HomeMy WebLinkAbout24S04 CCO 01.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
REEDLEY RADIO TOWER AND EQUIPMENT SHELTER CHANGE ORDER NO. 1
17626 E. MANNING AVE., REEDLEY, CA 93654 FEBRUARY 26, 2025
CONTRACT NO. 24-S-04 PAGE 1 OF 2
TO: KATCH GENERAL:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time.
PART I: TRANSPORT OWNER FURNISHED GENERATOR TO THE PROJECT SITE— EXTRA WORK
This extra work was requested by the project manager.
In accordance with Sub-section 2.25, "Changes to the Work," of Section 007200, "General Conditions,"
of the Project Manual, transport owner furnished generator from the storage facility located at 2909 S.
Elm Avenue, Fresno, California, to the project site, 17626 E Manning Avenue, Reedley, California.
Refer to the attached Exhibit A for the weight and dimensions. This work includes providing operator(s)
and equipment to upload, transport, and off load the generator. Compensation for this work will be
made at an agreed lumpsum price of$4,516.74 in accordance with Sub-section 2.25, "Changes to the
Work, D2," of Section 007200, "General Conditions," of the Project Manual. This agreed price includes
compensation for all labor, equipment, incidental, permits, markups, and profits, no additional
compensation will be allowed thereafter for this work. This amount will be paid as extra work.
This extra work did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART I: $4,516.74 INCREASE
TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS
PART II: OBTAIN BUILDING PERMIT— EXTRA WORK
This compensation adjustment was requested by the contactor.
In accordance with Sub-section 2.25, "Changes to the Work," of Section 007200, "General Conditions,"
of the Project Manual, obtain a building permit for the project. Compensation for this work will be made as the
actual cost incurred, in accordance with Sub-section 2.58, "Building Permit and Other Permits," of
Section 007200, "General Conditions," of the Project Manual. The total fees resulted in $10,540.52 (see
attached Exhibit B), no additional compensation will be allowed thereafter. This amount will be paid as extra
work.
This compensation adjustment did not impact the critical path for the project, therefore, granting additional
contract time was not warranted.
TOTAL COST PART II: $10,540.52 INCREASE
TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS
_Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors therefore the prices shown above.
_Const.Mgmt
RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
REEDLEY RADIO TOWER AND EQUIPMENT SHELTER CHANGE ORDER NO. 1
17626 E. MANNING AVE., REEDLEY, CA 93654 FEBRUARY 26, 2025
CONTRACT NO. 24-S-04 PAGE 2 OF 2
NET COST THIS CHANGE ORDER: $15,057.26 INCREASE
NET TIME EXTENSIONS THIS CCO: ZERO (0) -WORKING DAYS
Keith licked
Keith Eckert(Feb 26,2025 08:21 PST)
Keith Eckert, Project Manager
APPROVAL RECOMMENDED:
KATCH GENERAL V �
Contractor Mandeep S. Sekhon, PE
Construction Engineer
7'"00v Clwmy
By Tom cliacon(Feb 26,2025 11:27 PST) APPROVED BY:
Digitally signed by Steve
Whit
General Manager Steve WhlteD tee2025.02.26
Title 15:15:19-08,00,
Steven E. White, Director
Accepted Date:
Feb 26, 2025 Public Works and Planning
Date:
Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of supervisors therefore the prices shown above.
_Const.Mgmt
RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
CCO 01 - Exhibit A
Diesel r='roduct dine
BLUE S T*R
150 kwe/150 We Power Systems Inc.
DCP7310 Control Panel
Standard Features
- Digital Metering
- Engine Parameters
- Generator Protection Functions
O MITAL CONTROL PANEL
- Engine Protection
•- CAN Bus(J1939)ECU Communications 000 �
- Windows-Based Software 0 �
- Multilingual Capability GGc BLUE Sr4-R
cox
- Remote Communications to DSE2548 Remote Annunciator "°' Q Power Systems Inc. O Ocnearo•(Stzna! (h1a.:uz
- 8 Programmable Contact Inputs =•D :I •_ � M14N30';yl
&ea.a'LED O 5 waic,
- 10 Contact Outputs O O • O /1 O Ora 3be LEO
- RS485 Communicator Interface
a�na+ aux. ear,„�:• rnnr
- cLILus Listed,CE Approved
s:a�Pc; ace
- Event Recording - _.+ •: sr.,.e-1•==
,..,.._..;:,;.,E:...n ar.d.,,����, Aa•m du;e L Larp Tell suits
- IP 65 rating(with suppEed gasket)offers increased resistance to vrater ingress """d e-1ntl11.°Ca`0'
- NFPA 110 Level 1 Compatible
Weights / Dimensions / Sound Data
23.66
L x W x H Weight Ibs �966
s. z O
5in �§ 13.02
LeVel �$4-X-G6-X-$�-iR §l�y(3 APPROX.
BREAKER 4144
LOCATION
Level-8 174 x 669v-ii•-82 iFi 1.96
1.96 13.15
Please allow 6-12 inches for height of exhaust stack. 70 LITER DEF TAN"STI.-I 2_342-�}-
19 GALLONS AREA 8 X 8 2r.1 Y--••+- 8.30• 35.40
No Load Full Load TDI
OPU 79 dBA 82 dBA 1�•
(75.00)
Level 1 75 dBA 78 dBA ' 5076
Level 2 71 dBA 74 dBA
Level 3 67 dBA 69 dBA O O 10.00
10.0o r �6000
0-0
^ / \ \ \ }
7 ])S/ \ ! ® !
\ ) {/§)in / § ).§. �
,!q!m
@
\ }lE\[\ § -
Z\\ § !2k§
CL CL (2z
�\m.z
!\ §\ (\ E2
// .r!\
}� )§
<
§§ \uw »k
e--
�
R lop.
ai
0< [§�§
<u< L (/
)Q Ĥ
/ \\ &_
<m /
ca k[ § )�
Ln Ln \\ \ \} \
4-
Lr °� J . -
.
/
O= .
7\ Ln
eo ^ ° 2 f§5
eo 00
-
« 2/2
O O Ln . ° $ zk(k
°z Lri \ \\\
O O \\ . ' §
§k \
/
)§ \\ \ �22/�Lri
G S /\±
f/
k
j< <vi£=?o<
ilL gR>fz
£»$@§
}0
c<a c —
`A\
a< t=>�
0cna
9 CCO 01 - Exhibit B PCO #003
Katch General Project:2435-Reedley Radio Tower and Equipment Shelter
929 L Street 17626 E Manning Ave
Fresno,California 93721 Reedley,California 93654
Phone:+15592926653
Prime Contract Potential Change Order #003: Permit Costs
TO: County of Fresno Public Works FROM: Katch General
County of Fresno Public Works 2220 Tulare 929 L.St
St Fresno,California 93721
Fresno,California 93721
PCO NUMBER/REVISION: 003/0 CONTRACT: 1-Contract Agreement
REQUEST RECEIVED FROM: CREATED BY: Jason Cortez(Katch General)
STATUS: Approved CREATED DATE: 1/17/2025
REFERENCE: Permits PRIME CONTRACT #002-Permit Costs
CHANGE ORDER:
FIELD CHANGE: No
LOCATION: ACCOUNTING METHOD: Amount Based
SCHEDULE IMPACT: PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: $10,540.52
POTENTIAL CHANGE ORDER TITLE:Permit Costs
CHANGE REASON:Client Request
POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows)
Permit Costs
This change order is for the costs associated with the grading and building permits for this project.Reference#23-0980
ATTACHMENTS:
Permitlnvoice.pdf
# I Budget Code Description Amount
1 01-0100.O Permits.Other Permit Costs $10,540.52
Grand Total: $10,540.52
Joseph Harrell(County of Fresno Public County of Fresno Public Works Katch General
Works)
2220 Tulare St County of Fresno Public Works 2220 Tulare 929 L.St
St
Fresno,California 93721 Fresno,California 93721 Fresno,California 93721
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
Katch General Page 1 of 1 Printed On:2/25/2025 11:53 AM PST