Loading...
HomeMy WebLinkAbout2214C CCO 31.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE | CHANGE ORDER NO. 31 /\K8ER|CAN AVENUE TO MISSION STREET FEBUARY13. 2O25 CONTRACT NO. 22-14-C PAGE 1OF2 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the ohmn0e(n). will be added tn the contract time. PAINT DIAGONAL STRIPE PATTERNS BETWEEN STA' G6+f0 AND STA. 72*M0 (LEFT) -EXTRA WORK This extra work was requested bx the engineer. |n accordance with Section 4-1.O5. "Changes and Extra VVurh." of the Standard 3owc0fications. paint 4- vvide diagonal stripe patterns using white paint, between approximate sta. 85+1D and sta. 72+OOUeft\. behind the curb and gutter, in the Kingsburg region, as shown on the attached revised Plan Sheet 82A. Perform all work according to Section 84-2, "Traffic Stripes and Pavement Markings,"of the Standard Specifications. Compensation for this work will be made at an agreed lump sum price of$3,657.50, according to Section 9-1.03, "Payment Scope,"of the Special Provisions. This agreed price includes compensation for all materials, labor, equipment, incidental, markups, and profits, no additional compensation will be allowed thereafter for this work. This amount will be paid as extra work. This extra work did not impact the critical path for the project,therefore, granting additional contract time was not warranted. —Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if —/*moor Controller this proposal is approved,that we will provide all equipment,fumish all materials,except as may otherwise be —Business Office noted anunenm,maoye�/cesneoo,a�xxmexm,xaovve�veuneo and wmooenta,mopayment mm�"/s"=w�o ' ' ��mnst.Management therefore the prices shown above. RE/Arch. Design /r the Contractor does not sign acceptance vr this order,his attention/s directed m the requirements vrthe specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 31 AMERICAN AVENUE TO MISSION STREET FEBUARY 13, 2025 CONTRACT NO. 22-14-C PAGE 2 OF 2 NET COST THIS CHANGE ORDER: A $3,657.50 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS 1-410z.w,U�oaaean LaRue Goossen, Resident Engineer APPROVAL RECOMMENDED: I YARBS GRADING AND PAVING, INC. I✓�`v"�l�s Ca �� Contractor Mandeep S. Sekhon, PE Construction Engineer TYoti Yapbrown By Troyyar rotiph(Feb14,2025u9:47PST) APPROVED BY: /� } Digitally signed by Steve Whil Steve Leve V V h I Le Datee2025.02.14 Title President 12:52:26-08,00' Steven E. White, Director Accepted Date: Feb 14 2025 Public Works and Planning , Date: Ernest Buddy Mendel, Chairman Board of Supervisors Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business up noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.