HomeMy WebLinkAbout2407C CCO 01.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER EAST REEDLEY BRIDGE REPLACEMENTS CHANGE ORDER NO. 1 REEDLEY MAIN CANAL BRIDGE REPLACEMENT ON ENGLEHART DECEMBER 5, 2024 AVENUE: BRLO-5942(239) PAGE 1 OF 2 TRAVERS CREEK BRIDGE REPLACEMENT ON LINCOLN AVENUE: BRLO-5942(226) TRAVERS CREEK BRIDGE REPLACEMENT ON PARLIER AVENUE: BRLO-5942(227) CONTRACT NO. 24-07-C TO: CAL VALLEY CONSTRUCTION, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. INCREASE BID ITEM NO. 120 QUANTITY AT THE UNIT BID PRICE This quantity increase was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, increase Bid Item No. 120, Rock Slope Protection (3001b, Class IV, Method B) quantity by 91 cubic yards to correct the discrepancy between the estimated quantity in the bid proposal (Specifications) and actual areas shown on the Project Plans. The correction was addressed in RFI (Request for Information) No. 6, attached. Payment for the increased quantity will be made at the unit bid price according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in a $54,600 increase. Increased Item(s): Item Total Total No. Description Unit Quantity Price Amount (%) (°� 120 Rock Slope Protection (3001b, Class CY 91.00 $600.00 $54,600.00 227.50 227.50 IV, Method B) TOTAL INCREASE: $54,600.00 This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor approved,that we will provide all equipment,furnish all materials, except as may otherwise be noted above, Business Office and perform all services necessary for the work above specified,and will accept as full payment therefore the _Board of Supervisors _Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER EAST REEDLEY BRIDGE REPLACEMENTS CHANGE ORDER NO. 1 REEDLEY MAIN CANAL BRIDGE REPLACEMENT ON ENGLEHART DECEMBER 5, 2024 AVENUE: BRLO-5942(239) PAGE 2 OF 2 TRAVERS CREEK BRIDGE REPLACEMENT ON LINCOLN AVENUE: BRLO-5942(226) TRAVERS CREEK BRIDGE REPLACEMENT ON PARLIER AVENUE: BRLO-5942(227) CONTRACT NO. 24-07-C NET COST THIS CHANGE ORDER: $54,600.00 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: Cal Valley Construction, Inc. Contractor Mandeep S. Sekhon, PE Construction Engineer CG���s G�i�tr�t By Chris Grimm(Dec 9,202414:23 PST) APPROVED BY: Digly signed Bernard Bernard J me ezy Title Operations Manager Jimenez Date:2024.12.10 12:56:35-08'00' Steven E. White, Director Accepted Date: Dec 9 2024 Public Works and Planning � Date: Contractor We,the above signed contractor, have considered the change proposed and hereby agree,if this proposal is Auditor approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, _Business Office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors _Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. General Engineering♦Commercial&Residential Gj4(L �Ln—E } Heavy Equipment Rental.Grading&Paving Certified♦UDBE♦WBE CONSTRUCTION License#873800 REQUEST FOR INFORMATION#6 10/28/2024 Robert Hendrickson Resident Engineer County of Fresno Sent Via: E-Mail Project: 24-07-C East Reedley Bridge Replacements Project Number: 241213 Re: 3001b, Class IV RSP From: Ryan Douglas QUESTION: RFI from Cal Valley Construction... Bid item 120 calls for 40 CY of Class IV Rock Slope Protection. Sheet No. 34 of the plan set scales at 131 CY. Please confirm quantity to be installed. By: Ryan Douglas RESPONSE: 131 CY of Class IV Rock Slope Protection is the correct amount. Fresno County CP4?emora 11/06/2024 PW Design RJE ae; xM� 694"t• e- 0L■*gL •*x#m. �nn . ❑m.■❑ ��. r❑❑■ � V�or o .F�6 i�� ate[�� ruts . www.caIvaIleyconstruction.com