HomeMy WebLinkAbout2214C CCO 30.pdf COUNTY OFPRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE | CHANGE ORDER NO. 3O AK8ER|CAN AVENUE TO MISSION STREET [JECEK0BERO. 2O24 CONTRACT NO. 22-14-C PAGE 1OF2 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the nhonge/u\. will bo added to the contract timeline. INCREASE/DECREASE/EL!K8|NATEFTE8AS AT UNIT BID PRICES This change was proposed by the engineer. Quantities in the Bid Book are estimates only. This part adjusts items to the actual quantities used. Items:Increased Item Total TOTAL No. Description Unit Quantity Amount (0/6) (0/6) 82 4^ Yellow 2-Coot Paint Traffic LF 6.863.00 $0.80 $4.177.80 14.65 117.98 Striping (Detail 21.32.24.25.29.31.32\ 83 4^White Thermoplastic Traffic LF 1.623.00 0.80 1.298.40 2.56 179.40 Striping (Detail 12.27B) 84 4"Yellow Thermoplastic Striping LF 3.934.00 1.20 4.720.80 9.63 100.77 (Detail 21.25.27. ond35A) 85 8^White 2-Comt Paint Traffic LF 975.00 1.00 975.00 25.93 25.83 Striping (Detail 38.38A. and Chevron 8tdp|Mg\ 87 8"White Thermoplastic Traffic LF 4.222.00 2.00 8.444.00 315.07 315.07 Striping (Detail 37.38.38A. Chevron Striping) TOTAL INCREASES: $19.616.00 TOTAL COST PARTl: $19,616-00INCREASE TOTAL TIME EXTENSION PART|: ZERO (0) ^WORKING DAYS --Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal u approved,that we will provide all evu/nmen, mm/sxw/ma�na/�except ao may omenv/seue —««�onopm� nv�unov,ovnone�mnnoxurm/cesneus`��mrme���aoove�necmeoonowmaccentvsmxoovmen, m,omms"�=/m,s ' ' ��m"st.monaym"ent therefore the prices shown above. RE/ArchDesign If nmeContractor does not sign acceptance nr this order,his attention/s directed m the requirements vrthe specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 30 AMERICAN AVENUE TO MISSION STREET DECEMBER 6, 2024 CONTRACT NO. 22-14-C PAGE 2 OF 2 NET COST THIS CHANGE ORDER: A $19,616.00 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS LARue Goossen(Dec 9.2024 14:14 PST) LaRue Goossen, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING INC. Contractor Mandeep S. Sekhon, PE Construction Engineer r�o� rar6�r�cu,G� By Troy Yar rough(Dec10.202 0:15PST) APPROVED BY: Bernard Digitally signed by Bernard Jimenez President Dale:2024.12.10 Title Jimenez 12:57:47_08'00' Steven E. White, Director Accepted Date: Dec 10 2024 Public Works and Planning , Date: Nathan Magsig, Chairman Board of Supervisors Date: _Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,If _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business ounce Board or supervisors noted above,and perform all services necessary for the work above specified,and will accept as full payment _ therefore the prices_Const.Management p ces shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.