 2
EL PORVENIR(CSA 30)and CANTUA CREEK(GSA 32) CONTRACT NO, 18-07-C
PILOT HOLE TESTING AND PRODUCTION JULY 31, 2019
WELL CONSTRUCTION PAGE 2 OF 2
PART IV: GRANT TIME EXTENSION FOR WELL DESIGN:
Grant a time extension of five working days for a delay in the well design process. This time extension if
granted in accordance with Section 8-1.07B,"Time Adjustments,"of the project Special Provisions.
TOTAL TIME EXTENSION PART IV: FIVE WORKING DAYS
TOTAL COST PART IV: $0.00(NO COST)
PART V: GRANT TIME EXTENSION FOR SUBMITTAL ISSUES:
Grant a time extension of ten working days for delays in the returning of submittals. This time extension if
granted in accordance with Section 8-1.076,'Time Adjustments,"of the project Special Provisions.
i
TOTAL TIME EXTENSION PART V:TEN WORKING DAYS
TOTAL COST PART V: $0.00(NO COST)
NET COSTS THIS CHANGE ORDER: ($0.00) NO COST
NET TIME EXTENSION THIS CCO: 37 WORKING DAYS
x�e;j
JAS. N AHUMADA, ;ssi3 i Engineer T
APPROVAL RECOMMENDED:
ZIM INDUSTRIES INC.. --'`�
Contractor �J
STEVE7WHITE,
Constru
By:
r 1 ,M / STEVEirector
Title: �I ! 1 N9t / IQa /L V- Public Works and Planning
Accepted Date: f Date: ?
_contractor•white we,the above Signed contractor,have given careful consideration to the change proposed and hereby agree,if
_Auditor-Canary this proposal Is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Bus. -Onice Pink-Green
Board-Pin noted above,and perform all services necessary ror the work above specined,and will accept as full payment
_
_coast.tagmt-awe therefor the prices shown above,
_RE/Arch.•Blue
—pert rev.•Goldenrod If the Contractor does not Sigh acceptance of this order,his attention IS directed to the requirements of the
_Contractor before soecl)cd, nc ac to rataoding with the ordered work and ItlIf10 a written pretoet within the the therein
�ppravel-white F
cpeolned�