HomeMy WebLinkAbout1807C CCO 08.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER FRESNO COUNTY WESTSIDE GROUNDWATER PROJECT CHANGE ORDER NO. 8 EL PORVENIR (CSA 30) & CANTUA CREEK (CSA 32) JANUARY 14, 2025 PILOT HOLE TESTING AND PRODUCTION WELL PAGE 1 OF 2 CONSTRUCTION DRINKING WATER STATE REVOLVING FUND PROJECT NO: 1000359-005C CONTRACT NO. 18-07-C TO: ZIM INDUSTRIES, INC.: Make the following change(s) to the plans and specifications or do work not in the plans and specifications for this contract. Because of the proposed change(s), 721 -WORKING DAYS will be granted to the allotted contract time. The revised date of completion for the project was November 19, 2024. GRANT A TIME EXTENSION Grant a time extension of 721-working days to the allotted contract due to the design modifications associated with the groundwater table changes, excessive time required for vendors to provide submittals for the new equipment, long lead time for equipment and materials and additional time required by the engineers to review and approve submittals. There were some delays caused by the contractor. The compensation adjustment/settlement for the contractor's delays will be addressed in the subsequent change order. This time extension is being granted according to Section 8-1.07B, "Time Adjustments," of the Special Provisions. _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office Board noted above,and perform all services necessary for the work above specified,and will accept as full payment _ _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER FRESNO COUNTY WESTSIDE GROUNDWATER PROJECT CHANGE ORDER NO. 8 EL PORVENIR (CSA 30) & CANTUA CREEK (CSA 32) JANUARY 14, 2025 PILOT HOLE TESTING AND PRODUCTION WELL PAGE 2 OF 2 CONSTRUCTION DRINKING WATER STATE REVOLVING FUND PROJECT NO: 1000359-005C CONTRACT NO. 18-07-C NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: 721 -WORKING DAYS Jason Ahumada, Resident Engineer APPROVAL RECOMMENDED: Zim Industries, Inc. Contractor Mandeep S. Sekhon, PE Construction Engineer By — APPROVED BY: } Digitally signed by Steve Whit Estimator/Project Manager Steve WhlleDatee2025.01.15 Title 09:35:05-08'00' Steven E. White, Director Accepted Date. Jan 14 2025 Public Works and Planning Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office Board noted above,and perform all services necessary for the work above specified,and will accept as full payment _ _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.