HomeMy WebLinkAbout2326C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ARPA WATER METER REPLACEMENTS CHANGE ORDER NO. 2 CONTRACT NO. 23-26-C DECEMBER 4, 2024 PAGE 1 OF 6 TO: WEST VALLEY CONSTRUCTON, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline. PART I: INCREASE/DECREASE/ELIMINATE ITEMS AT UNIT BID PRICES This change was proposed by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, increase/decrease/eliminate items at the unit bid prices. These bid items are being adjusted per the actual field exploration. Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount 16 Water Meter Box Lid (1324) EA 1.00 $140.00 $140.00 20.00 20.00 Replacement 20 Water Meter Box Lid (139) EA 30.00 92.00 2,760.00 214.29 214.29 Replacement 24 Water Meter Box Lid (139) EA 3.00 92.00 276.00 15.00 15.00 Replacement 28 Water Meter Box Lid (139) EA 25.00 87.00 2,175.00 125.00 125.00 Replacement 32 Install Endpoint Only EA 3.00 61.00 183.00 75.00 75.00 35 Water Meter Full Replacement w/ EA 10.00 1,700.00 17,000.00 500.00 500.00 Service Lateral (Detail 132) TOTAL INCREASES: $22,534.00 Decrease Items: Item Total TOTAL No. Description Unit Quantity Price Amount °� 8 Water Meter Box Lid (133) EA 1.00 $79.00 $79.00 (0.70) (0.70) Replacement 12 New Water Meter Box B3 With EA 1.00 480.00 480.00 (50.00) (50.00) Lid by Existing (1340) Box 15 Water Meter Box Lid (B16) EA 6.00 113.00 678.00 (15.38) (15.38) Replacement _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ARPA WATER METER REPLACEMENTS CHANGE ORDER NO. 2 CONTRACT NO. 23-26-C DECEMBER 4, 2024 PAGE 2OF6 25 Water Meter Box Lid (B24) EA 49.00 140.00 6,860.00 (98.00) (98.00) Replacement 29 Water Meter Box Lid (B24) EA 38.00 135.00 5,130.00 (80.85) (80.85) Replacement 31 Water Meter Box Lid (B 16) EA 11.00 108.00 1,188.00 (61.11) (61.11) Replacement 37 Water Meter Box Lid (B16) EA 1.00 108.00 108.00 (1.72) (1.72) Replacement 40 Water Meter Box Lid (B16) EA 3.00 108.00 324.00 (2.86) (2.86) Replacement 46 Water Meter Box Lid (B16) EA 1.00 108.00 108.00 (0.31) (0.31) Replacement 49 Water Meter Box Lid (B16) EA 1.00 108.00 108.00 (0.47) (0.47) Replacement 55 Water Meter Box Lid (B24) EA 12.00 135.00 1,620.00 (50.00) (50.00) Replacement 60 Water Meter Box Steel Lid EA 48.00 712.00 34,176.00 (94.12) (94.12) Retrofit or New Lid 63 Water Meter Box Lid (B9) EA 121.00 97.00 11,737.00 (57.62) (57.62) Replacement 64 Water Meter Box Lid (B24) EA 211.00 145.00 30,595.00 (26.38) (26.38) Replacement 70 Water Meter Box Lid (B16) EA 5.00 108.00 540.00 (4.00) (4.00) Replacement TOTAL DECREASES: $93,731.00 Eliminated Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/0) (°� 5 Water Meter Replacement EA 20.00 $120.00 $2,400.00 (100.00) (100.00) 6 Water Meter Box Replacement EA 100.00 465.00 46,500.00 (100.00) (100.00) 7 Water Meter Box Adjustment EA 200.00 250.00 50,000.00 (100.00) (100.00) to Grade 17 New Water Meter Box B3 with EA 1.00 520.00 520.00 (100.00) (100.00) Lid by Existing (B40) Box 21 Water Meter Box Lid (B24) EA 30.00 140.00 4,200.00 (100.00) (100.00) Replacement 33 Water Meter Retrofit EA 14.00 101.00 1,414.00 (100.00) (100.00) TOTAL DECREASE: $105,034.00 _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ARPA WATER METER REPLACEMENTS CHANGE ORDER NO. 2 CONTRACT NO. 23-26-C DECEMBER 4, 2024 PAGE 3OF6 This change did not impact the critical path for the project, so granting additional contract time was not warranted. TOTAL COST PART I: $176,231.00 DECREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: INSTALL ADDITIONAL/ALTERNATIVE ITEMS— EXTRA WORK These additional/alternative items were requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install additional/alternative items as extra work at the pertaining County Service Areas (CSA) as shown below. Perform all work according to the Standard Specifications, Special Provisions, and/or manufacturer's recommendation, as directed by the engineer. Compensation for these items will be made at the agreed unit prices shown below, in accordance with Section 9-1.03, "Payment Scope," of the Special Provisions. Additional/Alternative Items: CSA 39AB Item Total No. Description Unit Quantity Unit Price Amount 8A Water Meter Box Lid (B16) EA 1.00 $108.00 $108.00 Replacement 88 Water Meter Box (1316) EA 1.00 465.00 465.00 Replacement CSA 43W 12A Water Meter Box Lid (B24) EA 1.00 145.00 145.00 Replacement CSA 49 16A Water Meter Box (B24) EA 1.00 550.00 550.00 Replacement 16B Water Meter Box Lid (1336) EA 6.00 225.29 1,351.74 Replacement 16C Water Meter Box (1336) EA 3.00 509.96 1,529.88 Replacement Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ARPA WATER METER REPLACEMENTS CHANGE ORDER NO. 2 CONTRACT NO. 23-26-C DECEMBER 4, 2024 PAGE 4 OF 6 CSA WWD40 25A Water Meter Box Lid (B36) EA 1.00 225.29 225.29 Replacement 25B Water Meter Box Lid (B30) EA 38.00 153.15 5,819.70 Replacement CSA WWD38 28A Water Meter Box Lid (B16) EA 8.00 108.00 864.00 Replacement 28B Water Meter Box (1316) EA 3.00 465.00 1,395.00 Replacement 28C Water Meter Box Lid (133) EA 1.00 79.00 79.00 Replacement 28D Water Meter Box (133) EA 1.00 448.63 448.63 Replacement 28E Water Meter Box Lid (B36) EA 1.00 225.29 225.29 Replacement 28F Water Meter Box (B36) EA 1.00 509.96 509.96 Replacement 28G Water Meter Box Lid (1330) EA 2.00 153.15 306.30 Replacement CSA 10 33A Water Meter Box (B16) EA 7.00 465.00 3,255.00 Replacement CSA 10A 37A Water Meter Box Lid (1330) EA 1.00 153.15 153.15 Replacement CSA 34A 40A Water Meter Box Lid (139) EA 1.00 87.00 87.00 Replacement 40B Water Meter Box Lid (1330) EA 1.00 153.15 153.15 Replacement 40C Water Meter Box Lid (B36) EA 1.00 225.29 225.29 Replacement _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ARPA WATER METER REPLACEMENTS CHANGE ORDER NO. 2 CONTRACT NO. 23-26-C DECEMBER 4, 2024 PAGE 5OF6 CSA 34B 43A Water Meter Box Lid (B36) EA 3.00 225.29 675.87 Replacement CSA 34C 46A Water Meter Box Lid (B30) EA 1.00 153.15 153.15 Replacement CSA 34D 49A Water Meter Box Lid (1336) EA 1.00 225.29 225.29 Replacement CSA 47 60A B1017 Lid Submittal 11.1 EA 36.00 712.00 25,632.00 CSA 31 C-G &WWD41 64A Water Meter Box Lid (1316) EA 27.00 108.00 2,916.00 Replacement 64B Water Meter Box (B16) EA 1.00 465.00 465.00 Replacement 64C Water Meter Box Lid (133) EA 2.00 79.00 158.00 Replacement 64D Water Meter Box (133) EA 2.00 448.63 897.26 Replacement 64E Water Meter Box (1324) EA 93.00 550.00 51,150.00 Replacement 64F Water Meter Box Lid (B36) EA 2.00 225.29 450.58 Replacement 64G Water Meter Box (B36) EA 1.00 509.96 509.96 Replacement 64H Water Meter Box Lid (1330) EA 4.00 153.15 612.60 Replacement 641 Bid Item No. 60 (Water EA 2.00 712.00 1,424.00 Meter Box Steel Lid Retrofit or New Lid) 64J B1017 Box EA 1.00 712.00 712.00 CSA 44D 70A Water Meter Box Lid (B9) EA 3.00 92.00 276.00 Replacement 70B New B1017 (Sub 11.1) EA 1.00 712.00 712.00 70C Retro Lid or Fiberglass Rod EA 1.00 712.00 712.00 in Existing Box 70D Water Meter Box (1316) EA 1.00 465.00 465.00 Replacement _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ARPA WATER METER REPLACEMENTS CHANGE ORDER NO. 2 CONTRACT NO. 23-26-C DECEMBER 4, 2024 PAGE 6OF6 TOTAL INCREASES: $106,043.09 This change did not impact the critical path for the project, so granting additional contract time was not warranted. TOTAL COST PART II: $106,043.09 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS NET COST THIS CHANGE ORDER: $70,187.91 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: West Vallev Construction, Inc. ki - ll 'S'�a Contractor Mandeep S. Sekhon, PE Construction Engineer By Ix 9p�'� APPROVED BY: C} `/�' } Digitally signed by Steve White -Title Assistant Vice President Steve �f hite 6tte:205:342.12.04 Steven E. White, Director Dec 4 2024 Public Works and Planning Accepted Date: , Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.