HomeMy WebLinkAbout2307M CCO 05.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ROAD MAINTENANCE AND REHABILITATION CHANGE ORDER NO. 5 ACCOUNT (SB-1)ASPHALT CONCRETE OVERLAYS OCTOBER 9, 2024 VARIOUS LOCATIONS IN FRESNO COUNTY PAGE 1 OF 4 CONTRACT NO. 23-07-M TO: YARBS GRADING AND PAVING, INC: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), 44 -WORKING DAYS will be added to the contract time. The revised completion date was September 17, 2024. PART I: RAISE DRAIN INLETS AT LOCATION NO. 3, BRAWLEY AVENUE - EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, raise two (2)— 36-inch drain inlets to match the existing grade at Location No. 3, Brawley Ave, on the northeast corner and northwest corner of Brawley and Belmont Avenues. Perform all work in accordance with Section 71-5, "Adjust Drainage Structures," of the Standard Specifications, as directed by the engineer. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $8,804.44. This amount will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. A total of six (6) additional working days will be granted for this work. TOTAL COST PART I: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART I: SIX(6) -WORKING DAYS PART II: PLACE ADDITIONAL TYPE E DIKE AND DOWN-DRAINS AT LOCATION NO. 11A, CSA 35 'AS' DOGWOOD - EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications," place an additional 2,070 LF Type E dike, and a total of four (4) down-drains at Location No. 11A, CSA 35 'AS' Dogwood, using hot mix asphalt (HMA). Perform all work in accordance with Section 39-2.01 C(9), "Miscellaneous Areas, Dikes, and Berms," of the Special Provisions, as directed by the engineer. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in a $15,057.76 increase. This amount will be paid as extra work. This work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: $15,057.76 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS _Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors _Const.management prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ROAD MAINTENANCE AND REHABILITATION CHANGE ORDER NO. 5 ACCOUNT (SB-1) ASPHALT CONCRETE OVERLAYS OCTOBER 9, 2024 VARIOUS LOCATIONS IN FRESNO COUNTY PAGE 2 OF 4 CONTRACT NO. 23-07-M PART III: PLACE ADDITIONAL TYPE E DIKE AT LOCATION NO. 12A, CSA 35 `AG' WILD ROSE - EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications," place an additional 1,750 LF Type E dike at Location No. 12A, CSA 35 `AG' Wild Rose, using HMA. Perform all work in accordance with Section 39-2.01 C(9), "Miscellaneous Areas, Dikes, and Berms," of the Special Provisions, as directed by the engineer. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in a $15,057.76 increase. This amount will be paid as extra work. This work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: $15,057.76 INCREASE TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: INSTALL SURVEY MONUMENT FRAMES AND COVERS ON ELKHORN AVENUE - EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install a total of 14 survey monuments frames and covers (G5 boxes) on Elkhorn Avenue between Elm and Jameson Avenues. Perform all work in accordance with Section 78.2, "Survey Monuments," of the Special Provisions and Standard Specifications. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $30,967.06. This amount will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. A total of 33 additional working days will be granted for this work. TOTAL COST PART IV: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART IV: 33 -WORKING DAYS PART V: INSTALL A TRAFFIC SENSOR LOOP AT LOCATION NO. 6, ASHLAN AVENUE - EXTRA WORK This extra work was requested by the engineer. Contractor We, the above signed contractor, have considered the change proposed and hereby agree,if this proposal is _Auditor Controller approved,that we will provide all equipment,furnish all materials, except as may otherwise be noted above, _Business office and perform all services necessary for the work above specified, and will accept as full payment therefore the Board of Supervisors _Const.Management prices Shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ROAD MAINTENANCE AND REHABILITATION CHANGE ORDER NO. 5 ACCOUNT (SB-1)ASPHALT CONCRETE OVERLAYS OCTOBER 9, 2024 VARIOUS LOCATIONS IN FRESNO COUNTY PAGE 3 OF 4 CONTRACT NO. 23-07-M In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install an advance traffic Type E loop in the westbound No. 2 through lane of Ashlan Avenue at Minnewawa Avenue intersection. Perform all work in accordance with Section 87-1.03V(2), "Inductive Loop Detectors,"of the Revised Standard Specifications Dated September 2, 2016, as directed by the engineer. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $5,535.41. This amount will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. A total of 11 additional working days will be granted for this work. TOTAL COST PART V: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART V: 11 -WORKING DAYS PART VI: INCREASE/DECREASE/ELIMINATE ITEMS AT UNIT PRICES This compensation adjustment was proposed by the engineer. Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount NO °\/0) 3 Supplemental Work $ $51,121.21 $1.00 $51,121.21 (51.12) (51.12) TOTAL DECREASE: $51,121.21 This compensation adjustment did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART VI: $51,121.21 DECREASE TOTAL TIME EXTENSION PART VI: ZERO (0) -WORKING DAYS _Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials, except as may otherwise be noted above, Business Office and perform all services necessary for the work above specified,and will accept as full payment therefore the _Board of Supervisors _Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ROAD MAINTENANCE AND REHABILITATION CHANGE ORDER NO. 5 ACCOUNT (SB-1) ASPHALT CONCRETE OVERLAYS OCTOBER 9, 2024 VARIOUS LOCATIONS IN FRESNO COUNTY PAGE 4 OF 4 CONTRACT NO. 23-07-M NET COST THIS CHANGE ORDER: $21,005.69 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: 44 -WORKING DAYS �6ont�utt�c.�aer� Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING & PAVING, INC. OAK(e� Contractor Mandeep S. Sekhon, PE Construction Engineer _TYo� YaYb�or��Gc By Troy Yar rough(Oct11,202 1:45PDT) APPROVED BY: Digitally signed by Steve Whit President Steve WhlteD tee2024.10.16 Title 16:00:23-07'00' Steven E. White, Director Public Works and Planning Accepted Date: Oct ll, 2024 Date: Contractor We, the above signed contractor, have considered the change proposed and hereby agree, if this proposal is _Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, _Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the _Board of Supervisors rites shown above. _Const.Management p RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.