HomeMy WebLinkAbout2001C CCO 09.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER SAND CREEK BRIDGE REPLACEMENT ON ENNIS ROAD CHANGE ORDER NO. 9 BRIDGE NO. 42CO697 DECEMBER 3, 2024 FEDERAL PROJECT NUMBER: BRLO-5942(238) PAGE 1 OF 2 CONTRACT NO. 20-01-C TO: AGEE CONSTRUCTION CORPORATION: Make the following changes to the plans and specifications or do work not included in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. ASSESS PENALTY (PARTIAL) IMPOSED BY ARMY CORPS OF ENGINEERS This compensation adjustment (penalty assessment) was proposed by the engineer. In accordance with Section 7-1.02A, "General," of the Standard Specifications, adjust compensation to assess penalty (partial) imposed by the Army Corps of Engineers (Army Corps) due to the additional rocks placed in the creek at the project site. Total penalty assessed by the Army Corps was $271,785, for an additional 7,024 square feet of areas of impact. However, the rock slope limits were not clearly identified on the plans, therefore, the contractor is being held responsible only for a portion of the total penalty, for areas of impact outside the right-of-way, totaling 1,265 square feet. The contractor's portion of the penalty resulted in $48,963.82, see attached Exhibit A for details. This amount will be deducted from the retention amount. This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and fling a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER SAND CREEK BRIDGE REPLACEMENT ON ENNIS ROAD CHANGE ORDER NO. 9 BRIDGE NO. 42CO697 DECEMBER 3, 2024 FEDERAL PROJECT NUMBER: BRLO-5942(238) PAGE 2 OF 2 CONTRACT NO. 20-01-C NET COST THIS CHANGE ORDER: $48,963.82 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS James Drews, Resident Engineer APPROVAL RECOMMENDED: AGEE CONSTRUCTION CORPORATION 045.�. Contractor Mandeep S. Sekhon, PE Construction Engineer By APPROVED BY: Bernard Digitally signed by Chief Estimator Bernard Jimenez Jimenez 09:26: 0-08'006 Title 09:26:30-08'00' Steven E. White, Director Dec 5 2024 Public Works and Planning Accepted Date: , Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be _Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. oA CCO 09 - Exhibit A � AMOUNT OF ADDED RSP \ OUTSIDE OF COUNTY ROW ROW LINE ROW LINE 37 3 - \ N Z LEGEND ` N XDf ROW LINE ADDITIONAL RSP =0.16 ac or 7,024 sq ft O \ ACB MATS \ ADDITIONAL RSP OUTSIDE OF ROW = 0.03 ac or 1,265 sq ft ❑ ❑ ❑ ❑ ❑aa❑ ❑ Total Penalty = $271,875.00 o 0 0 0 0 \ ❑ ❑ ❑ ❑ ❑ ❑ Contractor's Portion = 1,265/7,024 x $271,875 ° ° 1-17 1-1J ❑ ❑ ❑ ❑ ❑ ❑ = $48,963.82 :7171-171-1 � , ° ° 1-171-171-17 77 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑� AX ❑ ❑ ❑� O ❑ ❑ ❑ ❑ W ❑ ❑ ❑ ❑ ❑ 00000 ' 15,q„ � � -pp 01 AMOUNT OF ADDED RSP x OUTSIDE OF COUNTY ROW � �O \ DEPARTMENT OF PUBLIC WORKS AND PLANNING ROW LINE SAND CREEK BRIDGE REPLACEMENT ON ENNIS RD 1 INCH = 40 FT. \� ADDITIONAL ROCK SLOPE PROTECTION MAP