Loading...
HomeMy WebLinkAbout2304C CCO 02 (2).pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS CHANGE ORDER NO. 2 FEDERAL PROJECT NUMBER: CML-5942(293) OCTOBER 31, 2024 CONTRACT NO. 23-04-C PAGE 1 OF 3 TO: AVISON CONSTRUCTION INC.: Make the following change(s) to the plans and specifications or do work not in the plans and specifications for this contract. Because of the proposed change(s), THREE (3) -WORKING DAYS will be granted to the allotted contract time. The revised date of completion for the Second Order of Work is December 9, 2024. PART I: INCREASE / DECREASE / ELIMINATE ITEMS AT UNIT PRICES These quantity adjustments were proposed by engineer. Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Increased Items: Item Total Total No. Description Unit Quantity Price Amount 0/0) of/6) 4 Portable Changeable Message EA 2.00 $4,000.00 $8,000.00 33.33 33.33 Sign 17 Remove & Dispose Barbed Wire LF 195.00 3.00 585.00 19.21 19.21 Fence 44 Survey Monument (Type D) EA 1.00 1,200.00 1,200.00 100.00 100.00 TOTAL INCREASE: $9,785.00 Decreased Items: Item Total Total No. Description Unit Quantity Price Amount o� o� 13 Remove & Dispose Sign EA 3.00 $100.00 $300.00 (75.00) (75.00) Structure 14 Remove & Dispose Concrete LF 7.00 130.00 910.00 (16.28) (16.28) Pipe TOTAL DECREASE: $1,210.00 Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Mgmt therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS CHANGE ORDER NO. 2 FEDERAL PROJECT NUMBER: CML-5942(293) OCTOBER 31, 2024 CONTRACT NO. 23-04-C PAGE 2 OF 3 Eliminated Items: Item Total Total No. Description Unit Quantity Price Amount ° (0/-) 11 Remove & Dispose Light Fixtures LS 1.00 $800.00 $800.00 (100.00) (100.00) 12 Remove & Dispose Storage LS 1.00 3,500.00 3,500.00 (100.00) (100.00) Sheds 16 Remove & Dispose Hog Wire LF 744.00 3.00 2,232.00 (100.00) (100.00) Fence TOTAL DECREASE: $6,532.00 Since you did not incur any costs associated with these items, no payment will be made for these bid items. This work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: $2,043.00 INCREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: REMOVE & DISPOSE OF OLIVE TREES - EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, remove & dispose approximately 40 olive trees on the road right-of-way line on the north side of Olive Avenue, from approximately Sta. 92+00 to Sta. 98+00. Perform all work according to the applicable sections of the Standard Specifications and the Special Provisions. Payment for this work will be made as extra work at Force Account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $34,452.02. This amount will be paid as extra work. Three (3) working days will be added to the contract time for the above referenced extra work, in accordance with Section 8-1.07B, "Time Adjustments," of the Project Specifications. TOTAL COST PART IL $34,452.02 INCREASE TOTAL TIME EXTENSION PART II: THREE (3) -WORKING DAYS PART III: USE WHITE PAINT (2-COAT) FOR BID ITEM NOS. 53 & 59 IN-LEIU OF WHITE THERMOPLASTIC STRIPE AND MARKINGS This change was requested by the engineer. Contractor We, the above signed contractor,have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of supervisors therefore the prices shown above. _Const.Mgmt RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS CHANGE ORDER NO. 2 FEDERAL PROJECT NUMBER: CML-5942(293) OCTOBER 31, 2024 CONTRACT NO. 23-04-C PAGE 3 OF 3 In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, use paint (2- coat) in lieu of thermoplastic for Bid Item No. 53, Thermoplastic Traffic Stripe (Detail 39), and Bid Item No. 59, Thermoplastic Pavement Markings (Bike Lane Symbol with Person and Bike Lane Arrow). Perform all work according to the applicable Standard Specifications and the Special Provisions. This change is being made at no additional cost. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: $0.00 (NO COST) TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS NET COST THIS CHANGE ORDER: $36,495.02 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: THREE (3) -WORKING DAYS James Drews, Resident Engineer APPROVAL RECOMMENDED: AVISON CONSTRUCTION, INC. �A C-- Contractor Mandeep S. Sekhon, PE Construction Engineer By APPROVED BY: Digitally signed by Steve Whit Title Project Manager Steve W h lte 09:39:47-08'0D tee2024.11.18 0' Steven E. White, Director Accepted Date. Nov 15, 2024 Public Works and Planning Date: Contractor We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Mgmt therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.