HomeMy WebLinkAbout2324SW CCO 05.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
AMERICAN AVENUE DISPOSAL SITE CHANGE ORDER NO. 5
PHASE III - MODULES 9 & 10 NOVEMBER 6, 2024
EXCAVATION AND LINER CONSTRUCTION PAGE 1 OF 2
18950 W AMERICAN AVENUE, KERMAN, CA 93630
CONTRACT NO. 23-24-SW
TO: YARBS GRADING AND PAVING, INC:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time.
INSTALL 50 LINEAR FEET OF 12-INCH HIGH-DENSITY POLYETHYLENE (HDPE) PIPE— EXTRA WORK
This change was requested by the contractor.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, furnish labor
and equipment to install 50 linear feet of 12-inch HDPE (owner provided) across the access road to the winter
pad in Phase III, Module 6, at location marked by the engineer. Perform all work according to the applicable
sections of the Standard Specifications and Special Provisions, as directed by the engineer. Compensation for
this work will be made at an agreed lumpsum price of$4,246.48, in accordance with Section 9-1.03, "Payment
Scope," of the Special Provisions. This agreed price includes compensation for all labor, equipment, traffic
control, incidentals, mark-ups, and profits for performing the above referenced work, no additional
compensation will be made thereafter. This amount will be paid through Bid Item No. 1, Supplemental Work
Allowance, with no net increase to the contract.
This extra work did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is
Auditor Controller approved,that we will provide all equipment,furnish all materials, except as may otherwise be noted above,
Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the
Board of Supervisors
_Const.Management prices shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
AMERICAN AVENUE DISPOSAL SITE CHANGE ORDER NO. 5
PHASE III - MODULES 9 & 10 NOVEMBER 6, 2024
EXCAVATION AND LINER CONSTRUCTION PAGE 2 OF 2
18950 W AMERICAN AVENUE, KERMAN, CA 93630
CONTRACT NO. 23-24-SW
NET COST THIS CHANGE ORDER: $0.00 (PAID IN BID ITEM NO. 1)
NET TIME EXTENSION THIS CHANGE.ORDER: ZERO (0) -WORKING DAYS
Dz� 5
Oleg Savelyev, Resident Engineer
APPROVAL RECOMMENDED:
YARBS GRADING & PAVING, INC. ojy�-
Contractor Mandeep S. Sekhon, PE
Construction Engineer
Teo ya�b�o
By Troy Yar rough(Nov14,202 09:35PST) APPROVED BY:
Digitally signed by Steve
Wh
President Steve WhlteD tlee2024.11.14
Title 14:21:34-08'00'
Steven E. White, Director
Accepted Date:
Nov 14 2024 Public Works and Planning
,
Date:
_Contractor We,the above signed contractor, have considered the change proposed and hereby agree,if this proposal is
Auditor Controller approved, that we will provide all equipment, furnish all materials,except as may otherwise be noted above,
Business Office and perform all services necessary for the work above specified,and will accept as full payment therefore the
Board of Supervisors
_Const.Management prices shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.