HomeMy WebLinkAbout2214C CCO 28.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 28
AMERICAN AVENUE TO MISSION STREET JULY 25, 2024
CONTRACT NO. 22-14-C PAGE 1 OF 4
TO: YARBS GRADING AND PAVING, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s),ZERO(0) -WORKING DAYS will be added to the contract timeline.
PART 1: INCREASE/DECREASEIELIMINATE ITEMS AT UNIT BID PRICES
This change was proposed by the engineer.
Quantities in the Bid Book are estimates only.This part adjusts items to the actual quantities used.
Increased Items:
Item Total TOTAL
No. Description Unit Quantity Ca)_ Price Amount (0/0) (0/0)
61 Minor Concrete—Valley Gutter LF 10.5 $100.00 $1,050.00 15.00 15.00
91 Green Paint Pavement Marking SF 792.00 6.00 4,752.00 10.48 10.48
TOTAL INCREASES: $5,802.00
Decreased Items:
Item Total TOTAL
No. Description Unit Quantity A- Price Amount (0/0) P/0)
62 Minor Concrete-Valley Gutter TF 6.0 $42.00 $252.00 (3.00) (3.00)
(Modified)
TOTAL DECREASES: $252.00
Eliminated Items:
Item Total TOTAL
No. Description Unit Quantity A Price Amount (0/6) (0/.)
20 Temporary High-Visibility IF 500.00 $5.00 $2,500.00 (100-00) (100.00)
Fence(Type ESA)
TOTAL DECREASES: $2,500.00
This change did not impact the critical path for the project, therefore,granting additional contract time was not
warranted.
TOTAL COST PART 1: A$3,060.00 INCREASE
TOTAL TIME EXTENSION PART 1: ZERO (0) -WORKING DAYS
—Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,If
—Auditor Controller this proposal Is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
—Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment
—Board of Supervisors therefore the prices shown above.
—Const.Management
RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention Is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 28
AMERICAN AVENUE TO MISSION STREET JULY 25, 2024
CONTRACT NO. 22-14-C PAGE 2 OF 4
PART 11: COMPENSATE FOR PAINTING ASPHALT CONCRETE DIKE AND CONCRETE CURB
NOSES IN SELMA AND FOWLER REGIONS—EXTRA WORK
This compensation adjustment was requested by the contractor.
In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications,
compensate the contractor for painting the asphalt concrete dike between sta. 358+96 and sta. 361+29;
concrete curb noses at Park Street, North Street, Thompson Street, Floral Avenue, Branch Street, and
Highland Avenue in the Selma region; and concrete noses at San Antonio Drive in the Fowler region.
Compensation for this work will be made as an agreed price of$3,850, according to Section 9-1.03,
"Payment Scope,"of the Special Provisions. This agreed price includes all materials, labor, equipment,
traffic control, incidentals, markups, overhead costs and profits, no additional compensation will be
made for this work. This amount will be paid as extra work.
This extra work did not impact the critical path for the project, therefore, granting additional contract time
was not warranted.
TOTAL COST PART II: A $3,860.00 INCREASE
TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS
PART III: MOW VEGETATION IN THE SHOULDERS AND MEDIAN AREAS THROUGHOUT PROJECT
LIMITS—EXTRA WORK
This extra work was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, mow the
weeds in the shoulders and median areas throughout the project site as directed by the engineer.
Perform all work in accordance with Section 20-1.03C, "Roadside Clearing,"of the Standard
Specifications. Compensation for this work will be made at force account according to Section 9-1.03,
"Payment Scope,"of the Special Provisions. Total compensation for this work resulted in $28,797.06,
this amount will be paid as extra work.
This extra work did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART III: A$28,797.06 INCREASE
TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS
PART IV: REPAIR A DAMAGED IRRIGATION LINE AT WHITSON AND SECOND STREETS
INTERSECTION—EXTRA WORK
_Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors
_Const.Management therefore the prices shown above.
_RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 28
AMERICAN AVENUE TO MISSION STREET DULY 25, 2024
CONTRACT NO. 22-14-C PAGE 3 OF 4
This extra work was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, repair a
damaged irrigation line at the Whitson and Second Streets intersection as extra work. This irrigation
was damaged during boring for the 4-inch sleeve for new median irrigation line. This existing line,which
was damaged,was not marked, nor it was shown on the plans. Perform all work in accordance with
Section 20-2.01 C, "Construction,"of the Standard Specifications. Compensation for this work will be
made at force account according to Section 9-1.03, "Payment Scope,"of the Special Provisions.Total
compensation for this work resulted in $5,141,this amount will be paid as extra work.
This extra work did not impact the critical path for the project,therefore, granting additional contract time
was not warranted.
TOTAL COST PART IV: A$6,141.00 INCREASE
TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS
—Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
—Auditor Controller this proposal Is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
—Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment
—Board of Supervisors therefore the prices shown above.
Const.Management
RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 28
AMERICAN AVENUE TO MISSION STREET JULY 25, 2024
CONTRACT NO. 22-14-C PAGE 4 OF 4
NET COST THIS CHANGE ORDER: A$40,838.06 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
XL2LzAW.�
LARue Goossen(Jul 25,202414:49 POT(
LaRue Goossen, Resident Engineer
APPROVAL RECOMMENDED:
YARBS GRADING AND PAVING. INC.
Contractor Mandeep S. Sekhon, PE
Construction Engineer
Tlv� Y ?bYoQh
By Troy yar rough(Aug2,2024 :56PDT) APPROVED BY:
Digitally signed by Steve
Whit
President Steve WhIteDatee2024.08.05
Title President
-07'00'
Steven E. White, Director
Accepted Date:
Aug2 2024 Public Works and Planning
�
Date:
Nathan Magsig, Chairman
Board of Supervisors
Date:
_Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors P P P Y
_Const.Management therefore the prices shown above.
_RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.