HomeMy WebLinkAbout24-13-C Executed Contract.pdf SPECIFICATIONS
TRACTION RANCH MONITORING WELL
BUDGET / ACCOUNT: 4360 / 0300 / 7295
co
Dep
artment artment o Public Works and Planning
O� �O p f g
FR Ile,
S
CONTRACT NUMBER 24-13-C
TABLE OF CONTENTS
COVER SHEET
COUNTY ADOPTION AND ACKNOWLEDGMENT
Engineer's Signature
Consultant's Signature
NOTICE TO BIDDERS
SPECIAL PROVISIONS
PROJECT DETAILS / DRAWINGS
Location Map
Well Construction Detail
Self-Dealing Transactions Disclosure Form
BID BOOK
Bidder's Declaration
Bid Form
Abbreviations Used
Signature Page
Noncollusion Declaration
Public Contract Code
Subcontractor List
General Requirements for In-Use Off-Road Diesel-Fueled Fleets
Certifications
Guaranty
AGREEMENT
Contract Number 24-13-C
COUNTY ADOPTION AND ACKNOWLEDGEMENT
PROJECT: TRACTION RANCH MONITORING WELL
CONTRACT NUMBER: 24-13-C
Date Signed:
Steven E. White, Director
Department of Public Works and Planning
OFESS Date Signed:
0 P� /
�No. C76724 r
Exp.12131124
`�9TF a f VI L
F CALF
Supervising Engineer:
Sebastian Artal, PE 76724
FRESNO COUNTY
Department of Public Works and Planning
m/a 2220 Tulare Street, Suite 720
Fresno, CA 93721-2106
COUNTY ADOPTION AND ACKNOWLEDGEMENT
PROJECT: TRACTION RANCH MONITORING WELL
CONTRACT NUMBER: 24-13-C
SS\cjOL GFo Date Signed: 09/17/24
0
z
* No. 10177
��9TFOF CAL\�O���Q
Consultant Engineer:
Andrew Francis, #10177
Luhdorff and Scalmanini Consulting Engineers
500 First Street
Woodland, CA 95695
COUNTY OF FRESNO STATE OF CALIFORNIA
NOTICE TO BIDDERS
Sealed proposals will be received at:
https://www.bidexpress.com/businesses/36473/home
and at the Fresno County Department of Public Works and Planning (Department), Office of the
Design Engineer, Seventh Floor, Fresno County Plaza Building, 2220 Tulare Street, Fresno, CA
93721 until
2:00 P.M., (1400 hours and 00 seconds)
Thursday, October 10, 2024
If you have any questions about bid submission, please contact us at
Des ignServicesCa)fresnocountyca.gov or call (559) 353-4919 or (559) 600-4543.
Promptly following the closing of the bidding all timely submitted bids will be publicly opened and
viewable via a livestream (the link for which will be posted at
http://www.fresnocountyca.gov/planholders) for construction in accordance with the project
specifications therefor, to which special reference is made as follows:
TRACTION RANCH MONITORING WELL
CONTRACT NUMBER 24-13-C
The work to be done consists, in general, of initially drilling a test hole to a depth of approximately
580 feet to evaluate the lithologic character of subsurface formations and further conversion and
construction of a monitoring well with up to three piezometers installed and equipped with
appropriate centralizers as required by contract specifications.
This project is subject to the contracting requirements and implementing regulations as
amended in Title 13, Section 2449 General Requirements for In-Use Off-Road Diesel-Fueled
Fleets, of the California Code of Regulations (13 CCR § 2449(i)). Bidders must submit a valid
Certificate of Reported Compliance (CRC) issued by the California Air Resources Control
Board at the time of bidding. Bidders are responsible for submitting their listed
subcontractors' CRCs and any supporting documentation within five (5) calendar days of
bid opening. Failure to submit the required CRCs may render a bid non-responsive.
Bidders may fill out a Request to be Added to Planholders list:
https://www.fresnocountyca.gov/Departments/Public-Works-and-Planning/Construction-Bidding-
Opportunities/Request-to-Be-Added-to-the-Planholders-List-Form
Requesters will then be listed as a planholder for the project on the website and receive notifications
and addenda issued for the project.
Prospective bidders may also select the project on www.BidExpress.com. Those that demonstrate
interest in the project will be added to the planholders list, and receive notifications and addenda
issued for the project.
Planholder and exchange/publication names may be obtained from the Fresno County website at
http://www.fresnocountVca.gov/planholders.
Electronic copies, in ".pdf' file format, of the official project specifications, bid books and proposal
sheets, and such additional supplemental project information as may be provided, are available to
view, download, and print at http://www.fresnocountyca.gov/planholders.
If a bidder is unable to submit a bid via Bid Express, Bid Books, which contain bid proposal sheets
necessary to submit a bid, may be obtained within the Specifications documents posted on the
Fresno County website.
Electronic bids shall be submitted via the Bid Express website. Hardcopy bids shall be submitted in
a sealed envelope addressed to the Department and labeled with the name of the bidder, contract
number, name of the project, and the statement "Do Not Open Until The Time Of Bid Opening."
Bid security in the amount of ten (10) percent of the amount of the bid, and in the form of a bid bond
issued by an admitted surety insurer licensed by the California Department of Insurance, cash,
cashier's check or certified check shall accompany the bid. You must either attach an electronic bid
bond or provide an original bid bond (or other form of bid security authorized by Public Contract
Code section 20129(a)), prior to the bid opening. Bid security shall be made in favor of the County
of Fresno.
Hardcopy bid bonds shall be submitted in a sealed envelope addressed to the Department and
labeled with the name of the bidder, the name of the project and the statement "Do Not Open Until
The Time Of Bid Opening — BID BOND"
A Summary of Bids and a list of subcontractors for the apparent low bidder will be posted at the
above listed website, generally within 24 hours of the Bid Opening.
All questions regarding this project shall be in writing and shall be received by the Department of
Public Works and Planning, Design Division, no later than 2:00 P.M. on the seventh (7th) calendar
day before bid opening. Any questions received after this deadline will not receive a response
unless the Department of Public Works and Planning elects to issue an addendum to revise the bid
opening date. In the event that the bid opening date is revised, the deadline for questions will be
extended to no later than 2:00 P.M. on the seventh (7th) calendar day before the revised bid opening
date. Questions shall be submitted on the "Request for Clarification Form" provided on our website:
http://www.fresnocountyca.gov/Departments/Public-Works-and-Planning/Construction-Bidding-
0Pportunities/24-13-C-Traction-Ranch-Monitoring-Well/Request-for-Clarification-Form
Any changes to, or clarification of, the project plans and specifications shall be in the form of a
written addendum issued to planholders of record. Questions that prompt a change or clarification
shall be included in the addendum with the subsequent answer.
Any oral explanation or interpretations given to this project are not binding.
No contract will be awarded to a contractor who has not been licensed in accordance with the
provisions of the Contractors State License Law, California Business and Professions Code,
Division 3, Chapter 9, as amended, or whose bid is not on the proposal form included in the contract
document. A valid California Contractor's License, Class C-57 (Well Drilling), is required for this
project.
Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or
counties, in which the work is to be done have been determined by the Director of the California
Department of Industrial Relations. These wages are set forth in the General Prevailing Wage
Contract Number 24-13-C Notice to Bidders - 2
Rates for this project, available at County of Fresno, Department of Public Works and Planning,
2220 Tulare Street, Sixth Floor, Fresno CA 93721-2104 and available from the California
Department of Industrial Relations' Internet web site at http://www.dir.ca.gov/DLSR/PWD. Future
effective general prevailing wage rates, which have been predetermined and are on file with the
California Department of Industrial Relations are referenced but not printed in the general prevailing
wage rates.
This project is subject to compliance monitoring and enforcement by the Department of Industrial
Relations.
No contractor or subcontractor may be listed on a bid proposal for a public works project unless
registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with
limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project
unless registered with the Department of Industrial Relations pursuant to Labor Code section
1725.5.
This contract is subject to state contract nondiscrimination and compliance requirements pursuant
to Government Code section 12990.
Bids are required for the entire work described herein. Bids will be compared on the basis of the
cumulative sum of the bid amounts listed for the individual line items.
The successful bidder shall furnish a faithful performance bond in the amount of 100 percent of the
contract amount and a payment bond in the amount of 100 percent of the contract amount. Each
bond specified in this Notice (bid bond, faithful performance bond and payment bond) shall meet
the requirements of all applicable statutes, including but not limited to those specified in Public
Contract Code section 20129 and Civil Code section 3248.
Each bond specified in this Notice shall be issued by a surety company designated as an admitted
surety insurer in good standing with and authorized to transact business in this state by the
California Department of Insurance, and acceptable to the County of Fresno. Bidders are cautioned
that representations made by surety companies will be verified with the California Department of
Insurance. Additionally, the County of Fresno, in its discretion, when determining the sufficiency of
a proposed surety company, may require the surety company to provide additional information
supported by documentation. The County generally requires such information and documentation
whenever the proposed surety company has either a Best's Key Rating Guide of less than A and a
financial size designation of less than VIII. Provided, however, that the County expressly reserves
its right to require all information and documentation to which the County is legally entitled from any
proposed surety company.
Pursuant to Public Contract Code section 22300, substitution of securities for any moneys withheld
by the County of Fresno to ensure performance under the contract shall be permitted.
The Department of Public Works and Planning reserves the right to reject any or all bids.
Department of Public Works and Planning, County of Fresno
Issue Date: September 17, 2024
Contract Number 24-13-C Notice to Bidders - 3
Special Provisions
Contract Number 24-13-C
DIVISION I GENERAL PROVISIONS
1 GENERAL
1-1.01 GENERAL
Add to the beginning of Section 1:
The work is done in accordance with the 2023 Standard Specifications, 2023 Standard Plans and the
following special provisions.
Where these special provisions indicate to replace, add to, delete, delete from, or otherwise modify a
"section," or a portion thereof, the section or portion thereof to which such modification is to be applied is
the section or portion thereof with the corresponding numbering in the 2023 Standard Specifications.
Revised standard plans apply if listed on the "List of Revised Standard Plans," if any, in these special
provisions; or if shown or referenced on the project plans or in the project details section of the book
entitled "Specifications."
In case of conflict between the Standard Specifications and these special provisions, the special
provisions shall take precedence over and be used in lieu of such conflicting portions.
Add to the end of section 1-1.01:
Bid Items and Applicable Sections
REFER TO SECTION 1.2 OF THE TECHNICAL SPECIFICATIONS FOR BID ITEMS EXPLANATION
Add to the 1st table of section 1-1.06:
SJVAPCD San Joaquin Valley air pollution control district
METS Caltrans Material Engineering and Testing Services
Add to section 1-1.06:
Abbreviations in the Bid Items and Applicable Sections are also used in the Bid Item List- Proposal 2.
Add or Replace items in Section 1-1.07 with:
Authorized Facility Audit List: Caltrans-developed list of facilities. For the Authorized Facility Audit List,
go the METS website.
Authorized Material List: Caltrans-developed list of authorized materials. For the Authorized Material
List go to the METS website.
Authorized Material Source List: Caltrans-developed list of authorized source materials. For the
Authorized Material Source List go to the METS website.
Bid Item List: List of bid items, units of measure, and the associated quantities. The verified Bid Item List
is the Bid Item List with verified prices. The Contract Proposal (Proposal 2)of Low Bidder at the
Department's website is the verified Bid Item List. After contract award, interpret a reference to the
Bid Item List as a reference to the verified Bid Item List.
Caltrans: State of California Department of Transportation
County: The County of Fresno
Department: The Fresno County Board of Supervisors and its authorized representatives.
District Office: County of Fresno Department of Public Works and Planning
Director: Department's Chairman
2
Engineer: The County's Director of Public Works and Planning, acting through their authorized
designees.
federal-aid contract: Contract that has a federal-aid project number on the cover of the Specifications.
holiday: Holiday shown in the following table:
Holidays
Holiday Date observed
Every Sunday Every Sunda
New Year's Day January 1It
Birthday of Martin Luther King, Jr. 3rd Monday in January
Presidents' Day 3rd Monday in February
Cesar Chavez Day March 3111
Memorial Day Last Monday in May
Juneteenth June 191n
Independence Day July 4tn
Labor Day 1st Monday in September
Veterans Day November 11tn
Thanksgiving Day 4th Thursday in November
Day after Thanksgiving Day DaV after Thanksgiving Da
Christmas Day December 25tn
If January 1st, March 31st, June 19th, July 4th, November 11th, or December 25th fall on a Sunday, the
Monday following is a holiday. If January 1st, March 31st, July 4th, November 11th, or December 25th fall
on a Saturday, the preceding Friday is a holiday.
Office engineer: The Director of Public Works and Planning for the County of Fresno
permanent erosion control establishment period: Number of working days shown in Section 8-1.04 for
permanent erosion control establishment work.
plans: Standard plans, revised standard plans, and project plans.
1. standard plans: Drawings standard to Department construction projects. These plans are in a
book titled Standard Plans.
2. revised standard plans: New or revised standard plans. These plans are listed in the List of
Revised Standard Plans in a book titled Specifications.
3. project plans: Drawings specific to the project, including authorized shop drawings. These plans
also include a section titled Project Details of a book titled Specifications.
specifications: Standard specifications, revised standard specifications, and special provisions.
1. standard specifications: Specifications standard to Department construction projects. These
specifications are in a book titled Standard Specifications.
2. special provisions: Specifications specific to the project. These specifications are in a section
titled Special Provisions of a book titled Specifications.
Replace Section 1-1.08 with:
1-1.08 DISTRICTS
Not Used
Add to the end of Section 1-1.09
This project is not in a freeze-thaw area.
3
Replace Section 1-1.10 with:
1-1.10 PAVEMENT CLIMATE REGIONS
To help account for the effects of various climatic conditions on pavement performance, the State has
been divided into 9 climate regions.
Replace Section 1-1.11 with:
1-1.11 WEBSITES, ADDRESSES, AND TELEPHONE NUMBERS
4
Websites, Addresses, and Telephone Numbers
Reference or
agency or
department unit Website Address Telephone no.
Authorized https://dot.ca.gov/program
Material Lists s/engineering=
Authorized services/authorized-
Material Source materials-lists
Lists
CA Unified
Certification https:Hcaliforniaucp.dbesy
Program's list of stem.com/
certified DBEs
California https://dot.ca.gov/program
MUTCD s/safety- -- --
ro rams/camutcd
https://www.fresnocountyc 2220 Tulare Street
Department Design Division—Seventh Floor (559) 600-9908
a.g°V Fresno, CA 93721
Department of
Conservation, http://www.conservation.c
Office of Mine a.gov/dmr/
Reclamation
Department of 455 Golden Gate Ave
Industrial http://www.dir.ca.gov San Francisco CA 94102 --
Relations
Design Tel: (559) 353-
Services - 4919
Contract http2220 Tulare Street Fax:(559)455-
Administration, a.gov/plan
ountyc Design Division—Seventh Floor 4609 Email:
Planholders, a.gov/planholders Fresno, CA 93721 DesignServices(@
Bid Results fresnocountyca.g
ov
Division of Major Construction Payment and
Accounting, Information Unit
Office of https://dot.ca.gov/program Office of External Accounts Payable
External s/accounting Division of Accounting (916) 227-9013
Accounts Department of Transportation
Payable P.O. Box 168043
Sacramento, CA 95816-8043
Division of http://www.dot.ca.gov/hq/c
Construction onstruc/
Geotechnical Services
Geotechnical https://dot.ca.gov/program Department of Transportation (916) 227-7000
Services s/engineering-services 5900 Folsom Blvd
Sacramento, CA 95819-4612
Materials Engineering and Testing
https://dot.ca.aov/program Services
METS s/engineering-services Department of Transportation (916) 227-7000
5900 Folsom Blvd
Sacramento, CA 95819-4612
https://dot.ca.gov/program
MPQP s/construction/material- -- --
lant- ua I ity-prog ram
5
Director of Public Works & Planning
Office Engineer __ Fresno County �h (559) 600-4078
2220 Tulare St, 8 Floor
Fresno, CA 93721
Office of
Electrical Office of Electrical Systems Regional
Systems Transportation Management Center
Regional -- 3165 Gold Valley Dr
Transportation Rancho Cordova, CA 95742
Management
Center
MSC 9-4/41
Offices of Documents Unit Offices of Structure
Structure Design
Design, Department of Transportation (916) 227-0716
Documents Unit 1801 30th St
Sacramento, CA 95816-7006
Publication Unit
Publication Department of Transportation
Distribution Unit 1900 Royal Oaks Dr
Sacramento, CA 95815-3800
Replace Section 1-1.12 with:
1-1.12 MISCELLANY
Make checks and bonds payable to the County of Fresno.
2 BIDDING
2-1.01 GENERAL
Section 2 includes specifications related to bid eligibility and the bidding process.
2-1.02 BID INELIGIBILITY
A firm that has provided architectural or engineering services to the Department for this contract before
bid submittal for this contract is prohibited from any of the following:
1. Submitting a bid
2. Subcontracting for a part of the work
3. Supplying materials
2-1.03 CONTRACTOR REGISTRATION
No contractor or subcontractor may be listed on a bid proposal for a public works project unless
registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited
exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
Replace Section 2-1.04 with:
2-1.04 PREBID OUTREACH MEETING
Section 2-1.04 applies if a mandatory prebid meeting is shown on the Notice to Bidders.
The Department may conduct a meeting to provide access to the site and/or discuss the project in the
presence of County staff.
6
Each bidder must attend the meeting. The bidder's representative must be a company officer, project
superintendent, or project estimator. For a joint venture, one of the parties must attend the mandatory
prebid meeting.
The Department does not accept a bid from a bidder who did not attend the meeting.
A sign-in will be used to identify the attendees. Each bidder must include the name and title of the
company representative attending the meeting.
The Department may hold a single prebid meeting for more than one contract. Sign in for the contract you
intend to bid on. If you are bidding on multiple contracts, sign-in for each contract you intend to bid on.
The sign-in lists, with the names of all companies in attendance at each prebid meeting, will be made
available at the website shown on the Notice to Bidders for bidder inquiries.
Replace Section 2-1.06 with:
2-1.06 BID DOCUMENTS
2-1.06A General
The Bid book includes bid forms and certifications and may be requested from Design Services and are
available online at http://www.BidExpress.com.
The Specifications includes the Notice to Bidders, project details, and special provisions.
The Specifications, project plans, and any addenda to these documents may be accessed at the
planholders website at https://www.fresnocountyca.gov/pIanholders.
The Standard Specifications and Standard Plans may be accessed online at 2015 Caltrans Standard
Specifications and 2023 Caltrans Standard Specifications
2-1.06B Supplemental Project Information
The Department makes the following supplemental project information available:
Supplemental Project Information
Where Available Description
Included in Project Details Location Map
• Well Construction Detail
If as-built drawings are available, they may not show existing dimensions and conditions. Where new
construction dimensions are dependent on existing bridge dimensions, verify the field dimensions and
adjust the dimensions of the work to fit the existing conditions.
7
Replace Section 2-1.12 with:
2-1.12 RESERVED
Replace Section 2-1.15 with:
2-1.15 RESERVED
Replace Section 2-1.18 with:
2-1.18 RESERVED
Replace Section 2-1.27 with:
2-1.27 RESERVED
Replace Section 2-1.33 with:
2-1.33 BID DOCUMENT COMPLETION AND SUBMITTAL
2-1.33A General
Complete forms in the Bid book.
Certain bid forms must be submitted with the bid and properly executed.
Certain other forms and information must be submitted either with the bid or within the prescribed period
after bid opening as specified elsewhere in these special provisions.
Failure to submit the forms and information as specified results in a nonresponsive bid.
If an agent other than the authorized corporation officer or a partnership member signs the bid, file a
Power of Attorney with the Department either before opening bids or with the bid. Otherwise, the bid may
be nonresponsive.
Electronic Bids: Complete and submit the bid online at http://www.BidExpress.com (Section 2-1.33). Your
electronic signature is your confirmation of and agreement to all certifications and statements contained in
the Bid book. On forms and certifications that you submit through the electronic bidding service, you
agree that each form and certification where a signature is required is deemed as having your signature.
Hardcopy Bid: Submit a hardcopy bid:
1. Under sealed cover
2. Marked as a bid
3. Identifying the contract number and the bid opening date
4. Use ink or typewriter
2-1.33B Bid Item List and Bid Comparison
Submit a bid based on the bid item quantities the Department shows on the Bid Item List(Proposal 2).
Bids will be evaluated and the low bidder determined as indicated in the Notice to Bidders.
Do not submit an unbalanced bid. An unbalanced is a bid is one in which one or more bid items is/are
considered by the Department to have been bid at an amount that is unreasonably high or unreasonably
low. A bid may be considered to be non-responsive and may be rejected if it is considered by the
Department to be unbalanced.
2-1.33C Bid Document Completion
Proposal items are identified by title and by the word "Proposal"followed by the number assigned to the
proposal item in question. Proposal items are included in the Bid Book.
8
2-1.33C(1) Proposal 1 - Proposal to the County of Fresno
2-1.33C(2) Proposal 2 - Bid Item List
One or more sheet(s) or list(s) upon which the bidder completes the bid.
Fill out completely including a unit price and total for each unit price-based item and a total for each lump
sum item.
Do not make any additions such as "plus tax", "plus freight", or conditions such as "less 2% if paid by
15th".
Use ink or typewriter for paper bids.
2-1.33C(3) Proposal 3 - Evaluation of Bid Item List
Describes how inconsistences and irregularities are evaluated and corrected when Design Services
reviews the Bid Item List.
2-1.33C(4) Proposal 4 - Bid Security and Signature
Submit one of the following forms of bidder's security equal to at least 10 percent of the bid:
• Cash
• Cashier's check
• Certified check
• Signed bidder's bond by an admitted surety insurer
Indicate type of bid security provided.
• Cash—Acceptable but not recommended. Cash is deposited in a clearing account and is
returned to bidders by County warrant. This process may take several weeks.
• Cashier's or Certified Checks. This type of security is held until the bid is no longer under
consideration. If submitted by a potential awardee, they will be returned when the contract is fully
executed by the bidder and bonds and insurance have been approved.
• Bid Bonds - Must be signed by the bidder and by the attorney-in-fact for the bonding company.
Provide notarized signature of attorney-in-fact accompanied by bonding company's affidavit
authorizing attorney-in-fact to execute bonds. An unsigned bid bond will be cause for rejection.
Bonding companies may provide their own bid bond forms. Bid Security and Signature sections must be
completed by the bidder and submitted with their bid.
Provide contractor's license information.
State business name and if business is a:
• Corporation - list officers
• Partnership - list partners
• Joint Venture- list members; if members are corporations or partnerships, list their officers or
partners.
• Individual - list Owner's name and firm name style
Signature of Bidder-the following lists types of companies and corresponding authorized signers.
• Corporation - by an officer
• Partnership - by a partner
• Joint Venture- by a member
• Individual - by the Owner
9
If signature is by a Branch Manager, Estimator, Agent, etc., the bid must be accompanied by a power of
attorney authorizing the individual to sign the bid in question or to sign bids more generally, otherwise the
bid may be rejected.
Business Address- Firm's Street Address
Mailing Address- P.O. Box or Street Address
Complete, sign, and return with bid.
2-1.33C(5) Proposal 5 - Noncollusion Declaration
Must be completed, signed, and returned with bid.
2-1.33C(6) Proposal 6 - Public Contract Code Section 10285.1 Statement
Select"has" or"has not" in accordance with instructions on form, return with completed for with bid. Note
that signing the bid constitutes signing this statement.
2-1.33C(7) Proposal 7 - Public Contract Code Section 10162 Questionnaire And Public Contract
Code 10232 Statement
Select: "yes" or"no" accordance with instructions on form, include explanation if"yes" is selected. Return
completed form with bid. Note that signing the bid constitutes signing this questionnaire and statement.
2-1.33C(8) Proposal 8 -Subcontractors
Sheet(s)or spaces where bidders list subcontractors. List each subcontractor to perform work in an
amount in excess of 1/2 of 1 percent of the total bid (Pub Cont Code §4100 et seq.).
The Subcontractor List submitted with the bid must show the name, location of business, work portions to
be performed, and the contractor's license number for each subcontractor listed.
• Use subcontractor's business name style as registered with the License Board.
• Specify the city in which the subcontractor's business is located and the state if other than
California.
• Description of the work to be performed by the subcontractor. Indicate with bid item numbers
from the bid item list and/or work descriptions similar to those on bid item list.
• List license number and Department of Industrial Relations registration number for each
subcontractor.
Upon request from Design Services, provide the following additional information within 24 hours of bid
opening if not included on the Subcontractor List submitted with the bid:
• Complete physical address for each subcontractor listed.
• Percentage of the total bid or dollar amount associated with each subcontractor listed.
2-1.33C(18) Proposal 9 -Title 13, California Code of Regulations §2449(i) General Requirements
for In-Use Off-Road Diesel-Fueled Fleets
Contractors, if applicable, must submit valid Certificates of Reported Compliance with their bid.
Subcontractor certificates will be due no later than 4:00 p.m. on the fifth (5th) calendar day after the bid
opening if not submitted with the bid.
Proposal 10-18— Not used
10
2-1.33C(17) Proposal 19 - Guaranty
Does not need to be signed with the bid. Part of the contract which must be signed by the contractor
when contract is executed.
2-1.33D Electronic Bid Document Completion
Electronic versions of the bid book documents are available online at http://www.BidExpress.com, and
may be submitted through that website.
You must either attach an electronic bid bond or provide an original bid bond (or other form of bid security
authorized by Public Contract Code Section 20129(a)), prior to the bid opening.
Bidders submitting online may use one of the accepted electronic sureties (SurePath or Tinubu)to submit
their bid bond; or may submit cash, cashier's check, certified check, or a bidder bond to Design Services
at 2220 Tulare St., Seventh Floor, Fresno, CA 93721. Those submitting bid bonds directly to Design
Services must submit their bid bond:
1. Under sealed cover
2. Marked as a bid-bond
3. Identifying the contract number and the bid opening date on the cover
Replace Section 2-1.34 with:
2-1.34 BIDDER'S SECURITY
Submit one of the following forms of bidder's security equal to at least 10 percent of the bid:
1. Cash
2. Cashier's check
3. Certified check
4. Signed bidder's bond by an admitted surety insurer
Submit cash, cashier's check, certified check, or bidder's bond with your bid.
Replace Section 2-1.40 with:
2-1.40 BID WITHDRAWAL
1. An authorized agent may withdraw a bid before the bid opening date and time by submitting a written
bid withdrawal request at the location where the bid was submitted. Withdrawing a bid does not
prevent you from submitting a new bid. An authorized agent is an individual authorized to submit a
bid.
2. After the bid opening time, you cannot withdraw a bid.
2-1.41-2-1.42 RESERVED
2-1.43 BID OPENING
The Department publicly opens and reads bids at the time and place shown on the Notice to Bidders.
2-1.44-2-1.45 RESERVED
2-1.46 DEPARTMENT'S DECISION ON BID
The Department's decision on the bid amount is final.
The Department may reject:
1. All bids
2. A nonresponsive bid
11
Replace Section 2-1.47 with:
2-1.47 BID RELIEF
The Department may grant bid relief under Pub Cont Code § 5100 et seq. Submit any request for bid
relief via email to Design Services at the address listed in the table in Section 1-1.11.
Add Section 2-1.51:
2-1.51 DISCLOSURE OF SELF-DEALING TRANSACTIONS
This provision is only applicable if the contractor is operating as a corporation (a for-profit or non-profit
corporation) or if during the term of this agreement, the contractor changes its status to operate as a
corporation.
Members of the contractor's Board of Directors shall disclose any self-dealing transactions that they are a
party to while contractor is providing goods or performing services under this agreement. A self-dealing
transaction shall mean a transaction to which the contractor is a party and in which one or more of its
directors has a material financial interest. Members of the Board of Directors shall disclose any self-
dealing transactions that they are a party to by completing and signing a Self-Dealing Transaction
Disclosure Form which is included in Project Details of these special provisions.
In the event that the Contractor(to whom the project is awarded) is operating as a corporation or
incorporates during the course of the construction contract, and any member of its board of directors is
engaged or intends to become engaged in self-dealing transaction(s), each member of its board of
directors who is engaged or intends to become engaged in a self-dealing transaction or transactions must
complete and submit to the County a completed Self-Dealing Transaction Disclosure Form (in Project
Details)for each such transaction prior to engaging therein or immediately thereafter.
3 CONTRACT AWARD AND EXECUTION
Replace Section 3 with:
3-1.01 GENERAL
Section 3 includes specifications related to contract award and execution.
3-1.02 CONSIDERATION OF BIDS
3-1.02A General
Bids will be compared on the basis listed in the Notice to Bidders.
3-1.02B Tied Bids
The Department breaks a tied bid with a coin toss.
3-1.03 CONTRACTOR REGISTRATION
No contractor or subcontractor may be awarded a contract for public work on a public works project
(awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant
to Labor Code section 1725.5.
3-1.04 CONTRACT AWARD
3-1.04A BID PROTEST PROCEDURES
Any bid protest must be submitted in writing and delivered by the Bidder by either of the following means:
(1)via e-mail to DesignServices(a�-fresnocountyca.gov; or(2)via certified mail, return receipt requested to
the following address: Design Division, Department of Public Works and Planning, 2220 Tulare Street,
Sixth Floor, Fresno, CA 93721.
The bid protest must be received no later than 5:00 p.m. of the seventh (711) calendar day following
the bid opening for any issues found within the bid itself, or 5:00 p.m. of the third (3rd) calendar day
following the deadline for submittal of the specific bid document(s) placed at issue by the protest.
Any Bidder filing a protest is encouraged to submit the bid protest via e-mail, because the deadline is
12
based on the Department's receipt of the bid protest. A bid protest accordingly may be rejected as
untimely if it is not received by the deadline, regardless of the date on which it was postmarked. The
Bidder's compliance with the following additional procedures also is mandatory:
a. The initial protest document shall contain a complete statement of the grounds for the protest,
including a detailed statement of the factual basis and any supporting legal authority.
b. The protest shall identify and address the specific portion of the document(s)forming the basis for
the protest.
c. The protest shall include the name, address and telephone number of the person representing
the protesting party.
d. The Department will provide a copy of the initial protest document and any attached
documentation to all other Bidders or proposers who appear to have a reasonable prospect of
receiving an award depending upon the outcome of the protest.
e. The Board of Supervisors will issue a decision on the protest. If the Board of Supervisors
determines that a protest is frivolous, the party originating the protest may be determined to be
irresponsible and that party may be determined to be ineligible for future contract awards.
f. The procedure and time limits set forth herein are mandatory and are the Bidder's sole and
exclusive remedy in the event of a bid protest. Failure by the Bidder to comply with these
procedures shall constitute a waiver of any right to further pursue the bid protest, including the
subsequent filing of a Government Code Claim or legal proceedings.
3-1.04B AWARD PERIOD
If the Department awards the contract, the award is made to the lowest responsible bidder within 54
calendar days after bid opening.
The Department may extend the specified award period if the bidder agrees.
You may request to extend the award period by faxing a request to Design Services before 4:00 p.m. on
or before the last day of the award period. If you do not make this request, after the specified award
period:
1. Your bid becomes invalid
2. You are not eligible for the award of the contract
3-1.05 CONTRACT BONDS (PUB CONT CODE §§ 10221 AND 10222)
The successful bidder must furnish 2 bonds conforming to the requirements in the Agreement of these
special provisions.
3-1.06 CONTRACTOR LICENSE
For a federal-aid contract, the Contractor must be properly licensed as a contractor from contract award
through Contract acceptance (Pub Cont Code § 10164).
For a non-federal-aid contract:
1. Contractor must be properly licensed as a contractor from bid opening through Contract acceptance
(Bus & Prof Code § 7028.15)
2. Joint venture bidders must obtain a joint venture license before contract award (Bus & Prof Code §
7029.1)
13
3-1.07 INSURANCE POLICIES
The successful bidder must submit copies of its insurance policies conforming to the requirements in the
Agreement of these special provisions.
3-1.08—3-1.10 RESERVED
3-1.11 PAYEE DATA RECORD
Complete and deliver to the Engineer a Payee Data Record form when requested by the Engineer.
3-1.12 RESERVED
3-1.13 FORM FHWA-1273
For a federal-aid contract, form FHWA-1273 is included with the Contract form in the documents sent to
the successful bidder for execution. Comply with its provisions. Interpret the training and promotion
section as specified in section 7-1.11A.
3-1.14-3-1.17 RESERVED
3-1.18 CONTRACT EXECUTION
The successful bidder must sign the Agreement.
Deliver to Design Services:
1. Signed Agreement
2. Contract bonds
3. Documents identified in section 3-1.07
4. For a federal-aid contract, Local Agency Bidder-DBE Information form
Design Services must receive these documents before the 10th business day after the bidder receives
the contract.
The bidder's security may be forfeited for failure to execute the contract within the time specified (Pub
Cont Code §§ 10181, 10182, and 10183).
3-1.19 BIDDERS' SECURITIES
The Department keeps the securities of the 1st, 2nd, and 3rd low bidders until the contract has been
executed. The other bidders'securities, other than bidders' bonds, are returned upon determination of the
1 st, 2nd, and 3rd low bidders, and their bidders' bonds are of no further effect (Pub Cont Code § 10184).
4 SCOPE OF WORK
Replace Section 4-1.02 with:
4-1.02 INTENT
The Contract intent is to provide for work completion using the best general practices.
Nothing in the specifications, special provisions, Standard Specifications, or in any other Contract
document voids the Contractor's public safety responsibilities.
Replace Section 4-1.07D with:
4-1.07D Reserved
Replace the last paragraph of Section 4-1.13 with:
Remove warning, regulatory, and guide signs when directed by the Engineer.
14
5 CONTROL OF WORK
Delete the last paragraph of Section 5-1.01
Add the following before the last sentence in Section 5-1.02:
Caltrans Standard Plans, County of Fresno Standard Drawings, and any other other-agency Standard
Drawings included in the "Project Details"section of the book entitled "Specifications" have the same
ranking as Standard Plans."
All other drawings in the "Project Details" section of the book entitled "Specifications" have the same
ranking as Project Plans.
Tables and other documents in the "Project Details" section of the book entitled "Specifications" have the
same ranking as Special Provisions. If a portion of a document in the Project Details section conflicts with
the Special Provisions, the Special Provisions shall prevail.
Replace Section 5-1.09 with:
5-1.09 RESERVED
Replace Section 5-1.12 with:
5-1.12 ASSIGNMENT
The performance of the Contractor or any Contract part may be assigned only with prior written consent
from the Department. To request consent, submit a Contractor Action Request—Assignment of Contract
Performance form. The Department does not consent to any requested assignment that would relieve you
of your surety of the responsibility to complete the work or any part of the work. No third-party agreement
relieves you or your surety of the responsibility to complete the work. Do not sell, transfer, or otherwise
dispose of any Contract part without prior written consent from the Department.
If you assign the right to receive Contract payments, the Engineer accepts the assignment upon the
Engineer's receipt of a Contractor Action Request—Assignment of Contract Monies, Assignee Change of
Name/Address form. Assigned payments remain subject to deductions and withholds described in the
Contract. The Department may use withheld payments for work completion whether payments are
assigned or not.
A pending or disapproved request for assignment does not relieve you of the responsibility to commence
and pursue work timely and in strict accordance with contract documents.
Replace Section 5-1.13C with:
5-1.13C RESERVED
Replace Section 5-1.13D with:
5-1.13D RESERVED
Add the following paragraph to the end of section 5-1.16:
Submit Daily Log records to the Engineer weekly for the entire course of work unless the Engineer
requests another interval.
Replace Section 5-1.20B(4) with:
5-1.20B(4) Contractor—Property Owner Agreement
Before procuring material from or disposing or stockpiling of material on non-highway property:
1. Provide proof that the property where materials are to be stockpiled or equipment parked/stored
is appropriately zoned and/or permitted for the use proposed by the Contractor.
2. Obtain written authorization from each and every owner of the property where materials are to be
stockpiled or equipment parked/stored.
3. Provide proof that the signor(s) of the authorization are the owners of the property.
15
4. Provide an executed release from the property owner(s) absolving the Department from any and
all responsibility in connection with the stockpiling of materials or parking/storage of equipment on
said property.
5. Obtain written permission from the Engineer to stockpile materials or park/store equipment at the
location designated in said authorization.
Before Contract acceptance, submit a document signed by the owner of the material source or disposal
site stating that the Contractor has complied with the Contractor-owner agreement.
Failure by the Contractor to provide written authorization shall result in the withholding of all funds due to
the Contractor until said authorization is received by the County.
Replace Section 5-1.23A with:
5-1.23A General
Section 5-1.23 includes specifications for action and informational submittals.
Any submittal not specified as an informational submittal is an action submittal.
Submit action and informational submittals to the Engineer. Unless otherwise specified in these
Specifications, submittals shall be provided via email in .pdf format.
Each submittal must have a cover sheet that must include:
1. Contract number
2. Project Name
3. Date
4. Submittals (and resubmittals if applicable) must be numbered sequentially
5. Structure number if applicable
6. Contractor
7. Person responsible for submitting the submittal
8. Signature of Contractor's representative sending submittal
9. Section number and/or item submittal is referencing
10. Pages of submittal, excluding cover sheet
The Department rejects a submittal if it has any error or omission.
If the last day for submitting a document falls on a Saturday or holiday, it may be submitted on the next
business day with the same effect as if it had been submitted on the day specified.
Documents must be submitted in the English language.
Convert documents to US customary units.
Replace the first paragraph of Section 5-1.23B(2)(b) with:
If specified, email electronic shop drawing and calculation sheet submittals to the Engineer.
Replace Section 5-1.27E with:
5-1.27E CHANGE ORDER BILLS
Maintain separate records for change order work costs.
Replace Section 5-1.32 with:
5-1.32 AREAS FOR USE
Occupy the highway only for purposes necessary to perform the work.
16
Defend, indemnify, and hold the Department harmless to the same extent as under section 7-1.05.
The Department does not allow temporary residences within the County right-of-way.
Replace Section 5-1.43A with:
5-1.43A General
Minimize and mitigate the impacts of work or events for which you will make a potential claim.
For each potential claim assign an identification number determined by chronological sequencing and the
1 st date of the potential claim.
Use the identification number for each potential claim on the:
1. Initial Potential Claim Record form
2. Supplemental Potential Claim Record form
3. Full and Final Potential Claim Record form
Failure to comply with this procedure is:
1. Waiver of the potential claim and a waiver of the right to a corresponding claim for the disputed work
in the administrative claim procedure
2. Bar to arbitration (Pub Cont Code § 10240.2)
Replace the word "State" with "Department" in the 3rd paragraph of Section 5-1.43D.
Replace the word "Department's" with "Caltrans" in the 6tn paragraph of Section 5-1.43E(1)(a).
Replace the word "Department" with "Caltrans" where it appears in Section 5-1.43E(2)(a).
Replace the word "Department" with "Caltrans" where it appears in Section 5-1.43E(3)(a).
6 CONTROL OF MATERIALS
Replace section 6-1.05 with:
6-1.05 SPECIFIC BRAND OR TRADE NAME AND SUBSTITUTION
Unless substitution is expressly precluded in the special provisions, a reference to a specific brand or
trade name establishes a quality standard and is not intended to limit competition. Unless the Department
has made a public interest finding expressly authorizing sole source procurement of a particular item, you
may use a product that is equal to or better than the specified brand or trade name if authorized.
Submit a substitution request with a time period that:
1. Follows Contract award
2. Allows 30 days for review
3. Causes no delay
Include substantiating data with the substitution request that proves that substitution:
1. Causes no delay
2. Is of equal or better quality and suitability
If the special provisions disallow substitution of a particular item, provide the specified item and do not
propose substitution.
17
Replace Section 6-1.06 with:.
6-1.06 RESERVED
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Add after the last paragraph of Section 7-1.02C:
The following information is provided for the Contractor's information, and nothing herein or elsewhere
within these special provisions shall be construed as limiting the Contractor's responsibility for complying
with all applicable rules and regulations. In conformance with Title 13 § 2449(i), between March 1 and
June 1 of each year, new valid Certificates of Reported Compliance for the current compliance year, as
defined in section 2449(n)for the Contractor and all applicable subcontractors must be submitted. Submit
new valid Certificates of Reported Compliance to the Engineer at least one week prior to the expiration
date of the current certificate.
Replace the 2"d Paragraph of Section 7-1.02K(2)with:
The general prevailing wage rates and any applicable changes to these wage rates are available:
1. From Design Services
2. From the Department of Industrial Relations'Web site
Add to the list in the second paragraph of Section 7-1.02K(3)with:
1.10. Fringe Benefits
Replace section 7-1.02K(4)(a)with:
7-1.02K(4)(a) Apprenticeship Requirements for non-Federal Projects
A. Pursuant to Sections 1770-1780 of the Labor Code of the State of California, the Director of
the Department of Industrial Relations has determined the general prevailing rate of wages in
the locality for each craft or type of worker needed to execute the work. Said wage rates
pursuant to Section 1773.2 of the Labor Code are on file with the Clerk to the Fresno County
Board of Supervisors, and will be made available to any interested person on request. A
copy of this wage scale may also be obtained at the following Web Site: www.dir.ca.gov/dlsr.
B. Pursuant to Section 1775 of the Labor Code of the State of California, nothing in this Article
shall prevent the employment of properly registered apprentices upon public works. Every
such apprentice shall be paid the standard wage paid to apprentices under the regulations of
the craft or trade at which he/she is employed, and shall be employed only at the work of the
craft or trade to which he/she is registered.
C. Only apprentices, as defined in Section 3077, who are in training under apprenticeship standards
and written apprentice agreements under Chapter 4 (commencing at Section 3070), Division
3, of the Labor Code, are eligible to be employed on public works. The employment and
training of each apprentice shall be in accordance with the provisions of the apprenticeship
standards and apprentice agreements under which he/she is training.
Replace the 4th paragraph of section 7-1.02K(6)0)(ii)with:
Submit the lead compliance plan as an informational submittal.
Add to the end of Section 7-1.02M(2):
18
Except for motor trucks, truck tractors, buses, and passenger vehicles, equip all hydrocarbon-fueled
engines, both stationary and mobile including motorcycles, with spark arresters that meet USFS
standards as specified in the Forest Service Spark Arrester Guide. Maintain the spark arresters in good
operating condition. Spark arresters are not required by Cal Fire, the BLM, or the USFS on equipment
powered by properly maintained exhaust-driven turbo-charged engines or equipped with scrubbers with
properly maintained water levels. The Forest Service Spark Arrester Guide is available at the district
offices.
Each toilet must have a metal ashtray at least 6 inches in diameter by 8 inches deep half-filled with sand
and within easy reach of anyone using the facility.
Locate flammable materials at least 50 feet away from equipment service, parking, and gas and oil
storage areas. Each small mobile or stationary engine site must be cleared of flammable material for a
radius of at least 15 feet from the engine.
Each area to be cleared and grubbed must be cleared and kept clear of flammable material such as dry
grass, weeds, brush, downed trees, oily rags and waste, paper, cartons, and plastic waste. Before
clearing and grubbing, clear a fire break at the outer limits of the areas to be cleared and grubbed. Other
fire breaks may be ordered and are change order work.
Furnish the following fire tools:
1. 1 shovel and 1 fully charged fire extinguisher UL rated at 4 B:C or more on each truck, personnel
vehicle, tractor, grader, or other heavy equipment.
The pickup truck and operator must patrol the area of construction for at least 1/2 hour after job site
activities have ended.
Cal Fire, USFS, and BLM have established the following adjective class ratings for 5 levels of fire danger
for use in public information releases and fire protection signing: low, moderate, high, very high, extreme.
Obtain the fire danger rating daily for the project area from the nearest Cal Fire unit headquarters, USFS
ranger district office, or BLM field office.
Arrangements have been made with Cal Fire, USFS, and BLM to notify the Department when the fire
danger rating is very high or extreme. This information will be furnished to the Engineer who will notify
you for dissemination and action in the area affected. If a discrepancy between this notice and the fire
danger rating obtained from the nearest office of either Cal Fire or USFS exists, you must conduct
operations according to the higher of the two fire danger ratings.
If the fire danger rating reaches very high:
1. Falling of dead trees or snags must be discontinued.
2. No open burning is permitted and fires must be extinguished.
3. Welding must be discontinued except in an enclosed building or within an area cleared of flammable
material for a radius of 15 feet.
4. Blasting must be discontinued.
5. Smoking is allowed only in automobiles and cabs of trucks equipped with an ashtray or in cleared
areas immediately surrounded by a fire break unless prohibited by other authority.
6. Vehicular travel is restricted to cleared areas except in case of emergency.
If the fire danger rating reaches extreme, take the precautions specified for a very high fire danger rating
except smoking is not allowed in an area immediately surrounded by a firebreak and work of a nature that
could start a fire requires that properly equipped fire guards be assigned to such operation for the
duration of the work.
The Engineer may suspend work wholly or in part due to hazardous fire conditions. The days during this
suspension are non—working days.
19
If field and weather conditions become such that the determination of the fire danger rating is suspended,
section 7-1.02M(2)will not be enforced for the period of the suspension of the determination of the fire
danger rating. The Engineer will notify you of the dates of the suspension and resumption of the
determination of the fire danger rating.
Place the contents of Section 7-1.04 under the heading:
7-1.04 PUBLIC SAFETY
7-1.04A General
Replace the 71h paragraph in Section 7-1.04A with:
Provide flaggers whenever necessary to ensure that the public is given safe guidance through the work
zone.
Replace the 111" paragraph in Section 7-1.04A with:
Cover signs that direct traffic to a closed area.
Add to the end of Section 7-1.04A:
Where 2 or more lanes in the same direction are adjacent to the area where the work is being performed,
including shoulders, the adjacent lane must be closed under any of the following conditions:
1. Work is off the traveled way but within 6 feet of the edge of the traveled way, and the approach speed
is greater than 45 miles per hour
2. Work is off the traveled way but within 3 feet of the edge of the traveled way, and the approach speed
is less than 45 miles per hour
Closure of the adjacent traffic lane is not required when performing any of the following:
1. Working behind a barrier
2. Paving, grinding, or grooving
3. Installing, maintaining, or removing traffic control devices except Type K temporary railing
Do not reduce an open traffic lane width to less than 10 feet. When traffic cones or delineators are used
for temporary edge delineation, the side of the base of the cones or delineators nearest to traffic is
considered the edge of the traveled way.
Add the following to the end of Section 7-1.04:
7-1.04B WORK ZONE SAFETY AND MOBILITY
7-1.04B(1) POLICY
In order to ensure safe and efficient flow of traffic through work zones, the County of Fresno, via its
General Plan, Transportation and Circulation Element, Policy TRA-1, has adopted the use of AASHTO
Standards as supplemented by Caltrans and County Department of Public Works and Planning
Standards.
20
7-1.04B(2)TRAFFIC MANAGEMENT PLAN
Perform traffic management shall be in accordance with Section 12, "TEMPORARY TRAFFIC
CONTROL," of these special provisions.
7-1.04B(3)TEMPORARY TRAFFIC CONTROL PLAN
Prepare traffic control plan(s) in accordance with Section 12, "TEMPORARY TRAFFIC CONTROL," of
these special provisions.
7-1.04B(4)PUBLIC INFORMATION
Provide notice to public agencies and others to the extent required, if any, elsewhere in these special
provisions. The Engineer provides other noticing not identified to be performed by the Contractor.
Replace the word "State"with "County" where it occurs in Section 7-1.05C.
Replace the word "State" with "Department" in the 1st paragraph of Section 7-1.06B.
Replace the word "State" with "County" in the 5tn paragraph of Section 7-1.06C.
Replace the word "State" with "the Department" in Section 7-1.06D(1).
Replace Section 7-1.06D(2) with:
7-1.0611)(2) Liability Limits/Additional Insureds
Refer to the Agreement of these special provisions
Additional insured coverage must be provided by a policy provision or by an endorsement providing
coverage at least as broad as Additional Insured(Form B) endorsement form CG 2010 and CG 2037 (for
completed operations), as published by the Insurance Services Office (ISO), or equivalent form as
approved by the Department.
Replace the word "State"with "County" in Section 7-1.0611)(3).
Replace the word "State" with "County" in Section 7-1.06D(4).
Replace Section 7-1.06E with:
7-1.06E Automobile Liability Insurance
Comply with requirements in the Agreement of these special provisions.
Replace Section 7-1.06G with:
7-1.06G NOT USED
Replace Section 7-1.06H with:
7-1.06H Enforcement
The Department may assure your compliance with your insurance obligations. 30 days before an
insurance policy lapses, expires, or is canceled during the Contract period you must submit to the
Department evidence of renewal or replacement of the policy.
If you fail to maintain any required insurance coverage, the Department may maintain this coverage and
withhold or charge the expense to you or terminate your control of the work.
Any failure to comply with the reporting provisions of your policy shall not affect coverage provided to the
Department, including its officers, directors, agents (excluding agents who are design professionals), and
employees.
21
You are not relieved of your duties and responsibilities to indemnify, defend, and hold harmless the
County, its officers, agents, and employees by the Department's acceptance of insurance policies and
certificates.
Minimum insurance coverage amounts do not relieve you for liability in excess of such coverage, nor do
they preclude the County from taking other actions available to it, including the withholding of funds under
this Contract.
Replace Section 7-1.061 with:
7-1.061 Self-Insurance
Comply with the Agreement of these special provisions.
Add to the beginning of Section 7-1.07B:
This section applies to seal coat projects.
Add Section 7-1.07C:
7-1.07C Claims
This section applies to non-seal coat projects which involve asphalt concrete paving. Pay for claims for
personal property damage caused by your work. Claims are limited to:
1. 10 percent of the total bid
Within 30 days of the last working day placement of hot mix asphalt, do the following:
1. Process and resolve all claims reported or submitted to you by the public as follows:
1.1. Within 3 business days of receipt of a claim, submit to the Department a copy of the claim, a
written analysis of the claim, and a statement indicating whether or not you will pay the claim. If
you reject a claim, provide the reasons for rejection in writing.
1.2. If the claimant becomes dissatisfied with your handling of the claim, immediately refer the
claimant to the local district claims office for assistance in resolving the claim.
2. Submit to the Department evidence of your paid claims.
All claims presented to the Department, (Govt Code § 900 et seq.)are processed and resolved by the
Department as follows:
1. The claims are processed as formal government claims subject to all laws and policies and are
resolved as the Department determines including referring the claim to you for handling.
2. If the Department approves settlement of a claim or is ordered to pay pursuant to a court order, the
claim is paid from funds withheld from you.
3. Within 3 business days of the Department's determination that you are responsible for resolving the
claim, the Department sends a copy of the claim to you for resolution or notifies you of the
Department's decision to resolve the claim.
The Department withholds an amount not to exceed 5 percent of the total bid to resolve all claims. The
amount is held no longer than 60 days following the last working day so that the Department has ample
time to resolve any pending claims. After 60 days, any remaining amount withheld is returned to you.
If no withheld funds remain or have been returned, the Department may pay any claims and seek
reimbursement from you through an offset or any other legal means. Any reimbursement or offset to be
recovered from you, including all other paid claims, is limited to 10 percent of the total bid.
Section 7-1.07C does not limit your obligation to defend and indemnify the Department.
22
8 PROSECUTION AND PROGRESS
Replace Section 8-1.01 with:
8-1.01 GENERAL
Section 8 includes specifications related to prosecuting the Contract and work progress.
8-1.01A Work Hours
Perform all work on working days during daytime except drilling operations that may proceed 24 hrs a
day.
You may request approval to work on a holiday or on a non-working day. If, pursuant to such request, the
Engineer authorizes you to work on a holiday or on a non-working day, you pay the actual cost incurred
by the Department to perform all inspection, surveying, testing, and all other project-related work by the
Department on such holiday or non-working day. Such payment will be deducted from monies due or
which may become due to the Contractor.
Plan work so that all construction operations performed each day, including cleanup of the project site,
establishment of appropriate traffic control and any other work necessary for the safety of the public shall
be completed within the daytime hours.
Do not perform work during nighttime unless approved by the Engineer, except drilling operations that
may proceed 24 hrs a day.
For work other than drilling operations, request approval to work during nighttime in writing and include
the appropriate traffic control plan(s)and work plan(s)which clearly identify all provisions for illuminating
all portions of the work site, including any flagging operations.
For work other that drilling operations, if you work fail to complete work during the daytime hours, the
Engineer may stop all work upon the onset of nighttime and order you to perform any and all work the
Engineer deems necessary to ensure the safety of the public during the nighttime hours.
You are not entitled to any additional compensation or extension of the contract time as a result of the
Engineer stopping the work due to the onset of nighttime.
Replace the 151 paragraph of Section 8-1.02B(1) with:
No pay item is provided for Level 1 Critical Path Project Schedule. Payment is considered to be included
in the various items of work including revisions and time analysis.
Add to the end of the list in the 4tn paragraph of Section 8-1.02B(3)with:
3. Time Impact Analysis (Refer to Section 8-1.02C(8)(b)for description)
Replace Section 8-1.02C with:
8-1.02C Reserved except for 8-1.02C(8)(b)
Replace Section 8-1.04 with:
8-1.04 START OF JOB SITE ACTIVITIES
8-1.04A General
Provide signed contracts, bonds, and evidence of insurance timely as required.
This section, 8-1.04, "Start of Job Activities," does not modify remedies available to the Department
should you fail to provide signed contracts bonds and insurance timely.
Submit a notice 72 hours before starting job site activities. If the project has more than 1 location of work,
submit a separate notice for each location.
You may start job site activities before receiving notice of Contract approval if you:
23
1. Deliver the signed Contract, bonds, and evidence of insurance to the Department
2. Submit 72-hour notice
3. Are authorized by the Department to start
4. Perform work at your own risk
5. Perform work under the Contract
If the Contract is approved, work already performed that complies with the Contract is authorized.
If the Contract is not approved, leave the job site in a neat condition. If a facility has been changed,
restore it to its former condition or an equivalent condition. The Department does not pay for the
restoration.
8-1.04113 Standard Start
Be prepared to begin work at the project site no later than the 20th business day after award of the
Contract by the Department.
The Engineer may issue a notice to proceed as soon as the Contracts, including bonds and insurance
certificates, have been approved.
Start work on the day shown in the notice to proceed, unless an early start has been approved.
The Engineer may issue a notice of commencement of contract time if you fail to provide Contracts,
including bonds and insurance certificates or other required documents timely.
A notice of commencement of contract time does not authorize you to start work on the project site, but
contract time begins to elapse on the date shown in the notice of commencement of contract time.
Complete work before the expiration of
TWENTY(20)WORKING DAYS
from the date shown in said Notice to Proceed, or in the Notice of Commencement of Contract Time,
whichever comes first.
Complete all work, including corrective work and punch list work, prior to the expiration of the allotted
working days. Working days continue to accrue until corrective work and punch list work is completed
and accepted.
Pay to the County of Fresno the sum of
ONE THOUSAND DOLLARS ($1,000.00)
per day for each and every calendar day's delay in finishing the work, including corrective work and punch
list work, in excess of the total number of working days prescribed above.
Replace the 1st paragraph in Section 8-1.05 with:
Contract time starts on the day specified in the notice to proceed or in the notice of commencement of
contract time as described in section 8-1.04 or on the day you start job site activities, whichever occurs
first.
Replace the 3rd and 41" paragraph including the table in Section 8-1.10A with:
Liquidated damages are specified in section 8-1.04.
24
Replace the word "State's" with "County's" in Section 8-1.14A.
9 PAYMENT
Add Section 9-1.01A:
9-1.01A COMPENSATION
The bid items shown in the bid item list represent full compensation for performing all work. Full
compensation for any work for which there is no bid item shall be considered to be included in the various
items of work.
Delete paragraphs 11-14 of Section 9-1.03.
Add after the 6t" paragraph of Section 9-1.03:
Notwithstanding anything to the contrary in these special provisions, full compensation for
performing all work as shown, as specified, and as directed by the Engineer is considered to be
included in the various bid items, and no additional payment will be made, except pursuant to a
contract change order to perform work not shown and/or specified.
If one or more bid item(s) is/are not included, perform the work as shown and as specified and
payment therefor is considered to be included in the various items of work.
Replace the last paragraph of Section 9-1.03 with:
Pay your subcontractors within 10 days of receipt of each progress payment under Pub Cont Code §§
10262 and 10262.5.
Replace the word "Department's" with "Caltrans" in the 5t" paragraph of Section 9-1.07A.
Replace Section 9-1.16F with:
9-1.16F Retentions
The Department, once in each month, shall cause an estimate in writing to be made by the Engineer.
The estimate shall include the total amount of work done and acceptable materials furnished, provided
the acceptable materials are listed as eligible for partial payment as materials in the special provisions
and are furnished and delivered by the Contractor on the ground and not used or are furnished and
stored for use on the contract, if the storage is within the State of California and the Contractor furnishes
evidence satisfactory to the Engineer that the materials are stored subject to or under the control of the
Department, to the time of the estimate, and the value thereof. The estimate shall also include any
amounts payable for mobilization. Daily extra work reports furnished by the Contractor less than 5
calendar days, not including Saturdays, Sundays and legal holidays, before the preparation of the
monthly progress estimate shall not be eligible for payment until the following month's estimate.
The amount of any material to be considered in making an estimate will in no case exceed the amount
thereof which has been reported by the Contractor to the Engineer on State-furnished forms properly
filled out and executed, including accompanying documentation as therein required, less the amount of
the material incorporated in the work to the time of the estimate. Only materials to be incorporated in the
work will be considered. The estimated value of the material established by the Engineer will in no case
exceed the contract price for the item of work for which the material is furnished.
The Department shall retain 5 percent of the estimated value of the work done and 5 percent of the value
of materials so estimated to have been furnished and delivered and unused or furnished and stored as
aforesaid as part security for the fulfillment of the contract by the Contractor. The Department will not
hold retention for mobilization or demobilization.
The Department shall pay monthly to the Contractor, while carrying on the work, the balance not retained,
as aforesaid, after deducting therefrom all previous payments and all sums to be kept or retained under
25
the provisions of the contract. No monthly estimate or payment shall be required to be made when, in the
judgment of the Engineer, the work is not proceeding in accordance with the provisions of the contract.
No monthly estimate or payment shall be construed to be an acceptance of any defective work or
improper materials.
Attention is directed to the prohibitions and penalties pertaining to unlicensed contractors as provided in
Business and Professions Code Sections 7028.15(a) and 7031.
Add Section 9-1.23:
9-1.23 RESOLUTION OF CONTRACT CLAIMS
Public works contract claims of three hundred seventy-five thousand dollars ($375,000)or less which arise
between a Contractor and a local public agency shall be resolved in accordance with the provisions of
California Public Contract Code Sections 20104-20104.6, inclusive. In addition, California Public Contract
Code Section 9204 requires that the procedure established therein shall apply to all claims (as therein
defined)filed by a contractor in connection with a public works project. Accordingly, this contract expressly
incorporates all of the terms and conditions of those statutory provisions, which are as follows:
California Public Contract Code Section 9204
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure
that all construction business performed on a public works project in the state that is complete and not in
dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section
10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100)of Part 2, and Article 1.5
(commencing with Section 20104)of Chapter 1 of Part 3, this section shall apply to any claim by a
contractor in connection with a public works project.
(c) For purposes of this section:
(1) "Claim" means a separate demand by a contractor sent by registered mail or certified mail
with return receipt requested, for one or more of the following:
(A)A time extension, including, without limitation, for relief from damages or penalties for
delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on
behalf of, the contractor pursuant to the contract for a public works project and payment
for which is not otherwise expressly provided or to which the claimant is not otherwise
entitled.
(C) Payment of an amount that is disputed by the public entity.
(2) "Contractor" means any type of contractor within the meaning of Chapter 9 (commencing with
Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct
contract with a public entity for a public works project.
(3)(A) "Public entity" means, without limitation, except as provided in subparagraph (B), a state
agency, department, office, division, bureau, board, or commission, the California State
University, the University of California, a city, including a charter city, county, including a charter
county, city and county, including a charter city and county, district, special district, public
authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by
a public agency and formed to carry out the purposes of the public agency.
(B) "Public entity" shall not include the following:
(i)The Department of Water Resources as to any project under the jurisdiction of
that department.
(ii)The Department of Transportation as to any project under the jurisdiction of
that department.
26
(iii)The Department of Parks and Recreation as to any project under the
jurisdiction of that department.
(iv)The Department of Corrections and Rehabilitation with respect to any project
under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of
Title 7 of Part 3 of the Penal Code.
(v)The Military Department as to any project under the jurisdiction of that
department.
(vi)The Department of General Services as to all other projects.
(vii)The High-Speed Rail Authority.
(4) "Public works project" means the erection, construction, alteration, repair, or improvement of
any public structure, building, road, or other public improvement of any kind.
(5) "Subcontractor" means any type of contractor within the meaning of Chapter 9 (commencing
with Section 7000) of Division 3 of the Business and Professions Code who either is in direct
contract with a contractor or is a lower tier subcontractor.
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies
shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide
the claimant a written statement identifying what portion of the claim is disputed and what portion is
undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend
the time period provided in this subdivision.
(B)The claimant shall furnish reasonable documentation to support the claim.
(C) If the public entity needs approval from its governing body to provide the claimant a
written statement identifying the disputed portion and the undisputed portion of the claim,
and the governing body does not meet within the 45 days or within the mutually agreed to
extension of time following receipt of a claim sent by registered mail or certified mail,
return receipt requested, the public entity shall have up to three days following the next
duly publicly noticed meeting of the governing body after the 45-day period, or extension,
expires to provide the claimant a written statement identifying the disputed portion and
the undisputed portion.
(D)Any payment due on an undisputed portion of the claim shall be processed and made
within 60 days after the public entity issues its written statement. If the public entity fails
to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity's written response, or if the public entity fails to
respond to a claim issued pursuant to this section within the time prescribed, the claimant may
demand in writing an informal conference to meet and confer for settlement of the issues in
dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return
receipt requested, the public entity shall schedule a meet and confer conference within 30 days
for settlement of the dispute.
(B)Within 10 business days following the conclusion of the meet and confer conference,
if the claim or any portion of the claim remains in dispute, the public entity shall provide
the claimant a written statement identifying the portion of the claim that remains in
dispute and the portion that is undisputed. Any payment due on an undisputed portion of
the claim shall be processed and made within 60 days after the public entity issues its
written statement. Any disputed portion of the claim, as identified by the contractor in
writing, shall be submitted to nonbinding mediation, with the public entity and the claimant
sharing the associated costs equally. The public entity and claimant shall mutually agree
to a mediator within 10 business days after the disputed portion of the claim has been
identified in writing. If the parties cannot agree upon a mediator, each party shall select a
mediator and those mediators shall select a qualified neutral third party to mediate with
regard to the disputed portion of the claim. Each party shall bear the fees and costs
charged by its respective mediator in connection with the selection of the neutral
mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be
subject to applicable procedures outside this section.
27
(C) For purposes of this section, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an independent
third party or board assists the parties in dispute resolution through negotiation or by
issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this
section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the
mediation conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
(E)This section does not preclude a public entity from requiring arbitration of disputes
under private arbitration or the Public Works Contract Arbitration Program, if mediation
under this section does not resolve the parties' dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods
described in this subdivision or to otherwise meet the time requirements of this section shall result
in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public
entity's failure to have responded to a claim, or its failure to otherwise meet the time requirements
of this section, shall not constitute an adverse finding with regard to the merits of the claim or the
responsibility or qualifications of the claimant.
(4)Amounts not paid in a timely manner as required by this section shall bear interest at 7
percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a
public entity because privity of contract does not exist, the contractor may present to the public
entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may
request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that
the contractor present a claim for work which was performed by the subcontractor or by a lower
tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be
presented to the public entity shall furnish reasonable documentation to support the claim. Within
45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as
to whether the contractor presented the claim to the public entity and, if the original contractor did
not present the claim, provide the subcontractor with a statement of the reasons for not having
done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any
public works project that may give rise to a claim under this section.
(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however,
that(1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and
proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a
public entity may prescribe reasonable change order, claim, and dispute resolution procedures and
requirements in addition to the provisions of this section, so long as the contractual provisions do not
conflict with or otherwise impair the timeframes and procedures set forth in this section.
(g) This section applies to contracts entered into on or after January 1, 2017.
(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available
through a competitive application process, for the failure of an awardee to meet its contractual
obligations.
(i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a
later enacted statute, that is enacted before January 1, 2027, deletes or extends that date.
California Public Contract Code Sections 20104—20104.6
28
Section 20104
(a)(1) This article applies to all public works claims of three hundred seventy-five thousand dollars
($375,000)or less which arise between a contractor and a local agency.
(2) This article shall not apply to any claims resulting from a contract between a contractor and a
public agency when the public agency has elected to resolve any disputes pursuant to Article 7.1
(commencing with Section 10240)of Chapter 1 of Part 2.
(b)(1) "Public work" means "public works contract" as defined in Section 1101 but does not include any
work or improvement contracted for by the state or the Regents of the University of California.
(2) "Claim" means a separate demand by the contractor for(A) a time extension, (B) payment of
money or damages arising from work done by, or on behalf of, the contractor pursuant to the
contract for a public work and payment of which is not otherwise expressly provided for or the
claimant is not otherwise entitled to, or(C) an amount the payment of which is disputed by the
local agency.
(c) The provisions of this article or a summary thereof shall be set forth in the plans or specifications for
any work which may give rise to a claim under this article.
(d) This article applies only to contracts entered into on or after January 1, 1991.
Section 20104.2
For any claim subject to this article, the following requirements apply:
(a) The claim shall be in writing and include the documents necessary to substantiate the claim. Claims
must be filed on or before the date of final payment. Nothing in this subdivision is intended to extend the
time limit or supersede notice requirements otherwise provided by contract for the filing of claims.
(b) (1) For claims of less than fifty thousand dollars ($50,000), the local agency shall respond in writing to
any written claim within 45 days of receipt of the claim, or may request, in writing, within 30 days of
receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim
the local agency may have against the claimant.
(2) If additional information is thereafter required, it shall be requested and provided pursuant to
this subdivision, upon mutual agreement of the local agency and the claimant.
(3) The local agency's written response to the claim, as further documented, shall be submitted
to the claimant within 15 days after receipt of the further documentation or within a period of time
no greater than that taken by the claimant in producing the additional information, whichever is
greater.
(c) (1) For claims of over fifty thousand dollars ($50,000) and less than or equal to three hundred
seventy-five thousand dollars ($375,000), the local agency shall respond in writing to all written claims
within 60 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any
additional documentation supporting the claim or relating to defenses to the claim the local agency may
have against the claimant.
(2) If additional information is thereafter required, it shall be requested and provided pursuant to
this subdivision, upon mutual agreement of the local agency and the claimant.
29
(3) The local agency's written response to the claim, as further documented, shall be submitted
to the claimant within 30 days after receipt of the further documentation, or within a period of time
no greater than that taken by the claimant in producing the additional information or requested
documentation, whichever is greater.
(d) If the claimant disputes the local agency's written response, or the local agency fails to respond within
the time prescribed, the claimant may so notify the local agency, in writing, either within 15 days of receipt
of the local agency's response or within 15 days of the local agency's failure to respond within the time
prescribed, respectively, and demand an informal conference to meet and confer for settlement of the
issues in dispute. Upon a demand, the local agency shall schedule a meet and confer conference within
30 days for settlement of the dispute.
(e) Following the meet and confer conference, if the claim or any portion remains in dispute, the claimant
may file a claim as provided in Chapter 1 (commencing with Section 900)and Chapter 2 (commencing
with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those
provisions, the running of the period of time within which a claim must be filed shall be tolled from the time
the claimant submits his or her written claim pursuant to subdivision (a) until the time that claim is denied
as a result of the meet and confer process, including any period of time utilized by the meet and confer
process.
(f) This article does not apply to tort claims and nothing in this article is intended nor shall be construed
to change the time periods for filing tort claims or actions specified by Chapter 1 (commencing with
Section 900) and Chapter 2 (commencing with Section 910)of Part 3 of Division 3.6 of Title 1 of the
Government Code.
Section 20104.4
The following procedures are established for all civil actions filed to resolve claims subject to this article:
(a) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court
shall submit the matter to nonbinding mediation unless waived by mutual stipulation of both parties. The
mediation process shall provide for the selection within 15 days by both parties of a disinterested third
person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within
15 days from the commencement of the mediation unless a time requirement is extended upon a good
cause showing to the court or by stipulation of both parties. If the parties fail to select a mediator within
the 15-day period, any party may petition the court to appoint the mediator.
(b) (1) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to
Chapter 2.5 (commencing with Section 1141.10)of Title 3 of Part 3 of the Code of Civil Procedure,
notwithstanding Section 1141.11 of that code. The Civil Discovery Act(Title 4 (commencing with Section
2016.010)of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this
subdivision consistent with the rules pertaining to judicial arbitration.
(2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators
appointed for purposes of this article shall be experienced in construction law, and, upon
stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly
rates of pay not to exceed their customary rate, and such fees and expenses shall be paid
equally by the parties, except in the case of arbitration where the arbitrator, for good cause,
determines a different division. In no event shall these fees or expenses be paid by state or
county funds.
(3) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code
of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but
30
does not obtain a more favorable judgment shall, in addition to payment of costs and fees under
that chapter, pay the attorney's fees of the other party arising out of the trial de novo.
(c) The court may, upon request by any party, order any witnesses to participate in the mediation or
arbitration process.
Section 20104.6
(a) No local agency shall fail to pay money as to any portion of a claim which is undisputed except as
otherwise provided in the contract.
(b) In any suit filed under Section 20104.4, the local agency shall pay interest at the legal rate on any
arbitration award or judgment. The interest shall begin to accrue on the date the suit is filed in a court of
law.
DIVISION II GENERAL CONSTRUCTION
10 GENERAL
Add to the end of Section 10-1.02C(2):
Protect any irrigation component to be relocated before performing any other construction activity in the
area.
Replace Reserved in Section 10-1.02C(3)with:
Transplant any plant to be transplanted before performing any other construction activity in the area.
12 TEMPORARY TRAFFIC CONTROL
Replace section 12-1.04 with:
12-1.04 FLAGGING COSTS
You pay the cost of furnishing all flaggers, including transporting flaggers and furnishing stands and
towers for flaggers to provide for the passage of traffic through the work as specified in sections 7-
1.03 and 7-1.04.
Replace the 3rd paragraph of Section 12-3.01 C with:
If ordered, furnish and place additional temporary traffic control devices. This work is not change order
work if:
1. Required to conform with your traffic control plan
2. Required to conform with the MUTCD
3. Necessary for public safety or convenience as determined by the Engineer
4. Required to perform staged construction shown on the plans
Replace the last paragraph of Section 12-3.03C with:
Moving plastic traffic drums from location to location if ordered after initial placement is not change order
work if:
1. Required to conform with your traffic control plan
2. Required to conform with the MUTCD
31
3. Necessary for public safety or convenience as determined by the Engineer
4. Required to perform staged construction shown on the plans
Replace the last paragraph of Section 12-3.10C with:
Moving a barricade from location to location is change order work if ordered after initial placement of the
barricade unless.
1. Required to conform with your traffic control plan
2. Required to conform with the MUTCD
3. Necessary for public safety or convenience as determined by the Engineer
4. Required to perform staged construction shown on the plans
Replace Section 12-3.11 13(5)(b)with:
12-3.11 13(5)(b) Construction Project Funding Identification Signs
Reserved
Replace the word "Department's" with the word "Caltrans" in the 1'paragraph of Section 12-
3.20A(4)(a).
Replace the last paragraph of Section 12-3.20C(1)with:
If the Engineer orders a lateral move of temporary barrier system and repositioning is not shown, the
lateral move is change order work unless:
1. Required to conform with your traffic control plan
2. Required to conform with the MUTCD
3. Necessary for public safety or convenience as determined by the Engineer
4. Required to perform staged construction shown on the plans
Replace the 2"d paragraph of Section 12-3.20C(2)(c)with:
Install K rail as shown in the project plans.
Replace the last paragraph of Section 12-3.31 C with:
Moving portable flashing beacons from location to location if ordered after initial placement is change
order work unless:
1. Required to conform with your traffic control plan
2. Required to conform with the MUTCD
3. Necessary for public safety or convenience as determined by the Engineer
4. Required to perform staged construction shown on the plans
Replace the 2"d paragraph of Section 12-3.35B(6)with:
Provide any software on a CD or other Engineer-authorized data-storage device to the Engineer.
Add before the 111 paragraph of Section 12-3.41A(1):
Section 12-3.41 is used when shown in the Bid Item List.
Replace Section 12-4.02A(3)(a)with:
12-4.02A(3)(a) General
The Contractor shall prepare and submit to the County Construction Engineer for approval, a traffic
control system plan indicating the means and methods he will employ to institute and maintain traffic
control for all phases of the work within the project. The traffic control system plan shall be submitted to
32
the County Construction Engineer as early as possible, preferably five (5)working days prior to pre-
construction meeting. The Engineer will require five (5)working days to review the initial submittal of the
traffic control system plan and an additional five (5)working days for each successive review.
No work at the project site whatsoever, including preparatory work such as the installation of
construction project funding signs, shall commence until the traffic control system plan has been
approved in writing by the Engineer. In the event that the traffic control system plan is not
submitted timely, the Engineer may issue a notice of commencement of contract time prior to
approval of the traffic control system plan, and working days will begin to accrue against the
allotted contract time.
Late submittal of the traffic control plan or revisions thereafter required, due to the inadequacy of the plan,
shall not be accepted as justification for the delay in the start of the working days for the project.
It shall be the Contractor's responsibility to provide, install, maintain, and remove any and all detour
signage and traffic control devices and to obtain all permits, including permits from Caltrans, as may be
necessary to establish detours as part of the contractor's traffic control plan.
Traffic will not be allowed to be limited to one direction when construction activities are not actively in
progress. Providing, installing, maintaining, and removing all traffic control, including portable changeable
message signs if required, obtaining and complying with all permits, and providing all traffic control
operations shall be the responsibility of the contractor, and no additional compensation will be allowed
therefor.
Replace Section 12-4.02A(3)(b)with:
12-4.02A(3)(b) Closure Schedules
One-way traffic shall be controlled through the project in accordance with the California Manual MUTCD
and Caltrans Standard Plans T-11 and T-13 entitled "Traffic Control System for Lane Closure on Multilane
Conventional Highways" and "Traffic Control System for Lane Closure on Two Lane Conventional
Highways," and these special provisions. Night closure will not be permitted.
When traffic is under one way control on unpaved areas, the cones shown along the centerline on the
plan need not be placed.
Every Monday by noon, submit a closure schedule request for planned closures for the next week.
The next week is defined as Sunday at noon through the following Sunday at noon.
Submit a closure schedule request 5 days before the anticipated start of any job site activity that reduces:
1. Horizontal clearances of traveled ways, including shoulders, to 2 lanes or fewer due to activities such
as temporary barrier placement and paving
2. Vertical clearances of traveled ways, including shoulders, due to activities such as pavement
overlays, overhead sign installation, or falsework girder erection
Submit closure schedule changes, including additional closures, by noon at least 3 business days before
a planned closure.
Cancel closure requests at least 48 hours before the start time of the closure.
The Department notifies you of unauthorized closures or closures that require coordination with other
parties as a condition for authorization.
33
Replace Section 12-4.02A(3)(d)with:
12-4.02A(3)(d) Traffic Break Schedule
Not Used.
Replace Section 12-4.02C(1)with:
12-4.02C(1) General
Work that interferes with traffic is limited to the hours when closures are allowed.
Do not reduce an open traffic lane width to less than 10 feet. If traffic cones or delineators are used for
temporary edge delineation, the side of the base of the cones or delineators nearest to traffic is
considered the edge of the traveled way.
Discuss the contingency plan for any activity that could affect the closure schedule with the Engineer at
least 5 business days before starting the activity requiring the plan.
The Engineer may reschedule a closure that was canceled due to unsuitable weather.
Traffic will be controlled by flagmen by eyesight, radio (walkie talkie)or baton. In the event these
methods do not work satisfactorily, as determined by the Engineer, a pilot car will be required.
The Engineer may require a pilot car to be used during earthwork operations in preparation of the grading
plane or other operations when the Contractor's operations cover an area beyond the line of sight, or
beyond the range of radios or when the baton method does not function satisfactorily.
You may use automated flagger assistance devices to enhance the traffic control system for a lane
closure on a two-lane convention highway, except if a bid item for automated flagger assistance devices
is shown in the Bid Item List, the use of AFADs is required.
Do not use automated flagger assistance devices:
1. On multi-lane highways
2. As a substitute or a replacement for a temporary traffic control signal
3. If the devices impair access for pedestrians and bicycles, unless alternate access is provided
4. If the usable shoulder area is not wide enough to place a trailer mounted device
5. If the distance between the devices is more than 800 feet, except when each device is controlled by a
separate operator and radio communication is available between the AFAD operators
Replace Section 12-4.02C(2) with:
12-4.02C(2) Not Used
Replace Section 12-4.02C(3) with:
12-4.02C(3) Closure Requirements and Charts
12-4.02C(3)(a) General
Where 2 or more lanes in the same direction, including the shoulders, are adjacent to the area where the
work is being performed, close the adjacent lane under any of the following conditions:
1. Work is off the traveled way but within 6 feet of the edge of the traveled way, and the approach
speed is greater than 45 mph
2. Work is off the traveled way but within 3 feet of the edge of the traveled way, and the approach
speed is less than 45 mph
Closure of the adjacent traffic lane is not required during any of the following activities:
1. Work behind a barrier
2. Paving, grinding, or grooving
3. Installation, maintenance, or removal of traffic control devices except for temporary railing
34
12-4.02C(3)(b) - 12-4.02C(3)(n)
Reserved
12-4.02C(3)(o) Closure of Conventional County Roads
The type and location of signs, lights, flags, flagmen, and other traffic control and safety devices shall be
in accordance with the current edition of the California Manual on Uniform Traffic Control Devices
(MUTCD) issued by the State of California, Department of Transportation (Caltrans).
Allow public traffic to pass through construction at all times unless otherwise specified herein.
Provide access to properties abutting the project site at all times.
When directed by the Engineer, traffic shall be routed through the work under one-way control.
Under one-way reversing traffic control operations, public traffic may be stopped in one direction for periods
not to exceed 10 minutes.
Lane closure is defined as the closure of a traffic lane or lanes within a single traffic control system.
No work that would require a lane closure shall be performed.
Maintain vehicular access to the channel bank access roads at all times.
Personal vehicles of the Contractor's employees shall not be parked on the traveled way or shoulders
including sections closed to public traffic.
12-4.02C(3)(p)-12-4.02C(3)(s) Reserved
Replace Section 12-4.02C(7)(d)with:
12-4.02C(7)(d) Reserved
Replace the word "Department's" with "Caltrans" in Section 12-4.02C(9)(a)(iv).
Replace section 12-4.02C(9)(d)with:
12-4.02C(9)(d) Payment
You pay the cost of furnishing all flaggers, including transporting flaggers and furnishing stands and
towers for flaggers to provide for the passage of traffic through the work as specified in sections 7-1.03
and 7-1.04.
Add before the V paragraph of Section 12-4.02C(10):
Section 12-4.02C(10) is used when Pickup Truck Mounted Changeable Message Sign is shown in the Bid
Item List.
Replace item 3.6.1 in the list in Section 12-4.02C(11)(a)(iii)(B)with:
Not Used
Replace item 5 in the list in Section 12-4.02C(11)(a)(iv)(C)with:
Not Used
Replace Section 12-4.02C(11)(d)with:
12-4.02C(11)(d) Payment
Full payment for conforming to the requirements of this section shall be considered to be included in the
Traffic Control Plan item on the Bid Items List.
Replace Section 12-4.02C(14) with:
12-4.02C(14) Failure to Provide Traffic Control.
If you do not provide the traffic control and it becomes necessary for the Engineer to notify you of your
duties according to the Standard Specifications and these special provisions, you will pay$200 per 15-
minute period or portion thereof to the County for all the time required to acquire the traffic control,
including pilot car.
35
Such payment shall commence at the time notice of the improper traffic control condition is given to you
or your authorized representative by the Engineer and shall terminate when the condition is corrected.
Such payment will be deducted from your payment.
In addition, when it is necessary for the Engineer to perform the work, you will pay the actual cost for the
performance thereof. Such amount will be deducted from your payment. This will be in addition to any
penalties imposed in these special provisions.
The provisions in this section will not relieve you from your responsibility to provide such additional
devices or take such measures as may be necessary to comply with the provisions in Section 7-1.04,
"Public Safety," of the Standard Specifications.
Replace Section 12-4.02D with:
12-4.02D Payment
The Department pays for change order work for a traffic control system by force account for increased
traffic control and uses a force account analysis for decreased traffic control.
Traffic control system for lane closure is paid for as traffic control system. Flagging costs are paid for as
specified in section 12-1.04.
The requirements in section 4-1.05 for payment adjustment do not apply to traffic control system.
Adjustments in compensation for traffic control system will be made for an increase or decrease in traffic
control work if ordered.
A traffic control system required by change order work is paid for as a part of the change order work.
Full compensation for furnishing and operating the pilot car, (including driver, radios, and any other
equipment and labor required) shall be considered as included in the contract lump sum price paid for
traffic control system and no further payment will be made.
13 WATER POLLUTION CONTROL
Replace 13-1.01A with:
13-1.01A Summary
Section 13-1 includes general specifications for preventing, controlling, and abating water pollution within
waters of the State.
Information on forms, reports, and other documents is in the following Caltrans manuals:
1. Field Guide to Construction Site Dewatering
2. Stormwater Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP)
Preparation Manual
3. Construction Site Best Management Practices (BMPs) Manual
4. Construction Site Monitoring Program Guidance Manual
You may view these manuals at the Stormwater and Water Pollution Control Information link at the
Caltrans Division of Construction website or purchase them at the Caltrans Publication Distribution Unit.
A WPCP and a SWPPP must comply with the Caltrans Stormwater Pollution Prevention Plan (SWPPP)
and Water Pollution Control Program (WPCP) Preparation Manual and must be prepared using the latest
template posted on the Construction stormwater website.
36
Replace Section 13-1.01 D(2)with
13-1.01 D(2) Regulatory Requirements
Comply with the discharge requirements in the NPDES General Permit for Storm Water Discharges
Associated with Construction and Land Disturbance Activities; Order No. 2009-000 9-DWQ, CAS000002
(Construction General Permit)and any amendments thereto issued by the SWRCB. The Construction
General Permit may be found at:
http://www.waterboards.ca.gov/water i ssues/prog ra ms/stormwater/con stpe rm its.shtmI
Discharges from manufacturing facilities, such as batch plants and crushing plants, must comply with the
discharge requirements in the NPDES General Permit for Storm Water Discharges Associated with
Industrial Activities; Order No. 2014-0057-DWQ, CAS000001 (Industrial General Permit), issued by the
SWRCB. For the Industrial General Permit, go to the SWRCB website.
For a batch plant and crushing plant outside a job site or within a job site that serves one or more
contracts, obtain coverage under the Industrial General Permit before operating a batch plant to
manufacture concrete, HMA, or other material or a crushing plant to produce rock or aggregate.
This Project disturbs less than 1 acre of soil. A Water Pollution Control Plan (WCPC) is required
Replace Section 13-1.01 D(4)(b)with:
13-1.01 D(4)(b) Qualifications
The WPC manager must:
1. Comply with the requirements provided in the Construction General Permit for:
1.1. QSP if the project requires a WPCP
1.2. QSD if the project requires a SWPPP
2. Complete the stormwater management training described at the Stormwater and Water Pollution
Control Information link at the Caltrans Division of Construction website
Replace Section 13-2.04:
13-2.04 PAYMENT
The Department pays for prepare water pollution control program as follows:
1. Total of 50 percent of the item total upon authorization of the WPCP
2. Total of 90 percent of the item total upon work completion
3. Total of 100 percent of the item total upon Contract acceptance
Replace Section 13-4.03G with:
13-4.03G Dewatering
Dewatering consists of discharging accumulated stormwater, groundwater, or surface water from
excavations or temporary containment facilities.
If dewatering is required, perform dewatering work as specified for the work items involved, such as a
temporary ATS or dewatering and discharge.
If dewatering and discharging activities are not specified for a work item and you perform dewatering
activities:
1. Conduct dewatering activities under the Caltrans Field Guide for Construction Site Dewatering.
37
2. Ensure any dewatering discharge does not cause erosion, scour, or sedimentary deposits that could
impact natural bedding materials.
3. Discharge the water within the project limits. Dispose of the water if it cannot be discharged within
project limits due to site constraints or contamination.
4. Do not discharge stormwater or non-stormwater that has an odor, discoloration other than sediment,
an oily sheen, or foam on the surface. Immediately notify the Engineer upon discovering any such
condition.
Replace Section 13-5.04 with:
13-5.04 PAYMENT
The payment quantity for temporary soil stabilization bid items paid for by the area is the area measured
parallel with the ground surface not including the additional quantity used for overlaps.
If there is no bid item for temporary soil stabilization measures, payment therefor is considered to be
included in the bid item for prepare water pollution control program or in the bid item for prepare
stormwater pollution prevention plan, as applicable.
Replace Section 13-6.04 with:
13-6.04 PAYMENT
The payment quantity for temporary sediment control bid items paid for by the length is the length
measured along the centerline of the installed material.
The payment quantity, if any, for temporary fiber roll does not include the additional quantity used for
overlaps.
The Department does not pay for the relocation of temporary drainage inlet protection during work
progress.
If there are no bid items for installing or maintaining temporary sediment control measures, payment
therefor is considered to be included in the bid item for prepare water pollution control program or in the
bid item for prepare stormwater pollution prevention plan, as applicable.
Replace Section 13-7.03D with:
13-7.03D Payment
The Department does not pay for the relocation of temporary construction entrances or roadways during
work progress.
If there are no bid items for installing or maintaining temporary construction entrances or roadways,
payment therefor is considered to be included in the bid item for prepare water pollution control program
or in the bid item for prepare stormwater pollution prevention plan, as applicable.
14 ENVIRONMENTAL STEWARDSHIP
Add after the 3rd paragraph of section 14-10.01:
Food scraps, paper wrappers, food containers, cans, bottles and all food related trash and litter must be
removed from the project site at the end of each working day.
Replace the 7th paragraph of section 14-10.01 with:
Furnish and use closed-lid trash containers in the job-site yard, field trailers, and locations where workers
gather for lunch and breaks.
38
Add Section 14-12.04:
14-12.04 RELATIONS WITH SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT
(SJVAPCD)
You are responsible for compliance with all applicable SJVAPCD regulations and requirements. This
section is provided for your information, and nothing herein or elsewhere within these special provisions
shall be construed as limiting your responsibility for complying with all applicable rules and regulations.
In accordance with SJVAPCD Regulation VIII — Fugitive PM10 Prohibitions: Rule 8021, implementation of
an SJVAPCD-approved dust control plan is not required prior to commencement of any dust generating
activities. You must file Construction Notification with SJVAPCD 48 hours prior to starting work.
Pursuant to section 6.4 of District Rule 8021 —Construction, Demolition, Excavation, Extraction, and
Other Earthmoving Activities, the owner or operator of a construction project of at least 1.0 acre in size
shall provide written notification to the District at least 48 hours prior to his/her intent to commence any
earthmoving activities. Use the first two pages of this form to submit a written Construction
Notification. There are no fees for filing a construction notification.
It is your responsibility to be fully informed of the requirements of all rules, regulations, plans and
conditions that may govern your operations and to conduct the work accordingly.
Replace Section 14-12.05-14.12.08 With:
14-12.05-14.12.08 RESERVED
39
I. SPECIAL PROVISIONS
1.1 GENERAL
1.1.1 ENGINEER
The Engineer for the project is Luhdorff and Scalmanini,Consulting Engineers,500 First Street,Woodland,California
95695(Contact:Scott Lewis at(530)661-0109). The Engineer will act as Fresno County's(Owner)agent with respect
to interpretation of the Plans as well as serving as a technical advisor and inspector during drilling and well
construction activities. During the course of the Work, the Engineer may advise the Owner as to the quality or
acceptability of materials furnished and work performed and as to the manner of performance and rate of progress
of the Work. In addition, the Engineer may advise the Owner on questions which arise as to the interpretation of
the Plans and Technical Provisions, questions as to the acceptable fulfillment of the contract on the part of the
Contractor,and questions as to measurement and payment.
1.1.2 TERMINATION AND ALTERNATIVE WELL
Owner reserves the right to terminate the Work at any time. In such an event,the Contractor shall be paid for work
completed at that time in accordance with the prices stated on the BID FORM.The Owner reserves the right to select
an alternate site to replace an abandoned test hole or well. If an alternate site is chosen by the Owner, the
Contractor shall be paid for the work done on the alternate site in accordance with the unit prices stated on the BID
FORM.
1.1.3 PRELIMINARY TEST HOLE AND MONITORING WELL DESIGN
Final quantities for test hole drilling and well construction will be based on actual conditions encountered during the
drilling. The Work described in the Plans and Technical Provisions reflects the Owner's preliminary design and may
be modified in response to actual subsurface conditions revealed through the drilling operations. All compensation
shall be based on actual quantities using unit or lump sum prices stated on the BID FORM.
1.1.4 PERMITS AND NOTIFICATIONS
1.The Contractor shall be responsible for obtaining the necessary permits to perform the contract Work.
All permits shall be posted on the drilling rig prior to the start of drilling operations.
2.The permitting agency is as follows:
Fresno County Environmental Health
3. The Contractor shall notify the Owner and the appropriate regulatory agencies in advance of the
commencement and completion of the test hole and well construction, and prior to the placement of
surface annular seals.
1.1.S SERVICES FURNISHED BY THE OWNER
1.The Owner has obtained the necessary legal right-of-way for the drilling and well construction work.
2.Water for drilling will be made available at no cost to the Contractor at or near each work site.
1.1.6 REFERENCE POINTS
The Owner shall stake the location of the test hole as well as any setback boundaries defined under California Well
Standards Bulletin 74-90 Part II Section 8.
1.1.7 WORK AREA RESTRICTIONS
A. General--The Contractor shall protect all existing facilities and shall keep the site clear and open all the
time. The Contractor may use, without cost, all open areas on the project site, and as approved by the
Owner,for the Work.
B. Coordination With Other Activities -- Contractor is advised that other work by the Owner may be
conducted at the project site. The Contractor shall limit all activities to the designated work areas.
C. Work Hours—Drilling operation time and day will be determined by the Contractor.
D. Health and Safety--Contractor shall provide and adhere to a health and safety plan to address actual
or potential hazards associated with the Work. A copy of the Contractor's health and safety form shall be
posted at the job site.
E. Hazardous Materials -- The Contractor shall comply with all government laws, rules and regulations
concerning the use of hazardous materials and the disposal of hazardous wastes at the job site, including
but not limited to the following:
1. The Contractor shall not bring hazardous materials onto the job site or deliver hazardous
materials without providing the Owner, in advance, Material Safety Data Sheets for each
hazardous material.
2.All hazardous material shall be stored and used in a safe manner and shall not be stored or used
in any vehicular or pedestrian traffic lanes.
3. Any hazardous products, waste or empty containers used or generated shall not be poured
down any drain or sewer nor disposed of in any trash container or dumpster.
4.The Contractor will be considered to be the hazardous waste generator and will be responsible
for the legal transport and disposal of all hazardous waste. No containers or trash will be left in
any building or on any job site.
S.Violation of any of the above methods shall be sufficient cause for the Owner to stop all work.
Any expense incurred by the Owner caused by the work stoppage will be borne by the Contractor.
These expenses will include all costs to return the job site,and all other areas contaminated by the
Contractor to a hazard-free condition.
6.The Contractor will be solely responsible for all the costs, including fines and penalties,for the
investigation and cleanup of any suspected hazardous materials the Contractor used, left on the
job site,or disposed through a municipal drain or sewer,and any damage to property and/or injury
to any person.
1.1.8 CONSTRUCTION INSPECTION
The work specified in the Technical Provisions will be inspected by the Owner, or Owner's agent, at various stages
of the construction.
1.1.9 SITE SECURITY
The Contractor shall provide suitable means of protecting the borehole(s)from the entrance of foreign objects at
all times for the duration of the contract.
1.1.10 WATER FOR DRILLING
The Contractor is responsible for delivering the water to the drilling site from the water source located on site
assigned by the Owner. The Contractor must comply with any connection and metering requirements set forth by
the water supplier.
1.1.11 NUISANCE WATER,DEVELOPMENT WATER,AND DRILL CUTTINGS
A. Nuisance Water--Nuisance water, such as rainfall or surface runoff, may occur at the well sites during
the period of construction under this contract. The Contractor shall at all times protect the Work from
damage by such waters and shall take all due measures to prevent delays in progress of the Work caused
by such waters.
B. Development Water -- During development and testing of the well, the discharge water shall be
disposed of in such a manner as to cause the least impact to the site and vicinity.
(Check one)
Clean, low turbidity water produced during well development and testing will be discharged
in the vicinity of the project site(s)as directed by the Engineer.
X All water produced during well development and testing will be contained as to not harm or
destroy property.
C. Drill Cuttings and Development Solids--The Contractor is responsible for handling of drill cuttings and
development solids.
(Check one)
Drill cuttings and development solids may be spread at each site as directed by the Engineer.
X Drill cuttings and development solids shall be contained and lawfully disposed of offsite.
1.1.12 CONTINGENCIES
Materials and/or support services in connection with the Work,which are deemed"extraordinary"or"site-specific,"
and not"contemplated" under the Agreement shall be paid for separately.
1.2 MEASUREMENT AND PAYMENT
1.2.1 GENERAL
Direct payment will be made only for the items listed in the proposal. Items of work not listed, but necessary to
satisfactorily complete the Work, will not be paid for separately; and all costs in connection therewith shall be
considered to be included for payment with the listed items.
1.2.2 ITEM NO. 1: MOBILIZATION and DEMOBILIZATION
A. Measurement:—Mobilization for test hole drilling and well construction, satisfactorily completed, will
be paid for at the applicable lump sum price stated in the proposal.
B. Payment: -- Mobilization will be made at the unit prices stated in the proposal. Such payment will be
considered full compensation for mobilizing all labor, material, permit fees,tools and equipment necessary
and incidental to drill the test holes and construct the monitoring wells.
1.2.3 ITEM NO.2:TEST HOLE DRILLING
A. Measurement:—Test hole drilling will be measured as the number of lineal feet for which drill cuttings
and a geophysical log are acquired.
B. Payment:—Payment for test hole drilling will be made on a linear foot basis at the unit price stated in
the proposal. Such payment will be considered full compensation for furnishing all labor, material, tools
and equipment necessary and incidental to complete the test hole.
1.2.4 ITEM NO.3:GEOPHYSICAL LOGGING
A. Measurement and Payment:--Payment for this item shall be considered full compensation for all labor,
tools,equipment, insurance and doing all work necessary and incidental to running a geophysical log in the
test hole, including standby time. If the Owner requests additional logging runs, in writing,the Contractor
shall be paid for the additional logging"at-cost plus 15 percent".
1.2.5 ITEM NO.4:TEST HOLE REAMING
A. Measurement:—Borehole reaming will be measured as the number of lineal feet successfully completed
for construction of well.
B. Payment:--Payment for borehole reaming will be made on a linear foot basis at the unit price stated in
the proposal. Such payment will be considered full compensation for furnishing all labor, material, tools
and equipment necessary and incidental to complete the test hole reaming.
1.2.6 ITEM NOS.5a,5b:WELL CASING AND SCREEN
A. Measurement:—Well casing and screens shall be measured in place to the nearest whole unit of lineal
feet satisfactorily installed in the final well.
B. Payment:--The quantities of well casing and well screen, satisfactorily installed, will be paid for at the
applicable unit prices stated in the proposal for each item. Such payment will be considered full
compensation for furnishing all labor, material, tools and equipment necessary and incidental to
installation.
1.2.7 ITEM NO.6:GRAVEL ENVELOPE AND INTERMEDIATE SEALS
A. Measurement:—Gravel envelope and intermediate seals will be measured in place to the nearest whole
unit of lineal feet of annular space satisfactorily filled in the final well.
B. Payment:--The quantities of gravel envelope and intermediate seals satisfactorily installed,will be paid
for at the applicable unit prices stated in the proposal for each item. Such payment will be considered full
compensation for furnishing all labor, material, tools and equipment necessary and incidental to
installation.
1.2.8 ITEM NO.7:CEMENT ANNULAR SEAL
A. Measurement: — Annular seals will be measured in place to the nearest whole unit of lineal feet of
annular space satisfactorily filled in the final well.
B. Payment: --The quantity of annular seal, satisfactorily installed, will be paid for at the applicable unit
prices stated in the proposal for each item. Such payment will be considered full compensation for
furnishing all labor, material,tools and equipment necessary and incidental to installation.
1.2.9 ITEM NO.8:WELL DEVELOPMENT
A. Measurement and Payment:--The development of the well piezometers,satisfactorily completed,will
be paid for at the lump sum price stated in the proposal. Such payment will be considered full compensation
for furnishing all labor, material, tools and equipment necessary and incidental to developing the
piezometers.
1.2.10 ITEM NO.9:WELL SURFACE COMPLETION
A. Measurement and Payment: --The well surface completion, satisfactorily installed, will be paid for at
the lump sum price stated in the proposal. Such payment will be considered full compensation for
furnishing all labor, material, tools and equipment necessary and incidental to installation of the security
completion.
1.2.11 ITEM NO. 10:STANDBY TIME
A. Measurement:—Standby time,ordered by the Owner,will be measured to the nearest one-quarter unit
as the number of hours of idle time for drilling equipment and crew.
B. Payment:--Standby time,ordered and approved by the Owner,will be paid for at the unit price specified
in the proposal.
1.2.12 ITEM NO. 11:SITE CLEAN-UP,RESTORATION,AND RECORDS
A. Measurement and Payment:—The site clean-up, restoration, and submission of records satisfactorily
completed will be paid for at the lump sum price stated in the proposal. Such payment will be considered
full compensation for furnishing all labor,material,tools and equipment necessary and incidental to restore
the site to its original condition.
1.2.13 ITEM NO. 12:SUPPLEMENTAL WORK
A. Supplemental Work:-This item is provided to account for supplemental work for unforeseen work
which the Engineer determines is necessary to allow for the work required by the Contract Documents to
proceed as intended without interruption.This item will be used only for this purpose.The dollar amount
listed on the Bid Proposal Form is an estimated allowance set aside by the County and shall be included on
each Bidder's Bid Proposal sheets. Supplemental work shall be performed only upon direct written
authorization from the Engineer and daily extra work reports shall be submitted to and approved by the
Engineer.The Contractor shall maintain separate records for extra work performed in accordance with the
provisions of Section 5-1.27, "Records," of the Standard Specifications and the special provisions. The
Contractor will be paid only for the value of completed supplemental work which has been authorized in
writing by the County.The value of work,which the Owner may authorize under this item,may be less than
the amount shown on the Bid Proposal sheet,and it could be that no supplemental work will be authorized
at all. Accordingly, payments to the Contractor for supplemental work will likely differ substantially from
the estimated Allowance which is included in the Bid Proposal. If no supplemental work is authorized or if
no authorized supplemental work is performed, then no payments will be made to the Contractor under
this Bid item and the Contract Price will be reduced by the full amount of the item included in the Bid
Proposal for supplemental work.The provisions in Section 9-1.06, "Changed Quantity Pay Adjustments"of
the Standard Specifications shall not apply to the item "Supplemental Work Allowance. "The Contractor
shall have no claim for anticipated overhead or profit should the County fail to authorize any supplemental
work or should the value of authorized supplemental work be less than anticipated by the Contractor.
II.TECHNICAL PROVISIONS
2.1 GENERAL REQUIREMENTS
2.1.1 SCOPE OF WORK
A. Purpose --The test hole shall serve to evaluate the lithologic character of subsurface formations and
aquifers at the candidate well site and to determine characteristics of the aquifer materials through
geophysical surveys and measurements. The monitoring well will be used to sample ground water and
measure water levels at selected depth horizons. The test hole shall be converted to single or multiple
completion monitoring well with up to three, 2-inch diameter piezometers. Piezometers shall be
constructed of Schedule 40 PVC casing and screen.
B. Test Hole Drilling and Monitoring Well Construction
1. The Work to be completed under this Contract will consist of furnishing all materials, labor,
equipment,fuel,tools, transportation and services for the drilling, sampling and logging of a test
hole at the selected site. The test hole shall be converted to a permanent monitoring well. Up to
three individual piezometers may be installed in the reamed borehole. In the event that the Owner
does not elect to convert the test hole to a monitoring well,the test hole shall be destroyed in the
manner specified herein.
2. The project site is located at 36.713453, -120.242149 in Fresno County, CA. A map of the
proposed well site is attached in Figure 1
3.The Contractor shall contact Underground Service Alert (USA) no less than two full working days prior to drilling
to verify that the staked well locations are not within the path of buried utilities. The Contractor shall immediately
notify the Engineer and the Utility owner if they disturb,disrupt or damage any utility. No extra compensation will
be made for the repair of any services or mains damage. The Contractor shall also contact Fresno County Health
Department 48 hrs. prior to drilling at any well sited by the Contractor.
3.The test hole shall be drilled to a depth of 580 feet bgs. The actual depth of the test hole
will depend on the lithology encountered. A driller's log will be prepared to define the lithology
encountered during construction, drill cuttings of the formations encountered will be collected,
and the test hole will be logged with electric geophysical logging equipment.
S.The minimum diameter of the test hole is 8%-inches.The contractor may drill a larger diameter
test hole at his own expense.
4. The final design for the monitoring well will be prepared by the Engineer after evaluating the
test hole data.
5.Cuttings,drilling fluids,and development water shall be contained.The Contractor shall take full
ownership of cutting, drilling fluids, and development water and be responsible for handling and
proper offsite disposal unless otherwise directed by the Engineer.
C. Preliminary Monitoring Well Design
1.A conceptual, preliminary monitoring well design is depicted in the Plans. It is anticipated that
two piezometers will be installed in the reamed test hole with a combination of intermediate and
surface seals as shown conceptually in the preliminary design.The piezometer assemblies will be
equipped with appropriate centralizers to ensure that the screen intervals are adequately spaced
from the borehole wall.
2.A graded gravel envelope will be placed between the casing assemblies and the borehole from
the bottom of the well to the surface by the tremie pipe method. Intermediate seals, consisting
of graded bentonite chips in saturated zones, and sand/cement grout in unsaturated zones, may
be specified to isolate screened intervals. A sanitary/annular seal shall consist of a sand/cement
grout.
3. At the completion of well development an above-ground surface completion shall be
constructed,as directed by the Engineer.
D. SUBMITTAL REQUIREMENTS - The Contractor shall prepare and submit at a minimum, the following
information for each monitoring well:
1. Geophysical Logs (geophysical logging to be performed by Engineer approved logging firm and
paid for by the Contractor).
2. Well Completion Report showing the location of the well, casing diameter and wall thickness,
lengths and locations of casing installed, type of perforation and slot size, perforated interval(s),
borehole diameter, gradation of gravel pack, location of fine sand, annular seals, and other
pertinent information found on State Well Completion Reports.
3. Development records showing duration and volume of water pumped, and all other pertinent
information concerning development by pumping.
4. Manufacturer's or supplier's standard literature and certification that the following materials
for the monitoring well comply with this specification (to be submitted before well construction):
Blank Well Casing Perforated Well Casing Gravel Pack Annular Seal Material
S. Drilling plan including drill rig to be used, water disposal method and excavation disposal
method
6. Discussions on any problems, unique circumstances or other issues worthy of discussions that
were encountered during drilling and construction.
E. Local and State Standards
1. All drilling and well construction activities shall comply with local and State standards. If a
conflict arises between the Technical Provisions and regulatory requirements,the Contractor shall
immediately notify the Owner and not proceed until the Owner resolves the conflict.
2. It is the Contractor's sole responsibility to satisfy the well permitting requirements.
2.1.2 LOCAL CONDITIONS
The materials expected to be encountered during drilling of the borehole include interbedded clays, silts,
sands,and gravel.
2.1.3 DRILLING FLUID CONTROL PROGRAM
A drilling fluid program shall be employed by the contractor in accordance with the following general conditions.
1.A drilling fluid control program shall be prepared by a qualified, professional drilling fluids engineer and
submitted to the Owner for approval. Selection and use of the drilling fluid materials shall be a part of this
agreement. The Contractor shall be responsible for maintaining the quality of the drilling fluid to assure
protection of water bearing and potential water bearing formations exposed in the borehole,and the ability
to obtain reliable representative samples of the formation materials.
2.Material used by the Contractor to prepare the drilling fluid shall be composed of water from an assigned
source and drilling additives processed to meet or surpass the specification in the American Petroleum
Institute "Std. 13-A for Drilling Fluid Materials". All drilling fluid additives will comply with recognized
industry standards and practices and they shall be used as prescribed by the manufacturer. Toxic and/or
dangerous substances shall not be added to the drilling fluid.
3. The drilling fluid for the rotary construction shall be made up of high grade bentonite clays or organic
polymer additives in common drilling usage in the water well industry,and shall possess such characteristics
as required to condition the walls of the borehole to prevent caving of formations and excessive loss of
circulation,facilitate removal of the cuttings, and produce an easily removed thin filter cake.
4. In accordance with these Technical Provisions, the Contractor shall submit a drilling fluid program for
approval prior to construction. The submittal shall include the recommendations for make-up water
conditioning, quantities of clay base, and additives required to maintain a drilling fluid having properties
within the ranges specified below for test hole drilling and reaming operations.
The drilling fluid shall be maintained in such a manner as not to exceed the properties specified above for
weight, viscosity, and sand content without the approval of the Owner. In addition, the Contractor shall
maintain the minimum viscosity of the drilling fluid that will raise cuttings and adequately condition the
walls of the holes. At the completion of all drilling operations, the drilling fluid shall be conditioned and
meet the following property ranges for well construction.
Direct Circulation
Property Drilling Method
a) Weight: 8.7—9.3 lbs./gal
b) Marsh Funnel Viscosity: 28—35 sec/qt
c) API Filter Cake Thickness: <3/32
d) Sand Content of Returns: < 1/2%by volume
S.The drilling rig must be provided with equipment to measure the drilling fluid weight,viscosity,API filter
cake, and sand content.
6.The Contractor shall maintain a current log describing the condition of the drilling fluid on the site. The
log shall include the following:
a)time,depth and results of all drilling fluid tests;
b) materials added to the system;type,quantity,time, and depth;
c)variances or modifications from approved drilling fluid program (e.g.,time,depth, reason,and
authorization).
7. Proper control of the drilling fluid must be maintained to the satisfaction of the Owner. The Contractor
will be required, at the Contractor's expense,to retain or employ an experienced, qualified drilling fluid, or
mud,engineer to supervise and maintain drilling fluid characteristics to the satisfaction of the Owner if such
control cannot be accomplished by the Contractor.
8. If at any time the drilling fluid is not in compliance with these Technical Provisions or the
recommendations of the drilling fluid engineer,as approved by the Owner,the properties shall be adjusted
and the tests rerun until the drilling fluid obtains the specified characteristics. If the specified properties
cannot be maintained,the drilling fluid shall be replaced.
9.The Contractor shall provide one complete direct rotary drilling unit with shaker, de-sanding cones, and
containment facilities if directed by the Engineer.
2.2 MATERIALS
2.2.1 CERTIFICATES OF COMPLIANCE
If requested by the Owner,the Contractor shall provide certificates of compliance as specified herein.
A. Items Requiring a Certificate of Compliance
1. The Contractor shall submit to the Owner for approval, certificates of compliance for the
following materials:
a) Cement Grout Sealing Material
b) Blank Well Casing
c)Well Screen
d)Gravel Envelope Material
2. No material shall be incorporated into the Work until certificates of compliance have been
approved in writing by the Owner.
B. Content of Certificates of Compliance
1. Certificates of compliance from the Contractor, suppliers, and/or manufacturers, shall clearly
indicate that the material to be delivered to the job site will meet all requirements of the project
Technical Provisions. A certificate of compliance shall include, but not be limited to the project
title, delivery location, date (or approximate date) of delivery, name of the material with
appropriate classification or model numbers, quantity, name of the manufacturers, statement of
compliance with all requirements of the Technical Provisions,and the name,title and signature of
the certifying agent.
2.A factory or mill certification (laboratory test report) shall be submitted with the certificates of
compliance for all components of the casing assembly. The factory or mill certification shall not
be a substitute for the certificate of compliance, unless it contains all information required for a
certificate of compliance as described above.
3. Insufficient, incomplete, or unclear certificates will be rejected and the Contractor shall be
responsible for all delays caused by any need for re-submittal.
C. New Materials--All materials provided by the Contractor shall be new.
2.2.2 MATERIALS SPECIFICATIONS
A.Sealing Material--Sealing material,consisting of sand-cement grout shall be employed for abandonment
purposes and surface seal in the well. Bentonite chips as well as sand/cement grout may be employed in
the well for intermediate seals and to limit infiltration of cement grout into the gravel envelope.
1.The sealing material shall be composed of a slurry of sand-cement grout. The grout shall consist
of a sand-cement mixture in accordance with California Department of Water Resources Well
Standards, Bulletin 74-81/Supplement 74-90.
2. The mixture for the surface, or sanitary, seal shall conform to State standards and local
ordinances for sanitary seals.
3.The bentonite sealing material shall be a graded chip bentonite with granules ranging from 1/4
inch to 3/8 inch. An approved product for the bentonite seals is"HOLEPLUG"as manufactured by
the NL Baroid Division of NL Industries, Inc.
B. Well Casing and Screen Material
1. The PVC well casing and well screen for the monitoring well will be made of ASTM F-480-88A
Schedule 40 and Schedule 40 PVC.The ends of each joint shall be threaded and coupled with 0-
ring seals.The blank casing will be 2-inch Schedule 40 PVC,ASTM F480-88a.The well screen shall
be fabricated from the same material as the blank casing. The perforations shall be machine cut
horizontal slots,with openings of 0.030 inch.
2. The bottom of each PVC casing assembly shall be furnished with PVC threaded, pointed or
rounded end cap of the same schedule and size as the casing and the same specifications as
described herein.
3. Each casing will be fitted with appropriate centralizers to ensure that the well casings meet the
minimum 2-inch separation distance from the borehole wall
4.The top of each casing shall be furnished with a watertight and locking security plug.
C. Gravel Envelope--All gravel or coarse-grained sand for packing shall be hard,water-worn, and washed
clean of silt, fine sand, dirt, and foreign matter (crushed gravel will not be accepted). It shall be well
rounded, graded, and selected. The gravel envelope material is specified to be Silica Resources
Incorporated (SRI) (Marysville, CA)sand, or equal. Alternative materials are subject to the approval of the
Engineer. A description and sieve analysis of gravel packing materials to be delivered to the site must be
submitted prior to the use of the material in the Work. The gravel, if stockpiled at the well site, shall be
protected and kept free of foreign matter.
2.3 TEST HOLE DRILLING AND MONITORING WELL CONSTRUCTION
2.3.1 MOBILIZATION
A. General
1. Mobilization shall include acquisition of all necessary permits; transportation of personnel,
equipment, and operating supplies to and from the site establishment of portable sanitary
facilities, preparing a work site sufficient to support equipment and personnel in a safe and
workman-like manner, and other preparatory work at the site required by the Contractor for
his/her operations.
2. The Contractor shall provide one complete direct rotary drilling unit with shaker, de-sanding
cones,and containment facilities if directed by the Engineer. The Contractor shall also provide all
tools, accessories, power,fuel, materials, supplies, lighting, necessary to conduct efficient drilling
operations. The drilling unit shall be in good condition and of sufficient capacity to perform the
specified drilling and well construction.
2.3.2 TEST HOLE DRILLING
A. Scope -- The test hole shall be drilled using the direct rotary method. The hole shall be drilled at a
minimum diameter of 8-3/4 inches. The final depth of the test hole will depend on location and the lithology
encountered while drilling and will be determined by the Engineer. It is anticipated that the test hole will
need to be drilled to a depth of 580 feet.
B. Methods
1. The test hole shall be drilled using the direct circulation rotary drilling method of
construction. The drilling fluid for the direct rotary drilling operation shall conform to the
specifications in SECTION 2.1.3.
2.The drilling operations shall be conducted using equipment that is adequate to reach the depth
and perform the evaluations specified in the Technical Provisions. If, in the opinion of the
Engineer, the Contractor's equipment is not capable of satisfactorily performing the specified
work, the Contractor, at his/her own expense, shall substitute equipment satisfactory to the
Engineer.
3. The Contractor shall take all measures necessary to protect the top portions of the test hole
from caving or raveling.
4.The Contractor shall keep records providing the following information:
a)A record of construction activities for each shift.
b)A time drilling log of the test hole recording the time(in minutes) required to
drill down each section of drill pipe.
c)A log of drilling bit types and depths of changes.
d) Record of drilling fluid properties at 4-hour intervals during drilling operations. The
record shall show drilling fluid weights,Marsh Funnel viscosity,sand content,drilling fluid
losses, and any additives used.
e) A drilling log which defines and classifies the type of formations encountered during
the drilling. The log will consist of the depth at which each change in formation is
encountered, the classification of the material encountered, its color and particle
size. Classification of silt,sand,gravel,cobbles,etc.shall be based on the size of material
encountered in accordance with the established and accepted geologic standard for
classification of these materials. If more than one size of material is encountered in a
formation such as"sand and clay",an estimate of the quantity of each shall be recorded,
such as "20%sand, 80%clay".
f) All measurements for depth shall be referenced to the existing ground surface at the
well site.
S. During the drilling of the test holes, the Contractor shall collect representative samples of the
rotary drill cuttings at 10-foot intervals and at formation changes. The Owner may direct the
Contractor to collect samples at more frequent intervals if deemed appropriate. The samples
collected shall not be washed. They shall be carefully drained of excess drilling fluid but in a
manner which will preserve the finer particle size of the sample. Each sample taken shall be
preserved in quart-size "Zip-Lock" plastic freezer bags and marked as to date, depth, and well
number. The samples shall be properly stored by the Contractor in a manner so as to prevent
breakage or loss until they are accepted by the Engineer.
6. Upon completion of the test hole drilling, a geophysical log shall be conducted.
2.3.3 GEOPHYSICAL LOGGING
A. Scope--This item shall consist of conditioning the bore hole and conducting geophysical surveys in the
test hole. The geophysical surveys to be run in the test hole are the gamma ray,spontaneous potential and
resistivity surveys.
B. Methods
1.The Contractor shall furnish services for logging the test hole. Acceptable geophysical logging
service companies are Stewart Logging Services or Pacific Surveys. Borehole geophysical logs,
consisting of gamma ray,spontaneous potential (SP)and multiple resistivity,shall be conducted in
the test hole.
2.The spontaneous potential survey shall be plotted on a scale of one-inch equal to plus or minus
20 millivolts. The gamma ray survey shall be plotted on a scale of one-inch equal to plus or minus
20 API units. The multiple resistivity survey shall consist of a point resistivity curve and multiple
resistivity curves employing 16-inch short normal and 64-inch long normal spacings on a one-inch
equal to 20 or 40 ohm scale. All surveys will be plotted on a footage scale of one-inch equal to 20
feet in accordance with the American Petroleum Institute standard.
3. The Contractor is responsible for the integrity of the borehole to assure that the geophysical
logging can be successfully conducted. The Contractor shall maintain circulation in the borehole
with tools on the bottom of the hole until the logging equipment is on location and prepared to
conduct the survey. The logging service company shall obtain a ditch sample of the circulating
fluid for calibration of the logs prior to the securing of the circulating pump. Tools shall then be
pulled by the Contractor and the logging services immediately commenced. If the logging probe
fails to descend to the desired depth,the Contractor,at his/her own expense,shall run the drilling
tools to the target depth to recondition the hole.
4. Upon completion of logging operation, the Contractor will deliver four (4) field prints to the
Engineer. Four final prints and an electronic ASCII file of the geophysical surveys shall be provided
with the final records submittal. The field copies of the electrical log shall be approved by the
Owner before the logging service is released from the site by the Contractor.
2.3.4 TEST HOLE REAMING
A. Scope--This item shall consist of reaming the test holes to the final specified well depth in accordance
with the Engineers'design. The drilling and reaming of the borehole will be conducted by the direct rotary
drilling method to the depth and diameter specified in the Engineers design. Drilling fluid properties must
conform to those specified in SECTION 2.1.3.
B. Methods
1.The test hole shall be reamed to a minimum diameter and depth as specified in the Engineers
design. The drilling fluid for the direct rotary drilling operation shall conform to the specifications
in SECTION 2.1.3. The Contractor shall be responsible for protecting the pilot hole from
caving. The Contractor shall exercise caution to ensure that the hole remains straight and plumb
during the reaming operations.
2.The Contractor shall keep records providing the following information:
a)A record of construction activities for each shift.
b)A time drilling log of the test hole recording the time(in minutes) required to drill
down each section of drill pipe.
c)A log of drilling bit types and depths of changes.
d) Record of drilling fluid properties at 4-hour intervals during drilling operations. The
record shall show drilling fluid weights,Marsh Funnel viscosity,sand content,drilling fluid
losses, and any additives used.
All measurements for depths shall be referenced to the existing ground surface at the well location.
2.3.5 WELL CASING AND SCREEN
A. Scope--This item shall consist of furnishing and installing blank casing and well screen as specified in
the Owner's final design.
B. Methods
1.A wiper trip shall be conducted to ensure that the borehole is open to the total depth prior to
running casing.
2. A tremie pipe of a minimum two-inch diameter shall be run into the borehole to the total
depth of the casing installation. Circulation by pumping shall be commenced using fluid from
the drilling fluid/mud tank of the same viscosity as that in the borehole. Circulation shall
continue for a period of sixty minutes prior to casing installation.
3. With the tremie pipe remaining in the borehole, casing installation shall proceed in
accordance with the final well design for casing installation furnished by the Owner.
4.The casing assemblies shall be installed to the specified depth supported above the ground
surface. The casing shall be capped to ensure that foreign particles are prevented from entering
the casing.
S.The casing shall be suspended in tension from the surface by means of an appropriate hanger
or clamp. The bottom of the casing shall be at a sufficient distance above the bottom of the
reamed hole to ensure that none of the casing will be supported from the bottom of the hole.
6.Circulation through the tremie pipe shall continue during the casing installation.
7.If,for any reason,the casing cannot be landed in the correct position or at a depth acceptable
to the Owner,the Contractor shall remove the casing,recondition the borehole and reinstall the
casing to the specified depth. If the casing cannot be removed from the borehole the contractor
shall construct another well immediately adjacent to the original location and complete the well
in accordance with these Technical Provisions at no additional cost to the Owner. The
abandoned hole shall be sealed in accordance with these Technical Provisions and in accordance
with any laws pertaining to proper well abandonment at no additional cost to the Owner.
8. If any of the casing assembles collapse prior to well completion, the remaining hole shall be
abandoned in accordance with these Technical Provisions at no cost to the Owner. A
replacement borehole and well shall be drilled and constructed at an adjacent location as
directed by the Owner.
2.3.6 GRAVEL ENVELOPE AND INTERMEDIATE BENTONITE SEALS
A. Scope --This item shall consist of providing and installing gravel or coarse-grained sand opposite the
screen intervals and intermediate bentonite or sand/cement seals between the screen intervals, as
specified by the Engineer, in the annulus between the casing and screens and the well bore of each well.
Intermediate bentonite seals may be used in saturated zones. Sand/cement grout shall be used for
intermediate seals in unsaturated zones.
B. Methods
1. Prior to placement of the gravel pack and intermediate seals in the well, the drilling fluid shall
be thinned with clean water. Thinning shall be accomplished by reducing the viscosity of the
drilling fluid in the sump to a maximum marsh funnel viscosity of 30 seconds and a maximum
weight of 8.9 pounds per gallon by the addition of clean water to the sump. The Contractor shall
avoid the direct injection of water into the well bore through the tremie pipe in order to prevent
unbalancing the fluid consistency in the borehole.
2.Gravel packing and sealing material shall be pumped or gravity fed through the tremie pipe. The
gravel pumping system shall consist of a hopper,which will allow for the calculation of the amount
of gravel packing material entering the borehole. The Contractor shall provide the Owner with a
schematic drawing of the system of gravel placement he intends to employ prior to the installation
of casing.
3.The tremie pipe shall be removed in approximately twenty-foot intervals when the gravel in the
borehole reaches the tremie pipe.
4.The quantities of gravel placed in the annulus of each well shall not be less than the computed
volume of the annulus. A quantity less than the computed value will be judged as an indication of
voids,and corrective measures shall be taken by the Contractor.
S. If the volume of gravel installed in the annulus is less than the theoretical volume,the well may
be rejected by the Engineer.
6.Gravel packing and bentonite seal placement shall continue uninterrupted until the gravel pack
reaches the depth of the surface seal.
2.3.7 ANNULAR SEAL
A. Scope --. This item shall consist of providing and installing a sand/cement grout annular seal in the
annulus between the casing(s) and the well bore.
B. Methods - Installation of the annular seal shall conform to State Water Well Standards and the
requirements of the well permitting agency.
1)The Contractor shall proceed with sealing operations after the Engineer verifies the depth of the
top of the gravel in the well annulus.
2)The tremie pipe shall be installed no more than 5 feet above the placed gravel envelope before
beginning seal placement. The bottom of the tremie pipe shall remain submerged in the sealing
material maintaining a positive displacement throughout the sealing process until the grouting
material has reached the ground surface.
3)The Contractor shall take measures to ensure that the weight of the cement column does not
collapse the well casing during the sealing operation.
4)Well development shall not commence until a minimum of 24 hours after placement of the seal.
2.3.8 Well Development
A. Scope --. This item shall consist of airlift pumping and surging of the wells. The purpose of well
development is to remove drilling fluids and to develop the gravel pack and aquifer to ensure that proper
ground-water samples may be obtained from the piezometers.
B.Methods
1.The Contractor shall provide an air compressor, sufficient pipe, and necessary equipment used
for pumping that shall be capable of pumping 25 gpm from a static water level of 300 feet during
development.
2.The air compressor used during well development shall be fitted with in-line filters to prevent
volatile organic compounds from entering the well casings from the compressor. A 0.3-micron
pre-filter and a 0.01-micron filter run in series and verified compatible to the Contractor's
compressor will be required during all phases of well development. The Contractor shall furnish
the Owner with the make and model number of the air compressor to be used and the
manufacturer and model number of the proposed filters to be used prior to the construction of
the wells.
3. After the placement of the gravel envelope and annular seals has been completed, the gravel
envelope shall be cleaned of all fluids, cake, and substances that would impair the flow of water
into the well and the quality thereof. Cleaning shall be accomplished by airlift pumping and surging
until the gravel has been cleaned and consolidated.
4. Pumping will be done with a minimum 3/8-inch diameter air pipe using the well casing as the
eductor pipe. The air compressor and necessary equipment used for pumping shall be capable of
pumping 25 gpm from a static water level of 300 feet during development. The pumping
operations will be conducted until the well is fully developed and discharging clean ground water.
6. The development shall continue until the well produces water free of sand and the following
turbidity guidelines can be achieved after surging the well. For piezometers that produce less than
2 gpm, a turbidity of 10 NTU within two casing volumes of purging. For piezometers that produce
at least 2 gpm,a turbidity of 5 NTU must be achieved within two casing volumes of purging.
2.3.9 SURFACE COMPLETION
A. Scope--This item shall consist of furnishing and installing an above ground or flush mount(vault)surface
completion on the Plans and in accordance with State and local standards.The type of surface completion
shall be:
(Check one)
X Flush mount
Above ground
B. Methods
Above Ground Surface Completion
1.The Contractor shall excavate a 5-foot square hole extending 3 inches below the ground surface.
A 5-foot square wood form 6 inches deep shall be placed over the excavation to form the concrete
pedestal above the ground surface as shown in the Plans.
2. A protective cover constructed of a steel pipe (riser) with a minimum wall thickness of 3/16
inches and a minimum of 4-1/2 feet long and a locking lid shall be installed over the monitoring
well as shown in the plans. The minimum diameter of the riser shall be 8-inches for a single or a
dual completion monitoring well and 14-inches for a triple completion monitoring well.
3. The riser shall be suspended above the top of the well such that the top of the riser is 2 feet
above grade. A concrete slurry shall then be poured and tamped on top of the annular seal such
that the riser is set in concrete. The concrete will be poured and tamped until it is approximately
3 inches below grade. The remaining portion of the excavation and the wood from will then be
poured with concrete slurry, tamped and finished with a graded surface which shall slope gently
away from the riser.
4.The finished concrete pedestal shall be 9 inches in thickness at 6 inches above grade. The riser
set in the center of the pedestal will extend 2 feet above grade. The steel riser shall be painted
with a high-grade rust resistant paint of a neutral color approved by the Engineer.
S.A metal identification tag will be permanently affixed to the well casing.
6. A lockable device will be installed on the lid to prevent tampering or unauthorized access.
Flush Mount Surface Completions
1. At grade (flush mount) construction specifications are attached in Figure 2. Well completions
will be housed in a traffic-rated valve box with a cast iron lid and locking ring.The valve box will be
a Morrison Series 519 manhole or approved equal.
2.The Contractor shall excavate a hole large enough to allow for a 6-inch apron of concrete around
the manhole at ground surface to a depth of 16-inches to allow for the installation of the specified
manhole.
3.The box will be centered over the well casing and set flush with existing grade.
4. A concrete slurry shall then be poured and tamped on top of the annular seal and brought to
grade level such that the box is set in concrete.
S. A metal identification tag will be permanently set in concrete in a location that is visible.
6.A lockable device will be installed on the lid to prevent tampering or unauthorized access.
2.3.10 TEST HOLE ABANDONMENT
A. General--At the Engineer's determination,following completion of geophysical logging operations,the
test hole,or a lower portion of the test hole,shall be destroyed in accordance with State and local standards
for the construction and destruction of wells and other deep excavations.
B. Methods—Sand/cement grout shall be injected from the bottom of the borehole by means of pumping
equipment and a tremie pipe. The tremie pipe may be raised as the grout is placed but the discharge end
must be submerged in grout at all times until the grouting is completed. The test hole shall be filled with
cement grout to within 5 feet of the ground surface. The balance of the hole shall be filled with native
material to the ground surface.
2.3.11 REJECTED BOREHOLE OR WELL
A. General -- No payment will be made for any labor or materials involved in the construction of any
borehole or well when such a hole fails to reach the specified or directed final depth and/or diameter for
any preventable cause, or when such a test hole fails to meet these Technical Provisions. Such holes will
be rejected and shall be replaced as specified herein. Preventable failures include any failure caused by
faulty or inadequate drilling equipment, failure caused by negligence or improper drilling operations or
techniques, failure caused by the installation of faulty or non-approved materials, or failure caused by
improperly protecting drill holes and drilling work from the natural elements, including cave-ins resulting
from existing soil conditions.
B. Sealing and Replacement of a Rejected Borehole or Well--Any rejected borehole or well shall be sealed
at no additional cost to the Owner and in accordance with provisions of Section 2.3.12. Any casing
remaining in the hole shall be cut off at a depth of five feet and the upper portion thereof removed.
C. Non-Payment for Borehole and Well Abandonment
No payment will be made for the abandonment of a rejected borehole or well. The cost of abandonment
shall be borne by the Contractor. Any rejected borehole shall be replaced by another hole adjacent to the
first,or at a location as directed by the Owner.
2.3.12 STANDBY TIME
A. During the drilling operations, it may be necessary for the Engineer to perform work or analysis that will
require the drilling crew and equipment to stand idle. In such an event, the Engineer shall request the
Contractor to cease operations and shall state the anticipated extent or duration thereof. The Contractor
shall promptly cease operations.
B.Within 12 hours after the completion of test hole drilling and logging operations,the Owner will provide
the final design of the wells. Such time will not be considered standby time.
2.3.13 RECORDS
A. Scope--The item consists of preparing final records of the drilling and well construction.
B.Well Completion Records--Prior to final acceptance of a test hole or well,the Contractor shall prepare
and deliver to the Engineer a Driller's Report in the format required by the State of California.
C. Final Prints--The Contractor shall have prepared two(2)final prints of the daily tour reports,the drilling
logs, and as-built construction drawings.
2.3.14 SITE CLEAN-UP AND RESTORATION
A. Scope--This item shall consist of restoring the work site to its original condition after work is completed.
B. Methods--The Contractor shall keep the premises free from accumulations of waste materials,rubbish,
and other debris resulting from the Work, and at completion of the Work, he/she shall remove all waste
materials, rubbish,and debris from and about the well site as well as all tools,construction equipment,fuel
tanks, machinery and surplus materials. The Contractor shall leave the site clean and ready for use by the
Owner. The Contractor shall restore to their original condition all temporary work areas.Any cuttings and
drilling fluids left on site shall be spread by the Contractor at the site at the direction of the Owner. The
Contractor is responsible for any damages to properties adjacent to the sites caused by drilling or
construction activities associated with the Work described herein.
Project Details
Contract Number 24-13-C
i
X: -120.242149 .�
I u
Q C CAD
E.
An
4.
''I" Wildlife - � I
Area
Traction I
15.
a
� Io o Ranch
� J
a
I pr W,
t n Explanation
Fresno County
� All i Management Area
Mendota Wildlife I
't Area
OProposed Monitoring
Well Locations
Q Data sources:
E USGS-waterways,DEM;DWR-subbasin
boundaries;US Census-cities
r 0 0.47 0.95
r�* �� Miles
X Q022&22-033 Fresno Co -1-0331-l�.ppp4Yto DWR and GSP Re0 &Traction RanchUraction Ranch_innagery.a rz N
Fresno County Proposed Monitoring Well
Luhdorff G Figure 1
Scn I mn n i n i Fresno County GSP Implementation
Prop. 68 Round 1 Implementation Project
Consulting Engineers Monitoring Network Enhancements Delta-Mendota Subbasin
Dual Completion Monitoring Well-Traction Ranch
TRAFFIC VALVE BOX WITH VANDAL PROOF
CAST IRON LID.
MORRISON SERIES 519
MANHOLE OR APPROVED EQUAL
CONCRETE 2-INCH SCH 40 PVC
SURFACE REMOVABLE SLIP CAP
SEAL Ir
20"
EXISTING GRADE
4"
or
16
Luhdorff & Typical MW Flush Mount Surface Completion
Scalmanini Figure 2
Consulting Engineers
Client: Fresno County Lat/Lon : TBD
Well Name: Traction Ranch Monitoring Well Drill Date:TBD
LSCE#:24-057 Drilling Method:Direct Rotary
Location: Fresno County,CA Driller:TBD
Geologist:TBD Borehole Depth:TBD
a
Preliminary Monitoring Well Design
L
6
m
0 0
► I I
10.75-Inch Dia.Borehole
50 ►,. ,.
•'
►, Annular Seal-10.5 Sack
►�, �, �` Sand/Cement Grout
100
150
Gravel Envelope-SRI#8
(Typ-)
200
250
zso---
Bentonite Seal(Typ.)
zso---
300 300---
310---
315---
320---
330---
350
Well Casing-2-Inch Dia.
Sch.40 PVC ASTM
F480-88A(Typ.)
400
450 8.75-Inch Dia.Borehole
500
530---
540---
550 550---
Well Screen-2-Inch Dia.
560--- Sch.
sss--- 40 PVC ASTM
F480-88A w/0.030-Inch
570---
Slot Size(Typ.)
s8o---
soo
K\2024 Job Files\24-057
SELF-DEALING TRANSACTION DISCLOSURE FORM
(1) Company Board Member Information:
Name: Date:
Job Title:
(2) Company/Agency Name and Address:
(3) Disclosure (Please describe the nature of the self-dealing transaction you are a party to)
(4) Explain why this self-dealing transaction is consistent with the requirements of Corporations
Code 5233 (a)
(5) Authorized Signature
Signature: Date:
SELF-DEALING TRANSACTION DISCLOSURE FORM INSTRUCTIONS
In order to conduct business with the County of Fresno (hereinafter referred to as "County"), members of
a contractor's board of directors (hereinafter referred to as "County Contractor"), must disclose any self-
dealing transactions that they are a party to while providing goods, performing services, or both for the
County. A self-dealing transaction is defined below:
"A self-dealing transaction means a transaction to which the corporation is a party and which one or
more of its directors has a material financial interest"
The definition above will be utilized for purposes of completing the disclosure form.
(1) Enter board member's name, job title (if applicable), and date this disclosure is being made.
(2) Enter the board member's company/agency name and address.
(3) Describe in detail the nature of the self-dealing transaction that is being disclosed to the County.
At a minimum, include a description of the following:
a. The name of the agency/company with which the corporation has the transaction; and
b. The nature of the material financial interest in the Corporation's transaction that the board
member has.
(4) Describe in detail why the self-dealing transaction is appropriate based on applicable provisions
of the Corporations Codes.
(5) Form must be signed by the board member that is involved in the self-dealing transaction
described in Sections (3) and (4).
ID OOK
TRACTION RANCH MONITORING WELL
BUDGET / ACCOUNT: 4360 / 0300 / 7295
4� co
FRESH Department of Public Works and Planning
Contract Number 24-13-C
BID BOOK TABLE OF CONTENTS
TRACTION RANCH MONITORING WELL
CONTRACT NUMBER 24-13-C
PROPOSAL TITLE
NUMBER(S)
NOT APPLICABLE INSTRUCTIONS FOR COMPLETING THE BID BOOK
1 PROPOSAL TO THE COUNTY OF FRESNO
2 BID ITEM LIST
3 EVALUATION OF BID ITEM LIST
4 BID SECURITY
5 NON-COLLUSION DECLARATION
6 PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
7 PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE AND PUBLIC CONTRACT
CODE 10232 STATEMENT
8 SUBCONTRACTORS
9 TITLE 13,CALIFORNIA CODE OF REGULATIONS§2449(I)GENERAL REQUIREMENTS FOR
IN-USE OFF-ROAD DIESEL-FUELED FLEETS
10-18 NOT USED
19 GUARANTY
Contract Number 24-13-C
INSTRUCTIONS FOR COMPLETING THE BID BOOK FOR NON-FEDERAL AID
PROJECTS
General
Complete forms in the Bid Book.
Submit an electronic bid online at http://www.BidExpress.com (Section 2-1.33D)or submit a hardcopy bid:
1. Under sealed cover addressed to the Department and labeled with the name of the bidder, the name of the
project and the statement'Do Not Open Until The Time Of Bid Opening.'
2. Marked as a bid
3. Identifying the contract number and the bid opening date
Certain bid forms must be submitted with the bid and properly executed.
Certain other forms and information must be submitted either with the bid or within the prescribed period after bid
opening as specified elsewhere in these special provisions.
Failure to submit the forms and information as specified results in a nonresponsive bid.
If an agent other than the authorized corporation officer or a partnership member signs the bid, file a Power of
Attorney with the Department either before opening bids or with the bid. Otherwise, the bid may be
nonresponsive.
Bid Item List and Bid Comparison
Submit a bid based on the bid item quantities the Department shows on the Bid Item List. Bids will be evaluated
and the low bidder determined as indicated in the Notice to Bidders.
Bid Document Completion
Proposal items are identified by title and by the word "Proposal"followed by the number assigned to the proposal
item in question. Proposal items are included in the Bid Book.
Proposal to the Department of Public Works and Planning—Proposal 1
Provided for information.
Bid Item List— Proposal 2
One or more sheet(s) or list(s) upon which the bidder completes the bid.
Fill out completely including a unit price and total for each unit price-based item and a total for each lump sum
item.
Do not make any additions such as "plus tax", "plus freight", or conditions such as "less 2% if paid by 15th".
Use ink or typewriter for paper bids.
Evaluation of Bid Item List—Proposal 3
Describes how inconsistences and irregularities are evaluated and corrected when Design Services reviews the
Bid Item List.
Bid Security and Signature— Proposal 4
Submit one of the following forms of bidder's security equal to at least 10 percent of the bid:
• Cash
• Cashier's check
• Certified check
INSTRUCTIONS FOR COMPLETING THE BID BOOK FOR NON-FEDERAL AID PROJECTS: Page 2 of 4
• Signed bidder's bond by an admitted surety insurer
Indicate type of bid security provided.
• Cash—Acceptable but not recommended. Cash is deposited in a clearing account and is returned to
bidders by County warrant. This process may take several weeks.
• Cashier's or Certified Checks. This type of security is held until the bid is no longer under consideration.
If submitted by a potential awardee, they will be returned when the contract is fully executed by the
bidder and bonds and insurance have been approved.
• Bid Bonds - Must be signed by the bidder and by the attorney-in-fact for the bonding company. Provide
notarized signature of attorney-in-fact accompanied by bonding company's affidavit authorizing attorney-
in-fact to execute bonds. An unsigned bid bond will be cause for rejection.
Bonding companies may provide their own bid bond forms. The Bid Security and Signature sections must be
completed by the bidder and submitted with their bid.
Acknowledge Addenda
Provide contractor's license information.
State business name and if business is a:
• Corporation - list officers
• Partnership - list partners
• Joint Venture- list members; if members are corporations or partnerships, list their officers or partners.
• Individual - list Owner's name and firm name style
Signature of Bidder-the following lists types of companies and corresponding authorized signers.
• Corporation - by an officer
• Partnership - by a partner
• Joint Venture- by a member
• Individual - by the Owner
If signature is by a Branch Manager, Estimator, Agent, etc., the bid must be accompanied by a power of attorney
authorizing the individual to sign the bid in question or to sign bids more generally, otherwise the bid may be
rejected.
• Business Address- Firm's Street Address
• Mailing Address- P.O. Box or Street Address
• Complete, sign, and return with bid.
Noncollusion Declaration —Proposal 5
Must be completed, signed, and returned with bid.
Public Contract Code Section 10285.1 Statement— Proposal 6
Select"has" or"has not" in accordance with instructions on form, return completed form with bid. Note that
signing the bid constitutes signing this statement.
Public Contract Code Section 10162 Questionnaire And Public Contract Code 10232 Statement—
Proposal 7
Select"yes" or"no" accordance with instructions on form, include explanation if"yes" is selected. Return
completed form with bid. Note that signing the bid constitutes signing this questionnaire and statement.
INSTRUCTIONS FOR COMPLETING THE BID BOOK FOR NON-FEDERAL AID PROJECTS: Page 3 of 4
Subcontractors— Proposal 8(a)through Proposal 8(c)
Sheet(s)or spaces where bidders list subcontractors. List each subcontractor to perform work in an amount in
excess of 1/2 of 1 percent of the total bid (Pub Cont Code §4100 et seq.).
The Subcontractor List submitted with the bid must show the name, location of business, work portions to be
performed, the contractor's license number and the public works contractor registration number issued pursuant
to Labor Code Section 1725.5, for each listed subcontractor.
• Use subcontractor's business name style as registered with the License Board.
• Specify the city in which the subcontractor's business is located and the state if other than California.
• Description of the work to be performed by the subcontractor. Indicate with bid item numbers from the
bid item list and/or work descriptions similar to those on bid item list.
• List license number for each subcontractor.
Upon request from Design Services, provide the following additional information within 24 hours of bid opening if
not included on the Subcontractor List submitted with the bid:
• Complete physical address for each subcontractor listed.
• Percentage of the total bid or dollar amount associated with each subcontractor listed.
• Department of Industrial Relations registration number.
Title 13, California Code of Regulations §2449(i) General Requirements for In-Use Off-Road Diesel-
Fueled Fleets— Proposal 9
Contractors, if applicable, must submit valid Certificates of Reported Compliance with their bid. Subcontractor
certificates will be due no later than 4:00 PM on the fifth (51h) calendar day after the bid opening if not submitted
with the bid.
Proposal 10— Proposal 18 —Not Used
Guaranty - Proposal 19
This document may, but does not need to be, submitted with the bid. It is part of the contract documents and
must be separately signed and submitted by the contractor to whom the award is made, together with the
executed Agreement.
INSTRUCTIONS FOR COMPLETING THE BID BOOK FOR NON-FEDERAL AID PROJECTS: Page 4 of 4
PROPOSAL TO THE DEPARTMENT OF PUBLIC WORKS AND PLANNING
COUNTY OF FRESNO
hereinafter called the Owner
TRACTION RANCH MONITORING WELL
The work embraced herein shall be done in accordance with the 2023 Standard Specifications
and with the 2023 Standard Plans, of the State of California, Department of Transportation
insofar as the same may apply and in accordance with these special provisions.
Except to the extent that they may conflict with these special provisions, revised Standard
Specifications apply to the extent included in the section entitled "Project Details" of the book
entitled "Specifications."
The undersigned, as bidder, declares that the only persons, or parties interested in this proposal
as principals are those named herein, that this proposal is made without collusion with any other
person, firm or corporation; that they have carefully examined the location of the proposed work,
the annexed proposed form of contract, and the plans therein referred to; and they propose and
agrees if this proposal is accepted, that they will contract with the Owner to provide all necessary
machinery, tools, apparatus and other means of construction, and to do all the work and furnish
all the materials specified in the contract in the manner and time therein prescribed, and
according to the requirements of the Engineer as therein set forth, and that they will take in full
payment therefor the following unit prices, to-wit:
Proposal 1
Contract Number 24-13-C
Fresno County Department of Public Works and Planning
Bid Item List - Proposal
Contract
4-13-C
Contract Name
Traction Ranch Monitoring Well
Bid Items
Item ID Quantity Unit Unit Price Total
Description
1 1 L8 25,000 00 � � 25,000,00
global ization/Demobi l izati on
2 580 LF 1 45.00 26,100.00
Vest Hole Drilling
3 1 L 3,200.00 3,200.00
Geophysical Logging
4 330 LF $ 30.00 � 9,900.00
Testhole Reaming
5 860 LF 18.00 $15,480.00
Blank Well Casing -2-Inch,AST ASTM P480-88 ch.40 PVC
6 20 LF 30.00 $ 600.00
Well Screen-2-Inch, ABTM F4480-88A Bch.40 PVC w/0.030"Blot Size
7 480 LF 45.00 � 21,600.00
Gravel Envelope and Intermediate Seals
8 100 LF $ 45.00 __j L4,500.00
Cement Annular Beal
9 1 L 6,000.00 j 6,000.00
Well Development
Bid Item List 9/17/2024
24-13-C Page 1 of 2
Item ID Quantity Unit Unit Price Total
Description
10 1 LS 1,5dd.dd��� 1,8dd.dd
Surface Completion
11 1 575.dd � �75.dd
Standby Time
12 1 LS L5,-000,00� 5,000.00
Site Clean-up, Restoration, and Records
13 10,000 1 5:10:,dCld
Supplemental Work
Id Items Total: Eii.dd
Bid Item List 9/17/2024
24-1 3-C Page 2 of 2
EVALUATION OF BID PROPOSAL IT LIST
Abbreviations used in the bid proposal sheet are identified in Section 1-1,06, "Abbreviations," of these
special provisions.
Bids are required for the entire work. Bids will be compared on the basis indicated in the Notice to
Bidders. The bidder shall set forth for each unit basis item of work a unit price and a total for the item,
and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces
provided for that purpose. In the case of unit basis items, the amount set forth under the "Item Total"
column shall be the product of the unit price bid and the estimated quantity for the item.
In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price
shall prevail, except as provided in (a) or (b), as follows:
(a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the
same as the amount as the entry in the item total column, then the amount set forth in the item
total column for the item shall prevail and shall be divided by the estimated quantity for the item
and the price thus obtained shall be the unit price,
(b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is exactly off
by a factor of ten, one hundred, etc., or one-tenth, or one-hundredth, etc. from the entered total,
the discrepancy will be resolved by using the entered unit price or item total, whichever most
closely approximates percentage-wise the unit price or item total in the Owner`s Final Estimate
of cost
If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may
be deemed irregular. Likewise, if the item total for a lump sum item is unreadable or otherwise unclear,
or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a
clear, readable total bid is provided.
Symbols such as commas and dollar signs will be ignored and have no mathematical significance in
establishing any unit price or item total or lump sums, Written unit prices, item totals and lump sums will
be interpreted according to the number of digits and, if applicable, decimal placement, Cents symbols
also have no significance in establishing any unit price or item total since all figures are assumed to be
expressed in dollars and/or decimal fractions of a dollar. Bids on lump sum items shall be item totals
only; if any unit price for a lump sum item is included in a bid and it differs from the item total, the items
total shall prevail.
The foregoing provisions for the resolution of specific irregularities cannot be so comprehensive as to
cover every omission, inconsistency, error or other irregularity which may occur in a bid. Any situation
not specifically provided for will be determined in the discretion of the Owner, and that discretion will be
exercised in the manner deemed by the Owner to best protect the public interest in the prompt and
economical completion of the work. The decision of the Owner respecting the amount of a bid, or the
existence or treatment of an irregularity in a bid, shall be final.
If this proposal shall be accepted and the undersigned shall fail to contract, as aforesaid, and to give the
two bonds in the sums to be determined as aforesaid, with surety satisfactory to the Owner, within eight
(8) days not including Saturdays, Sundays and legal holidays, after the bidder has received notice of
award of the contract, the Owner, at its option, may determine that the bidder has abandoned the
contract, and thereupon this proposal and the acceptance thereof shall be null and void, and the
forfeiture of such security accompanying this proposal shall operate and the same shall be the property
of the Owner.
Proposa13
Contract Number 24-13-C
Bid Security
Accompanying this proposal is security (check one only) in amount equal to at least ten percent
(10%) of the total amount of the bid:
Bid Bond (X); Certified Check Cashier's Check Cash ($
Addenda Acknowledgement
Bidder has and acknowledges the following addenda: e,
Bidder Signature
Business Name
Note: If bidder or other interested person is a corporation, state legal name of corporation. If
bidder is a co-partnership, state true name of firm.
Business Owners and Officers Names Rick Bradliey-President Rod Bradyv-Vice President Gin -Secretary
Note: If bidder or other interested person is:
• a corporation, list names of the president, secretary, treasurer and manager thereof
• a partnership, list names of all individual co-partners composing firm,
• an individual, state first and last name in full.
Names of Owners and Key Employees Rick Bradley-prgaL
Note: List majority owners of your firm. If multiple owners, list all. Also include anyone, including
key employees, who are actively promoting the contract. (SB 1439)
Licensed in accordance with an act providing for the registration of Contractors:
Class -C-57 — Contractor License No. _4.14Z$_ Expires D3-3_1-2026
DI R Registration Number
Business Address: 3625 5, Higb1and Ave.
Zip Code
Mailing Address: Zip Code
Business Phone: 441- _55 _)1401_ Fax Number: ( 9 441 IJ29
Email Address
Signature of Bidder: Z Dated: jD-Q9-2D24_
1
NOTE: If bidder is a corporation, the legal na e of the corporation shall be set forth above
together with the signature of the officer or officers authorized to sign contracts on behalf of the
corporation; if bidder is a co-partnership, the true name of the firm shall be set forth above
together with the signature of the partner or partners authorized to sign contracts on behalf of
the co-partnership; and if bidder is an individual, his or her signature shall be placed above. If
signature is by an agent, other than an officer of a corporation or a member of a partnership, a
Power of Attorney must be on file with the Owner prior to opening bids or submitted with the
bid; otherwise, the bid will be disregarded as irregular and unauthorized.
Proposa14
Contract Number 24-13-C
To the Department of Public Works and Planning, County of Fresno:
NONCOLLUSION DECLARATION
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID*
The undersigned declares:
I am the _QwnjU__ of
(owner, Partner, Corporate Officer (list title), CdVe�ntuier)
Bradlev & So the party making the
foregoing-bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation. The bid is genuine and not collusive or
sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a
false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or
agreed with any bidder or anyone else to put in a sham bid, or refrain from bidding. The bidder
has not in any manner, directly or indirectly, sought by agreement, communication, or
conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any
overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements
contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid
price or any breakdown thereof, or the contents thereof, or divulged information or data relative
thereto, to any corporation, partnership, company, association, organization, bid depository, or
to any member or agent thereof, and has not paid, and will not pay, any person or entity for that
purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership,
joint venture, limited liability company, limited liability partnership, or any other entity, hereby
represents that he or she has full power to execute, and does execute, this declaration on behalf
of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is
true and correct and that this declaration is executed on _JD_0R_, 2024,
at $
city] state]
(Signature)
(See Title 23 United States Code Section 112; Calif Public Contract Code Section /'7
106)
*NOTE: Completing, signing, and returning the Non-Collusion Declaration is a required part of
the Proposal, Bidders are cautioned that making a false certification may subject the certifier
to criminal prosecution.
Proposal
Contract Number 24-13®C
PUBLIC CONTRACT CODE
Public Contract Code Section 10285.1 Statement
In conformance with Public Contract Code Section 10285,1 (Chapter 376, Stats. 1985), the
bidder hereby declares under penalty of perjury under the laws of the State of California that
the bidder has—, has not been convicted within the preceding three years of any offenses
referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any
other act in violation of any state or Federal antitrust law in connection with the bidding upon,
award of, or performance of, any public works contract, as defined in Public Contract Code
Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including
the Regents of the University of California or the Trustees of the California State University.
The term "bidder" is understood to include any partner, member, officer, director, responsible
managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.
Note: The bidder must place a check mark after "has" or "has not" in one of the blank spaces
provided. The above Statement is part of the Bid. Signing this Bid on the signature
portion thereof shall also constitute signature of this Statement. Bidders are cautioned
that making a false certification may subject the certifier to criminal prosecution.
Proposa16
Contract Number 24-13-C
Public Contract Code Section 10162 Questionnaire
In conformance with Public Contract Code Section 10162, the Bidder shall complete, under
penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary
interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on,
or completing a federal, state, or local government project because of a violation of law or a
safety regulation?
Yes No _X
If the answer is yes, explain the circumstances in the following space.
Public Contract Code 10232 Statement
In conformance with Public Contract Code Section 10232, the Contractor, hereby states under
penalty of perjury, that no more than one final unappealable finding of contempt of court by a
federal court has been issued against the Contractor within the immediately preceding two-year
period because of the Contractor's failure to comply with an order of a federal court which orders
the Contractor to comply with an order of the National Labor Relations Board.
Note: The above Statement and Questionnaire are part of the Bid. Signing this Bid on
the signature portion thereof shall also constitute signature of this Statement and
Questionnaire.
Bidders are cautioned that making a false certification may subject the certifier to
criminal prosecution.
Proposal
Contract Number 24-13-C
BIDDER:
SUBCONTRACTORS:
The following named subcontractor(s) will perform with labor, or otherwise render services
to the general contractor in or about the construction of the work or improvement in
an amount in excess of one-half of one percent of the total bid presented herewith. Each
listed subcontractor's name, location of business and description of work, and both
their contractor's license number and public works contractor registration number, issued
pursuant to Section 1725.5 of the Labor Code, are REQUIRED, by Section 4104 of the
California Public Contract Code, to be submitted prior to bid opening. (The "location
f business" must specify the city in which the subcontractor's business is located, and
the state if other than California.) All other requested information shall be submitted,
either with the bid or within 24 hours after bid opening.
Please fill out as completely as possible when submitting your bid. Use subcontractor's
business name style as registered with the License Board.
FAILURE TO LIST SUBCONTRACTORS AS DIRECTED MAY RENDER TIME BID NOW
RESPONSIVE, OR MAY RESULT IN ASSESSMENT OF A PENALTY AGAINST THE
BIDDER IN ACCORDANCE WITH SECTION 4110 OF THE CALIFORNIA PUBLIC
CONTRACT CODE.
�SUBCONTRACTOR:
Business address: 4456 Via Saint AMbrose QaLelngn"A1
s Mass License No. DIR registration No. 1. D0 9 4.DC}f
Item No. or Description of Work: €
I
Dollar Amount Or Percentage of Total Bid
Email Address: I
! SUBCONTRACTOR: �
k
Business Address:
Mass License No, DIR Registration No
Item No. or Description of York: ,
0 Dollar Amount OR Percentage of Total Bid
Email address:
Proposal 8(a)
Contract Number 24.-1 wC
TITLE 13, CALIFORNIA CODE OF REGULATIONS § 2449(1) GENERAL REQUIREMENTS
FOR IN-USE OFF-ROAD DIESEL-FUELED FLEETS
In conformance with Title 13 § 2449(i), bidders will be required to attach copies of valid
Certificates of Reported Compliance for the fleet selected for the contract and their listed
subcontractors.
Before May 15th of each year, the prime contractor must collect a new valid Certificate of
Reported Compliance for the current compliance year, as defined in section 2449(n), from all
fleets that have an ongoing contract with the prime contractor as of March 1 of that year.
Prime contractors must not write contracts to evade this requirement. Annual renewals must
be provided to the Resident Engineer at least one week prior to the expiration date of the
current certificate.
https://ww2.arb ca gov/resources/fact-sheets/fact-sheet-contracting-requirements
Choose all that apply:
I Bidder's Certificate of Reported Compliance has been attached to the bid.
Bidder does not have a fleet subject to this regulation as outlined in Section 2449(i)(1)-(4).
LIJ Listed subcontractors' certificates have been attached or will be submitted within five (5)
calendar days of the bid opening.
X The following subcontractors do not have a fleet subject to this regulation as outlined in
Section 2449(i)(1)-(4):
Pacific Survers LLC
FAILURE TO PROVIDE THE CERTIFICATES OF REPORTED COMPLIANCE AS
DIRECTED MAY RENDER THE BID NON-RESPONSIVE.
Proposal — 9
Contract Number 24-13-C
(This guaranty shall be executed by the successful bidder in accordance with instructions in the
special provisions. The bidder may execute the guaranty on this page at the time of submitting
his bid.)
GUARANTY
To the Owner: County of Fresno
CONTRACT NUMBER 24-1 -C
The undersigned guarantees the construction and installation of the following work included in
this project:
ALL WORK
Should any of the materials or equipment prove defective or should the work as a whole prove
defective, due to faulty workmanship, material furnished or methods of installation, or should
the work or any part thereof fail to operate properly as originally intended and in accordance
with the plans and specifications, due to any of the above causes, all within twelve (12) months
after date on which this contract is accepted by the Owner, the undersigned agrees to reimburse
the Owner, upon demand, for its expenses incurred in restoring said work to the condition
contemplated in said project, including the cost of any such equipment or materials replaced
and the cost of removing and replacing any other work necessary to make such replacement or
repairs, or, upon demand by the Owner, to replace any such material and to repair said work
completely without cost to the Owner so that said work will function successfully as originally
contemplated,
The Owner shall have the unqualified option to make any needed replacement or repairs itself
or to have such replacements or repairs done by the undersigned. In the event the Owner
elects to have said work performed by the undersigned, the undersigned agrees that the repairs
shall be made and such materials as are necessary shall be furnished and installed within a
reasonable time after the receipt of demand from the Owner.
Name (Printed): $
Signature: OZL
Title: ,Vice Preside
Date: 10-09-2024 Contractor: ,Bradley & Snn's,. Ing
Proposal — 19
Contract Number 24-13-C
AGREEMENT
THIS AGREEMENT made at Fresno, in Fresno County, California, by and between Bradley and Son's,
Inc hereinafter called the Contractor, and the County of Fresno hereinafter called the Owner.
WITNESSETK That the Contractor and the Owner, for the consideration hereinafter named, agree as
follows:
ARTICLE I. The Contractor agrees to furnish all labor and materials, including tools, implements, and
appliances required, but excluding such materials as are mentioned in the specifications to be furnished
by the Owner, and to perform all the work in a good and workmanlike manner, free from any and all liens
and claims of mechanics, materialmen, teamsters, subcontractors, artisans, machinists, and laborers
required for:
TRACTION RANCH MONITORING WELL
CONTRACT NUMBER: 24-13-C
All in strict compliance with the plans, drawings and specifications therefor prepared by the Owner, and
other contract documents relating thereto.
ARTICLE II. The Contractor and the Owner agree that the Notice to Bidders and Special Provisions,
the Wage Scale (Prevailing Wages), the Plans and Drawings, Addenda and Bulletins thereto, and the
Proposal (Bid Book) hereto attached, together with this Agreement, form the contract, and they are as
fully a part of the contract as if hereto attached or herein repeated.
All portions of the Standard Specifications of the State of California, Department of Transportation, dated
2015, which are not in conflict with this contract shall be deemed a part of the specifications as though
fully therein set forth; provided, however, that revisions to the said Standard Specifications shall apply
only to the extent, if any, included in the Project Details of these specifications or as otherwise
incorporated directly herein. No part of said specifications which is in conflict with any portion of this
agreement, or which is not actually descriptive of the work to be done thereunder, or of the manner in
which said work is to be executed, shall be considered as any part of this agreement, but shall be utterly
null and void.
ARTICLE III. The Owner agrees to pay the Contractor in current funds for the performance of the
contract the sum of ONE HUNDRED TWENTY-NINE THOUSAND SEVEN HUNDRED FIFTY-FIVE
DOLLARS AND 00/100 ($129,755.00) it being understood that said price is based upon the estimated
quantities of materials to be used as set forth in the Proposal, except where provisions are made in the
contract documents whereby the estimated quantities shall constitute the final quantity; that upon
completion of the project the final contract prices shall be revised by change order, if necessary, to reflect
the true quantities used at the stated unit price thereof as contained in the Contractor's Proposal hereto
attached. Payments on account thereof will be made as set forth in the special provisions.
ARTICLE IV. If the Contractor should be adjudged a bankrupt, or if he should make a general
assignment for the benefit of his creditors, or if a receiver should be appointed on account of his
insolvency, or if he or any of his subcontractors should persistently violate any of the provisions of the
contract, or if he should persistently or repeatedly refuse or should fail, except in cases for which
extension of time is provided, to supply enough properly skilled workmen or proper materials, or if he
should fail to make prompt payment to subcontractors or for material or labor, or persistently disregard
laws, ordinances or the instructions of the Engineer, then the Owner may, upon certificate of the
Engineer when sufficient cause exists to justify such action, serve written notice upon the Contractor
and his surety of its intention to terminate the contract, and unless within five days after the serving of
Contract Number 24-13-C
such notice, such violations shall cease and satisfactory arrangements for correction thereof be made,
the contract shall, upon the expiration of said five days, cease and terminate.
In the event of any such termination, the Owner shall immediately serve written notice thereof upon the
surety and the Contractor, and the surety shall have the right to take over and perform the contract,
provided, however, that if the surety within ten (10) days after the serving upon it of notice of termination
does not give the Owner written notice of its intention to take over and perform the contract or does not
commence performance thereof within the ten (10) days stated above from the date of the serving of
such notice, the Owner may take over the work and prosecute the same to completion by contract or by
any other method it may deem advisable, for the account and at the expense of the Contractor, and the
Contractor and his surety shall be liable to the Owner for any excess cost occasioned the Owner thereby,
and in such event the Owner may without liability for so doing, take possession of and utilize in
completing the work such materials, appliances, plant and other property belonging to the Contractor as
may be on the site of the work and necessary therefor. In such case the Contractor shall not be entitled
to receive any further payment until the work is finished. If the unpaid balance of the contract price shall
exceed the expenses of finishing the work, including compensation for additional managerial and
administrative services, such excess shall be paid to the Contractor. If such expense shall exceed such
unpaid balance, the Contractor shall pay the difference to the Owner. The expense incurred by the
Owner, as herein provided and damage incurred through the Contractor's default, shall be certified by
the Engineer.
ARTICLE V. To the fullest extent permitted by law with respect to any work required to be done under
this contract, the Contractor will indemnify and hold harmless the COUNTY OF FRESNO, STATE OF
CALIFORNIA, CONSULTANTS and all other participating public agencies, whether or not said agencies
are named herein, who have jurisdiction within the areas in which the work is to be performed, and all
officers and employees of the Owner, the County, the State, the United States and said other
participating agencies, from any and all costs and expenses, attorney fees and court costs, damages,
liabilities, claims and losses occurring or resulting to COUNTY in connection with the performance, or
failure to perform, by CONTRACTOR, its officers, agents or employees under this Agreement, and from
any and all costs and expenses, attorney fees and court costs, damages, liabilities, claims and losses
occurring or resulting to any person, firm or corporation who may be injured or damaged by the
performance, or failure to perform, of CONTRACTOR, its officers, agents or employees under this
Agreement. In addition, CONTRACTOR agrees to indemnify COUNTY for Federal, State of California
and/or local audit exceptions resulting from non-compliance herein on the part of CONTRACTOR.
CONTRACTOR agrees to indemnify, save, hold harmless, and at COUNTY'S request, defend the
COUNTY, its officers, agents, and employees from any and all costs and expenses, damages, liabilities,
claims, and losses occurring or resulting to COUNTY in connection with the performance, or failure to
perform, by CONTRACTOR, its officers, agents, or employees under this Agreement, and from any and
all costs and expenses, damages, liabilities, claims, and losses occurring or resulting to any person,
firm, or corporation who may be injured or damaged by the performance, or failure to perform, of
CONTRACTOR, its officers, agents, or employees under this Agreement.
The Certificate of Insurance shall be issued in duplicate, to the COUNTY OF FRESNO and all other
participating agencies, whether or not said agencies are named herein, who contribute to the cost of the
work or have jurisdiction over areas in which the work is to be performed and all officers and employees
of said agencies while acting within the course and scope of their duties and responsibilities.
In the event CONTRACTOR fails to keep in effect at all times insurance coverage as herein provided,
the COUNTY may, in addition to other remedies it may have, suspend or terminate this Agreement upon
the occurrence of such event.
All policies shall be with admitted insurers licensed to do business in the State of California. Insurance
purchased shall be purchased from companies possessing a current AM Best Company rating of A FSC
VI or better.
Contract Number 24-13-C
Without limiting the COUNTY'S right to obtain indemnification from CONTRACTOR or any third parties,
CONTRACTOR, at its sole expense, shall maintain in full force and effect, the following insurance
policies or a program of self-insurance, including but not limited to, an insurance pooling arrangement
or Joint Powers Agreement (JPA) throughout the term of the Agreement:
A. Commercial General Liability
Commercial General Liability Insurance with limits not less than those shown in the following table:
Liability Insurance Requirements
Total bid For each Aggregate for products/completed General b Umbrella or
occurrencea operation aggregate excess liabilityc
15 $500,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000
> $500,000
:5 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $5,000,000
> $1,000,000
<_ $1 00 000 $1,000,000 $2,000,000 $2,000,000 $10,000,000
'Combined single limit for bodily injury and property damage.
bThis limit must apply separately to your work under this Contract.
`The umbrella or excess policy must contain a clause stating that it takes effect (drops down) in the
event the primary limits are impaired or exhausted.
This policy shall be issued on a per occurrence basis. COUNTY may require specific coverages including
completed operations, products liability, contractual liability, Explosion-Collapse-Underground, fire legal
liability, or any other liability insurance deemed necessary because of the of the nature of this contract.
Such Commercial General Liability insurance shall name the County of Fresno, its officers, agents, and
employees, individually and collectively, as additional insured, but only insofar as the operations under
this Agreement are concerned. Such coverage for additional insured shall apply as primary insurance
and any other insurance, or self-insurance, maintained by COUNTY, its officers, agents and employees
shall be excess only and not contributing with insurance provided under CONTRACTOR's policies
herein. This insurance shall not be cancelled or changed without a minimum of thirty (30) days advance
written notice given to COUNTY. CONTRACTOR shall obtain endorsements to the Commercial General
Liability insurance policy naming COUNTY as an additional insured and providing for a thirty (30) day
prior written notice of cancellation or change in terms or coverage.
Within eight (8) days from date CONTRACTOR executes this Agreement, CONTRACTOR shall provide
certificates of insurance and endorsement as stated above for all of the foregoing policies, as required
herein, to the County of Fresno, or to designservicesCc)-a) stating that such insurance
coverages have been obtained and are in full force; that the County of Fresno, its officers, agents and
employees will not be responsible for an premiums on the policies; that such Commercial General
Liability insurance names the County of Fresno, its officers, agents, and employees, individually and
collectively, as additional insured, but only insofar as the operations under this Agreement are
concerned; that such coverage for additional insured shall apply as primary insurance an any other
insurance, or self- insurance shall not be cancelled or changed without a minimum of thirty (30) days
advance, written notice given to COUNTY.
CONTRACTOR shall obtain endorsements to the Commercial General Liability insurance naming the
County of Fresno, its officers, agents, and employees, individually and collectively, as additional insured,
but only insofar as the operations under this Agreement are concerned. Such coverage for additional
insured shall apply as primary insurance and any other insurance, or self-insurance, maintained by
Contract Number 24-13-C
COUNTY, its officers, agents, and employees shall be excess only and not contributing with insurance
provided under CONTRACTOR'S policies herein. This insurance shall not be cancelled or changed
without a minimum or thirty (30) days advance written notice given to COUNTY.
B. Automobile Liability
Comprehensive Automobile Liability Insurance with limits of not less than One Million Dollars
($1,000,000) per accident for bodily injury and property damage. Coverage should include owned and
non-owned vehicles used in connection with this Agreement and all applicable endorsements.
C. Professional Liability
If CONTRACTOR is a licensed professional or employs professional staff, (e.g., Architect, Engineer,
Surveyor, etc.) in providing services, Professional Liability Insurance with limits of not less than One
Million Dollars ($1,000,000.00) per occurrence, Three Million Dollars ($3,000,000.00) annual aggregate
with a provision for 3 year tail coverage.
D. Worker's Compensation
A policy of Worker's Compensation insurance as may be required by the California Labor Code.
ARTICLE VI. Contractor represents that he has secured the payment of Worker's Compensation in
compliance with the provisions of the Labor Code of the State of California and during the performance
of the work contemplated herein will continue so to comply with said provisions of said Code. Contractor
shall supply the Owner with certificates of insurance, in duplicate, evidencing that Worker's
Compensation Insurance is in effect and providing that the Owner will receive ten days notice of
cancellation. If Contractor self-insures Worker's Compensation, Certificate of Consent to Self-insure
should be provided the Owner.
ARTICLE VII. The Contractor shall forthwith furnish in duplicate, a faithful performance bond in an
amount equal to 100% of the contract price and a payment bond in an amount equal to 100% of the
contract price, both bonds to be written by a surety company acceptable to the Owner and in the form
prescribed by law.
The payment bond shall contain provisions such that if the Contractor or his subcontractors shall fail to
pay (a) amounts due under the Unemployment Insurance Code with respect to work performed under
the contract, or (b) any amounts required to be deducted, withheld and paid over to the Employment
Development Department and to the Franchise Tax Board from the wages of the employees of the
Contractor and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with
respect to such work and labor, then the surety will pay these amounts. In case suit is brought upon the
payment bond, the surety will pay a reasonable attorney's fee to be fixed by the court.
ARTICLE VIII. This project is subject to compliance monitoring and enforcement by the Department of
Industrial Relations.
Except as provided in Labor Code section 1725.5(f), no contractor or subcontractor may be listed on a
bid proposal for a public works project unless registered with the Department of Industrial Relations
pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes
only under Labor Code section 1771.1(a)].
Except as provided in Labor Code section 1725.5(f), no contractor or subcontractor may be awarded a
contract for public work on a public works project or engage in the performance of work on any public
works project unless registered with the Department of Industrial Relations pursuant to Labor Code
section 1725.5.
Contract Number 24-13-C
Contractor shall comply with all applicable laws and regulations relating to wages and employment,
including all requirements imposed by the California Department of Industrial Relations (DIR).
Contractor shall cooperate with County to furnish timely all information necessary for County's
completion of the form required to be submitted by County when registering the Project on the DIR
website; and County thereafter shall provide to Contractor the "Project ID Number" assigned by DIR in
order to facilitate Contactor's submission to DIR of its certified payrolls for the Project, in the manner
required and using such form as may be prescribed by DIR, in accordance with the provisions of Labor
Code section 1771.4(a)(3).
ARTICLE IX: Governing Law—Venue for any action arising out of or relating to this Agreement shall be
in Fresno County, California. This Agreement shall be governed by the laws of the State of California.
ARTICLE X: EXECUTIVE CORDER N-6-22: Under Executive Order N-6-22 as a contractor,
subcontractor, or grantee, compliance with the economic sanctions imposed in response to Russia's
actions in Ukraine is required, including with respect to, but not limited to, the federal executive orders
identified in the EO and the sanctions identified on the U.S. Department of the Treasury website
(htt s://ofac.treasury.gov/sanctions-programs-and-country-information/ukraine-russia-relateo-
sanctions). Failure to comply may result in the termination of contracts or grants, as applicable. Specially
Designated Nationals and Blocked Persons List (SDN) (htt�s://ofac.treasury.aov/specially-desirariated-
nationals-and-blocked-oersons-.list-sdi-i-human-r(--adable-lists).
This Contract, 24-13-C, was awarded by the Director of Public Works and Planning on October 22, 2024.
It has been reviewed by the Department of Public Works and Planning and is in proper order for signature
of the Director of Public Works and Planning.
IN WITNESS WHEREOF, they have executed this Agreement this 18th day of
November , 2024
COUNTY OF FRESNO
(CONTRACTOR) (OWNER)
Digitally signed by Steve
Steve White White
Date:2024.11.18
By �__� By 10 01 01-08,00,
Steven E. White, Director
Public Works and Planning
County of Fresno
Title
Contract Number 24-13-C