HomeMy WebLinkAboutWest Annex Jail Change Order 28 approved.pdf LETTER OF TRANSMITTAL - C.C.O. No. 028 April 4, 2024
Page 1 of 8
TO: Steven White, Director West Annex Jail
Public Works and Planning
ATTN: Will Kettler
Division Manager CONTRACT NO. 16-S-04
FROM:
Jim Anderson, Sr. Project Manager
Kitchell CEM
STATUS OF FUNDS
Contract Items $ 81,756,000.00 Original Allotment $ 85,843,800.00
Co. Furnished Materials $ 0.00 *Supplemental Allotment $ 1,100,000.00
Previous CCO's $ 4,035,753.00 Total Allotment $ 86,943,800.00
This CCO $ 132,942.00 Obligated Funds $ 85,924,695.00
Total Obligated Fund $ 85,924,695.00 Unobligated Balance $ 1,019,105.00
Note: 1. Total allotment is the bid amount plus the Board Chairman's limit to authorize
Change Orders $4,087,800.00
*Note 2. *Board Action dated September 6, 2022 to increase the original contingency
$1,100,00 for a revised contingency of$5,187,800
DESCRIPTION (PCO 0533)
ASI 106—Stair Vestibule Hdwr Changes @ Door 1105
WHY:
The Sheriff requested an alarm installed at Door 1105 (Visitor area) that would alert staff if door was
opened.
HOW:
Lump Sum
COST:
A $2,359.00 Increase
TIME:
No time extension requested by contractor.
DESCRIPTION (PCO 559)
RFI 1109 — Dayroom Handrail Attachment
WHY:
Handrail extensions at dayroom stairs were too long and were not supported to the floor. The
Letter Of Transmittal—C.C.O. No 028
Contract No. 16-S-04
April 4, 2024
Page 2 of 8
extensions would bend and could have caused a hazard.
HOW:
Time and Material
COST:
A$5,588.00
TIME:
No time extension requested by contractor.
DESCRIPTION (PCO 0595.1)
RFI 1130, 1271 —Frame Modifications required at Recreation Yard Smoke Dampers
WHY:
Installed Smoke Dampers were not accepted by the State Fire Marshall's Office and were required to
be removed and replaced by a different damper.
HOW:
Time and Material
COST:
A$33,165.00 Increase
TIME:
No time extension requested by contractor.
DESCRIPTION (PCO 0637)
Credit for the deletion of rubber base in various locations throughout the building
WHY:
The architect determined that rubber base was not required within particular rooms.
HOW:
Lump Sum
COST:
A$1,703.00 Decrease
TIME:
No time extension requested by contractor.
Letter Of Transmittal—C.C.(]. No 028
Contract No. 16'S-04
April 4. 2024
Page 3Of8
AS[ 1Y2—Male/Female Locker Room Mirror for&OA
A MDi[nowVvaS required to be installed in the K88/G and Female locker rooms to comply with ADA
Lump Sum
A$2.214.00Increase
No time extension naquoabsd by contractor.
Credit for Combination Padlocks
Contract required the turnover of pad|ock& The Sheriff did not require these padlocks thus requiring
the Contractor to provide acredit
Lump Sum
A840.00Decrease
No time extension requested bycontractor.
RR414.1 —F|oorbox Relocation at Guard Stations
Low Voltage floor boxes were installed per Contract and conflicted with the placement of the tables in
the space. Contractor was directed to relocate the floor boxes.
H(}VV
Time and Material
A$15.784.DO Increase
No time extension requested bvcontractor
Letter Of Transmittal —C.C.[}. N0028
Contract No. 16-S-04
April 4' 2024
Page 4Cf 8
RF| 8O7.1 —Elevator Renumbering
The Sheriffs Dept requested the elevators toberenumbered
Lump Sum
A$1.7WO.O0 Increase
No time extension requested bycontractor
AS| 118.3—Additional bollards around site fire devices
The SFM required (4) additional steel bollards installed around fire water system devices
Time and Material
A $5.4U8.ODIncrease
No time extension requested bycontractor
RF| 1238—Steel Shrouds for Fire Sprinkler Piping in PnoQnarn Rooms
Steel Shrouds were required to be placed to protect fire sprinkler piping that was exposed in Inmate
Program Rooms
Lump Sum
A $2.178.ODIncrease
No time extension requested by contractor
Letter Of Transmittal—C.C.<]. No 028
Contract No. 16-S-04
April 4, 2024
Page 5 of 8
RF|'m 1232. 1232.1 —Additional 3OACircuits in Telecommunications Rooms
The Sheriff|T requested to change the circuits to3O amps for equipment they were to place there.
Time and Material
A$9.12O.ODIncrease
No time extension requested bycontractor
Relocate TV Bracket in Sheriff Bneahroorn
The TV bracket located in the Sherdfbramkroorn conflicted with the door swing and needed to be
adjusted.
Time and Material
A$479.00 |nCremse
No time extension requested by contractor
RFI 1257— Elevator Machine Room 3204C}ut|et
The electrical outlet in elevator machine room 3204xvae required to be on e dedicated circuit.
Lump Sum
A $45O.00Increase
No time extension requested bycontractor
Letter Of Transmittal — C.C.[lNo 028
Contract NO. 16-S-04
April 4' 2024
Page 8Of8
RF| 1272 —Return Air Duct Opening Register
There was no air register called out /n the Construction Documents for the return air duct in the
basement
Lump Sum
A$71O.00Increase
No time extension requested by contractor
/\S| 122—Black Light to Illuminate Stair Tnaode in Stairwells
WHY:
Lighting called out in the Construction Documents were not sufficient to illuminate the stair treads
within the stairwells, Black lights were installed.
HOW:
Time and Material
A$2O.404.0] Increase
TIME:
No time extension requested by contractor
RF| 1279—Automatic Transfer Switch Interface with Elevators
Elevator Control panel required an annuciobqn from the automatic transfer am/itch at the emergency
generator to reflect when the facility transferred to emergency power.
Time and Material
A$7.478.00 |nonaase
NV time extension requested bvcontractor
Letter Of Transmittal —C.C.O. No 028
Contract No. 1A-S-04
April 4' 2024
Page 7of 8
Credit for Paint Attic Stock
The County elected to receive m credit for spare paint material rather than storing the paint
A $3.2OO.QDDecrease
No time extension requested bycontractor
F|F| 1296—Dedicated Light Circuits for Elevator Machine Rooms
WHY: -
Elevator Code required dedicated circuits within all elevator machine rooms.
Time and Material
A$4.177.00Increase
No time extension requested bycontractor
RF| 1288—Demo and Replace Southwest Ramp
The landing area outside of the stairwell door did not comply with AOA which required the demolition
and replacement of the concrete ramp.
HOW:
Lump Sum
A$15.49T.00Increase
TIME:
No time extension requested hycontractor
Letter Of Transmittal —C.C.O. No 028
Contract No. 16-S-04
April 4, 2024
Page 8 of 8
DESCRIPTION (PCO 0690.1)
RFI 1286—Replacemnt of Handrails at the Southwest Ramp
WHY:
The demolition and replacement of the ramp required the handrails to be modified and reinstalled
HOW:
Lump Sum
COST:
A $10,559.00 Increase
TIME:
No time extension requested by contractor
DESCRIPTION (PCO 0694)
RFI 1228—Door 0039B Floor Bolt
WHY:
The Contract specified floor bolt for door 0039B did not extend far enough to the floor to properly
secure the door. A replacement was directed for use with a longer bolt extension.
HOW
Lump Sum
COST:
A$1,053.00 Increase
TIME:
No time extension requested by contractor
NET COST THIS CCO : $132,942.00 INCREASE AND 0 CALENDAR DAY EXTENSION
Prime Contract Change Order
Detailed
Date: 3/712024
To Contractor: Contract Number: 16-S-004
Bemards Change Order Number: 028
1781 E Fir Ave,#205
Fresno,CA 93720
The Contract is hereby revised by the following items:
Contract Change Order#028
PCO Description Amount
0533 ASI 106-Stair Vestibule Hrdwr Changes Door 1105 $2,359.00
0559 RFI 1109-Bldg_Dayroom Handrail Attachment $5,588.00
0595.0001 RFI 1130,1271-Bldg-Smoke Damper Sealant-Rec Yards,Dayrooms(Frame $33,165.00
Modifications and Install)
Q637 RFl 1202-Request to Delete Rubber Base Scope of Work Various Locations $(1,703.00)
0639 ASI_112 FWAJ Female Locker and Mate Locker ADA Mirror $2,214.00
0643 Credit for Combination Padlocks fo Metal Lockers $(648.00)
0644 RFI 0414A-Floorbox Relocation at Guard Stations $15,794.00
0651 RFI 967.1-Elevator Renumbering $1,780.00
0655 ASI 119.3-Site Bollards $5,408.00
0658 RFI 1238-Pipe Extrusion at Multi/Purpose Program Rooms 2003&3003 $2,178.00
0659 RFI 1232,1232.1-Add l 30A Circuits in Telecomm Rooms for UPS $9,120.00
0674 Relocate TV Bracket in Room 0012 $479.00
0676 RFI 1257-Elevator Machine Room'3204 Outlet $450.00
0681 RFI 1272-RA Duct Opening @ 0047 $710.00
0682 ASI 122-Black Light for Stair Tread Illumination $20,484.00
0684 RFI 1279-ATS Interface w/Elevators $7,478.,00
0685 Credit for Paint Attic Stock $(3,200.00)
0688 RFl 1296-Dedicated Light Circuit for Elev Mach Rms $4,177.00
0690 RFI 1286-Demo and Replace SW Ramp(Concrete Only) $15,497.00
0690,0001 RFI 1286-Replace Handrails at SW Ramp $10.559.00
0694 RFC 1228 Dr 0039B Floor Batt $1,053.00
Theoriginal Contract Value was....................................................................................................................... $81,756,000.00
Sum of changes by prior Prime Contract Change Orders.......,........................................................................ $4,035,753.00
The Contract Value prior to this Prime Contract Change Order was................................................................ $85,791,753.00
The Contract Value will be changed by this Prime Contract Change Order in the amount of.......................... $132,942.00
The new Contract Value including this Prime Contract Change Order will be.................................................. $85,924,695.00
The Contract duration will be changed by.—............................................................................................—.- 0 Days
The revised Completion date as of this Prime Contract Change Order is....................................................... September 18,2020
R Prone Contract Change Order
Detailed
We the above-signed contractor,have given careful consideration to the change proposed and hereby agree,when this proposal is approved
that we will provide all equipment,furnish afi materials,except as may otherwise be noted above,and perform all services necessary for the work
above specified,and wlA accept as full,payment therefor the prices shown above.
if the Cont#actor does not sign acceptance of this order,his attention is directed to the lequirements of the Specifications as to proceeding with
the ordered work and sting a written protest within the time therein specified.
By accepting a Change Older,Contractor agrees to the dwiges,If any.in the Contract Price specified for each Item and to the speeded
Fjdamaon of raw allcoad if any,for compietim of to entire Work on account of mxb Change larder'.and agrees to fwTbh all labor and
materials and perform all Work necessary to complete all additional Work specified thereln for the price s4uslment and within the dme specified
therein. Contractor shah make no additional claim for adjustment to the Contract Price or Contract Time,nor for additional costs or damages,on
account of the worktefenmced In such Change Order. A e Order ally Issued by the Owner and accepted by"Contractor attaA
constitute a complete accord and satisfaction as to the Work,Contract Price,and Ca tact Time changed thereby. Contractor shads defend and
ledemnVy lire Owner,lis officers,dm agents and consultants,it any Subcontractor asserts any c Wm against the Diner fist contradicts,
or Is inconsistent w++itir,ad*issued Change Order accepted by Contraclor. Sectkin 0126 At1,1.9
Q[►3.1i1.►13M Prime Contract Change Order
Detailed
Approval Recommended
Semards Kitchell CEM
CONTRACTOR PROJECT MANAGER
By Sam Laham By Jim Anderson
SIGNATURE > _ SIGNATURCC—;::;�--��
DATE March 8,2024 DATE 7
Approval Recommended Approved By
DLR Fresno County
PROJECT MANAGER � DIRECTOR
BY Gregg Williams By Steven White
6
SIGNATURE y�GC��� _ SIGNATURE
DATE 4/3/24 DATE LG'
Approved By
Fresno County Fresno County
COUNTY COUNSEL COUNTY ADMINISTRATIVE OFFICER
BY Daniel C:Codof'" BY Paul Nertand
SIGNATURE r SIGNATURE p
DATE DATE �3 Z
Fresno Ccimty
CMRMAA BOARD OF SUPERVISORS
By Nathan Magsig
SIGNATURE
DATE