EAST REEDLEY BRIDGE REPLACEMENTS CHANGE ORDER NO. 1
REEDLEY MAIN CANAL BRIDGE REPLACEMENT ON ENGLEHART DECEMBER 5, 2024
AVENUE: BRLO-5942(239) PAGE 1 OF 2
TRAVERS CREEK BRIDGE REPLACEMENT ON LINCOLN AVENUE:
BRLO-5942(226)
TRAVERS CREEK BRIDGE REPLACEMENT ON PARLIER AVENUE:
BRLO-5942(227)
CONTRACT NO. 24-07-C
TO: CAL VALLEY CONSTRUCTION, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time.
INCREASE BID ITEM NO. 120 QUANTITY AT THE UNIT BID PRICE
This quantity increase was requested by the contractor.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, increase
Bid Item No. 120, Rock Slope Protection (3001b, Class IV, Method B) quantity by 91 cubic yards to
correct the discrepancy between the estimated quantity in the bid proposal (Specifications) and actual
areas shown on the Project Plans. The correction was addressed in RFI (Request for Information) No.
6, attached. Payment for the increased quantity will be made at the unit bid price according to Section
9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in a
$54,600 increase.
Increased Item(s):
Item Total Total
No. Description Unit Quantity Price Amount (%) (°�
120 Rock Slope Protection (3001b, Class CY 91.00 $600.00 $54,600.00 227.50 227.50
IV, Method B)
TOTAL INCREASE: $54,600.00
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is
Auditor approved,that we will provide all equipment,furnish all materials, except as may otherwise be noted above,
Business Office and perform all services necessary for the work above specified,and will accept as full payment therefore the
_Board of Supervisors
_Const.Management prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
EAST REEDLEY BRIDGE REPLACEMENTS CHANGE ORDER NO. 1
REEDLEY MAIN CANAL BRIDGE REPLACEMENT ON ENGLEHART DECEMBER 5, 2024
AVENUE: BRLO-5942(239) PAGE 2 OF 2
TRAVERS CREEK BRIDGE REPLACEMENT ON LINCOLN AVENUE:
BRLO-5942(226)
TRAVERS CREEK BRIDGE REPLACEMENT ON PARLIER AVENUE:
BRLO-5942(227)
CONTRACT NO. 24-07-C
NET COST THIS CHANGE ORDER: $54,600.00 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
Robert Hendrickson, Resident Engineer
APPROVAL RECOMMENDED:
Cal Valley Construction, Inc.
Contractor Mandeep S. Sekhon, PE
Construction Engineer
CG���s G�i�tr�t
By Chris Grimm(Dec 9,202414:23 PST) APPROVED BY:
Digly
signed
Bernard Bernard J me ezy
Title Operations Manager Jimenez Date:2024.12.10
12:56:35-08'00'
Steven E. White, Director
Accepted Date:
Dec 9 2024 Public Works and Planning
�
Date:
Contractor We,the above signed contractor, have considered the change proposed and hereby agree,if this proposal is
Auditor approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above,
_Business Office and perform all services necessary for the work above specified,and will accept as full payment therefore the
Board of Supervisors
_Const.Management prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
General Engineering♦Commercial&Residential Gj4(L �Ln—E } Heavy Equipment Rental.Grading&Paving
Certified♦UDBE♦WBE CONSTRUCTION License#873800
REQUEST FOR INFORMATION#6 10/28/2024
Robert Hendrickson
Resident Engineer
County of Fresno
Sent Via: E-Mail
Project: 24-07-C East Reedley Bridge Replacements
Project Number: 241213
Re: 3001b, Class IV RSP
From: Ryan Douglas
QUESTION:
RFI from Cal Valley Construction... Bid item 120 calls for 40 CY of Class IV Rock Slope Protection.
Sheet No. 34 of the plan set scales at 131 CY. Please confirm quantity to be installed.
By: Ryan Douglas
RESPONSE: 131 CY of Class IV Rock Slope Protection is the correct amount.
Fresno County CP4?emora 11/06/2024