HomeMy WebLinkAbout2327C CCO 1.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER BIOLA COMMUNITY SIDEWALK IMPROVEMENTS CHANGE ORDER NO. 1 STATE PROJECT NUMBER: ATPL-5942(303) SEPTEMBER 20, 2024 CONTRACT NO. 23-27-C PAGE 1 OF 2 TO: DAVE CHRISTIAN CONSTRUCTION COMPANY, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ONE (1) -WORKING DAY will be added to the contract timeline. FURNISH AND INSTALL TWO (2) NEW FIRE HYDRANTS - EXTRA WORK This extra work was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, furnish and install two (2) new Mueller Medallion fire hydrants, at approximate Sta. 15+10 and Sta. 18+05 (Biota Ave). These new fire hydrants replace the outdated existing fire hydrants which were to be relocated to the above referenced locations. Perform all work as shown on the Plans, according to the applicable sections of the Special Provisions, and/or Standard Specifications. Compensation for this work (materials costs plus delivery/handling) will be made at an agreed lump sum price of$12,532.98, according to Section 9-1.03, "Payment Scope,"of the Standard Specifications. This lump sum price includes all materials, labor, traffic control, and equipment, and all markups associated with furnishing and delivering/handling the two new fire hydrants to the project site. Compensation for the relocations/installations will be paid in Bid Item No. 52, Relocate Fire Hydrants. Compensation for the materials costs plus delivery/handling for the new fire hydrants will be paid as extra work. One (1) working day will be granted for this work. _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,If Auditor Controller this proposal Is approved,that we will provide ail equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of supervisors therefore the prices shown above. _Const.Management RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER BIOLA COMMUNITY SIDEWALK IMPROVEMENTS CHANGE ORDER NO. 1 STATE PROJECT NUMBER: ATPL-5942(303) SEPTEMBER 20, 2024 CONTRACT NO. 23-27-C PAGE 2 OF 2 NET COST THIS CHANGE ORDER: A $12,532.98 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ONE (1) -WORKING DAY LaRue Goossen, Resident Engineer APPROVAL RECOMMENDED- DAVE CHRISTIAN CONSTRUCTION COMPANY. INC. Mandeep S. Sekhon, PE Contractor Construction Engineer By APPROVED BY: } Digitally signed by Steve /J// Steve White White Title V I\�� �I I '� V V Date:26-07'00' 10:05:56-07'00' Steven E. White, Director 9, nD �� Public Works and Planning Accepted Date- oC Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, If Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _ Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors therefore the prices shown above. _Const.Management _RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time thereln specified.