HomeMy WebLinkAbout2214C CCO 30.pdf COUNTY OFPRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE | CHANGE ORDER NO. 3O
AK8ER|CAN AVENUE TO MISSION STREET [JECEK0BERO. 2O24
CONTRACT NO. 22-14-C PAGE 1OF2
TO: YARBS GRADING AND PAVING, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the nhonge/u\. will bo added to the contract timeline.
INCREASE/DECREASE/EL!K8|NATEFTE8AS AT UNIT BID PRICES
This change was proposed by the engineer.
Quantities in the Bid Book are estimates only. This part adjusts items to the actual quantities used.
Items:Increased
Item Total TOTAL
No. Description Unit Quantity Amount (0/6) (0/6)
82 4^ Yellow 2-Coot Paint Traffic LF 6.863.00 $0.80 $4.177.80 14.65 117.98
Striping (Detail
21.32.24.25.29.31.32\
83 4^White Thermoplastic Traffic LF 1.623.00 0.80 1.298.40 2.56 179.40
Striping (Detail 12.27B)
84 4"Yellow Thermoplastic Striping LF 3.934.00 1.20 4.720.80 9.63 100.77
(Detail 21.25.27. ond35A)
85 8^White 2-Comt Paint Traffic LF 975.00 1.00 975.00 25.93 25.83
Striping (Detail 38.38A. and
Chevron 8tdp|Mg\
87 8"White Thermoplastic Traffic LF 4.222.00 2.00 8.444.00 315.07 315.07
Striping (Detail 37.38.38A.
Chevron Striping)
TOTAL INCREASES: $19.616.00
TOTAL COST PARTl: $19,616-00INCREASE
TOTAL TIME EXTENSION PART|: ZERO (0) ^WORKING DAYS
--Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal u approved,that we will provide all evu/nmen, mm/sxw/ma�na/�except ao may omenv/seue
—««�onopm� nv�unov,ovnone�mnnoxurm/cesneus`��mrme���aoove�necmeoonowmaccentvsmxoovmen,
m,omms"�=/m,s ' '
��m"st.monaym"ent therefore the prices shown above.
RE/ArchDesign If nmeContractor does not sign acceptance nr this order,his attention/s directed m the requirements vrthe
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 30
AMERICAN AVENUE TO MISSION STREET DECEMBER 6, 2024
CONTRACT NO. 22-14-C PAGE 2 OF 2
NET COST THIS CHANGE ORDER: A $19,616.00 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
LARue Goossen(Dec 9.2024 14:14 PST)
LaRue Goossen, Resident Engineer
APPROVAL RECOMMENDED:
YARBS GRADING AND PAVING INC.
Contractor Mandeep S. Sekhon, PE
Construction Engineer
r�o� rar6�r�cu,G�
By Troy Yar rough(Dec10.202 0:15PST) APPROVED BY:
Bernard Digitally signed by
Bernard Jimenez
President Dale:2024.12.10
Title Jimenez 12:57:47_08'00'
Steven E. White, Director
Accepted Date:
Dec 10 2024 Public Works and Planning
,
Date:
Nathan Magsig, Chairman
Board of Supervisors
Date:
_Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,If
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business ounce Board or supervisors noted above,and perform all services necessary for the work above specified,and will accept as full payment
_ therefore the prices_Const.Management p ces shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.